Loading...
HomeMy WebLinkAboutWPO201600074 Review Comments WPO VSMP 2017-01-04COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Woodbrook Elementary School Addition Project file number: WP0201600074 Plan preparer: Timmons Group, Craig Kotarski. [craig.kotarski@timmons.com] Owner or rep.: Albemarle County School Board, Uletteri@kl2albemarle.org] Plan received date: 30 Nov 2016 Date of comments: 5 Jan 2017 Reviewers: Bobby Jocz - VSMP Geoff Elsie - VESCP County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Provide signatures for the registration statement. 2. Provide signatures for the Certification Statement (section 9). 3. Complete/sign the Delegation of Authority (section 10). 4. Provide a copy of DEQ coverage letter when obtained. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Provide proposed locations for concrete washout, material delivery and storage, and portable sanitary facilities as noted in PPP on the plans. 2. Revise plans for diverting wash waters to sediment basin. No diversion dike is shown adjacent to the construction entrance as stated. Engineering Review Comments Page 2 of 4 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Remove Sheets C1.1, C1.2, L1.0, L2.0. L3.0, L3.1, L3.2, C4.0. Not needed for Erosion and Sediment Control or Stormwater Management review or installation. 2. Re -name cover sheet to identify the submission as a VSMP plan, make sure to include the WPO submission number (WPO201600074). 3. Original Signature of professional engineer will be needed for final submittal on both the plan sheets and supporting design calculations. 4. Remove section of demolished pipe shown extending from SWM facility A to the roadway from the Auxiliary Site Improvements sheet [C6.0]. Verify all sheets are expressing intended information. 5. As stated in site plan comments, provide details for proposed storm sewer structures (i.e. Doghouse MH, surface drains, DI-1, DI-3C, MH-1, etc). All structures must meet VDOT standards. Provide details for SWM facilities including, inspection and maintenance access/schedules/procedures, pipe inverts, profile views, cross sections, backfill materials and any other details necessary to properly identify and evaluate SWM facility designs. 6. Provide manufacturer specifications proving pollutant removal efficiencies specified in VRRM spreadsheet. 7. Revise storm sewer profile labels to match the structures being represented in the profile. For instance, the profile showing STR 138-SWM A is labeled as STR 100-106, which is not what is represented in the profile. Please correct. 8. Provide proposed grading on profile for SWM A - STR 100 [sheet C8.0] or indicate no change. 9. Profile scale does not match vertical scale presented in profiles [Sheet C8.0, C8.1]. Please correct. 10. The labeling of proposed drainage areas (A and B) in Runoff Reduction Spreadsheet, design calculations, and drainage area maps is inconsistent and needs to be corrected. The labels appear to be swapped in the Runoff Reduction Calculations. 11. In the Water Quality Analysis section on sheet C10.0, the value provided for Q(10) Pre -developed differs from the one shown calculated for the 10 year pre developed condition in the model. In addition, the elements labeled in RV (1 Year Post) under "Drainage Area A" are mislabeled as Post Developed B detained and Post Developed B Un-detained. Please verify and correct this. 12. Verify throat lengths for inlets are correctly identified and modeled on the LD204 form. Structures are shown to have throat lengths of 2' which contradicts throat lengths identified for those same structures elsewhere in the plans. 13. Verify calculations for STR 122 and STR 106 are correct. Carryover is shown through STR 122, but is not modeled entering STR 106. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Remove Sheets Cl. 1, C1.2, L1.0, L2.0. L3.0, U.1, L3.2, C4.0. Not needed for Erosion and Sediment Control or Stormwater Management review or installation. 2. Correct title block for Sediment Basin Design, Sheet C3.0, currently refers to Permanent Seeding for the Piedmont. 3. Sediment Basin detail elevations do not match those provided on plan sheet C3.1 and C3.2 (for: Engineering Review Comments Page 3 of 4 top of dam elevation, barrel out invert, bottom of basin, principle spillway crest, etc.). In addition, basin volumes provided in the detail do not match those provided in the component breakdown spreadsheet. Please correct and provide updated calculations if necessary. Ensure basin design is compliant with VESCP standards. Also note: Baffles required if L/We is < 2, not greater than 2 as stated in detail spreadsheet. 4. Show stockpile areas and associated controls. 5. Verify location of Construction Entrance. It should be located at the entrance to the construction site with wash facility or barricade. Current location appears to be too far inside site. 6. Add Safety Fence with signage that reads Danger Quicksand around Sediment Basin. 7. Show detail for tree protection, temporary slope drain, and culvert inlet protection as specified to be installed in the structural practices and sequence of installation notes presented on sheet C3.0. Also specify where these practices will take place on site. If these practices are not to be used, remove them from the narrative. 8. Show Permanent Seeding and Mulching at the CMP pipe from the Basin to the doghouse. Sheets C3.1 and Sheet C3.2 insert. 9. E&S measures and limits of clearing and grading must extend to the portion of stormsewer installed from the north portion of the site to Brookemere Drive for Phase II E&S (Sheet C3.4). 10. Extend silt fencing across the southern portion of the site along Idlewood Drive. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Engineering Review Comments Page 4 of 4 Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hiq2://www.albemarle.org/deptforyns.asl2?department--cdengno Bobby Jocz, EIT Civil Engineer 1 (434) 296-5832 ext: 3283 County of Albemarle Department of Community Development 401 McIntire Rd. Charlottesville, VA 22902