Loading...
HomeMy WebLinkAboutSUB201500148 Checklist - Project Closeout (Administrative) 2016-12-30 ► ► n�drTl/W Vl w SUBDIVISION/SITE PLAN , . , FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please com i ete this form within 30 days of final action,place in folder and forward to CDA FOR QC and sta s la el. CDA will forward �� cA,-)-A,to the Imaging Center for digital closeout. C$e� aJ SDP SUB # �° 1 S -- , ' (I PROJEC TITLE 4-1 A"( FUL ' AME OF LEAD REVIEWER 5 12N-2. FINAL ACTION DATE: -�^ `94.# ig' 1 Co tyView— Application,Page 2 Data Entered - _ . . - I Hardcopy—File Folder Closeout: Ml items listed should be placed in project folder, in reverse 11 ( chronological order(latest on top). I Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" ! next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide 1 clarity to the file,please indicate that item on the"Other" lines provided. I Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. `Engineering Folder Information/documentation ❑ Scan ❑ Saved location Application(signature copy) � ITHDRAvvN ❑ Scan ❑ Saved location Per Zoning Ordinance_ gf Applicant Correspondence(to/from, memos/emails) O Scan 0 Saved location CompIrt of printed Review Comments kn---- Scan 0 Saved location ... . _. _ ,,.'.eer name) Qiisaiiser IiiiMPOINISMINismip 11•Imillgm-fial"iit,ilaiiiiii"itiajah presen e , can aved location �Scau LJ Fav • .-. . Other(Please explain-i.e. Studies) 7V „ Ccr S o + e- Gs)- yip r o ,,r of ,.[?1" Scan ❑ Saved loca ion D« `l,..9,5l/ 'Other(Please explain-i.k. Stu cies) (/ Co, p32n S ok ,/J -e✓ d O Scan -(Le- Saved location ,e ❑ At the planner's discretion,copies of unapprovedf p plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be ( clearly marked as unapproved and contain a note clarifying why it was included. O Scan 0 Saved location i 7 Additional Information nn this nrniect!