Loading...
HomeMy WebLinkAboutWPO201600025 Bond Estimates 2017-01-06 (3)Mass Grading Plan for General Industrial Office WPO file number: WP0201600025 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed pipe length height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter -ff 24 sf 12ft 4ft 8 sf 248.9 cy _ft ft 4ft 48 in 45 ft 18I in length Witftlength ft depth in channel depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) It pipe diameter -in cut at high side ft cut at face ft length of cutoft ft width of cut (area below transition) 400 sf (total width of cut) 56 ft (depth below transitior -2 ft (area above transition, -60 sf (total fill volume) 2770.4 cy (TOAL CY estimate) 2853 cy (spillway stone tons) 0 tons (riser unit price) $150.00 base plate orfdn - (barrel unit price) $40.00 barrel collars baffle length Mft width ft width ft oft channel width length -ft (tons) 508.875 tons traps and basins No. Unit Unit Cost Cost (installed) Eacres $5,000.00 $27,500.00 ft $5.00 $6,700.00 ft $5.00 $5,650.00 ft $13.00 $8,190.00 $40.00 $3,900.00 $13.00 $37,089.00 $50.00 $0.00 $600.00 $200.00 $200 $1,800.00 $200.00 $0 $50.00 $6,000 ■ $100.00 $0.00 $200.00 $2000.00 $1,008.00 $3,024.00 $6,136.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $30,532.50 $3,250.00 $500.00 $0.00 cost sum $145,271.50 contingency $14,527.15 Total $159,800 1 /6/2017