Loading...
HomeMy WebLinkAboutWPO201600025 Bond Estimates 2017-01-06Mass Grading Plan for General Industrial Office WPO file number: WP0201600025 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch it $13.00 $0.00 standard manhole frame top (not inlet) ea $500.00 $0.00 drop inlet or grate ea $3,500.00 $0.00 manhole structure (per ft. rise) ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") 0.0 in d ES-1,2 0 EC-1 0. ft $0.00 $0.00 aggregate base or drainage stone .0 in d ft L 0.0 ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin 9 height of dam at toeOft it cut at high side 9 f[ height of fill at faceit cut at face f[ length of damft length of cut ft top width width of cut ft (area above transition; 0 at (area below transition 0 at IN ESC PORTION (total width of dam) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transitio 0 ft (area below transition) 0 at (area above transitior 0 st (total till volume) 0.0 cy (total till volume) 0.0 cy length of spillway _it (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway it (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser heightMin it riser diameterin (riser unit price) $0.00 $0.00 barrel lengthft base plate or fdn $200.00 $0 barrel diameter (barrel unit price) $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 trees ea $275.00 $0.00 shrubs ea $50.00 $0.00 seedlings ea $5.00 $0.00 underdrain (LF) ft $5.00 $0.00 biofilter soil mix ICY) cy $38.00 $0.00 trash rack/ anti vortex devices ft $1,500.00 $0.00 maintenance access road (LF) mitt $50.00 $0.00 rip -rap, placed depth length 0.0 ft width WIt (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres basins 01 $0.00 mobilization $500.00 as -built drawings(perfacility) ea $2,000.00 $2,000.00 materials testing (per facility) ea Mae $2,000.00 $2,000.00 compaction testing (per dam) $5,000.00 $5,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 atsum $9,500.00 contingency $950.00 Total $10,450 1/6/2017