Loading...
HomeMy WebLinkAboutSUB201600057 Review Comments 2016-05-27Short Review Comments Report for: SUB201600057 SubApplication Type: Whittington Sub. Phases B2 & B4 - Final Final Plat Date Completed:04/06/2016 Reviewer:Ellie Ray CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/23/2016 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:~Road bonds willl need to be requested and amounts posted and approved prior to final plat approval. http://www.albemarle. org/upload/images/forms_center/departments/Community_Development/forms/bonds/Bond_Request _to_Establish_a_Bond.pdf ~There appears to be a drainage easement missing between lots 75 & 76 per the approved road plans SUB201400193. Division: Date Completed:03/17/2016 Reviewer:Andrew Slack CDD E911 Review Status:Requested Changes Reviews Comments:The applicant should contact this office with a list of three (3) proposed road names to replace "Pine Knot Road" The word "Pine" has been used more than five times in named roads and is not acceptable. Please contact this office with any questions. Division: Date Completed:03/21/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plat dated February 18, 2016. No comments or conditions. Division: Date Completed:04/14/2016 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/01/2016 Reviewer:Joel DeNunzio VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/20/2016 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 2/18/16. No comments objections. Division: Page:1 of 2 County of Albemarle Printed On:January 09, 2017 Date Completed:05/04/2016 Reviewer:Rebecca Ragsdale CDD Zoning Review Status:No Objection Reviews Comments: Division: Date Completed:05/18/2016 Reviewer:Ellie Ray CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/10/2016 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:~Road bonds willl need to be requested and amounts posted and approved prior to final plat approval. http://www.albemarle. org/upload/images/forms_center/departments/Community_Development/forms/bonds/Bond_Request _to_Establish_a_Bond.pdf Division: Date Completed:05/06/2016 Reviewer:Andrew Slack CDD E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:05/18/2016 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:05/18/2016 Reviewer:Justin Deel VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/25/2016 Reviewer:Ellie Ray CDD Planning Review Status:See Recommendations Reviews Comments:Plat is approvable, but still need: All bonds, check with Max/Ana Division: Date Completed:06/01/2016 Reviewer:Justin Deel VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:05/27/2016 Reviewer:Unassigned CDD Planning Review Status:No Objection Reviews Comments:Sent declaration to CAO for review. Greg says the previous declaration is sufficient. Division: Page:2 of 2 County of Albemarle Printed On:January 09, 2017 Ellie Ray From: Deel, Justin (VDOT) <Justin.Deel@vdot.virginia.gov> Sent: Wednesday, June 01, 2016 3:39 PM To: Ellie Ray Cc: Megan Yaniglos; Bill Fritz Subject: SUB201600057 Whittington Phases B2 and B4 Ellie, We have reviewed the final plat for SUB201600057 Whittington Phases B2 and B4, last revised on June 1, 2016, as submitted by Roudabush, Gale, & Associates. All previous comments have been addressed and we have no further objection to the plat as submitted. Justin Justin Deel, EIT Land Use Engineer Virginia Department of Transportation Culpeper District -Charlottesville Residency 434-422-9894 Ellie Ray From: Ellie Ray Sent: Friday, May 27, 2016 2:59 PM To: 'Jeremy W. Swink'; Kris Winters Subject: RE:Whittington Plat The County Attorney's Office got back to me and said the recorded declaration is sufficient. Thanks, Ellie Carter Ray, PLA,LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From:Jeremy W.Swink [mailto:SwinkJW@stanleymartin.com] Sent:Thursday, May 26, 2016 1:13 PM To: Ellie Ray<eray@albemarle.org>; Kris Winters<Kwinters@roudabush.com> Subject: RE:Whittington Plat Thanks for clarifying. From: Ellie Ray [mailto:eray@albemarle.org] Sent:Thursday, May 26, 2016 1:11 PM To:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Kris Winters<Kwinters@roudabush.com> Subject: RE:Whittington Plat I'm aware of all of this; the County Attorney will verify that the language in the previously recorded declaration is adequate to cover the current phases. It should be a simple review. Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From:Jeremy W.Swink [mailto:SwinkJW@stanleymartin.com] Sent:Thursday, May 26, 2016 1:08 PM To: Ellie Ray<eray@albemarle.org>; Kris Winters<Kwinters@roudabush.com> Subject: RE:Whittington Plat Ellie—B2/ B4 are already subjected to the Declaration... The documents you are referencing are already recorded (except for B2/B4 plat)and Greg has already reviewed them (when B1 was recorded). I am not sure if we can change anything at this point... The purpose with sharing the information is to address the comment that the B2/B4 parcel needed to be subjected to the Declaration. We have provided proof that the recorded Supplemental Declaration covers the area. What is the County attorney reviewing at this point? 1 Ellie Ray From: Greg Kamptner Sent: Friday, May 27, 2016 2:22 PM To: Ellie Ray Subject: RE: SUB201600057 Whittington Phase B2 & B4 - Declaration Ellie - Yes, a supplementary declaration is sufficient provided that the lands in Phases B2 and B4 are part of the same lands described in Exhibit A to the Phase B1 supplementary declaration, e.g., the parcel B residue. Greg Kamptner Deputy County Attorney County of Albemarle ekamr)tner(@albemarle.ore xL ! �'> lid �IiZ:�I�!1 �c�►�:J!�a From: Ellie Ray Sent: Thursday, May 26, 2016 9:57 AM To: Greg Kamptner <GKamptne@albemarle.org> Subject: FW: SUB201600057 Whittington Phase B2 & B4 - Declaration Importance: High Hi Greg, I am currently reviewing SUB201600057 Whittington Phase B2 & B4 final plat. I requested that the application submit a supplemental declaration (as was done for the previous phase) to address maintenance of open space, trails, pedestrian bridges, facilities within open space(picnic shelter), temporary turnaround, etc. The amenities are tied to ZMA200600011. The applicant claims the previously recorded declaration (attached) subjects the current phases to the original declaration (see below), so no further review should be required. Can you let me know if this is sufficient or if they need to submit something additional? I have also attached the plat currently under review and the approved plat for Phase 131 (referenced below). If you need paper copies, let me know and I'll send them up. Thanks, E//ie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Kris Winters [mailto:Kwinters@roudabush.com] Sent: Thursday, May 26, 2016 8:05 AM To: Ellie Ray <eray@albemarle.org> Cc: Jeremy W. Swink <SwinkJW@stanleymartin.com>; Chip Royer <crover@rcmplc.com>; Pete Caramanis <pcaramanis@rcmplc.com>; Bill Ledbetter <BLedbetter@roudabush.com>; Mike Myers <mmyers@dominioneng.com> Subject: FW: Whittington Plat Importance: High AL IRGII4Z� County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Kris Winters (kwinters@dominioneng.com ) From: Ellie Ray, PLA, Senior Planner Division: Planning Date: April 6, 2016 Rev 1: May 18, 2016 Rev 2: May 25, 2016 Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14): 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. Final: See Final Plat comments below. Revi : See Final Plat comments below. Rev2: Comment addressed. 2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631. Final: Comment addressed. 3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'. Final: Comment addressed. 4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5, 13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer. Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated above) and show that lots limited by stream buffer in fact provide this minimum required building site. Final: Comment addressed. 5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in addition to the information shown on sheet 2. Final: Comment addressed. 6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note. Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The previous phase plat had this note: Z MM PARD S JUTE ZONED PAD & EG - RIJNNO RESVENUL 6E4E OMNT & ENTRANCE CORE OR. ZMA M-11 was APPROVO FOR THESE PARMS. THERE AIRE PROFFERS kS9DaA1ED KITH THIS PEM1%%UL Rev1: Comment addressed. 7. [14-302(B)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have a 35' rear setback. Final: Comment addressed. 8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." Final: Comment addressed. 9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document should include maintenance responsibility for all open space and other privately owned improvements, and must be reviewed and approved by the County Attorney's Office. Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and Restrictions of the homeowner's association; please submit a supplemental declaration covering these phases for review and approval by the County Attorney's Office. Rev1: Comment still valid. Rev2: Comment still valid. 10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the square footage calculations for each lot rather than the acreages. Final: Comment addressed. 11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a reduction of the number of approvable lots. Final: Comment addressed with road plans. 12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter within Open Space J and two trails leading from Open Space J and connecting to the larger trail system within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in Open Space E. These amenities should be provided as shown on the Application Plan; show the trail system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic shelter. Final: Comment addressed; however, verification of posted bond for the current phases is required. Revi : Comment addressed. 13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on the plat. A landscaping plan that meets current regulations for screening must be provided, either with the road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting affected owners to this easement restriction on their property shall be stated on the Final Plat. Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance of the required landscaping shown on the road plans. Please also include a note alerting affected owners to this easement restriction as required by the proffer. Revi : Comment still valid. Please also include a note alerting affected owners to this easement restriction as required by the proffer. Phase 1 had the note below (though the circumstances of the easement were slightly different). THERE IS A 25' SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE OF LOTS 80, 61 ANIS 82 AND A 5' WIDE PORTION OF A 25' WADE SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE OF _LOTS 1, B3, 84 AND 86. Rev2: Comment addressed. 14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or WPO Plans. Final: Comment addressed with road plans. 15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match the application plan. Final: Comment addressed. 16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat approval. Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the current phases have been posted is required. Revi: Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval. Rev2: Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval. Final Plat Comments: 17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments. Monuments found or installed prior to plat recordation may be referred to if they are permanent and undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the certification of the professional engineer or land surveyor shall so note. Rev1: Comment addressed. 18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two (2) permanent monuments on the exterior boundary of the property and further tie to existing street intersection where possible and reasonably convenient. Rev1: Comment addressed. 19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names. Rev1: Comment addressed. However, please revise the note on Sheet V4 that says "Lots Pine Knot Road comprise Phase 1134" to indicate the new road name. Rev2 Cnmment addressed. 20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their reviews and have no objection. E911 and Engineering comments have been provided. Rev1: Comment not fully addressed. This plat cannot be approved until VDOT completes their review and grants their approval; comments will be forwarded upon receipt. ACSA, E911 and Engineering have completed their reviews and have no objection. Rev2: Comment not fully addressed. This plat cannot be approved until VDOT completes their review and grants their approval; comments will be forwarded upon receipt. Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for further information. S Ellie Ray From: Ana Kilmer Sent: Wednesday, May 25, 2016 10:21 AM To: Ellie Ray; Max Greene Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 - Final. As of today: 1. I received the water and sewer bond amount today. 2. Waiting for schedule of completion for bonded improvements form. 3. I cannot format sub bonds until Mark Graham approves form listed in#2 4. I have not been asked about the mitigation bond. Thanks Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org From: Ellie Ray Sent:Wednesday, May 25, 2016 10:08 AM To: Max Greene<MGreene@albemarle.org>;Ana Kilmer<akilmer@albemarle.org> Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2&B4-Final. The revised plat has been submitted. Please keep me posted on the status of their bonds. Thanks, Ellie Carter Ray,PLA, Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Max Greene Sent:Tuesday, May 17,2016 11:44 AM • To: Ellie Ray<eray@albemarle.org> Subject: RE: Planning Application Review for SUB201 0057 Whittington Sub. Phases 62 & B4-Final. Yep, I'm going to hold the plats 62 and B4 until they post the mitigation. They should have posted it before Justin Deel allowed a Grading permit for Phase B... From: Ellie Ray Sent:Tuesday, May 17, 2016 11:28 AM �• 1 Now Ellie Ray From: Deel,Justin (VDOT) <Justin.Deel@vdot.virginia.gov> Sent: Monday, May 23, 2016 3:17 PM To: Ellie Ray;Joel DeNunzio, P.E. Subject: RE: SUB 201600057 Whittington Phases B2 & B4 Resubmittal Ellie, PDF is fine for this. From: Ellie Ray [mailto:eray@albemarle.org] Sent: Monday, May 23, 2016 2:42 PM To: DeNunzio, Joel D., P.E. (VDOT); Deel, Justin (VDOT) Subject: RE: SUB 201600057 Whittington Phases B2 &B4 Resubmittal Justin/Joel, Are you ok with reviewing the PDF or should I send a paper copy your way?...or did you get your own paper copy? Ellie Carter Ray, PCA, Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Kris Winters [mailto:Kwinters@roudabush.com] Sent: Monday, May 23,2016 7:49 AM To:Joel DeNunzio, P.E. <ioel.denunzio@vdot.virginia.gov>;Justin.Deel@vdot.virginia.gov Cc: Ellie Ray<eray@albemarle.org>; Bill Ledbetter<BLedbetter@roudabush.com>;Jeremy W.Swink <SwinkJW@stanleymartin.com> Subject:SUB 201600057 Whittington Phases B2 & B4 Resubmittal Joel and Justin, Please find attached the electronic copy of the revised plat per VDOT comments. We will be delivering hard copies this morning as well.Any help you could provide in expediting this review would be greatly appreciated.Thank you. Kris Kristopher C. Winters, LS Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 434-296-5220 fax t Ellie Ray From: Kris Winters <Kwinters@roudabush.com> Sent: Monday, May 23, 2016 7:58 AM To: Ellie Ray Subject: SUB201600057 Whittington Phases B2 & B4 Resubmittal Attachments: SUB201600057 Whittington SUBD Phases B2 & B4 Resubmittal 20160520.pdf Ellie, Bill directed me to go ahead and transmit the revisions directly to Joel and Justin to try to expedite things (copied you on this, so you were aware).Attached is the file we transmitted,just in case the attachment doesn't come through to you on copy.We will be delivering hard copies to the Planning Office this morning as well.Thanks. Kris Kristopher C. Winters, LS Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 434-296-5220 fax 1 Ellie Ray From: Ellie Ray Sent: Friday, May 20, 2016 10:22 AM To: 'Miller, Theodore Aldred (Ted) (tm8zf)' Subject: RE:Whittington Development Ted, It was nice speaking with you a few minutes ago, I hope I was able to answer some of your questions. As discussed, here are the links to our digital files: SUB201400110 The Approved Preliminary Plat for Phase B: http://www.albemarle.org/weblink/3/doc/230375/Pagel.aspx?searchid=41b8ecc6-7f9b-49ae-9a32-bdd6b8950a le SUB201500145 The Approved Final Plat for Phase B1: http://www.albemarle,org/weblink/3/doc/258573/PayeLaspx?searchid=309556bb-3d0e-46b4-872a-cd415a57a368 SUB201600057 The Phase B2 & B4 Final Plat is currently under review,and includes the area closest to Singleton Lane. SUB201400193 (Whittington-Phase B- Road Plans) is the application number for the approved Road Plans, but as I said the plan itself has not been scanned into RMS. It is considered a working/construction document and isn't archived in the same way as plats. If you would like to see the plans,you can request that they be scanned and a link provided,or you can request to review the physical file here in our office. Paul Bjornsen is our records management officer,you can contact him to make either request. His email is pbiornsen@albemarle.org or his extension is 7940. Please let me know if you need anything additional. Thanks, E//ie Carter Ray,PLA, Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Miller,Theodore Aldred (Ted) (tm8zf) [mailto:tm8zf@eservices.virginia.edu] Sent:Wednesday, May 18,2016 5:41 PM To: Ellie Ray<eray@albemarle.org> Subject:Whittington Development Greetings Ellie, I am a resident of Mosby Mountain and member of their Board of Directors. At our meeting last night there were several questions raised about the Whittington subdivision and its impact on the Mosby Mountain community. Below are the two primary questions that came up. 1. What is the plan for the Whittington subdivision where it closely approaches Singleton Lane? They have clear cut all the way down to Singleton Lane and made at least one underground connection. What else is planned for that area and is there a plan of the development available? 2. There had been talk about a fire road connecting to Ridgetop. Is that still planned and if so,what kind of road is planned? Will it be a paved road with full access or something along the lines of a gravel road with barriers? Are there any approved or preliminary plans you can point me to regarding Whittington? 1 Ted Miller/Operations Mana er p g Jniversity of Virginia Center for Applied Biomechanics/ 4040 Lewis and Clark Drive, Charlottesville,VA 22911/ph+1434.297.8043/tm8zf@virginia.edu 2 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virgmla 22701 Charles A. Kilpatrick, P.E. Commissioner May I8, 2016 Ms. Ellie Carter Ray Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat Dear Ms. Ray: We have reviewed the final plat for Whittington Subdivision Phase B2 & B4, dated 2/18/16 with a revision date of 4/27/I6, as submitted by Roudabush, Gale & Associates, Inc. and offer the following comments: I. Previous comment; proposed storm water management easement missing ort Lot 70 {streets V5 and VG 2. The plat is not signed. If you need further information concerning this project please do not hesitate to contact me at 434-422-9373. Si _ rely, i r Joel DeNunzio, P.E. Resident Engineer VDOT Charlo Rtency WE KEEP VIRGINIA MOVING Ellie Ray From: Ellie Ray Sent: Thursday, May 26, 2016 9:57 AM To: Greg Kamptner Subject: FW: SUB2O1600057 Whittington Phase B2 & B4 - Declaration Attachments: 2O1605251937.pdf; SUB2O15OO145 Whittington Phase B1 Plat - Approved 2016-01-28.pdf; SUB2O160OO57 Whittington SUBD Phases B2 & B4 Resubmittal 2O16O52O.pdf Importance: High Hi Greg, I am currently reviewing SUB201600057 Whittington Phase B2 & B4 final plat. I requested that the application submit a supplemental declaration (as was done for the previous phase)to address maintenance of open space,trails, pedestrian bridges, facilities within open space(picnic shelter),temporary turnaround, etc. The amenities are tied to ZMA200600011. The applicant claims the previously recorded declaration (attached) subjects the current phases to the original declaration (see below), so no further review should be required. Can you let me know if this is sufficient or if they need to submit something additional? I have also attached the plat currently under review and the approved plat for Phase B1 (referenced below). If you need paper copies, let me know and I'll send them up. Thanks, Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Kris Winters [mailto:Kwinters@roudabush.com] Sent:Thursday, May 26, 2016 8:05 AM To: Ellie Ray<eray@albemarle.org> Cc:Jeremy W. Swink<SwinkJW@stanleymartin.com>;Chip Royer<croyer@rcmplc.com>; Pete Caramanis <pcaramanis@rcmplc.com>; Bill Ledbetter<BLedbetter@roudabush.com>; Mike Myers<mmyers@dominioneng.com> Subject: FW:Whittington Plat Importance: High Ellie, Please find attached the revised Declaration for Whittington per the Developer's Attorney, with explanation from their office below. Is this suitable for submittal electronically, or does the County need us to submit hard copy?Thanks. Kris Kristopher C. Winters, LS Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 1 Ellie Ray From: Ellie Ray Sent: Thursday, May 26, 2016 9:46 AM To: 'Kris Winters' Cc: Jeremy W.Swink; Chip Royer; Pete Caramanis; Bill Ledbetter; Mike Myers Subject: RE:Whittington Plat Kris, I will try to send all of the documents(Declaration, B1 plat and B2/B4 plat) electronically to the County Attorney's Office for review. If they need something additional, I will let you know. Thanks, Ellie Carter Ray, PLA,LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Kris Winters [mailto:Kwinters@roudabush.com] Sent:Thursday, May 26,2016 8:05 AM To: Ellie Ray<eray@albemarle.org> Cc:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Chip Royer<croyer@rcmplc.com>; Pete Caramanis <pcaramanis@rcmplc.com>; Bill Ledbetter<BLedbetter@roudabush.com>; Mike Myers<mmyers@dominioneng.com> Subject: FW:Whittington Plat Importance: High Ellie, Please find attached the revised Declaration for Whittington per the Developer's Attorney, with explanation from their office below. Is this suitable for submittal electronically, or does the County need us to submit hard copy?Thanks. Kris Kristopher C. Winters, LS Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 434-296-5220 fax From:Chip Royer[mailto:croyer@rcmplc.com] Sent:Wednesday, May 25, 2016 7:39 PM To:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Pete Caramanis<pcaramanis@rcmplc.com>; Bill Ledbetter <BLedbetter@roudabush.com>; Kris Winters<Kwinters@roudabush.com> Cc: Mike Myers<mmyers@dominioneng.com> Subject: RE: Whittington Plat Importance: High 1 All, We were ahead of the game here. To avoid continued back and forth with our lender, when we put B1 to record, we subjected the entire balance of the neighborhoods to the Declaration. This avoided going back and forth with lender for approval—especially if we needed something in a pinch. Pursuant to the attached supplemental declaration, all of Residue A and Residue B on the B1 plat were subjected. B2 and B4 come out of Residue B, so nothing further is required. Please let me know of any questions. Declaration is attached as recorded. Thanks, Chip FrROVER CARR ANIS a McDONOUGH Collison F. Royer Attoincy croyer(&rcmplc.com Royer, Caramanis & McDonough, PLC 200-C Garrett St. Charlottesville, VA 22902 (434) 260-8756 (434) 710-4061 Fax Please note that our firm requires all funds needed for closing on the purchase or refinance of real estate to be tendered in the form of a wire transfer. Our wiring instructions are sent to every purchaser/borrower in our firm's introductory letter and are also available upon request. NOTICE:This electronic mail transmission may constitute an attorney-client communication that is privileged at law. It is not intended for transmission to,or receipt by,any unauthorized persons.If you have received this electronic mail transmission in error,please delete it from your system without copying it,and notify the sender by reply e-mail,so that our address records can be corrected. Thank you. IRS Circular 230 Notice: Unless specifically stated otherwise,any tax advice contained in this communication(including any attachments)is not intended or written to be used,and cannot be used,for the purpose of(i)avoiding penalties under the Internal Revenue Code or(ii)promoting, marketing or recommending to another party any transaction or matter addressed herein. 2 'ter' Ellie Ray From: Ellie Ray Sent: Wednesday, May 25, 2016 11:18 AM To: 'Kris Winters' Subject: SUB201600057 Whittington Phases 132 and B4 - Final Attachments: CDP3_sub_ECR_Whittington Phase B2 B4 - Final.pdf Kris, Please find attached my comments for the above referenced application. I am awaiting comment from VDOT and will send any along as soon as I receive them. Feel free to contact me if you have any questions,concerns,or need further clarification. As an aside, my last day with the County is next Thursday; assuming this plat is not yet approved at that point, I will make sure this project file is up to date to assist in its transition to a new lead planner. Thank you, Ellie Carter Ray,PLA, Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville,Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 AL IRGII4Z� County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Kris Winters (kwinters@dominioneng.com ) From: Ellie Ray, PLA, Senior Planner Division: Planning Date: April 6, 2016 Rev 1: May 18, 2016 Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14): 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. Final: See Final Plat comments below. Rev1: See Final Plat comments below. 2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631. Final: Comment addressed. 3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'. Final: Comment addressed. 4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5, 13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer. Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated above) and show that lots limited by stream buffer in fact provide this minimum required building site. Final: Comment addressed. 5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in addition to the information shown on sheet 2. Final: Comment addressed. 6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note. Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The previous phase plat had this note: Z THESE PARCELS JURE ZONED PRD & EC - PLANNED RESM71 L OMOPMNT & ENTRANCE CC OR. ZMA M-11 WAS APPROVED FOR THME PAWLS. THERE ARE PROFFERS ASSOCATED WrH THS PEM1051LUT, Rev1: Comment addressed. 7. [14-302(B)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have a 35' rear setback. Final: Comment addressed. 8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." Final: Comment addressed. 9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document should include maintenance responsibility for all open space and other privately owned improvements, and must be reviewed and approved by the County Attorney's Office. Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and Restrictions of the homeowner's association; please submit a supplemental declaration covering these phases for review and approval by the County Attorney's Office. Rev1: Comment still valid. 10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the square footage calculations for each lot rather than the acreages. Final: Comment addressed. 11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a reduction of the number of approvable lots. Final: Comment addressed with road plans. 12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter within Open Space J and two trails leading from Open Space J and connecting to the larger trail system within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in Open Space E. These amenities should be provided as shown on the Application Plan; show the trail system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic shelter. Final: Comment addressed; however, verification of posted bond for the current phases is required. Rev1: Comment addressed. 13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on the plat. A landscaping plan that meets current regulations for screening must be provided, either with the road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting affected owners to this easement restriction on their property shall be stated on the Final Plat. Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance of the required landscaping shown on the road plans. Please also include a note alerting affected owners to this easement restriction as required by the proffer. Rev1: Comment still valid. Please also include a note alerting affected owners to this easement restriction as required by the proffer. Phase 1 had the note below (though the circumstances of the easement were slightly different). THERE IS A 25' SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE OF LOTS 80, 81 AND 82 AND A 5' WIDE PORTION OF A 25' WIDE SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE OF LOTS 1, B3, 84 AND 86. 14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or WPO Plans. Final: Comment addressed with road plans. 2 15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match the application plan. Final: Comment addressed. 16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat approval. Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the current phases have been posted is required. Revi : Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval. Final Plat Comments: 17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments. Monuments found or installed prior to plat recordation may be referred to if they are permanent and undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the certification of the professional engineer or land surveyor shall so note. Rev1: Comment addressed. 18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two (2) permanent monuments on the exterior boundary of the property and further tie to existing street intersection where possible and reasonably convenient. Revi : Comment addressed. 19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names. Rev1: Comment addressed. However, please revise the note on Sheet V4 that says "Lots Pine Knot Road comprise Phase B4" to indicate the new road name. 20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their reviews and have no objection. E911 and Engineering comments have been provided. Revi : Comment not fully addressed. This plat cannot be approved until VDOT completes their review and grants their approval; comments will be forwarded upon receipt. ACSA, E911 and Engineering have completed their reviews and have no objection. Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for further information. Ellie Ray From: Max Greene Sent: Tuesday, May 17, 2016 11:44 AM To: Ellie Ray Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 - Final. Yep, I'm going to hold the plats B2 and B4 until they post the mitigation. They should have posted it before Justin Deel allowed a Grading permit for Phase B... From: Ellie Ray Sent:Tuesday, May 17, 2016 11:28 AM To: Max Greene<MGreene@albemarle.org> Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final. The mitigation bond doesn't need to be posted prior to plat approval? Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Max Greene Sent:Tuesday, May 17, 2016 11:27 AM To: Ellie Ray<eray@albemarle.org> Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final. Ellie, They have not posted the mitigation bond, but the E&SC and SWM bonds of$2,000,000 have been posted. The road bonds will need to be posted for phases B2 and 64 Plats (I will generate them tomorrow) that will leave road bond for phase 83 outstanding. Max From: Ellie Ray Sent:Tuesday, May 17, 2016 10:58 AM To: Max Greene<MGreeneL albemarle.org> Subject: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final. Quick question on your review...do they also still have WPO bonds to post? I'm trying to get everything documented, so whoever takes this over will know what's going on. Thanks! -e The Review for the following application has been completed: Application Number=SUB201600057 1 PHOFAX(NE(434)434)97'7-296-0205 5220 INFO@ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. A PROFESSIONAL CORPORATION AND SURVEYING Serving Virginia Since 1956 ENGINEERING 914 MONTICELLO ROAD LAND PLANNING CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBE I I ER,L.S. J.CLINT HARMON,L.S. CHRISTOPHER C.MULLIGAN,P.E. DAVID A.JORDAN,L.S. AMMY M.GEORGE,L.A. BRIAN D.JAMISON,L.S. May 5, 2016 Ellie Ray, PLA, Senior Planner Planning Services Department of Community Development County of Albemarle,VA Re: Whittington Phases B2 &B4, Subdivision Resubmittal (SUB2o1600057), The following Planning Comments have been addressed as follows in italics, underlined: 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. Final: See Final Plat comments below. 2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631. Final: Comment addressed. 3. [14-302(A)4&5] Private &public easements. Label all new easements as `proposed'. Final: Comment addressed. 4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer(lots 5, 13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer. Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated above) and show that lots limited by stream buffer in fact provide this minimum required building site. Final: Comment addressed. 5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in addition to the information shown on sheet 2. Final: Comment addressed. 6. [14-302(6)5] Zoning classification. Add Entrance Corridor(EC) to the zoning note. Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The previous phase plat had this note: THESE PARIES ARE ZONED PRO k EG_PLANNED RESCOINAL DEWELDRINI a ENTRANCE CORRIDOR, INA 2008-I1 WAS APPROVED FOR THESE PARCELS, THERE ARE PROFFERS ASSOCIATED 1s1TH ORS DEVELOPMENT, Comment addressed with Note 2, Cover Sheet(V1), changed. 7. [14-302(6)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have a 35' rear setback. Final: Comment addressed. Albemarle County Department of Community Development Page 2 of 4 Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016 8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." Final; Comment addressed. 9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document should include maintenance responsibility for all open space and other privately owned improvements, and must be reviewed and approved by the County Attorney's Office. Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and Restrictions of the homeowner's association; please submit a supplemental declaration covering these phases for review and approval by the County Attorney's Office. Comment to be addressed by others under different cover. 10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the square footage calculations for each lot rather than the acreages. Final: Comment addressed. 11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a reduction of the number of approvable lots. Final: Comment addressed with road plans. 12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter within Open Space J and two trails leading from Open Space J and connecting to the larger trail system within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in Open Space E. These amenities should be provided as shown on the Application Plan; show the trail system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic shelter. Final: Comment addressed; however,verification of posted bond for the current phases is required. 13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on the plat. A landscaping plan that meets current regulations for screening must be provided, either with the road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting affected owners to this easement restriction on their property shall be stated on the Final Plat. Final: Comment not fully addressed.The Covenants and Restrictions should include maintenance of the required landscaping shown on the road plans. Please also include a note alerting affected owners to this easement restriction as required by the proffer. Comment to be addressed by others under different cover. 14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or WPO Plans. Final: Comment addressed with road plans. Albemarle County Department of Community Development Page 3 of 4 Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016 15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match the application plan. Final: Comment addressed. 16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat approval. Final: Comment not fully addressed.Verification that all subdivision and WPO bonds for the current phases have been posted is required. Comment to be addressed by others under different cover. Final Plat Comments: 17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments. Monuments found or installed prior to plat recordation may be referred to if they are permanent and undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the certification of the professional engineer or land surveyor shall so note. Comment addressed with addition of existing monumentation shown on Sheet V2, and noted in Note 17, Cover Sheet(V1) 18. [14-303(l)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two (2) permanent monuments on the exterior boundary of the property and further tie to existing street intersection where possible and reasonably convenient. Comment addressed with requested ties shown on Sheet V2. 19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names. Comment addressed with "Pine Knot Way"changed to "Dubine Drive". 20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their reviews and have no objection. E911 and Engineering comments have been provided. See comment responses here below. VDOT Comment as follows: 1. Proposed access and storm water management easements missing on Open Space C (sheet V5) and proposed storm water management missing on Lot 70 (sheets V5 and V6); all of these are shown on the final approved road plans. Comment addressed graphically Sheets V5& v6. E911 Comment as follows: "The applicant should contact this office with a list of three (3) proposed road names to replace "Pine Knot Road" The word "Pine" has been used more than five times in named roads and is not acceptable. Please contact this office with any questions." Comment addressed with E911 approved street name "Dubine Drive"as shown on revised plat. Albemarle County Department of Community Development Page 4 of 4 Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016 Plat related Engineering comment as follows: "There appears to be a drainage easement missing between lots 75 & 76 per the approved road plans SUB201400193. Comment addressed graphically Sheet V5 ACSA Comment as follows: "The applicant shall add a note to the cover page that water and sewer easements are to be centered on the as-built location." Comment addressed with Note 18, Cover Sheet(V1). Zoning, as of the date of this letter, is still shown on County View as"Pending". Per correspondence between this office and Zoning, they have no comments. Respectfully Submitted, i< ,----- s---• Kristopher C. Winters, L.S. ROUDABUSH GALE&ASSOCIATES,INC Ellie Ray From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Thursday, April 14, 2016 8:59 AM To: Ellie Ray Cc: Bill Ledbetter Subject: SUB201600057: Whittington Phase B2 & B4 - Final Ellie, I have reviewed the plat and have 1 comment. The applicant shall add a note to the cover page that water and sewer easements are to be centered on the as -built location. Let me know if you have any questions. Thanks Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 AL IRGII4Z� County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Kris Winters (kwinters@dominioneng.com ) From: Ellie Ray, PLA, Senior Planner Division: Planning Date: April 6, 2016 Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14): 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. Final: See Final Plat comments below. 2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631. Final: Comment addressed. 3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'. Final: Comment addressed. 4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5, 13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer. Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated above) and show that lots limited by stream buffer in fact provide this minimum required building site. Final: Comment addressed. 5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in addition to the information shown on sheet 2. Final: Comment addressed. 6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note. Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The previous phase plat had this note: 3. THESE PARCELS ,ARE ZONED PRO & EG - PLANNED RESOENI L DEYELO# Y:Nr & ENTRANCE CORRIDOR. 261a M-tt WAS APPMED FOR THM PARCFiS. THERE AIRE PRQI FE *SWQATED PATH THIS DENEL{I OT, 7. [14-302(8)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have a 35' rear setback. Final: Comment addressed. 8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." Final: Comment addressed. 9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document should include maintenance responsibility for all open space and other privately owned improvements, and must be reviewed and approved by the County Attorney's Office. Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and Restrictions of the homeowner's association; please submit a supplemental declaration covering these phases for review and approval by the County Attorney's Office. 10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the square footage calculations for each lot rather than the acreages. Final: Comment addressed. 11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a reduction of the number of approvable lots. Final: Comment addressed with road plans. 12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter within Open Space J and two trails leading from Open Space J and connecting to the larger trail system within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in Open Space E. These amenities should be provided as shown on the Application Plan; show the trail system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic shelter. Final: Comment addressed; however, verification of posted bond for the current phases is required. 13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on the plat. A landscaping plan that meets current regulations for screening must be provided, either with the road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting affected owners to this easement restriction on their property shall be stated on the Final Plat. Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance of the required landscaping shown on the road plans. Please also include a note alerting affected owners to this easement restriction as required by the proffer. 14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or WPO Plans. Final: Comment addressed with road plans. 15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match the application plan. Final: Comment addressed. 16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat approval. Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the current phases have been posted is required. Final Plat Comments: 17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments. Monuments found or installed prior to plat recordation may be referred to if they are permanent and 2 undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the certification of the professional engineer or land surveyor shall so note. 18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two (2) permanent monuments on the exterior boundary of the property and further tie to existing street intersection where possible and reasonably convenient. 19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names. 20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their reviews and have no objection. E911 and Engineering comments have been provided. Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for further information. Ellie Ray From: John Anderson Sent: Tuesday, April 26, 2016 4:31 PM To: Bill Ledbetter Cc: Max Greene; Ellie Ray Subject: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 - Final. The Review for the following application has been completed: Application Number= SUB201600057 Reviewer= Max Greene Review Status =See Recommendations Completed Date =03/23/2016 Thanks for your patience. Courtesy of M. Greene,please accept the following recommendations: —Road bonds will' need to be requested and amounts posted and approved prior to final plat approval. http://www.albemarlc.org/upload/images/forms_center/departments/Community_Development/forms/bond s/Bond_Rcquc st to_Establish_a Bond.pdf —There appears to be a drainage easement missing between lots 75 & 76 per the approved road plans SUB201400193. 1 Ellie Ray From: Lisa Green Sent: Monday, April 18, 2016 6:11 PM To: Ana Kilmer; Ellie Ray Subject: RE: site development performance bond for Whittington Phase B1 -Amenities As Ellie and I confirmed the bond for Whittington that has been posted for 90k+ is for the entire project. Lisa Green, CZA Senior Code Compliance Officer County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902-4596 ph(434)296-5832 ext.3013 Igreen2 a(�albemarle.orq From:Ana Kilmer Sent: Monday,April 11, 2016 2:13 PM To: Ellie Ray<eray@albemarle.org>; Lisa Green<Igreen2@albemarle.org> Subject: RE: site development performance bond for Whittington Phase B1 -Amenities Ellie: I can only provide information on what I was told that needed bonding. Any other information needs to come from Zoning. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org From: Ellie Ray Sent: Monday,April 11,2016 2:08 PM To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org> Subject: RE: site development performance bond for Whittington Phase B1-Amenities Has there been any further progress on this? My comments were due last week so I included a note about making sure the bonds were posted, but I probably need to let them know where things stand. Thanks! Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner 1 Albemarle County Community Developmer ph: 434.296.5832 x. 3432 From: Ellie Ray Sent:Wednesday,April 06, 2016 10:51 AM To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org> Subject: RE: site development performance bond for Whittington Phase B1-Amenities Yes, I see where the email says B1, but the spreadsheet includes 8 bridges(it seems like that covers the whole development, not just B1),the scenic overlook(which is in B3) and over 12,000 linear feet of trail. To me, it seems like this covers the whole development, but I wasn't involved in the bonding process so I'm not certain. Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From:Ana Kilmer Sent:Tuesday,April 05,2016 1:54 PM To: Ellie Ray<eray@albemarle.org>; Lisa Green<Igreen2@albemarle.org> Subject: RE:site development performance bond for Whittington Phase B1-Amenities The site bond covers Whittington phase B1-amenities. Thanks Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org NOTE: I will be out of the office from 4/6/2016-4/8/2016. I will return to the office on 4/11/2016. From: Ellie Ray Sent:Tuesday,April 05, 2016 1:43 PM To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org> Subject: FW: site development performance bond for Whittington Phase B1-Amenities Ana/Lisa, Can either of you tell me if this bond covered all of Whittington or just Phase 131? The spreadsheet you all used is in the attached email. I think it covers the whole subdivision and not just Phase B1, but since the email subject says B1 it has me a little concerned. I'm currently reviewing Phases B2 and B4 so I'm trying to remember where this all stands. Thanks! E//ie Carter Ray, PLA,LEED GREEN AssoCIArt Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 2 From:Ana Kilmer Sent:Wednesday,January 27,2016 5:36 PM To:Jeremy W.Swink<SwinkJW@stanleymartin.com>;John Kessler<iakyells@aol.com>; Mike Myers <mmyers@dominioneng.com> Cc:Amelia McCulley<AMCCULLE@albemarle.org>; Lisa Green<Igreen2@albemarle.org>; Ron Higgins <rhiggins@albemarle.org>; Ellie Ray<erav@albemarle.org> Subject:site development performance bond for Whittington Phase B1-Amenities The $90,300 site development performance bond for the project mentioned above has been posted and approved. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 3 `pro ' Ellie Ray From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Thursday,April 14, 2016 8:59 AM To: Ellie Ray Cc: Bill Ledbetter Subject: SUB201600057:Whittington Phase B2 & B4 - Final Ellie, I have reviewed the plat and have 1 comment.The applicant shall add a note to the cover page that water and sewer easements are to be centered on the as-built location. Let me know if you have any questions. Thanks. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 • 1 Ellie Ray From: Ellie Ray Sent: Wednesday,April 06, 2016 10:54 AM To: 'kwinters@roudabush.com' Subject: FW:SUB-2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat 04-01-16 Attachments: SUB-2016-00057 Whittington Subdivision Phase 82 & 84 Final Plat 04-01-16.pdf Just remembered I had this email. VDOT comments attached. Ellie Carter Ray, PLA, Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From:Gaituah, Kobina (VDOT) [mailto:Kobina.Gaituah@vdot.virginia.gov] Sent: Friday,April 01,2016 3:30 PM To: Ellie Ray<eray@albemarle.org> Cc:Joel DeNunzio, P.E.<joel.denunzio@vdot.virginia.gov> Subject:SUB-2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat 04-01-16 Hello Ellie, Please see attached comments for the above SUB plat. Please reach out with any queries. Regards, Kobina Gaituah Engineering Associate VDOT Charlottesville Residency 701 VDOT Way Charlottesville,VA 22911 Office:434-422-9859 Cell: 540-717-9466 E-mail: Kobina.GaituahPVDOT.Virginia.gov 1 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner April 01, 2016 Ms. Ellie Carter Ray Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB -2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat Dear Ms. Ray: We have reviewed the final plat for Whittington Subdivision Phase B2 & B4 dated 2/18/16 as submitted by Roudabush, Gale & Associates, Inc. and offer the following comments: 1. Proposed access and storm water management easements missing on Open Space C (sheet V5) and proposed storm water management missing on Lot 70 (sheets V5 and V6); all of these are shown on the final approved road plans. If you need further information concerning this project please do not hesitate to contact me at 434-422-9373. Joel DeNunzio, P.E. Resident Engineer VDOT Charlottesville Residency WE KEEP VIRGINIA MOVING