HomeMy WebLinkAboutSUB201600057 Review Comments 2016-05-27Short Review Comments Report for:
SUB201600057
SubApplication Type:
Whittington Sub. Phases B2 & B4 - Final
Final Plat
Date Completed:04/06/2016
Reviewer:Ellie Ray CDD Planning
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:03/23/2016
Reviewer:Max Greene CDD Engineering
Review Status:See Recommendations
Reviews Comments:~Road bonds willl need to be requested and amounts posted and approved prior to final plat
approval.
http://www.albemarle.
org/upload/images/forms_center/departments/Community_Development/forms/bonds/Bond_Request
_to_Establish_a_Bond.pdf
~There appears to be a drainage easement missing between lots 75 & 76 per the approved road
plans SUB201400193.
Division:
Date Completed:03/17/2016
Reviewer:Andrew Slack CDD E911
Review Status:Requested Changes
Reviews Comments:The applicant should contact this office with a list of three (3) proposed road names to replace "Pine
Knot Road" The word "Pine" has been used more than five times in named roads and is not
acceptable. Please contact this office with any questions.
Division:
Date Completed:03/21/2016
Reviewer:Jay Schlothauer CDD Inspections
Review Status:No Objection
Reviews Comments:Based on plat dated February 18, 2016.
No comments or conditions.
Division:
Date Completed:04/14/2016
Reviewer:Alexander Morrison ACSA
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:04/01/2016
Reviewer:Joel DeNunzio VDOT
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:03/20/2016
Reviewer:Robbie Gilmer Fire Rescue
Review Status:No Objection
Reviews Comments:Based on plans dated 2/18/16.
No comments objections.
Division:
Page:1 of 2 County of Albemarle Printed On:January 09, 2017
Date Completed:05/04/2016
Reviewer:Rebecca Ragsdale CDD Zoning
Review Status:No Objection
Reviews Comments:
Division:
Date Completed:05/18/2016
Reviewer:Ellie Ray CDD Planning
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:05/10/2016
Reviewer:Max Greene CDD Engineering
Review Status:See Recommendations
Reviews Comments:~Road bonds willl need to be requested and amounts posted and approved prior to final plat
approval.
http://www.albemarle.
org/upload/images/forms_center/departments/Community_Development/forms/bonds/Bond_Request
_to_Establish_a_Bond.pdf
Division:
Date Completed:05/06/2016
Reviewer:Andrew Slack CDD E911
Review Status:Approved
Reviews Comments:Approved.
Division:
Date Completed:05/18/2016
Reviewer:Alexander Morrison ACSA
Review Status:No Objection
Reviews Comments:
Division:
Date Completed:05/18/2016
Reviewer:Justin Deel VDOT
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:05/25/2016
Reviewer:Ellie Ray CDD Planning
Review Status:See Recommendations
Reviews Comments:Plat is approvable, but still need:
All bonds, check with Max/Ana
Division:
Date Completed:06/01/2016
Reviewer:Justin Deel VDOT
Review Status:No Objection
Reviews Comments:
Division:
Date Completed:05/27/2016
Reviewer:Unassigned CDD Planning
Review Status:No Objection
Reviews Comments:Sent declaration to CAO for review. Greg says the previous declaration is sufficient.
Division:
Page:2 of 2 County of Albemarle Printed On:January 09, 2017
Ellie Ray
From: Deel, Justin (VDOT) <Justin.Deel@vdot.virginia.gov>
Sent: Wednesday, June 01, 2016 3:39 PM
To: Ellie Ray
Cc: Megan Yaniglos; Bill Fritz
Subject: SUB201600057 Whittington Phases B2 and B4
Ellie,
We have reviewed the final plat for SUB201600057 Whittington Phases B2 and B4, last revised on June 1, 2016, as
submitted by Roudabush, Gale, & Associates. All previous comments have been addressed and we have no further
objection to the plat as submitted.
Justin
Justin Deel, EIT
Land Use Engineer
Virginia Department of Transportation
Culpeper District -Charlottesville Residency
434-422-9894
Ellie Ray
From: Ellie Ray
Sent: Friday, May 27, 2016 2:59 PM
To: 'Jeremy W. Swink'; Kris Winters
Subject: RE:Whittington Plat
The County Attorney's Office got back to me and said the recorded declaration is sufficient.
Thanks,
Ellie Carter Ray, PLA,LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From:Jeremy W.Swink [mailto:SwinkJW@stanleymartin.com]
Sent:Thursday, May 26, 2016 1:13 PM
To: Ellie Ray<eray@albemarle.org>; Kris Winters<Kwinters@roudabush.com>
Subject: RE:Whittington Plat
Thanks for clarifying.
From: Ellie Ray [mailto:eray@albemarle.org]
Sent:Thursday, May 26, 2016 1:11 PM
To:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Kris Winters<Kwinters@roudabush.com>
Subject: RE:Whittington Plat
I'm aware of all of this; the County Attorney will verify that the language in the previously recorded declaration is
adequate to cover the current phases. It should be a simple review.
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From:Jeremy W.Swink [mailto:SwinkJW@stanleymartin.com]
Sent:Thursday, May 26, 2016 1:08 PM
To: Ellie Ray<eray@albemarle.org>; Kris Winters<Kwinters@roudabush.com>
Subject: RE:Whittington Plat
Ellie—B2/ B4 are already subjected to the Declaration... The documents you are referencing are already recorded
(except for B2/B4 plat)and Greg has already reviewed them (when B1 was recorded). I am not sure if we can change
anything at this point...
The purpose with sharing the information is to address the comment that the B2/B4 parcel needed to be subjected to
the Declaration. We have provided proof that the recorded Supplemental Declaration covers the area.
What is the County attorney reviewing at this point?
1
Ellie Ray
From: Greg Kamptner
Sent: Friday, May 27, 2016 2:22 PM
To: Ellie Ray
Subject: RE: SUB201600057 Whittington Phase B2 & B4 - Declaration
Ellie -
Yes, a supplementary declaration is sufficient provided that the lands in Phases B2 and B4 are part of the same lands
described in Exhibit A to the Phase B1 supplementary declaration, e.g., the parcel B residue.
Greg Kamptner
Deputy County Attorney
County of Albemarle
ekamr)tner(@albemarle.ore
xL ! �'> lid �IiZ:�I�!1 �c�►�:J!�a
From: Ellie Ray
Sent: Thursday, May 26, 2016 9:57 AM
To: Greg Kamptner <GKamptne@albemarle.org>
Subject: FW: SUB201600057 Whittington Phase B2 & B4 - Declaration
Importance: High
Hi Greg,
I am currently reviewing SUB201600057 Whittington Phase B2 & B4 final plat. I requested that the application submit a
supplemental declaration (as was done for the previous phase) to address maintenance of open space, trails, pedestrian
bridges, facilities within open space(picnic shelter), temporary turnaround, etc. The amenities are tied to
ZMA200600011. The applicant claims the previously recorded declaration (attached) subjects the current phases to the
original declaration (see below), so no further review should be required. Can you let me know if this is sufficient or if
they need to submit something additional? I have also attached the plat currently under review and the approved plat
for Phase 131 (referenced below).
If you need paper copies, let me know and I'll send them up.
Thanks,
E//ie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Kris Winters [mailto:Kwinters@roudabush.com]
Sent: Thursday, May 26, 2016 8:05 AM
To: Ellie Ray <eray@albemarle.org>
Cc: Jeremy W. Swink <SwinkJW@stanleymartin.com>; Chip Royer <crover@rcmplc.com>; Pete Caramanis
<pcaramanis@rcmplc.com>; Bill Ledbetter <BLedbetter@roudabush.com>; Mike Myers <mmyers@dominioneng.com>
Subject: FW: Whittington Plat
Importance: High
AL
IRGII4Z�
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Fax 434-972-4126
Memorandum
To: Kris Winters (kwinters@dominioneng.com )
From: Ellie Ray, PLA, Senior Planner
Division: Planning
Date: April 6, 2016
Rev 1: May 18, 2016
Rev 2: May 25, 2016
Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat
The County of Albemarle Planning Division will approve the plat referenced above once the following comments
have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is
preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14):
1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance.
Final: See Final Plat comments below.
Revi : See Final Plat comments below.
Rev2: Comment addressed.
2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631.
Final: Comment addressed.
3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'.
Final: Comment addressed.
4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated
dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the
proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5,
13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer.
Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated
above) and show that lots limited by stream buffer in fact provide this minimum required building site.
Final: Comment addressed.
5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in
addition to the information shown on sheet 2.
Final: Comment addressed.
6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note.
Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The
previous phase plat had this note:
Z MM PARD S JUTE ZONED PAD & EG - RIJNNO RESVENUL 6E4E OMNT
& ENTRANCE CORE OR. ZMA M-11 was APPROVO FOR THESE PARMS.
THERE AIRE PROFFERS kS9DaA1ED KITH THIS PEM1%%UL
Rev1: Comment addressed.
7. [14-302(B)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they
are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have
a 35' rear setback.
Final: Comment addressed.
8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed
in accordance with the Albemarle County Water Protection Ordinance."
Final: Comment addressed.
9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and
Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document
should include maintenance responsibility for all open space and other privately owned improvements, and
must be reviewed and approved by the County Attorney's Office.
Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and
Restrictions of the homeowner's association; please submit a supplemental declaration covering
these phases for review and approval by the County Attorney's Office.
Rev1: Comment still valid.
Rev2: Comment still valid.
10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the
square footage calculations for each lot rather than the acreages.
Final: Comment addressed.
11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that
meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a
reduction of the number of approvable lots.
Final: Comment addressed with road plans.
12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter
within Open Space J and two trails leading from Open Space J and connecting to the larger trail system
within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open
Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in
Open Space E. These amenities should be provided as shown on the Application Plan; show the trail
system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a
performance bond will likely be required for the picnic shelter.
Final: Comment addressed; however, verification of posted bond for the current phases is required.
Revi : Comment addressed.
13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on
the plat. A landscaping plan that meets current regulations for screening must be provided, either with the
road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the
easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting
affected owners to this easement restriction on their property shall be stated on the Final Plat.
Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance
of the required landscaping shown on the road plans. Please also include a note alerting affected
owners to this easement restriction as required by the proffer.
Revi : Comment still valid. Please also include a note alerting affected owners to this easement
restriction as required by the proffer. Phase 1 had the note below (though the circumstances of the
easement were slightly different).
THERE IS A 25' SCREENING AND LANDSCAPE EASEMENT ACROSS THE
SOUTHERN EDGE OF LOTS 80, 61 ANIS 82 AND A 5' WIDE PORTION OF A 25'
WADE SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE
OF _LOTS 1, B3, 84 AND 86.
Rev2: Comment addressed.
14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or
WPO Plans.
Final: Comment addressed with road plans.
15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering
provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match
the application plan.
Final: Comment addressed.
16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built
or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat
approval.
Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the
current phases have been posted is required.
Revi: Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval.
Rev2: Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval.
Final Plat Comments:
17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments.
Monuments found or installed prior to plat recordation may be referred to if they are permanent and
undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the
certification of the professional engineer or land surveyor shall so note.
Rev1: Comment addressed.
18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two
(2) permanent monuments on the exterior boundary of the property and further tie to existing street
intersection where possible and reasonably convenient.
Rev1: Comment addressed.
19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names.
Rev1: Comment addressed. However, please revise the note on Sheet V4 that says "Lots Pine Knot
Road comprise Phase 1134" to indicate the new road name.
Rev2 Cnmment addressed.
20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their
approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their
reviews and have no objection. E911 and Engineering comments have been provided.
Rev1: Comment not fully addressed. This plat cannot be approved until VDOT completes their
review and grants their approval; comments will be forwarded upon receipt. ACSA, E911 and
Engineering have completed their reviews and have no objection.
Rev2: Comment not fully addressed. This plat cannot be approved until VDOT completes their
review and grants their approval; comments will be forwarded upon receipt.
Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for
further information.
S
Ellie Ray
From: Ana Kilmer
Sent: Wednesday, May 25, 2016 10:21 AM
To: Ellie Ray; Max Greene
Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 -
Final.
As of today:
1. I received the water and sewer bond amount today.
2. Waiting for schedule of completion for bonded improvements form.
3. I cannot format sub bonds until Mark Graham approves form listed in#2
4. I have not been asked about the mitigation bond.
Thanks
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville, VA 22902
434-296-5832
akilmer@albemarle.org
From: Ellie Ray
Sent:Wednesday, May 25, 2016 10:08 AM
To: Max Greene<MGreene@albemarle.org>;Ana Kilmer<akilmer@albemarle.org>
Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2&B4-Final.
The revised plat has been submitted. Please keep me posted on the status of their bonds.
Thanks,
Ellie Carter Ray,PLA,
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Max Greene
Sent:Tuesday, May 17,2016 11:44 AM •
To: Ellie Ray<eray@albemarle.org>
Subject: RE: Planning Application Review for SUB201 0057 Whittington Sub. Phases 62 & B4-Final.
Yep, I'm going to hold the plats 62 and B4 until they post the mitigation. They should have posted it before Justin Deel
allowed a Grading permit for Phase B...
From: Ellie Ray
Sent:Tuesday, May 17, 2016 11:28 AM �•
1
Now
Ellie Ray
From: Deel,Justin (VDOT) <Justin.Deel@vdot.virginia.gov>
Sent: Monday, May 23, 2016 3:17 PM
To: Ellie Ray;Joel DeNunzio, P.E.
Subject: RE: SUB 201600057 Whittington Phases B2 & B4 Resubmittal
Ellie,
PDF is fine for this.
From: Ellie Ray [mailto:eray@albemarle.org]
Sent: Monday, May 23, 2016 2:42 PM
To: DeNunzio, Joel D., P.E. (VDOT); Deel, Justin (VDOT)
Subject: RE: SUB 201600057 Whittington Phases B2 &B4 Resubmittal
Justin/Joel,
Are you ok with reviewing the PDF or should I send a paper copy your way?...or did you get your own paper copy?
Ellie Carter Ray, PCA,
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Kris Winters [mailto:Kwinters@roudabush.com]
Sent: Monday, May 23,2016 7:49 AM
To:Joel DeNunzio, P.E. <ioel.denunzio@vdot.virginia.gov>;Justin.Deel@vdot.virginia.gov
Cc: Ellie Ray<eray@albemarle.org>; Bill Ledbetter<BLedbetter@roudabush.com>;Jeremy W.Swink
<SwinkJW@stanleymartin.com>
Subject:SUB 201600057 Whittington Phases B2 & B4 Resubmittal
Joel and Justin,
Please find attached the electronic copy of the revised plat per VDOT comments. We will be delivering hard copies this
morning as well.Any help you could provide in expediting this review would be greatly appreciated.Thank you.
Kris
Kristopher C. Winters, LS
Roudabush, Gale and Associates
914 Monticello Road
Charlottesville, Virginia 22902
434-977-0205
434-296-5220 fax
t
Ellie Ray
From: Kris Winters <Kwinters@roudabush.com>
Sent: Monday, May 23, 2016 7:58 AM
To: Ellie Ray
Subject: SUB201600057 Whittington Phases B2 & B4 Resubmittal
Attachments: SUB201600057 Whittington SUBD Phases B2 & B4 Resubmittal 20160520.pdf
Ellie,
Bill directed me to go ahead and transmit the revisions directly to Joel and Justin to try to expedite things (copied you on
this, so you were aware).Attached is the file we transmitted,just in case the attachment doesn't come through to you
on copy.We will be delivering hard copies to the Planning Office this morning as well.Thanks.
Kris
Kristopher C. Winters, LS
Roudabush, Gale and Associates
914 Monticello Road
Charlottesville, Virginia 22902
434-977-0205
434-296-5220 fax
1
Ellie Ray
From: Ellie Ray
Sent: Friday, May 20, 2016 10:22 AM
To: 'Miller, Theodore Aldred (Ted) (tm8zf)'
Subject: RE:Whittington Development
Ted,
It was nice speaking with you a few minutes ago, I hope I was able to answer some of your questions. As discussed, here
are the links to our digital files:
SUB201400110 The Approved Preliminary Plat for Phase B:
http://www.albemarle.org/weblink/3/doc/230375/Pagel.aspx?searchid=41b8ecc6-7f9b-49ae-9a32-bdd6b8950a le
SUB201500145 The Approved Final Plat for Phase B1:
http://www.albemarle,org/weblink/3/doc/258573/PayeLaspx?searchid=309556bb-3d0e-46b4-872a-cd415a57a368
SUB201600057 The Phase B2 & B4 Final Plat is currently under review,and includes the area closest to Singleton Lane.
SUB201400193 (Whittington-Phase B- Road Plans) is the application number for the approved Road Plans, but as I said
the plan itself has not been scanned into RMS. It is considered a working/construction document and isn't archived in
the same way as plats. If you would like to see the plans,you can request that they be scanned and a link provided,or
you can request to review the physical file here in our office. Paul Bjornsen is our records management officer,you can
contact him to make either request. His email is pbiornsen@albemarle.org or his extension is 7940.
Please let me know if you need anything additional.
Thanks,
E//ie Carter Ray,PLA,
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Miller,Theodore Aldred (Ted) (tm8zf) [mailto:tm8zf@eservices.virginia.edu]
Sent:Wednesday, May 18,2016 5:41 PM
To: Ellie Ray<eray@albemarle.org>
Subject:Whittington Development
Greetings Ellie,
I am a resident of Mosby Mountain and member of their Board of Directors. At our meeting last night there were
several questions raised about the Whittington subdivision and its impact on the Mosby Mountain community. Below
are the two primary questions that came up.
1. What is the plan for the Whittington subdivision where it closely approaches Singleton Lane? They have clear
cut all the way down to Singleton Lane and made at least one underground connection. What else is planned
for that area and is there a plan of the development available?
2. There had been talk about a fire road connecting to Ridgetop. Is that still planned and if so,what kind of road is
planned? Will it be a paved road with full access or something along the lines of a gravel road with barriers?
Are there any approved or preliminary plans you can point me to regarding Whittington?
1
Ted Miller/Operations Mana er
p g Jniversity of Virginia Center for Applied Biomechanics/ 4040 Lewis and Clark Drive,
Charlottesville,VA 22911/ph+1434.297.8043/tm8zf@virginia.edu
2
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virgmla 22701
Charles A. Kilpatrick, P.E.
Commissioner
May I8, 2016
Ms. Ellie Carter Ray
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SUB -2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat
Dear Ms. Ray:
We have reviewed the final plat for Whittington Subdivision Phase B2 & B4, dated 2/18/16 with
a revision date of 4/27/I6, as submitted by Roudabush, Gale & Associates, Inc. and offer the
following comments:
I. Previous comment; proposed storm water management easement missing ort Lot 70
{streets V5 and VG
2. The plat is not signed.
If you need further information concerning this project please do not hesitate to contact me at
434-422-9373.
Si _ rely,
i
r
Joel DeNunzio, P.E.
Resident Engineer
VDOT Charlo
Rtency
WE KEEP VIRGINIA MOVING
Ellie Ray
From: Ellie Ray
Sent: Thursday, May 26, 2016 9:57 AM
To: Greg Kamptner
Subject: FW: SUB2O1600057 Whittington Phase B2 & B4 - Declaration
Attachments: 2O1605251937.pdf; SUB2O15OO145 Whittington Phase B1 Plat - Approved
2016-01-28.pdf; SUB2O160OO57 Whittington SUBD Phases B2 & B4 Resubmittal
2O16O52O.pdf
Importance: High
Hi Greg,
I am currently reviewing SUB201600057 Whittington Phase B2 & B4 final plat. I requested that the application submit a
supplemental declaration (as was done for the previous phase)to address maintenance of open space,trails, pedestrian
bridges, facilities within open space(picnic shelter),temporary turnaround, etc. The amenities are tied to
ZMA200600011. The applicant claims the previously recorded declaration (attached) subjects the current phases to the
original declaration (see below), so no further review should be required. Can you let me know if this is sufficient or if
they need to submit something additional? I have also attached the plat currently under review and the approved plat
for Phase B1 (referenced below).
If you need paper copies, let me know and I'll send them up.
Thanks,
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Kris Winters [mailto:Kwinters@roudabush.com]
Sent:Thursday, May 26, 2016 8:05 AM
To: Ellie Ray<eray@albemarle.org>
Cc:Jeremy W. Swink<SwinkJW@stanleymartin.com>;Chip Royer<croyer@rcmplc.com>; Pete Caramanis
<pcaramanis@rcmplc.com>; Bill Ledbetter<BLedbetter@roudabush.com>; Mike Myers<mmyers@dominioneng.com>
Subject: FW:Whittington Plat
Importance: High
Ellie,
Please find attached the revised Declaration for Whittington per the Developer's Attorney, with explanation from their
office below. Is this suitable for submittal electronically, or does the County need us to submit hard copy?Thanks.
Kris
Kristopher C. Winters, LS
Roudabush, Gale and Associates
914 Monticello Road
Charlottesville, Virginia 22902
434-977-0205
1
Ellie Ray
From: Ellie Ray
Sent: Thursday, May 26, 2016 9:46 AM
To: 'Kris Winters'
Cc: Jeremy W.Swink; Chip Royer; Pete Caramanis; Bill Ledbetter; Mike Myers
Subject: RE:Whittington Plat
Kris,
I will try to send all of the documents(Declaration, B1 plat and B2/B4 plat) electronically to the County Attorney's Office
for review. If they need something additional, I will let you know.
Thanks,
Ellie Carter Ray, PLA,LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Kris Winters [mailto:Kwinters@roudabush.com]
Sent:Thursday, May 26,2016 8:05 AM
To: Ellie Ray<eray@albemarle.org>
Cc:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Chip Royer<croyer@rcmplc.com>; Pete Caramanis
<pcaramanis@rcmplc.com>; Bill Ledbetter<BLedbetter@roudabush.com>; Mike Myers<mmyers@dominioneng.com>
Subject: FW:Whittington Plat
Importance: High
Ellie,
Please find attached the revised Declaration for Whittington per the Developer's Attorney, with explanation from their
office below. Is this suitable for submittal electronically, or does the County need us to submit hard copy?Thanks.
Kris
Kristopher C. Winters, LS
Roudabush, Gale and Associates
914 Monticello Road
Charlottesville, Virginia 22902
434-977-0205
434-296-5220 fax
From:Chip Royer[mailto:croyer@rcmplc.com]
Sent:Wednesday, May 25, 2016 7:39 PM
To:Jeremy W.Swink<SwinkJW@stanleymartin.com>; Pete Caramanis<pcaramanis@rcmplc.com>; Bill Ledbetter
<BLedbetter@roudabush.com>; Kris Winters<Kwinters@roudabush.com>
Cc: Mike Myers<mmyers@dominioneng.com>
Subject: RE: Whittington Plat
Importance: High
1
All,
We were ahead of the game here. To avoid continued back and forth with our lender, when we put B1 to
record, we subjected the entire balance of the neighborhoods to the Declaration. This avoided going back
and forth with lender for approval—especially if we needed something in a pinch.
Pursuant to the attached supplemental declaration, all of Residue A and Residue B on the B1 plat were
subjected. B2 and B4 come out of Residue B, so nothing further is required.
Please let me know of any questions. Declaration is attached as recorded.
Thanks,
Chip
FrROVER
CARR ANIS a
McDONOUGH
Collison F. Royer
Attoincy
croyer(&rcmplc.com
Royer, Caramanis & McDonough, PLC
200-C Garrett St.
Charlottesville, VA 22902
(434) 260-8756
(434) 710-4061 Fax
Please note that our firm requires all funds needed for closing on the purchase or refinance of real
estate to be tendered in the form of a wire transfer. Our wiring instructions are sent to every
purchaser/borrower in our firm's introductory letter and are also available upon request.
NOTICE:This electronic mail transmission may constitute an attorney-client communication that is privileged at law. It is not intended for transmission
to,or receipt by,any unauthorized persons.If you have received this electronic mail transmission in error,please delete it from your system without
copying it,and notify the sender by reply e-mail,so that our address records can be corrected. Thank you.
IRS Circular 230 Notice: Unless specifically stated otherwise,any tax advice contained in this communication(including any attachments)is not
intended or written to be used,and cannot be used,for the purpose of(i)avoiding penalties under the Internal Revenue Code or(ii)promoting,
marketing or recommending to another party any transaction or matter addressed herein.
2
'ter'
Ellie Ray
From: Ellie Ray
Sent: Wednesday, May 25, 2016 11:18 AM
To: 'Kris Winters'
Subject: SUB201600057 Whittington Phases 132 and B4 - Final
Attachments: CDP3_sub_ECR_Whittington Phase B2 B4 - Final.pdf
Kris,
Please find attached my comments for the above referenced application. I am awaiting comment from VDOT and will
send any along as soon as I receive them. Feel free to contact me if you have any questions,concerns,or need further
clarification.
As an aside, my last day with the County is next Thursday; assuming this plat is not yet approved at that point, I will
make sure this project file is up to date to assist in its transition to a new lead planner.
Thank you,
Ellie Carter Ray,PLA,
Senior Planner
Albemarle County Community Development
Planning Division
401 McIntire Road, North Wing
Charlottesville,Virginia 22902
ph: 434.296.5832 x. 3432
fax: 434.972.4126
1
AL
IRGII4Z�
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Fax 434-972-4126
Memorandum
To: Kris Winters (kwinters@dominioneng.com )
From: Ellie Ray, PLA, Senior Planner
Division: Planning
Date: April 6, 2016
Rev 1: May 18, 2016
Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat
The County of Albemarle Planning Division will approve the plat referenced above once the following comments
have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is
preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14):
1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance.
Final: See Final Plat comments below.
Rev1: See Final Plat comments below.
2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631.
Final: Comment addressed.
3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'.
Final: Comment addressed.
4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated
dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the
proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5,
13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer.
Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated
above) and show that lots limited by stream buffer in fact provide this minimum required building site.
Final: Comment addressed.
5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in
addition to the information shown on sheet 2.
Final: Comment addressed.
6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note.
Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The
previous phase plat had this note:
Z THESE PARCELS JURE ZONED PRD & EC - PLANNED RESM71 L OMOPMNT
& ENTRANCE CC OR. ZMA M-11 WAS APPROVED FOR THME PAWLS.
THERE ARE PROFFERS ASSOCATED WrH THS PEM1051LUT,
Rev1: Comment addressed.
7. [14-302(B)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they
are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have
a 35' rear setback.
Final: Comment addressed.
8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed
in accordance with the Albemarle County Water Protection Ordinance."
Final: Comment addressed.
9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and
Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document
should include maintenance responsibility for all open space and other privately owned improvements, and
must be reviewed and approved by the County Attorney's Office.
Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and
Restrictions of the homeowner's association; please submit a supplemental declaration covering
these phases for review and approval by the County Attorney's Office.
Rev1: Comment still valid.
10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the
square footage calculations for each lot rather than the acreages.
Final: Comment addressed.
11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that
meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a
reduction of the number of approvable lots.
Final: Comment addressed with road plans.
12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter
within Open Space J and two trails leading from Open Space J and connecting to the larger trail system
within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open
Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in
Open Space E. These amenities should be provided as shown on the Application Plan; show the trail
system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a
performance bond will likely be required for the picnic shelter.
Final: Comment addressed; however, verification of posted bond for the current phases is required.
Rev1: Comment addressed.
13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on
the plat. A landscaping plan that meets current regulations for screening must be provided, either with the
road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the
easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting
affected owners to this easement restriction on their property shall be stated on the Final Plat.
Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance
of the required landscaping shown on the road plans. Please also include a note alerting affected
owners to this easement restriction as required by the proffer.
Rev1: Comment still valid. Please also include a note alerting affected owners to this easement
restriction as required by the proffer. Phase 1 had the note below (though the circumstances of the
easement were slightly different).
THERE IS A 25' SCREENING AND LANDSCAPE EASEMENT ACROSS THE
SOUTHERN EDGE OF LOTS 80, 81 AND 82 AND A 5' WIDE PORTION OF A 25'
WIDE SCREENING AND LANDSCAPE EASEMENT ACROSS THE SOUTHERN EDGE
OF LOTS 1, B3, 84 AND 86.
14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or
WPO Plans.
Final: Comment addressed with road plans.
2
15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering
provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match
the application plan.
Final: Comment addressed.
16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built
or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat
approval.
Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the
current phases have been posted is required.
Revi : Comment still valid. All subdivision and WPO bonds must be posted prior to plat approval.
Final Plat Comments:
17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments.
Monuments found or installed prior to plat recordation may be referred to if they are permanent and
undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the
certification of the professional engineer or land surveyor shall so note.
Rev1: Comment addressed.
18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two
(2) permanent monuments on the exterior boundary of the property and further tie to existing street
intersection where possible and reasonably convenient.
Revi : Comment addressed.
19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names.
Rev1: Comment addressed. However, please revise the note on Sheet V4 that says "Lots Pine Knot
Road comprise Phase B4" to indicate the new road name.
20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their
approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their
reviews and have no objection. E911 and Engineering comments have been provided.
Revi : Comment not fully addressed. This plat cannot be approved until VDOT completes their
review and grants their approval; comments will be forwarded upon receipt. ACSA, E911 and
Engineering have completed their reviews and have no objection.
Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for
further information.
Ellie Ray
From: Max Greene
Sent: Tuesday, May 17, 2016 11:44 AM
To: Ellie Ray
Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 -
Final.
Yep, I'm going to hold the plats B2 and B4 until they post the mitigation. They should have posted it before Justin Deel
allowed a Grading permit for Phase B...
From: Ellie Ray
Sent:Tuesday, May 17, 2016 11:28 AM
To: Max Greene<MGreene@albemarle.org>
Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final.
The mitigation bond doesn't need to be posted prior to plat approval?
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Max Greene
Sent:Tuesday, May 17, 2016 11:27 AM
To: Ellie Ray<eray@albemarle.org>
Subject: RE: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final.
Ellie,
They have not posted the mitigation bond, but the E&SC and SWM bonds of$2,000,000 have been posted. The road
bonds will need to be posted for phases B2 and 64 Plats (I will generate them tomorrow) that will leave road bond for
phase 83 outstanding.
Max
From: Ellie Ray
Sent:Tuesday, May 17, 2016 10:58 AM
To: Max Greene<MGreeneL albemarle.org>
Subject: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4- Final.
Quick question on your review...do they also still have WPO bonds to post? I'm trying to get everything
documented, so whoever takes this over will know what's going on.
Thanks! -e
The Review for the following application has been completed:
Application Number=SUB201600057
1
PHOFAX(NE(434)434)97'7-296-0205
5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
AND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBE I I ER,L.S. J.CLINT HARMON,L.S.
CHRISTOPHER C.MULLIGAN,P.E. DAVID A.JORDAN,L.S.
AMMY M.GEORGE,L.A. BRIAN D.JAMISON,L.S.
May 5, 2016
Ellie Ray, PLA, Senior Planner
Planning Services
Department of Community Development
County of Albemarle,VA
Re: Whittington Phases B2 &B4, Subdivision Resubmittal (SUB2o1600057),
The following Planning Comments have been addressed as follows in italics, underlined:
1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance.
Final: See Final Plat comments below.
2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631.
Final: Comment addressed.
3. [14-302(A)4&5] Private &public easements. Label all new easements as `proposed'.
Final: Comment addressed.
4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated
dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the
proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer(lots 5,
13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer.
Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated
above) and show that lots limited by stream buffer in fact provide this minimum required building site.
Final: Comment addressed.
5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in
addition to the information shown on sheet 2.
Final: Comment addressed.
6. [14-302(6)5] Zoning classification. Add Entrance Corridor(EC) to the zoning note.
Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The
previous phase plat had this note:
THESE PARIES ARE ZONED PRO k EG_PLANNED RESCOINAL DEWELDRINI
a ENTRANCE CORRIDOR, INA 2008-I1 WAS APPROVED FOR THESE PARCELS,
THERE ARE PROFFERS ASSOCIATED 1s1TH ORS DEVELOPMENT,
Comment addressed with Note 2, Cover Sheet(V1), changed.
7. [14-302(6)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they
are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have
a 35' rear setback.
Final: Comment addressed.
Albemarle County Department of Community Development Page 2 of 4
Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016
8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be
managed in accordance with the Albemarle County Water Protection Ordinance."
Final; Comment addressed.
9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the
Covenants and Restrictions of the homeowner's association (assuming CCRs were created for
Phase A). This document should include maintenance responsibility for all open space and other
privately owned improvements, and must be reviewed and approved by the County Attorney's
Office.
Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the
Covenants and Restrictions of the homeowner's association; please submit a supplemental
declaration covering these phases for review and approval by the County Attorney's Office.
Comment to be addressed by others under different cover.
10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet.
Provide the square footage calculations for each lot rather than the acreages.
Final: Comment addressed.
11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted
that meets all requirements listed in Proffer 4 for Engineering review and approval. This review
may result in a reduction of the number of approvable lots.
Final: Comment addressed with road plans.
12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic
shelter within Open Space J and two trails leading from Open Space J and connecting to the larger
trail system within the subdivision. One of the trails goes through Open Space H connecting to the
trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to
connect to the trail system in Open Space E. These amenities should be provided as shown on the
Application Plan; show the trail system as indicated and note that the picnic shelter will be
provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic
shelter.
Final: Comment addressed; however,verification of posted bond for the current phases is
required.
13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and
labeled on the plat. A landscaping plan that meets current regulations for screening must be
provided, either with the road or WPO plans or as a separate submittal. Maintenance and
responsibility of the screening within the easement should be addressed in the Covenants and
Restrictions mentioned above. A note alerting affected owners to this easement restriction on
their property shall be stated on the Final Plat.
Final: Comment not fully addressed.The Covenants and Restrictions should include
maintenance of the required landscaping shown on the road plans. Please also include a
note alerting affected owners to this easement restriction as required by the proffer.
Comment to be addressed by others under different cover.
14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the
Road and/or WPO Plans.
Final: Comment addressed with road plans.
Albemarle County Department of Community Development Page 3 of 4
Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016
15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot
numbering provided on the application plan. To eliminate confusion, please revise the lot numbers
on this plat to match the application plan.
Final: Comment addressed.
16. [Comment] Road Plans and WPO application must be approved, all required improvements
must be built or bonded, and all required Deeds and Declarations must be reviewed and
approved prior to Final Plat approval.
Final: Comment not fully addressed.Verification that all subdivision and WPO bonds for
the current phases have been posted is required.
Comment to be addressed by others under different cover.
Final Plat Comments:
17. [14-303(H)] Monuments. Provide the location and material of all permanent reference
monuments. Monuments found or installed prior to plat recordation may be referred to if
they are permanent and undisturbed. If any monument required by this chapter will be
installed after recordation of the final plat, the certification of the professional engineer or
land surveyor shall so note.
Comment addressed with addition of existing monumentation shown on Sheet V2, and noted in
Note 17, Cover Sheet(V1)
18. [14-303(l)] Bearing and distance ties. Provide a definite bearing and distance tie between not less
than two (2) permanent monuments on the exterior boundary of the property and further tie to
existing street intersection where possible and reasonably convenient.
Comment addressed with requested ties shown on Sheet V2.
19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names.
Comment addressed with "Pine Knot Way"changed to "Dubine Drive".
20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and
grant their approval; comments will be forwarded upon receipt. Fire Rescue and Inspections
have completed their reviews and have no objection. E911 and Engineering comments have
been provided.
See comment responses here below.
VDOT Comment as follows:
1. Proposed access and storm water management easements missing on Open Space C
(sheet V5) and proposed storm water management missing on Lot 70 (sheets V5 and V6);
all of these are shown on the final approved road plans.
Comment addressed graphically Sheets V5& v6.
E911 Comment as follows:
"The applicant should contact this office with a list of three (3) proposed road names to replace
"Pine Knot Road" The word "Pine" has been used more than five times in named roads and is not
acceptable. Please contact this office with any questions."
Comment addressed with E911 approved street name "Dubine Drive"as shown on revised
plat.
Albemarle County Department of Community Development Page 4 of 4
Whittington Phases B2&B4 Subdivision Resubmittal May 5,2016
Plat related Engineering comment as follows:
"There appears to be a drainage easement missing between lots 75 & 76 per the approved road plans
SUB201400193.
Comment addressed graphically Sheet V5
ACSA Comment as follows:
"The applicant shall add a note to the cover page that water and sewer easements are to be centered on
the as-built location."
Comment addressed with Note 18, Cover Sheet(V1).
Zoning, as of the date of this letter, is still shown on County View as"Pending". Per correspondence
between this office and Zoning, they have no comments.
Respectfully Submitted,
i< ,----- s---•
Kristopher C. Winters, L.S.
ROUDABUSH GALE&ASSOCIATES,INC
Ellie Ray
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Thursday, April 14, 2016 8:59 AM
To: Ellie Ray
Cc: Bill Ledbetter
Subject: SUB201600057: Whittington Phase B2 & B4 - Final
Ellie,
I have reviewed the plat and have 1 comment. The applicant shall add a note to the cover page that water and sewer
easements are to be centered on the as -built location. Let me know if you have any questions.
Thanks
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434-977-4511 Ext. 116
(C) 434-981-5577
(F) 434-979-0698
AL
IRGII4Z�
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Phone 434-296-5832
Fax 434-972-4126
Memorandum
To: Kris Winters (kwinters@dominioneng.com )
From: Ellie Ray, PLA, Senior Planner
Division: Planning
Date: April 6, 2016
Subject: SUB 201600057 Whittington Subdivision Phase B2 & B4 - Final Subdivision Plat
The County of Albemarle Planning Division will approve the plat referenced above once the following comments
have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is
preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise
specified.]
Conditions of Preliminary Plat Approval (from approval letter dated 9/3/14):
1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance.
Final: See Final Plat comments below.
2. [14-302(A)3] Existing or platted streets. Provide the right-of-way width of State Route 631.
Final: Comment addressed.
3. [14-302(A)4&5] Private & public easements. Label all new easements as `proposed'.
Final: Comment addressed.
4. [14-302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated
dwelling footprint plus the area of setbacks/yards. While critical slope disturbance was addressed in the
proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5,
13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer.
Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated
above) and show that lots limited by stream buffer in fact provide this minimum required building site.
Final: Comment addressed.
5. [14-302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in
addition to the information shown on sheet 2.
Final: Comment addressed.
6. [14-302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note.
Final: Comment not addressed. Revise the Zoning note to indicate the correct zoning. The
previous phase plat had this note:
3. THESE PARCELS ,ARE ZONED PRO & EG - PLANNED RESOENI L DEYELO# Y:Nr
& ENTRANCE CORRIDOR. 261a M-tt WAS APPMED FOR THM PARCFiS.
THERE AIRE PRQI FE *SWQATED PATH THIS DENEL{I OT,
7. [14-302(8)8 & 18-19.9.1] Setbacks. The plat indicates that lots 30-36 will have a 35' rear setback as they
are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have
a 35' rear setback.
Final: Comment addressed.
8. [14-302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed
in accordance with the Albemarle County Water Protection Ordinance."
Final: Comment addressed.
9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and
Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document
should include maintenance responsibility for all open space and other privately owned improvements, and
must be reviewed and approved by the County Attorney's Office.
Final: Comment not addressed. The lots in Phases B2 and B4 must be added to the Covenants and
Restrictions of the homeowner's association; please submit a supplemental declaration covering
these phases for review and approval by the County Attorney's Office.
10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the
square footage calculations for each lot rather than the acreages.
Final: Comment addressed.
11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that
meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a
reduction of the number of approvable lots.
Final: Comment addressed with road plans.
12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter
within Open Space J and two trails leading from Open Space J and connecting to the larger trail system
within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open
Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in
Open Space E. These amenities should be provided as shown on the Application Plan; show the trail
system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a
performance bond will likely be required for the picnic shelter.
Final: Comment addressed; however, verification of posted bond for the current phases is required.
13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on
the plat. A landscaping plan that meets current regulations for screening must be provided, either with the
road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the
easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting
affected owners to this easement restriction on their property shall be stated on the Final Plat.
Final: Comment not fully addressed. The Covenants and Restrictions should include maintenance
of the required landscaping shown on the road plans. Please also include a note alerting affected
owners to this easement restriction as required by the proffer.
14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and/or
WPO Plans.
Final: Comment addressed with road plans.
15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering
provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match
the application plan.
Final: Comment addressed.
16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built
or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat
approval.
Final: Comment not fully addressed. Verification that all subdivision and WPO bonds for the
current phases have been posted is required.
Final Plat Comments:
17. [14-303(H)] Monuments. Provide the location and material of all permanent reference monuments.
Monuments found or installed prior to plat recordation may be referred to if they are permanent and
2
undisturbed. If any monument required by this chapter will be installed after recordation of the final plat, the
certification of the professional engineer or land surveyor shall so note.
18. [14-303(1)] Bearing and distance ties. Provide a definite bearing and distance tie between not less than two
(2) permanent monuments on the exterior boundary of the property and further tie to existing street
intersection where possible and reasonably convenient.
19. [14-303(M)] Street names. Refer to E911 comments for guidance on street names.
20. [Comment] This plat cannot be approved until VDOT and ACSA complete their reviews and grant their
approval; comments will be forwarded upon receipt. Fire Rescue and Inspections have completed their
reviews and have no objection. E911 and Engineering comments have been provided.
Please contact Ellie Ray in the Planning Division by using eray@albemarle.org or 434-296-5832 ext. 3432 for
further information.
Ellie Ray
From: John Anderson
Sent: Tuesday, April 26, 2016 4:31 PM
To: Bill Ledbetter
Cc: Max Greene; Ellie Ray
Subject: Planning Application Review for SUB201600057 Whittington Sub. Phases B2 & B4 -
Final.
The Review for the following application has been completed:
Application Number= SUB201600057
Reviewer= Max Greene
Review Status =See Recommendations
Completed Date =03/23/2016
Thanks for your patience.
Courtesy of M. Greene,please accept the following recommendations:
—Road bonds will' need to be requested and amounts posted and approved prior to final plat approval.
http://www.albemarlc.org/upload/images/forms_center/departments/Community_Development/forms/bond s/Bond_Rcquc
st to_Establish_a Bond.pdf
—There appears to be a drainage easement missing between lots 75 & 76 per the approved road plans SUB201400193.
1
Ellie Ray
From: Lisa Green
Sent: Monday, April 18, 2016 6:11 PM
To: Ana Kilmer; Ellie Ray
Subject: RE: site development performance bond for Whittington Phase B1 -Amenities
As Ellie and I confirmed the bond for Whittington that has been posted for 90k+ is for the entire project.
Lisa Green, CZA
Senior Code Compliance Officer
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville,VA 22902-4596
ph(434)296-5832 ext.3013
Igreen2 a(�albemarle.orq
From:Ana Kilmer
Sent: Monday,April 11, 2016 2:13 PM
To: Ellie Ray<eray@albemarle.org>; Lisa Green<Igreen2@albemarle.org>
Subject: RE: site development performance bond for Whittington Phase B1 -Amenities
Ellie:
I can only provide information on what I was told that needed bonding. Any other information needs to come from
Zoning.
Thank you
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
From: Ellie Ray
Sent: Monday,April 11,2016 2:08 PM
To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org>
Subject: RE: site development performance bond for Whittington Phase B1-Amenities
Has there been any further progress on this? My comments were due last week so I included a note about making sure
the bonds were posted, but I probably need to let them know where things stand.
Thanks!
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
1
Albemarle County Community Developmer
ph: 434.296.5832 x. 3432
From: Ellie Ray
Sent:Wednesday,April 06, 2016 10:51 AM
To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org>
Subject: RE: site development performance bond for Whittington Phase B1-Amenities
Yes, I see where the email says B1, but the spreadsheet includes 8 bridges(it seems like that covers the whole
development, not just B1),the scenic overlook(which is in B3) and over 12,000 linear feet of trail. To me, it seems like
this covers the whole development, but I wasn't involved in the bonding process so I'm not certain.
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From:Ana Kilmer
Sent:Tuesday,April 05,2016 1:54 PM
To: Ellie Ray<eray@albemarle.org>; Lisa Green<Igreen2@albemarle.org>
Subject: RE:site development performance bond for Whittington Phase B1-Amenities
The site bond covers Whittington phase B1-amenities.
Thanks
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville, VA 22902
434-296-5832
akilmer@albemarle.org
NOTE: I will be out of the office from 4/6/2016-4/8/2016. I will return to the office on 4/11/2016.
From: Ellie Ray
Sent:Tuesday,April 05, 2016 1:43 PM
To:Ana Kilmer<akilmer@albemarle.org>; Lisa Green<Igreen2@albemarle.org>
Subject: FW: site development performance bond for Whittington Phase B1-Amenities
Ana/Lisa,
Can either of you tell me if this bond covered all of Whittington or just Phase 131? The spreadsheet you all used is in the
attached email. I think it covers the whole subdivision and not just Phase B1, but since the email subject says B1 it has
me a little concerned. I'm currently reviewing Phases B2 and B4 so I'm trying to remember where this all stands.
Thanks!
E//ie Carter Ray, PLA,LEED GREEN AssoCIArt
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
2
From:Ana Kilmer
Sent:Wednesday,January 27,2016 5:36 PM
To:Jeremy W.Swink<SwinkJW@stanleymartin.com>;John Kessler<iakyells@aol.com>; Mike Myers
<mmyers@dominioneng.com>
Cc:Amelia McCulley<AMCCULLE@albemarle.org>; Lisa Green<Igreen2@albemarle.org>; Ron Higgins
<rhiggins@albemarle.org>; Ellie Ray<erav@albemarle.org>
Subject:site development performance bond for Whittington Phase B1-Amenities
The $90,300 site development performance bond for the project mentioned above has been posted and approved.
Thank you
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
3
`pro '
Ellie Ray
From: Alexander Morrison <amorrison@serviceauthority.org>
Sent: Thursday,April 14, 2016 8:59 AM
To: Ellie Ray
Cc: Bill Ledbetter
Subject: SUB201600057:Whittington Phase B2 & B4 - Final
Ellie,
I have reviewed the plat and have 1 comment.The applicant shall add a note to the cover page that water and sewer
easements are to be centered on the as-built location. Let me know if you have any questions.
Thanks.
Alexander J. Morrison, P.E.
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0)434-977-4511 Ext. 116
(C)434-981-5577
(F)434-979-0698
•
1
Ellie Ray
From: Ellie Ray
Sent: Wednesday,April 06, 2016 10:54 AM
To: 'kwinters@roudabush.com'
Subject: FW:SUB-2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat 04-01-16
Attachments: SUB-2016-00057 Whittington Subdivision Phase 82 & 84 Final Plat 04-01-16.pdf
Just remembered I had this email. VDOT comments attached.
Ellie Carter Ray, PLA,
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From:Gaituah, Kobina (VDOT) [mailto:Kobina.Gaituah@vdot.virginia.gov]
Sent: Friday,April 01,2016 3:30 PM
To: Ellie Ray<eray@albemarle.org>
Cc:Joel DeNunzio, P.E.<joel.denunzio@vdot.virginia.gov>
Subject:SUB-2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat 04-01-16
Hello Ellie,
Please see attached comments for the above SUB plat. Please reach out with any queries.
Regards,
Kobina Gaituah
Engineering Associate
VDOT Charlottesville Residency
701 VDOT Way
Charlottesville,VA 22911
Office:434-422-9859
Cell: 540-717-9466
E-mail: Kobina.GaituahPVDOT.Virginia.gov
1
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
Charles A. Kilpatrick, P.E.
Commissioner
April 01, 2016
Ms. Ellie Carter Ray
Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SUB -2016-00057 Whittington Subdivision Phase B2 & B4 Final Plat
Dear Ms. Ray:
We have reviewed the final plat for Whittington Subdivision Phase B2 & B4 dated 2/18/16 as
submitted by Roudabush, Gale & Associates, Inc. and offer the following comments:
1. Proposed access and storm water management easements missing on Open Space C
(sheet V5) and proposed storm water management missing on Lot 70 (sheets V5 and V6);
all of these are shown on the final approved road plans.
If you need further information concerning this project please do not hesitate to contact me at
434-422-9373.
Joel DeNunzio, P.E.
Resident Engineer
VDOT Charlottesville Residency