HomeMy WebLinkAboutWPO201500057 Bond Estimates 2017-01-13Avinity Estates WPO file number: WP0201500057 Erosion and Sediment Control Bond Estimate Item Item Number No. Unit Unit Cost Cost installed stablization (PS, TS) $5,000.00 $49,000.00 silt fence (SF) %acres ft $5.00 $12,500.00 safety fence (SAF) ft $5.00 $10,500.00 diversion (DID, FD, RWD) ft $13.00 $17,680.00 temporary slope drain (TSD) pipe length - =ft pipe diameter F'r-- E& in $0.00 $0.00 earthwork for trap/basin height of dam at toe ft 11 cut at high side 26 ft height of fill at face length of dam ft ft cut at face 15 ft length of cut 180 ft top width ft width of cut ft S131 (area above transition) 0 sf (area below transition) 690 sf (total width of dam) 0 ft (total width of cut) 98 ft (height below transition) 0 ft (depth below transitior 11 ft (area below transition) 0 sf (area above transition, 418 sf (total fill volume) 0.0 cy (total fill volume) 7386.7 cy length of spillway _ft (TOAL CY estimate) 7387 cy $13.00 $96,031.00 width of spillway ft (spillway stone tons) 38.8 tons $50.00 $1,940.00 structures for basin riser height ft riser diameterMin in (riser unit price) $70.00 $560.00 barrel lengthft base plate or fdn $200.00 $200 barrel diameter (barrel unit price) $50.00 $3,650.00 barrel collars $200.00 $0 baffle length ft $50.00 $0 earthwork for trap/basin height of dam at toe ft cut at high side ft height of fill at faceOft ft cut at face ft length of damft length of cut ft top width width of cut ft S132 (area above transition) 48 sf (area below transition) 126 sf (total width of dam) 20 ft (total width of cut) 58 ft (height below transition) 7 ft (depth below transitior 5 ft (area below transition) 21 sf (area above transition, 120 sf (total fill volume) 511.1 cy (total fill volume) 1731.1 cy length of spillway ft (TOAL CY estimate) 1901 cy $13.00 $24,713.00 width of spillway ft (spillway stone tons) 51.8 tons $50.00 $2,590.00 structures for basin riser height ft riser diameterMin in (riser unit price) $65.00 $650.00 barrel lengthft base plate or fdn $200.00 $200 barrel diameter (barrel unit price) $35.00 $2,800.00 barrel collars $200.00 $0 baffle length ft $50.00 $0 silt fence inlet protection (IP) $100.00 $1,000.00 stone inlet protection (IP) $200.00 $7,000.00 1 /13/2017 Avinity Estates WPO file number: WP0201500057 Erosion and Sediment Control Bond Estimate Item Item Number outlet protection (OP) length outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) width 8 It width 9 ft width 0 ft channel width 0 ft _ft length r 0.0 ft (tons) traps and basins 2 No. Unit Unit Cost Cost installed $288.00 $.00 $1,134134.00 $1,134134.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $5,900.00 $500.00 $0.00 cost sum $246,336.00 contingency $24,633.60 Total $270,970 1 /13/2017