Loading...
HomeMy WebLinkAboutWPO201500057 Bond Estimates 2017-01-13 (4)Avinity Estates WPO file number: WP0201500057 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") aggregate base or drainage stone earthwork for trap/basin IN ESC PORTION structures for basin in d ES-1,2 0 EC-1 in d ftL _.5ftW height of dam at toe ft cut at high sideoft ft height of fill at faceWit ft cut at face ft length of damft length of cutft top width width of cut (area above transition) 0 sf (area below transition, 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitior 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway _ft (TOAL CY estimate) 0 cy width of spillway ft (spillway stone tons) 0 tons riser height ft riser diameterMin in (riser unit price) $0.00 barrel lengthft base plate or Win - barrel diameter (barrel unit price) $0.00 barrel collars Mft baffle length trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth .ft length width (tons) survey and layout (price per 0.1 mi.) acres basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) -ft 0 No. Unit Unit Cost Cost installed momm9ft $13.00 $0.00 0 ea $500.00 $0.00 0 ea $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 476.9 ton $35.00 $16,690.63 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $275.00 $0.00 11,ea ea $50.00 $5,900.00 0 ea $5.00 $0.00 600 ft $5.00 $3,000.00 1200 cy $38.00 $45,600.00 2 ft $1,500.00 $3,000.00 160 ft $50.00 $8,000.00 $60.00 $0.00 $5,900.00 $500.00 ea $2,000.00 $4,000.00 ea $2,000.00 $4,000.00 ea $5,000.00 $10,000.00 $90,000.00 cost sum $196,590.63 contingency $19,659.06 1 /13/2017 Avinity Estates WPO file number: WPO201500057 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed Total $216,250 1 /13/2017