HomeMy WebLinkAboutSDP201600067 Action Letter 2017-01-18Christopher Perez
From: Christopher Perez
Sent: Wednesday, January 18, 2017 7:05 AM
To: 'Lindsay Bowman'
Cc: Daniel Hines; Brandy Booker; V152031@nf.bohlereng.com
Subject: RE: SDP-2016-00067 - Shops at Westfield — initial site plan
Lindsay,
RE: SDP-2016-00067 - Shops at Westfield — initial site plan
Sounds good. You have six months to resubmit to address the required changes before it is involuntarily withdrawn.
Below I offer the applicable section of the County Code. If you have any questions let me know. Thanks
32.4.2.4 DEFERRAL OF REVIEW,- WHENAPPLICATIONDEEMED WITHDRAWN The review of, and action on, an
initial site plan may be deferred, and an application for an initial site plan may be deemed withdrawn, as follows: a.
Request to defer by developer. A developer may request that review or action on its application for an initial site plan be
deferred for a specified period up to six (6) months. If during the deferral period the developer does not request the agent
to take action on the initial site plan as provided in section 32.4.2.5 within six (6) months after the date the deferral was
requested, the application shall be deemed to have been voluntarily withdrawn. b. Failure to submit revised plan. If a
developer fails to submit a revised initial site plan to address all of the requirements within six (6) months after the date of
the letter from the agent as provided in section 32.4.2.3, the application shall be deemed to have been voluntarily
withdrawn by the developer. c. Extension of deferral period or period to submit revised plan. Before the deferral period in
subsection (a) expires, the developer may request that the agent extend the period before the application is deemed to have
been voluntarily withdrawn. The request must be received by the agent before the deferral period expires. The agent may
grant one extension for a period determined to be reasonable, taking into consideration the size or nature of the proposed
development, the complexity of the review, and the laws in effect at the time the extension request is made.
Christopher P. Perez I Senior Planner
Department of Community Development ICounty of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3443
From: Lindsay Bowman [mailto:lbowman@bohlereng.com]
Sent: Tuesday, January 17, 2017 4:55 PM
To: Christopher Perez <cperez@albemarle.org>
Cc: Daniel Hines <DHines@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com>; V152031@nf.bohlereng.com
Subject: SDP-2016-00067 - Shops at Westfield
Good afternoon,
We would like to request a deferral of the above mentioned project.
Thank you,
Lindsay Bowman
BOHLER
F. N C; i N F. F R i N C.
28 Blackwell Park Lane, Suite 2011 Warrenton, VA 20186
P: 540-349-4500 1 Ibowman@bohlereng.com
www.BohIerEngineering.com
M
no
2016
BE97 PLACES 74 WORIK
Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients,
which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any
use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please
notify the sender via reply e-mail and immediately delete this e-mail from your system.