Loading...
HomeMy WebLinkAboutSDP201600053 Correspondence 2016-09-19Megan Yaniglos From: Christopher Perez Sent: Monday, September 19, 2016 3:56 PM To: Megan Yaniglos Subject: FW: Pre app follow-up Attachments: Dam Break Inundation Zones_SOP.DOC;TMP 76-46B Woodlands site plan Proposed.pdf Wow, what a set of pre app notes. If I remembered I was this deep in it I would have said something. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville, VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Tuesday, October 20,2015 10:25 AM To: 'jensurber@surberdev.com' <jensurber@surberdev.com> Cc: Margaret Maliszewski<MMaliszewski@albemarle.org>; Ron Higgins<rhiggins@albemarle.org>; 'Liz Russell' Irussell@monticello.org>; 'Plaster,Shelly(VDOT)'<Shelly.Plaster@vdot.virginia.gov> Subject: Pre app follow-up Jen, It was nice meeting with you and Brian yesterday to discuss your proposal located on TMP 07600-00-00-046B0. Those in attendance: VDOT(shelly Plaster), Ron Higgins of Zoning, Margaret Maliszewski of ARB, and myself-Christopher Perez of Planning. As promised, below I am providing Liz Russel of the Thomas Jefferson Foundation's contact information lrussell(cr,monticello.org She can help guide you on the roof colors that are acceptable as this proposal is located in the Monticello View Shed. Also let this email serve as a brief summary of some of the discussions from yesterday's pre app. 1)As discussed the proposal would come in as an Initial Site Plan and go through Site Review Committee(SRC)review. The submittal schedule can be found at: http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/forms/schedules/Site_Plan Subdivision_&_Tier II_Wireless_Schedule.pdf A link to the application is provided below. The fee has changed from that which is depicted on the application, it is truly 1,290 now. http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/forms/applications/Initial Site Plan Application_&_Checklist.pdf After the initial site plan is approved a Final Site Plan would be required to come in for final review, along with WPO plan and ARB plans. 2)ARB will need to review/approve this proposal prior to final site plan approval as it is in the Entrance Corridor(EC). If you have any questions about the ARB guidelines please contact Margaret Maliszewski, MMaliszewski0),,albemarle.org 434.296.5832 ext. 3276 3) Setbacks for this zoning are guided by Section 4.19(non infill). Please utilize this section of the ordinance when the New 406.0 building is being moved closer to the street. Also moving the building closer to the street also conforms to the Neighborhood Model Principles which we discussed/I provided you a handout on. 4)ACSA seemed to have a fairly substantial comment on the W/S capacity in that area and the need to upsize the sewer line downstream(see hardcopy email given to you at the meeting from ACSA staff). 5) Sidewalks will be expected to be provided along the frontage of the property. 6)VDOT—provided comments that the left and right inner section needs to be met for sight distance. locate the entrance directly across from"Old Lynchburg Place"or 200' offset. Turn Lane Warrants(Right and Left) R/W dedication is requested Commercial Entrance see appendix F. 7)Additionally it appears this development will be subject to Recreational Regulations per Section 4.16 of County Code. Please assure you review this section of code provided below and provide for such improvements on the initial site plan. http://www.albemarle.org/upload/images/Forms Center/Departments/County Attorney/Forms/Albemarle Count y Code Ch18 Zoning04 General Regulations.pdf 8)Portions of this site are within the State Dam Break Inundation Zone(DBIZ).Thus the applicant must show the DBIZ on the initial and final site plan. Attached is County staff internal guidance(Standard Operating Procedures) for properties located in this zone. Rob VanLier is the contact person at DCR that we'd forward the plans to if the proposal was determined to affect the DBIZ.From previous discussions with him they are only interested in reviewing proposed development"that falls within the DBIZ. The main concern is keeping new structures out of the DBIZ, so even a lot that falls within the DBIZ would not necessarily be of concern so long as the building site is out of the area.He said if there is ever any question about whether or not DCR should review something, feel free to send him an email at robert.vanlierL),dcr.va.gov. He's also pretty responsive by phone(434)244-0653.Thus when relocating the structure to address setbacks and Neighborhood Model Principles,assure proposed structures remain outside of the DBIZ. Map of property with DBIZ layer. http://gisweb.albemarle.org/Map/Viewer.aspx?state=954509198557 Below I offer the following sections of the ordinance-Chapter 18 (site plans), as it related to the property being partially in the DBIZ if it is determined by Rob VanLier that it's applicable. Dam break inundation zone:The term"dam break inundation zone"means the area downstream of a dam that would be inundated or otherwise directly affected by the failure of a dam that has been mapped as provided in Virginia Code§10.1-606.2.(Added 1-1-14) Development:The term"development,"as used in regulations pertaining to dam break inundation zones,means one or more lots developed or to be developed as a unit under single ownership or unified control which is to be used for any business or industrial purpose or is to contain three or more dwelling units,but does not include any lot or lots that will be principally devoted to agricultural production.(Added 1-1-14) 32.4.2.8 EFFECT AN APPROVED INITIAL SITE PLAN HAS ON CERTIFICATES OF APPROPRIATENESS AND EARLY OR MASS GRADING An approved initial site plan affects the following pending and future approvals: a.Issues pertaining to a certificate of appropriateness.An approved initial site plan that has complied with the architectural review board's requirements identified under section 32.4.2.2(b)shall be deemed to be consistent with the applicable design guidelines pertaining to the elements of sections 30.6.4(c)(2),(3)and(5)delineated in section 32.4.2.2(b)(1). b.Early or mass grading.On any site within a conventional or planned development district,regardless of whether the site is also within an entrance corridor overlay district,early or massgradingmaybeapprovedunderchapter17,subject to the following:(i)no grading permit,building permit,or other permit shall be issued and no land disturbing activity may begin until thedevelopersatisfiestherequirementsofsections17-414 through 17-717;provided that land disturbing activity may occur prior to approval of a stormwater management plan if the activity was previously covered under the general permit,as that term is defined in chapter 17,issued by the Commonwealth on July 1,2009;(ii)the developer has satisfied the conditions of approvalidentifiedbytheagentintheletterrequiredbysection32.4.2.5(d);and(iii)any site within a dam break inundation zone is subject to section 32.8.7. (This section reference appeals to be a trpo in the ordinance,seems this should he 32,8.6) 32.5.6 DAM BREAK INUNDATION ZONESIftheproposeddevelopmentislocatedwhollyor partially within a dam break inundation zone,the site review committee shall review the initial site plan as follows:(i)it shall review the dam break inundation zone map on file with the county for the affected impounding,structure;(ii)notify the dam owner about the proposed development;and(iii)within ten(10)days after the application is deemed complete,send a written request to the Virginia Department of Conservation and Recreation to make a determination of the potential impacts of the proposed development on the spillway design flood standards required for the dam as provided in Virginia Code§10.1-606.3. 32.6.4 DAM BREAK INUNDATION ZONES;ENGINEERING STUDY AND MAPPING INFORMATION If the proposed development is located wholly or partially within a dam break inundation zone,the developer shall submit with the final site plan the following: a.Engineering study.If the Virginia Department of Conservation and Recreation determines that a plan of development proposed by a developer would change the spillway design floodstandardsofanimpoundingstructurepursuanttoVirginiaCode§10.1-606.3,the developer shall submit an engineering study in conformance with the Virginia Soil and Water Conservation Board's standards under the Virginia Dam Safety Act in Virginia Code§10.1-604 et seq.and the Virginia Impounding Structure regulations in 4VAC50-20-10 et seq.The engineering study shall be reviewed and acted upon by the Virginia Department of Conservation and Recreation as provided in Virginia Code§15.2-2243.1. 2 NINO" wool b.Mapping information.The developer shall provide the dam owner,the county,and any other affected localities with information necessary for the dam owner to update the dam break inundation zone map to reflect any new development within the dam break inundation zone following completion of the development. Ord.13-18(7),12-4-13,effective 1-1-14;Ord.15-18(5),7-8-15) 32.8.6 DAM BREAK INUNDATION ZONES;PREREQUISITE TO DEVELOPMENT Following the completion of the engineering studies in accordance with Virginia Code§15.2-2243.1(A)and the determination by the Virginia Department of Conservation and Recreation that the developer's plan of development would change the spillway design flood standards of the impounding structure,before any development within a dam break inundation zone: a.Payment ler portion of necessary upgrades.The developer shall pay fifty(50)percent of the contract-ready costs for necessary upgrades to an impounding structure attributable to the development,together with an administrative fee not to exceed one(1)percent of the total amount of payment required or one thousand dollars($1,000.00),whichever is less.Any payments shall be made to the Darn Safety,Flood Prevention and Protection Assistance Fund held by the Virginia Resources Authority pursuant to Virginia Code§10.1-603.19:1."Necessary upgrades" do not include costs associated with routine operation,maintenance,and repair,nor do they include repairs or upgrades to the impounding structure not made necessary by the proposeddevelopment;or b.Redesign the development.The developer shall amend the site plan so that it does not alter the spillway design flood standards required of the impounding structure.Ord.13-18(7),12-4-13,effective 1-1-14) Christopher P. Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 Mclntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 3