HomeMy WebLinkAboutWPO201400031 VSMP - SWPPP 2014-10-21 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: WESTLAKE HILLS-PHASES I, II, III, & IV Terminus of Jonna Street & Westhall Drive CROZET, VA 22932 SWPPP Prepared For: LICKINGHOLE CREEK, LLC 2421 IVY ROAD CHARLOTTESVILLE, VA 22902 SWPPP Prepared By: COLLINS ENGINEERING, LLC 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 2202 434.293.3719 scott@collins-engineering.com SWPPP Preparation Date: 10/08/2014 Estimated Project Dates: Project Start Date: 07/01/2014 Project Completion Date: 12/01/2017 APPROVE by the Albemarle County Community I velo• -nt D- artment Date c 2 1 0 1 File e v"2.0 66 v r X0°31 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Contents SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES 1 1.1 Operator(s) /Subcontractor(s) 1 1.2 Stormwater Team 1 SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING 2 2.1 Project/Site Information 2 2.2 Discharge Information 2 2.3 Nature of the Construction Activity 5 2.4 Sequence and Estimated Dates of Construction Activities 8 2.5 Allowable Non-Stormwater Discharges 10 2.6 Site Maps 10 SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS 11 3.1 Endangered Species Protection 11 3.2 Historic Preservation 13 3.3 Safe Drinking Water Act Underground Injection Control Requirements 14 SECTION 4: EROSION AND SEDIMENT CONTROLS 15 4.1 Natural Buffers or Equivalent Sediment Controls 15 4.2 Perimeter Controls 16 4.3 Sediment Track-Out 16 4.4 Stockpiled Sediment or Soil 17 4.5 Minimize Dust 17 4.6 Minimize the Disturbance of Steep Slopes 18 4.7 Topsoil 18 4.8 Soil Compaction 18 4.9 Storm Drain Inlets 19 4.10 Constructed Stormwater Conveyance Channels 19 4.11 Sediment Basins 20 4.12 Chemical Treatment 21 4.13 Dewatering Practices 21 4.14 Other Stormwater Controls 22 4.15 Site Stabilization 22 SECTION 5: POLLUTION PREVENTION STANDARDS 23 5.1 Potential Sources of Pollution 23 5.2 Spill Prevention and Response 24 5.3 Fueling and Maintenance of Equipment or Vehicles 24 5.4 Washing of Equipment and Vehicles 24 5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes 24 5.6 Washing of Applicators and Containers used for Paint, Concrete or Other Materials 27 5.7 Fertilizers 27 5.8 Other Pollution Prevention Practices 27 SECTION 6: INSPECTION AND CORRECTIVE ACTION 28 6.1 Inspection Personnel and Procedures 28 6.2 Corrective Action 29 6.3 Delegation of Authority 29 SECTION 7:TRAINING 30 SECTION 8: CERTIFICATION AND NOTIFICATION 31 SWPPP APPENDICES 32 ii Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES 1.1 Operator(s) /Subcontractor(s) Operator(s): PIEDMONT NEIGHBORHOODS, LP JEREMY SWINK 200 GARRETT STREET, SUITE B CHARLOTTESVILLE, VA 22902 434.975.7445 SwinkJW@stanleymartin.com Subcontractor(s): Emergency 24-Hour Contact: JEREMY SWINK 571.309.5043 swinkjw@stanleymartin.com 1.2 Stormwater Team PROJECT MANAGER-SCOTT COLLINS, PE 434.987.1631 scott@collins-engineering.com 1 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING 2.1 Project/Site Information Project Name and Address Project/Site Name: WESTLAKE HILLS- PHASE II, III, & IV Project Street/Location:Terminus of Westhall Drive and Jonna Street City: CROZET State: VIRGINIA ZIP Code:22932 County or Similar Subdivision: ALBEMARLE COUNTY Project Latitude/Longitude Latitude: 38.060094 N Longitude: 78.685532 W Method for determining latitude/longitude: ❑ USGS topographic map (specify scale: ) ❑ EPA Web site ❑ GPS ® Other (please specify): GOOGLEMAPS Horizontal Reference Datum: ❑ NAD 27 ® NAD 83 or WGS 84 ❑ Unknown If you used a U.S.G.S topographic map,what was the scale? Additional Project Information Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? ❑ Yes ® No If yes, provide the name of the Indian tribe associated with the area of Indian country (including the name of Indian reservation if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property: If you are conducting earth-disturbing activities in response to a public emergency, document the cause of the public emergency (e.g., natural disaster, extreme flooding conditions), information substantiating its occurrence (e.g., state disaster declaration), and a description of the construction necessary to reestablish effective public services: Are you applying for permit coverage as a "federal operator" as defined in Appendix A of the 2012 CGP? El Yes ® No 2.2 Discharge Information Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? ❑ Yes ® No Are there any surface waters that are located within 50 feet of your construction disturbances? ® Yes ❑ NO 2 O 2j £ Lo -, i \ \ / cJ | °\ % 2 e | ® \ / � } / \ / § \ } a / 0i § ot SZ } 45 2f ` /3 ® CL G , 3 'n b 4 } = E ; / E / 1 > 0 / 7 32 > 2 Cl/ > } \ g . _ / } \ j } 0 r 0 E / * f = ® / / \ /\ \ i I- o g \ \ \ / / \ > / ® ) ® 2 « 0 '56C ® } 5\ $ L 7 0 kCD * o � \ 0 / � / / / / k / : / Q ® gam ® � � ° , � E 20 > ) ƒ ❑❑ \ \ \/ % 1 o o o t / i4- / \ E 2 23 E 22 ) ) @ o o 0 x w w 0 / e e ± i f3 o 0 0 ❑❑ b ® k / } + £ / £ / @co.2 5 e } - I © $ 6 2 / U : \ ° 2 1 E / ■ E • • 2 ® © / ° } } r _C 0 \ * - 2 ° ^ % ƒ ® � ! \ \ ¥ b { I o r i- \ } § \ o < \ � 0 / g E z 0 0 � { � 7 e <2 _\ r E4- - oQ 0 0 \ � 2 2 \ 4-... \ } x 0 0 0 ; . a I - -C « O 0 s g t Z Z Z t f / ■ & Ur0 ® 6m22EI00 U / g 1 n ¥ _ I Q .\ e § N. 0 O 0 0 ° j \ <1-11 g 2 % = / } O -0 ug . z zZ £ ku / Ix ¥ ! - tge § 2 ® ® \ ❑ ❑❑ % X26- \❑0❑ | ° 000z 2 ) 7 ® E c4 '5 � 3 0 E / \ E \ \ \ / .- / On zos � i7E2 I � ¥ - IZI 0 o 1a / \ 0 ■ E @ / $ Z -D - c) $ wM / $ .- wtO Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 2.3 Nature of the Construction Activity (WESTLAKE HILLS-PHASE I) General Description of Project The purpose of the land-disturbing activity is to create phase I of the Westlake Hills Subdivision. Phase 1 shall include clearing of existing vegetation and grading operations to construct 47 proposed lots, roadway, and utility improvements. Size of Construction Project Total property acreage: 139.93 acres (Phase 1 -46.09 acres total) Total disturbed area: 27.64 acres Maximum area disturbed at one time: 27.64 acres Construction Support Activities N/A 2.4 Sequence and Estimated Dates of Construction Activities Phase 1. Notify Albemarle County to schedule a pre-construction meeting as required. 2. No erosion control measures may be removed during the construction process without the approval from the inspector on the project. 3. Contractor shall install tree protection fencing before any site disturbance shall take place. Contractor shall use tree protection fencing to stake out the limits of clearing and disturbance on-site. Contractor shall ensure that trees to be saved are flagged along the limits of clearing to ensure the proposed tree preservation acreage is met. Disturbance outside of the limits of clearing is solely permitted for the installation of the greenway, and mitigation plantings. The proposed greenway and mitigation plantings shall be installed without any clearing of existing trees. 4. Install the paved construction entrance with wash rack as shown on the plans. Construction entrance to be installed where construction vehicle routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by (vehicular) tracking onto the paved surface. Where sediment is transported onto a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transporting to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. Install the wash rack uphill from proposed sediment trap #1. Acsa will determine the appropriate method of supplying the wash rack. Install the access from Westhall Drive and the parking and staging area with construction road stabilization. Construction road stabilization shall consist of 4"of 21a gravel in the parking area, and 8"of 21a gravel in any portion of the construction entrance which is unpaved. Parking and construction entrance areas shall be cleared of all vegetation, roots, or other objectionable materials before construction road stabilization is installed. A 2nd construction entrance shall be installed at Jonna Street following the same guidelines as above. Install the washrack uphill from sediment trap #3. 5 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 5. Install the initial construction measures as shown on the phase I erosion control plan sheets. This includes 3 sediment basins and 5 sediment traps. Silt fence, culvert inlet protection, and diversion berms shall also be installed at this time. Stabilization measures shall be applied to earthen structures such as dams, berms, and diversions immediately after installation. Measures intended to trap sediment shall be constructed as a first step with any land disturbance activity and shall be made functional before upslope land disturbance takes place. 6. Install any remaining erosion control items as shown on the phase I erosion control plan. • CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE: o ESTIMATED START DATE: 8/4/2014 o ESTIMATED END DATE: 7/24/2015 • INSTALLATION OF STORMWATER CONTROL: o ESTIMATED DATE: 9/31/2014 • APPLICATION OF STABILIZATION MEASURES: o ESTIMATED DATE: 9/31/2015 • STORMWATER CONTROLS WILL BE REMOVED: o ESTIMATED DATE: 5/31/2015 Phase II 7. Once all the erosion control items have been installed as shown on the phase I erosion control plan and the inspector has approved the erosion control measures, the contractor can install the two permanent diversion ditches and begin grading operations. 8. Install the temporary pipe from STR 38 to sediment basin #3. 9. Install the temporary pipe from STR F58 to sediment trap #3 10. Install sediment trap #6 11. Rough grade the site to the contours shown on the erosion control plan. 12. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 13. Install the construction measures as shown on the phase II erosion control plan sheets. Measures intended to trap sediment shall be constructed as a first step with any land disturbance activity and shall be made functional before upslope land disturbance takes place. 14. Install the utilities, curb and gutter, and roads. Convert sediment basin #2 to sediment trap #7 upon inspector approval to allow the sanitary sewer and cul-de-sac to be installed. Inlet protection shall be inspected after each rainfall event and repairs shall be made as needed. If the stone filter becomes clogged with sediment so that it no longer adequately performs its function, the stone must be pulled away and cleaned and/or replaced. Install any remaining erosion control items as shown on the phase II erosion control plan. 15. Once the inspector gives approval the contractor shall install the remaining storm piping to the existing pond forebay and remove the temporary pipe to sediment basin 3. 16. Once the inspector gives approval the contractor shall install the outfall from STR F58 and remove the temporary pipe to sediment trap 3. 17. Once phase ii of construction is complete, the site is stabilized and the inspector has given approval, the contractor can remove the erosion control measures. No item shall be removed unless the upstream areas are stabilized and the inspector gives permission. 6 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 18. Maintain all erosion control measures as specified in the Virginia Erosion and Sediment Control Handbook, removing only when approved by the local program administrator in accordance with the Virginia Erosion and Sediment Control Handbook. 19. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program administrator.Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. • CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE: o ESTIMATED START DATE: 10/24/2014 o ESTIMATED END DATE: 5/31/2015 • INSTALLATION OF STORMWATER CONTROL: o ESTIMATED DATE: 3/31/2015 • APPLICATION OF STABILIZATION MEASURES: o ESTIMATED DATE: 5/31/2015 • STORMWATER CONTROLS WILL BE REMOVED: o ESTIMATED DATE: 6/15/2015 2.5 Allowable Non-Stormwater Discharges List of Allowable Non-Stormwater Discharges Present at the Site Type of Allowable Non-Stormwater Discharge Likely to be Present at Your Site? Discharges from emergency fire-fighting activities ❑ YES X NO Fire hydrant flushings ❑ YES X NO Landscape irrigation ❑ YES X NO Waters used to wash vehicles and equipment X YES ❑ NO Water used to control dust X YES ❑ NO Potable water including uncontaminated water line flushings ❑ YES X NO Routine external building wash down ❑ YES X NO Pavement wash waters X YES ❑ NO Uncontaminated air conditioning or compressor condensate 0 YES X NO Uncontaminated, non-turbid discharges of ground water or spring water 0 YES X NO Foundation or footing drains ❑ YES X NO Construction dewatering water ❑ YES X NO 2.6 Site Maps SEE APPENDIX A. 7 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 2.3 Nature of the Construction Activity (WESTLAKE HILLS-PHASE II, 111, &IV) General Description of Project Provide a general description of the construction project: THE PURPOSE OF THIS LAND-DISTURBING ACTIVITY IS TO CREATE PHASE II, III, & IV OF THE WESTLAKE HILLS SUBDIVISION. Size of Construction Project What is the size of the property (in acres), the total area expected to be disturbed by the construction activities (in acres), and the maximum area expected to be disturbed at any one time? INSERT SIZE OF PROPERTY (in acres): 139.93 AC (PHASES II, III, & IV-93.84 AC) INSERT TOTAL AREA OF CONSTRUCTION DISTURBANCES (in acres): 51.14 AC INSERT MAXIMUM AREA TO BE DISTURBED AT ANY ONE TIME (in acres): 51.14 AC Construction Support Activities (only provide if applicable) Describe any construction support activities for the project (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) N/A 2.4 Sequence and Estimated Dates of Construction Activities Phase 1 1. Notify Albemarle County to schedule a pre-construction meeting as required. 2. No erosion control measures may be removed during the construction process without the approval from the inspector on the project. 3. Contractor shall install tree protection fencing before any site disturbance shall take place. Contractor shall use tree protection fencing to stake out the limits of clearing and disturbance on- site. Contractor shall ensure that trees to be saved are flagged along the limits of clearing. Mitigation plantings shall be installed without any clearing of existing trees. 4. Install the paved construction entrance with wash area as shown on the plans. Construction entrance to be installed where construction vehicle routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by (vehicular) tracking onto the paved surface. Where sediment is transported onto a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. Install the wash rack uphill from proposed sediment trap #1. ACSA will determine the appropriate method of supplying the wash rack. Parking and construction entrance areas shall be cleared of all vegetation, roots, or other objectionable materials before construction road stabilization is installed. 5. Install the initial construction measures as shown on the Phase I Erosion Control Plan sheets. This includes 5 sediment basins and 1 sediment trap, silt fence, and diversion dikes shall also be installed at this time. Stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions immediately after installation. Measures intended to trap sediment shall be constructed as a first step with any land disturbance activity and shall be made functional before upslope land disturbance takes place. 6. Install any remaining erosion control items as shown on the Phase I Erosion Control Plan. 8 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 7. Once all the erosion control items have been installed as shown on the Phase I Erosion Control Plan and the inspector has approved the erosion control measures, the contractor can begin grading operations. 8. Rough grade the site to the contours shown on the erosion control plan. 9. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. • CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE: o ESTIMATED START DATE: 11/01/2014 o ESTIMATED END DATE: 11/01/2015 • INSTALLATION OF STORMWATER CONTROL: o ESTIMATED DATE: 11/01/2014 • APPLICATION OF STABILIZATION MEASURES: o ESTIMATED DATE: 11/01/2014 • STORMWATER CONTROLS WILL BE REMOVED: o ESTIMATED DATE: 11/01/2015 Phase H 10. Install the construction measures shown on the Phase II Erosion Control Plan sheets. Measures intended to trap sediment shall be constructed as a first step with any land disturbance activity and shall be made functional before upslope land disturbance takes place. Remove sediment trap #1. 11. Install the utilities, curb and gutter, and roads. Inlet protection shall be inspected after each rainfall event and repairs shall be made as needed. If the stone filter becomes clogged with sediment so that it no longer adequately performs its function, the stone must be pulled away and cleaned and/or replaced. Install any remaining erosion control items as shown on the Phase II Erosion Control Plan. 12. Once phase II of construction is complete, the site is stabilized and the inspector has given approval, the contractor can remove the erosion control measures. No item shall be removed unless the upstream areas are stabilized and the inspector gives permission. 13. Maintain all erosion control measures as specified in the Virginia Erosion and Sediment Control Handbook, removing only when approved by the local program administrator in accordance with the Virginia Erosion and Sediment Control Handbook. 14. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures hall be permanently stabilized to prevent further erosion and sedimentation. • CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE: o ESTIMATED START DATE: 11/01/2014 o ESTIMATED END DATE: 11/01/2015 • INSTALLATION OF STORMWATER CONTROL: o ESTIMATED DATE: 11/01/2014 • APPLICATION OF STABILIZATION MEASURES: o ESTIMATED DATE: 11/01/2014 • STORMWATER CONTROLS WILL BE REMOVED: • ESTIMATED DATE: 11/01/2015 9 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, Ill, & IV 2.5 Allowable Non-Stormwater Discharges List of Allowable Non-Stormwater Discharges Present at the Site Type of Allowable Non-Stormwater Discharge Likely to be Present at Your Site? Discharges from emergency fire-fighting activities ❑ YES ® NO Fire hydrant flushings ❑ YES ® NO Landscape irrigation ❑ YES ® NO Waters used to wash vehicles and equipment ® YES ❑ NO Water used to control dust ® YES ❑ NO Potable water including uncontaminated water line flushings ❑ YES ® NO Routine external building wash down ❑ YES ® NO Pavement wash waters ® YES ❑ NO Uncontaminated air conditioning or compressor condensate ❑ YES ® NO Uncontaminated, non-turbid discharges of ground water or spring water ❑ YES ® NO Foundation or footing drains ❑ YES ® NO Construction dewatering water ❑ YES ® NO 2.6 Site Maps SEE APPENDIX A. 10 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, Ill, & IV SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS 3.1 Endangered Species Protection Eligibility Criterion Under which criterion listed in Appendix D are you eligible for coverage under this permit? ®A 111 ❑ C ❑ D ❑ E For reference purposes, the eligibility criteria listed in Appendix D are as follows: Criterion A. No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area"as defined in Appendix A of this permit. Criterion B. The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally- listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse of NPDES permit coverage in the other operator's certification. By certifying eligibility under this Criterion,you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C,you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in your NOI form. Criterion C. Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area,"and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification,you must include the following in your NOI: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with your NOI. Criterion D. Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally- designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Criterion E. Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat. The result of this consultation must be either: 11 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV i. a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or ii. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOL Criterion F. Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally-listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and your NOI. Supporting Documentation Provide documentation for the applicable eligibility criterion you select in Appendix D, as follows: For criterion A, indicate the basis for your determination that no federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's action area (as defined in Appendix A of the permit). Check the applicable source of information you' relied upon: ❑ Specific communication with staff of the U.S. Fish & Wildlife Service or National Marine Fisheries Service. INSERT DATE OF COMMUNICATION AND WHO YOU SPOKE WITH ❑ Publicly available species list. INSERT SPECIFIC DOCUMENT AND/OR WEBSITE RELIED UPON ❑ Other source: INSERT SPECIFIC SOURCE For criterion B, provide the Tracking Number from the other operator's notification of permit authorization: INSERT AUTHORIZATION TRACKING NUMBER FROM OTHER OPERATOR'S NOTIFICATION LETTER/EMAIL Provide a brief summary of the basis used by the other operator for selecting criterion A, B, C, D, E, or F: INSERT TEXT HERE For criterion C, provide the following information: ■ INSERT LIST OF FEDERALLY-LISTED SPECIES OR FEDERALLY-DESIGNATED CRITICAL HABITAT LOCATED IN YOUR ACTION AREA ■ INSERT DISTANCE BETWEEN YOUR SITE AND THE LISTED SPECIES OR CRITICAL HABITAT (in miles) Also, provide a brief summary of the basis used for determining that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat: INSERT TEXT HERE For criterion D, E, or F, attach copies of any letters or other communication between you and the U.S. Fish &Wildlife Service or National Marine Fisheries Service concluding consultation or coordination activities. INSERT COPIES OF LETTERS OR OTHER COMMUNICATIONS HERE 12 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 3.2 Historic Preservation Appendix E, Step 1 Do you plan on installing any of the following stormwater controls at your site? Check all that apply below, and proceed to Appendix E, Step 2. ® Dike ® Berm ❑ Catch Basin ® Pond ❑ Stormwater Conveyance Channel (e.g., ditch, trench, perimeter drain, swale, etc.) ® Culvert ❑ Other type of ground-disturbing stormwater control: Appendix E, Step 2 If you answered yes in Step 1, have prior surveys or evaluations conducted on the site already determined that historic properties do not exist, or that prior disturbances at the site have precluded the existence of historic properties? ® YES ❑ NO • If yes, no further documentation is required for Section 3.2 of the Template. • If no, proceed to Appendix E,Step 3. Appendix E,Step 3 If you answered no in Step 2, have you determined that your installation of subsurface earth- disturbing stormwater controls will have no effect on historic properties? ❑ YES 0 NO If yes, provide documentation of the basis for your determination. If no, proceed to Appendix E, Step 4. Appendix E, Step 4 If you answered no in Step 3, did the State Historic Preservation Officer (SHPO),Tribal Historic Preservation Office (THPO), or other tribal representative (whichever applies) respond to you within 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? 0 YES 0 NO If no, no further documentation is required for Section 3.2 of the Template. If yes, describe the nature of their response: O Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. O No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. O Other: 13 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV 3.3 Safe Drinking Water Act Underground Injection Control Requirements Do you plan to install any of the following controls? Check all that apply below. NONE ❑ Infiltration trenches (if stormwater is directed to any bored, drilled,driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) ❑ Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow ❑ Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system) If yes, INSERT COPIES OF LETTERS, EMAILS, OR OTHER COMMUNICATION BETWEEN YOU AND THE STATE AGENCY OR EPA REGIONAL OFFICE 14 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS -PHASES I, II, III, & IV SECTION 4: EROSION AND SEDIMENT CONTROLS 4.1 Natural Buffers or Equivalent Sediment Controls Buffer Compliance Alternatives Are there any surface waters within 50 feet of your project's earth disturbances? ® YES ❑ NO Check the compliance alternative that you have chosen: ® I will provide and maintain a 50-foot undisturbed natural buffer. ❑ I will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. ❑ It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore I will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer. ❑ I qualify for one of the exceptions in Part 2.1.2.1.e. (If you have checked this box, provide information on the applicable buffer exception that applies, below.) Buffer Exceptions Which of the following exceptions to the buffer requirements applies to your site? ❑ There is no discharge of stormwater to the surface water that is located 50 feet from my construction disturbances. ❑ No natural buffer exists due to preexisting development disturbances that occurred prior to the initiation of planning for this project. ❑ For a "linear project" (defined in Appendix A), site constraints (e.g., limited right-of-way) make it infeasible for me to meet any of the CGP Part 2.1.2.1.a compliance alternatives. ❑ The project qualifies as "small residential lot" construction (defined in Part 2.1.2.1.e.iv and in Appendix A). ❑ Buffer disturbances are authorized under a CWA Section 404 permit. ❑ Buffer disturbances will occur for the construction of a water-dependent structure or water access area (e.g., pier, boat ramp, and trail). 15 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 4.2 Perimeter Controls General ■ As a first step, the contractor shall install silt fencing and diversion berm per the approved ESC plan. Specific Perimeter Controls Perimeter Control # 1 Perimeter Control Description ■ Silt fence to be installed at the perimeter of site disturbance area as indicated on the approved ESC plan. ■ See detail on sheet 29, ESC Narration and Details from approved plan set for Phase I. ■ See detail on sheet 10, ESC Narrative and Details from approved plan set for Phases 11, 111, & IV. Installation ■ Approximate date of installation for Phase !: 8/4/2014-8/18/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ All silt fence barriers will be checked regularly for undermining or deterioration of the fabric and repaired as required. Sediment shall be removed when the level of sediment disposition reaches half way to the top of the barrier. Perimeter Control # 2 Perimeter Control Description ■ Diversion berms to be installed at the perimeter of site disturbance area as indicated on the approved ESC plan. ■ See detail on sheet 29, ESC Narrative and Details from approved plan set for Phase I. ■ See detail on sheet 10, ESC Narrative and Details from approved plan set for Phases II, Ill, & IV. Installation ■ Approximate date of installation for Phase I: 8/5/2014-8/19/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ All diversion berms will be checked regularly for deterioration and repaired as required. Sediment shall be removed when the level of sediment disposition reaches half way to the top of the diversion. 4.3 Sediment Track-Out General ■ A paved construction entrance with wash rack shall be installed per the approved plans. Specific Track-Out Controls Track-Out Control # 1 Track-Out Control Description 16 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV ■ A paved construction entrance with wash rack shall be installed per the approved plans where construction vehicles intersect public roads. Sediment shall be removed from the roads by shoveling or sweeping and transporting to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. ■ See detail on sheet 29, ESC Narrative and Details from approved plan set for Phase I. ■ See detail on sheet 10, ESC Narrative and Details from approved plan set for Phases 11, 111, & IV. Installation ■ Approximate date of installation for Phase I: 4/31/2015 ■ Approximate date of installation for Phases II, III, & IV: 11/01/2014 Maintenance Requirements ■ Where sediment has been tracked-out from the project site onto the surface of off-site streets, other paved areas, and sidewalks, the contractor must remove the deposited sediment by the end of the same work day in which the track-out occurs or by the end of the next work day if track-out occurs on a non-work day. The contractor must remove the track-out by sweeping, shoveling, or vacuuming these surfaces, or by using other similarly effective means of sediment removal. The contractor is prohibited from hosing or sweeping tracked-out sediment into any stormwater conveyance (unless it is connected to a sediment basin, sediment trap, or similarly effective control), storm drain inlet, or surface water. 4.4 Stockpiled Sediment or Soil General ■ Phase I:The proposed stockpile shall be surrounded by a silt fence. A diversion berm shall direct any runoff to sediment trap #2. ■ Phases II, Ill, & IV: The two proposed stockpiles shall be surrounded by silt fence. A diversion berm shall direction any runoff to sediment basins #4 & 5. Specific Stockpile Controls Stockpile Control # 1 Stockpiled Sediment/Soil Control Description ■ Silt fence shall surround the stockpiles. A diversion berm shall direct runoff to a sediment trap or basin. ■ See detail on sheet 29, ESC Narrative and Details from approved plan set for Phase I. ■ See detail on sheet 10, ESC Narrative and Details from approved plan set for Phases II, Ill, & IV. Installation ■ Approximate date of installation: 10/24/2014 ■ Approximate date of installation: 11/01/2014 Maintenance Requirements ■ Do not hose down or sweep soil or sediment accumulated on pavement or other impervious surfaces into any stormwater conveyance (unless connected to a sediment basin,sediment trap, or similarly effective control), storm drain inlet, or surface water. 4.5 Minimize Dust General ■ Dust control shall be applied to disturbed areas to reduce surface and air movement of dust. 17 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Specific Dust,Controls Dust Control # 1 Dust Control Description ■ Dust control adhesives shall be applied to disturbed areas. ■ See detail (Table 3.39-A) on the ESC Narrative and Detail sheet. Installation ■ Approximate date of installation for Phase I: 8/4/2014-4/31/2015 ■ Approximate date of installation for Phases 11, 111, & IV: 11/01/2014 Maintenance Requirements ■ Dust control shall be reapplied if it becomes ineffective from disturbance, wind, etc. 4.6 Minimize the Disturbance of Steep Slopes General ■ Steep slopes are largely avoided by the construction activity limits of disturbance. Stabilization measures shall be applied to earthen structures such as dams, dikes, and diversion immediately after installation. Specific Steep Slope Controls Steep Slope Control # 1 Steep Slope Control Description ■ Soil stabilization blankets and matting shall be applied to earthen structures. ■ See detail on ESC Narrative and Details sheet from approved plan set. Installation ■ Approximate date of installation: 5/31/2015 ■ Approximate date of installation: 11/01/2014 Maintenance Requirements ■ Soil blankets and matting should be inspected periodically following installation and after rainstorms to check for erosion and undermining. Reinstall material after repairing damage to the slope or ditch if washout or breakage occurs. 4.7 Topsoil General ■ Temporary stockpile areas will be maintained from topsoil that will be stripped from areas to be grades and stored for later spreading. Specific Topsoil Controls Topsoil Control # 1 Topsoil Control Description ■ Topsoil will be stockpiled and surrounded with silt fencing. ■ See silt fencing detail on ESC Narrative and Details sheet from approved plan set. 18 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV Installation • Approximate date of installation for Phase I:9/15/2014 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • All silt fence barriers will be checked regularly for undermining or deterioration of the fabric and repaired as required. Sediment shall be removed when the level of sediment disposition reaches half way to the top of the barrier. 4.8 Soil Compaction General • Where final vegetative stabilization (permanent seeding) will occur, vehicles will be restricted from crossing. If disturbance to final vegetative stabilization occurs, the slopes shall be replanted. Specific Soil Compaction Controls Soil Compaction Control # 1 Soil Compaction Control Description • Soil shall be compacted and final seeding shall be applied. Once final seeding is applied, no vehicular traffic may disturb slopes. • See permanent seeding detail on ESC Narrative and Details sheet from approved plan set. Installation • Approximate date of installation for Phase I: 9/1/2014-4/31/2014 ■ Approximate date of installation for Phases II, III, & IV: 11/01/2014 Maintenance Requirements ■ Seeded areas shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as necessary. 4.9 Storm Drain Inlets General • Inlet protection shall be each existing and proposed storm drain inlet. Specific Storm Drain Inlet Controls Storm Drain Inlet Control # 1 Storm Drain Inlet Control Description • Block and gravel curb inlet sediment filters shall be applied at each existing and proposed storm drain inlet. • See detail on ESC Narrative and Details sheet from approved plan set. Installation ■ Approximate date of installation for Phase I: 5/31/2015 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. Where there is evidence of sediment 19 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV accumulation adjacent to the inlet protection measure, you must remove the deposited sediment by the end of the same work day in which it is found or by the end of the following work day if removal by the same work day is not feasible. 4.10 Constructed Stormwater Conveyance Channels General ■ N/A 4.11 Sediment Basins General ■ Phase I:Three sediment basins will be installed. Riser outlet structures with dewatering orifices have been designed to withdraw water ■ Phases II, Ill, & IV: Five sediment basins and one sediment trap will be installed. Riser outlet structures with dewatering orifices have been designed to withdraw water. Specific Sediment Basin Controls Sediment Basin Control # 1 Sediment Basin Control Description ■ Sediment basins shall be installed per the approved plans. ■ See Erosion & Sediment Control Calculations, sheet 34 for complete design details for Phase I. ■ See Erosion & Sediment Control Calculations, sheet 13 & 14 for complete design details for Phases 11, 111, & IV. Installation ■ Approximate date of installation for Phase !: 9/31/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ Keep in effective operating condition and remove accumulated sediment to maintain at least 1/2 of the design capacity of the sediment basin at all times. 20 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES 1, II, III, & IV 4.12 Chemical Treatment Soil Types List all the soil types (including soil types expected to be found in fill material) that are expected to be exposed during construction and that will be discharged to locations where chemicals will be applied: ■ 81B-THURMONT LOAM ■ 7B-BRADDOCK CLAY LOAM ■ 37C3 & 37D3-HAYESVILLE CLAY LOAM ■ 76-RIVERVIEW LOAM ■ 16-CHEWACLA SILT LOAM ■ 36B & 36C-HAYESVILLE LOAM ■ 77-RIVERVIEW-CHEWACLA COMPLEX Treatment Chemicals List all treatment chemicals that will be used at the site and explain why these chemicals are suited to the soil characteristics: FLOCCULANT LOGS WILL BE USED IF NEEDED. Describe the dosage of all treatment chemicals you will use at the site or the methodology you will use to determine dosage: LOGS WILL BE SET WITHIN SEDIMENT POUNDS PER MANUFACTURERS INSTRUCTIONS. Provide information from any applicable Material Safety Data Sheets (MSDS): N/A Describe how each of the chemicals will stored: CHEMICALS WILL BE STORED WITHIN THE CONTRACTORS VEHICLES. Include references to applicable state or local requirements affecting the use of treatment chemicals, and copies of applicable manufacturer's specifications regarding the use of your specific treatment chemicals and/or chemical treatment systems: N/A Special Controls for Cationic Treatment Chemicals (if applicable) If you have been authorized by your applicable Regional Office to use cationic treatment chemicals, include the official EPA authorization letter or other communication, and identify the specific controls and implementation procedures you are required to implement to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards: Schematic Drawings of Stormwater Controls/Chemical Treatment Systems Provide schematic drawings of any chemically-enhanced stormwater controls or chemical treatment systems to be used for application of treatment chemicals: N/A Training Describe the training that personnel who handle and apply chemicals have received prior to permit coverage, or will receive prior to the use of treatment chemicals: N/A 4.13 Dewatering Practices General ■ N/A 21 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 4.14 Other Stormwater Controls General • NO OTHER STORMWATER CONTROLS ARE PROPOSED AT THIS TIME. 4.15 Site Stabilization Site Stabilization Practice (only use this if you are not located in an arid, semi-arid, or drought-stricken area) ® Vegetative ❑ Non-Vegetative Temporary ❑ Permanent Description of Practice • Temporary seeding shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than 30 days. • See table 3.31-b on ESC Narrative and Details sheet of the approved plan set. Installation • Approximate date of installation for Phase I: 9/15/2014 • Approximate completion date for Phase I: 4/31/2015 ■ Approximate date of installation for Phases II, III, & IV: 11/01/2014 • Approximate completion date for Phases II, III, & IV: 11/01/2015 Maintenance Requirements • All seeded areas shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as needed. Site Stabilization Practice (only use this if you are located in an arid, semi-arid, or drought-stricken area) ® Vegetative ❑ Non-Vegetative ❑ Temporary ® Permanent Description of Practice • Permanent stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. • See permanent seeding table on ESC Narrative and Details sheet of the approved plan set. Installation • Approximate date of installation for Phase I: 5/15/2014 • Approximate completion date for Phase I: 5/31/2015 • Approximate date of installation for Phases II, III, & IV: 11/01/2014 ■ Approximate completion date for Phases II, III, & IV: 11/01/2015 Maintenance Requirements • All seeded areas shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as needed. 22 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV SECTION 5: POLLUTION PREVENTION STANDARDS 5.1 Potential Sources of Pollution Construction Site Pollutants Pollutants or Pollutant Location on Site Pollutant-GeneratingActivityConstituents (that could be discharged if (or reference SWPPP site map exposed to stormwater) where this is shown) Paving operations Asphalt Roadways 23 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 5.2 Spill Prevention and Response Spills will be immediately and promptly cleaned up by the contractor. Regular checks of equipment on site shall occur and any pollutants shall be stored properly to prevent spills. 5.3 Fueling and Maintenance of Equipment or Vehicles General ■ Equipment maintenance and fueling shall be conducted appropriately with spill kits present and full in areas where a liquid spill could be expected. Specific Pollution Prevention Practices Pollution Prevention Practice # I Description ■ Spill kits shall be available at areas of refueling. ■ See plan sheet for area of spill kits. Installation ■ Approximate date of installation for Phase I:8/11/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ Check to see that spill kits are maintained and full. 5.4 Washing of Equipment and Vehicles General ■ Equipment washing shall occur on the wash rack,which drains to approved sediment traps. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description ■ Wash racks shall be installed in an appropriate method determined by ACSA. ■ See plan sheet for area of wash racks. Installation ■ Approximate date of installation for Phase I:8/4/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ Wash racks shall be maintained to ensure drainage is conveyed to an approved sediment trap. 24 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 5.5 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes 5.5.1 Building Products (Note: Examples include asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures.) General ■ Construction products, materials, and wastes shall be stored in the construction staging area. Disposal shall be carried offsite to an approved disposal facility. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description • Proper storage and handling. Installation • Approximate date of installation for Phase I: 8/4/2014 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • Construction staging area shall be maintained with stone to ensure proper storage. 5.5.2 Pesticides, Herbicides, Insecticides, Fertilizers, and Landscape Materials General • These materials will be clearly labeled, and proper handling shall be ensured. Spill kits shall be maintained. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description • Proper storage and handling. Installation • Approximate date of installation for Phase I: 8/4/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • Spill kits shall be maintained. 5.5.3 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals General • These materials will be clearly labeled, and proper handling shall be ensured. Spill kits shall be maintained. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description 25 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV ■ Proper storage and handling. Installation ■ Approximate date of installation for Phase I:8/4/2014 ■ Approximate date of installation for Phases 11, 111, & IV: 11/01/2014 Maintenance Requirements ■ Spill kits shall be maintained. 5.5.4 Hazardous or Toxic Waste (Note: Examples include paints, solvents, petroleum-based products, wood preservatives, additives, curing compounds, acids.) General ■ These materials will be clearly labeled, and proper handling shall be ensured. Spill kits shall be maintained. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description ■ Proper storage and handling. Installation ■ Approximate date of installation for Phase I: 8/4/2014 ■ Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements ■ Spill kits shall be maintained. 5.5.5 Construction and Domestic Waste (Note: Examples include packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, styrofoam, concrete, and other trash or building materials.) General ■ Construction and domestic waste shall be regularly picked up, clean work spaces shall be maintained, regular sweeping of paved areas shall occur. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description ■ Regular pick up of waste and disposal at an appropriate facility. Installation ■ Approximate date of installation for Phase !: 8/4/2014 ■ Approximate date of installation for Phases II, III, & IV: 11/01/2014 Maintenance Requirements ■ Clean work spaces shall be maintained and waste collected for disposal. 26 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, Ill, & IV 5.5.6 Sanitary Waste General • Sanitary waste shall be contained in porta-johns. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description • Sanitary waste shall be restricted to porta-johns. Installation • Approximate date of installation for Phase I:8/4/2014 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • Porta-johns shall be regularly emptied by an approved outside vendor. 5.6 Washing of Applicators and Containers used for Paint, Concrete or Other Materials General • A concrete washout area will be set up adjacent to a sediment trap. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description • Concrete washout shall be limited to areas uphill from sediment traps and basins. Installation • Approximate date of installation for Phase I: 8/4/2014 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 Maintenance Requirements • Contractor shall ensure washout is conveyed to an approved sediment trap or basin. 5.7 Fertilizers General • Fertilizer shall be applied in accordance with the approved product labeling. Specific Pollution Prevention Practices Pollution Prevention Practice # 1 Description • Fertilizer shall be applied in accordance with the approved product labeling. Installation • Approximate date of installation for Phase I: 8/4/2014 • Approximate date of installation for Phases II, Ill, & IV: 11/01/2014 27 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Maintenance Requirements ■ Fertilizer shall be applied on a dry day when runoff of the area of interest is not anticipated. 5.8 Other Pollution Prevention Practices General ■ No other pollution prevention practices are proposed at this time. SECTION 6: INSPECTION AND CORRECTIVE ACTION 6.1 Inspection Personnel and Procedures Personnel Responsible for Inspections Scott Collins, PE Note: All personnel conducting inspections must be considered a "qualified person." CGP Part 4.1.1 clarifies that a "qualified person" is a person knowledgeable in the principles and practices of erosion and sediment controls and pollution prevention, who possesses the skills to assess conditions at the construction site that could impact stormwater quality, and the skills to assess the effectiveness of any stormwater controls selected and installed to meet the requirements of this permit. Inspection Schedule Specific Inspection Frequency Inspections shall occur once every 14 calendar days and within 24 hours of the occurrence of a storm event of 0.25 inches or greater. Storm event information will be obtained from a weather station representative of the project location. The total rainfall measured for business days with 0.25 inches of rain of greater shall be recorded. Rain Gauge Location (if applicable) See location of rain gauge on exhibit sheets. Reductions in Inspection Frequency (if applicable) • For the reduction in inspections resulting from stabilization: N/A (Note: It is likely that you will not be able to include this in your initial SWPPP. If you qualify for this reduction (see CGP Part 4.1.4.1), you will need to modify your SWPPP to include this information.) • For the reduction in inspections in arid,semi-arid, or drought-stricken areas: N/A • For reduction in inspections due to frozen conditions: N/A Inspection Report Forms FORMS ARE IN APPENDIX D. 28 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV 6.2 Corrective Action Personnel Responsible for Corrective Actions Scott Collins, PC Corrective Action Forms FORMS ARE IN APPENDIX E. 6.3 Delegation of Authority Duly Authorized Representative(s) or Position(s): COLLINS ENGINEERING, LLC SCOTT COLLINS, PE PROJECT MANAGER 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 scott@collins-engineering.com 29 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, Ill, & IV SECTION 7:TRAINING Table 7-1: Documentation for Completion of Training Name Date Training Completed 30 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, Ill, & IV SECTION 8: CERTIFICATION AND NOTIFICATION I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: L Title: 131,4, .47(--- Signature: Date: i i0 2 Vi 31 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, Ill, & IV SWPPP APPENDICES Attach the following documentation to the SWPPP: Appendix A-Site Maps Appendix B-Copy of 2012 CGP Appendix C-NOI and EPA Authorization Email Appendix D-Inspection Form Appendix E-Corrective Action Form Appendix F-SWPPP Amendment Log Appendix G-Subcontractor Certifications/Agreements Appendix H-Grading and Stabilization Activities Log Appendix I-Training Log Appendix J-Delegation of Authority Appendix K-Endangered Species Documentation Appendix L-Historic Preservation Documentation 32 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, Ill, & IV ~~-~_^ ~_-_____'___-~�_^_-___-__�_~�___~__~_~--~__-__-_~ Appendix A-Site Maps m m` t` - ..^..,..1 o $ s a a c I i i > m c a ag i g, k gn e i ia $ � y 2 8 i zz [ M w R F m - amR2gg A ; A $ $ ? 0 R P m ' C W A $ " 2 A O �nN nl 2 'aA' 2 '' gm x ;NI sm� 3" z z as aro N�s2 = $ z m c Atli i o A .o0 0 o v WA ac 0 o 0,. o yo . r a m i ' a � ° S' x m 2 g Fl o$ i _$ m a g 1 H n1 i o h� :as `d m `1 "WI ' P.§ n ,q Az GR• " '" > .a� X n czifn $ F m $o .£� 1+PE A o '88 2nnr < Ii ! • $ F o ' 2m m,$ o ,,, -- "'"N m n, n oz ri 2n o $g $ > r;', Zo PI � gm� ':oo � 0000' a n $ani, > • n m F 4- o$� o 2 m n: go g m g; >,zi 6 y A6 o Pw " Eg$ i 0, eo ti n > nz �� o+z n n A 6 O N8 o $a> on s a o'i2 R -aa o g ti i a m�m 2 $i2 am a ag + 1n 4ttx�� R o2 v>,yy"� 1P $ a :yip $ ? d° ;4u n roti g N. „ R O C e <An V 6 4 x D'll 0 wP g,-2. 0^ C < - .. R C N b(mi, 'n o e A<t 2 $N ; s �mm aa��' R $ am . k n2 R n g $ Q i kn,r o$ m z o �o mgA k m N> o a $m '� a i S a �8a > ' �' ns '0, _ 0 8n & $` a ym = a 1 o o l $ I$ a y z2 n h '0 m cn N A a i� a '2 i�x v o n f i C �A m "t m> '''.1 F' I Aa $ m i m ' n R 0, ti k� 3 -$ P$ u na 56 - o ' c ilea $g n m g2 > a$ A o9 u LTi 'na g is m'3 0 P 1', 'r ho n arc m 0 0 0 Ea ,0 a x� sQFQ i ' aA P I 2 n �r� z cg a r=., o ' o gz 12 2 in lEin1 i /' `i Aill o ��I— 3 0 0 70 X 3 '1oR: *. , IMMO D .I 3 3 T L- gam- D D �^ h-V) 1 0 II, /' -,4 D X 1 ! ~ \ 1 w - DN-Ib^ r ` \ I��,V RI m W I�VV o�Cn�n > rn - iD--ID ITI / C S /V1 1 ,\„. 403/4411 1 m 0 H_eC3 D Z rn c11 muCDD ITl •-- .. EM 'i 3 O noxa � v (n n ,4', m of gOOO1* O >r 71 rm. � ,, ; �m =ou, z(7 Cr— 0 r . , I D =o n 1T1 v F O z m C D ITT % r z m 0 m- 1 v / �- i ,/ v -1 O � J 41 z x m C rn =n = m D O II ,� �� / O n m O cn 1� H \ < -, :=,,C 7° n , a o C —� \\\c�g0 � o H f c / �o� r m m �Pm �� $fin t 3 O Z ril \ / D r D v 0 _- � CD � m oPOI m m m J z GI rO O Immill I o o A n ZPaul 7J rn VI 0 I i 1 1 H°O x<av o 8fdYi3Y6 -i mAm`a-- 3 -m z3m9gi� �'. W2-',.! .a n� N z ,Z; Y d; Tl-- �, $N ya°O °z° - I ,',...1.1 moz'" zn tZ"1 D �� yyym n3'O i g o p ' ° z o<n Zo o- g C 2:y mvri 3 ; xip Dn ... �2 �� m � Q � � � Ff mZ � t �° N p o - FJ 3 m i 5 vuo> �. v sail COLLINS ENGINEERINGREVISIONS MTE REVISION DESCRIPTION DATE REVISION DESCRIPTION o�C o 1/29/1{ INITIAL SUBMITTAL y, 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 .a A H o a PROJECTWESTLAKE HILLS PHASE I WPO AMENDMENT �2'"* vtNi.A\c 6 i N SHEET TITLE COVER SHEET CIXLNS Ervf,NEERING a e ueeE for y p p ae wnotaoever,IncluaHe,tut not limitee to conetrvcton.EiE g, ne/afc cmrtrucuan ato g snout the e p esa vri<ten consent of COLLINS ErvcIrvEERiNc. m-ImD0xDOr-1,,T-,ii ,',� 1 45 I, 9 I xM$ m 1 -tp Z I \ E 8 •HPJi / z D t _ ,,. \ 4 vo0 m ! \ 5omv70 ,_ \ sf Tl-NDO_=p Zn / �� 8 ,, qq / N: I a. A OT,-.2.Z-0,,220,-<90C-1 3ZDCIin - --"' 8 6 / (..gg•. ` � ; aomo ,w,9. n So m8" gu ; V 1 a: A .0 j— 4.. �cayTpmm070cCo01 oQs� - rl,1 PA; \ / s' 'm- nm 5� -n°- 1 8�fi .ss � \ / w� I It, � 1m00m mz-{mai ot.cnn 'm 8 0J 8 'I E� 1\ i 1 g•.\w� \'.� .// / '� 370000/.0<0.. m� 3 -1i g I N t \\ w ; m v aJ_70 m Iw m to o-{ 'V v 'V / �§ . ''2-1("7000c--°':'"0°,22 T7l�IZn70�D DZ< ` I VA I . \ A• / q. A I Y Z-1C7000 00 0 !^ ii ss 5 Dp3om m0<mmm V)", ., I..I. as \. \ .. y 46 \ ) ,: 70vTn= zm070pD�3y a'I�„ g8. '11 l'' v� -� w ��`. s om m3�70cocm VD Wcm" I 6 %/ I % %/ �. \`oa370mw<>zOCCN 8 zZ Pr, `�'`4G oo. o ;. ��• N / .,q�, .,;�,: i 6.. vm°D<O �c�9I :IIm t E'q 'Y$ I o I / t J. i 9' z70AZvro ow 70<mz g8 :0,-,Rt re � ,/ / 8 G . • o0 ) T^ ZxCOA70-1 { Ew$ o s I i. - x & GJomzmm0-0 S-ZDoo< -mM ,/- I s ,', II r _ / v'Y • •i m a - N g Z a w< D r m k 4 - ' ' °zmN �i�m 18 1 ii E "4 . 4 4 mA ' xODz P `\ 0'0.' zO N <m o Z ' 6 g4 wN ' I �' 8 , " Za07C 0 3m § ay I .30.10 \ y V 5 8 1 1 1 a gxo i / , / aN �` Ai " V ' \g % „-- 8 Y/ t as 9 ae u g0- pa , $m m / 11 m > l' RS ME •\ °*a+. X !§ 8' ,1 \ Ni 8 dNr a. .. a. N• T,� . � ts 1 D t .\ wg as wz �,,\ �\ \, 4 • 7CHLINE THIS SHEET , 0 . ()Xi ,, ,\, , . ,, , A % .✓, M'' 1 ,i. y _ O. ON a_r o \ -:,'. \.. \,\i; °5$8 0 ,,,,,,:,.:;, P Q F y''�p " 8 m l 6 w 9 o / \ I r a , e:5 \i '/ L a n N I ,'may, t"y'81\, r ri e" A c M O o \ \ "\ \ .yip ii °� \\ "\ " °1 % �� jj p§ ? ,41 V'4, F P, \ fib° % `��,,'+� • Il 3 �A - -. -ams , •.\J' \ $ Ko� YQ \ 41414ti .-r--'---------A:r:\: i.,/,/ ',,,„...00,0 ii ; 11 k LI kil '''' '.\ \ ' .-)1 m 5, ,41;t' ,:i„,,, .,•1- ',.\'‘,..• '',..----•••:- i z 0§ f , ., ' . . . : i • , 1g 9 m 53 , / /6 �� i y 449'444,s $ to/ c °��a m _ ° µ•41 / woo move • 8 ,..„,m ,8• Z CP Cr] r),?c,. c 84.,, i.g /.1 , ,.1 F, \ 4 4 4 °> aItI ;,: Z MD 811 yy ' g i '' [ ,,.i :1 . g 1 D m r , \ , �.� - e e8 c t Esr^ 5 ' \ 1 s S o R \ �" s \ / r5 0Neau 1 '. u WY m 0 u \ \ / Q> po n 70 \•,, `.` `, `. k� U' t u // %�'_ —--ice — 9 R to \ �. v 8 8 ,�, -'�� �I • s4 6 x \ \ Etmq 0 , m°' � a n 8 \ \ ,Qat' \� q gol0 8= , dW rt ilti: 0,.,E I '"\ HLINE THIS SHEET / •\ 9 ' 4 i , , , 1:!i t;""' COLLINS ENGINEERING DATE REVISION DESCRIPTION DATE REVISION DESCRIPTION A COro 4/14/14 INITIAL SUBMITTAL y' •`G 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT <S 8/26/14 REVISED PER COUNTY COMMENT v PROJECT -10/14/34 REVISED Po0.SIGNATURE SET m F 40 N „s o m WESTLAKE HILLS PHASE II, III, &IV WPO PLAN ' R V/'VA\c g 54 SHEETTE EXISTING CONDITIONS .�a„o•.,..,���,.w,e�, o,�m„ea,o�o,,.�„o.e,d s. �a�;.`o,,. ,o „o N ,�o,,n, P ,..„ea„�o��oLL�N�LN°NtLN�N� _ ,.d,o, ,P,Pa,• T IBJ I J �u 'Nm z'TI�" 4- 'e 5 oN" qi /l UNm 'z !" mNv_ -Ail.!5 102 fir' r2,1 ...'a't .> 1 �/ gxm Cr $ '$ E `sw� � Sw-r$x� � E� w € g=a 1 I I ♦ O 8 O g ' w8m g g $s$ ®xx � ® .= w ® � � nDnm ti2m° tuc ww fe mm ww mZ00 O�^0220a� V 6e; $ F 8.e S ii,i4� F.1/, d: a !, 0 1'x 4 Z Z p y, II s' a s 9 8 �>z g g$ ,� g a� 98 8 w 9 p A�ym� 2 �� 1 i----4--k`r �- � �� g- �- � Ft w _ � oo�mDAO aq, l- - T g2 vapor G V17� x x x x x x Z"AA==D= 2022 flJfl !4fl = p I� 1 \i II\ I Z 2 DyZDpy=£ Coram 1 �- `I � N f �ZapA s ZONa y Im q / ym�^ 9-Nay °ems \ -„1 - � I � `yy .,,..-.-�,,,,,ti.. mGpp ZmouOZi y�00 --1----4, I IN � _;° >£T> £Da,€ 1.1-1- 1--'1 �`,.�I\7 2 - / , ' �4 ' Dp Os R-1 I,', '�mg m .Ee♦ ♦ :r7 -moi "'°°z z ,n wK *`` Ama ` I r ;' 4 ©- �IMd 60;15=-707,. Q„'F£ -1�+i 1 �' I�Qe �' � f OO�-ZOGy, pp!nm2 II It: ------ 8'j II \ 1 o2y �. 1 a Acm 1, 7 7`,I m€gip �'- m o�D, Pg! \T�� poi o /'/ � \\ m -�4zilk, -,,,, _ mn° a p 'Dc a '”--:-:...,:---/41/ -7 i,_e,,:b= Fl\It \\ Z(5, 1., :-,,T--I 1 .... _...,...::---- ,.__...n_....._..._,0..'_-,:A--'-1- \\-1:::- N V \ ". r 2<' r"; '..*mm r� :.1-- 41:1\\ \ \\' ! 1 t t ,.------..-- --%-1"-:-..t.-----___.—....-0---'' . V -0../ '- :1 Ig10.11 ' ) - _-- \ -- 1 3 / i IP .W. 6_„..011 . ® r 1--J I .." ,/ --%''''''-,0' ---\-- 8,- ' L it/ ; 111.116 fISW'411ei No m __ \, _____-- \ Esi :77...e 1,..,..,..---. 011...illOgt,0010 - \ m;� T I /If// Dm 'o ® \t\ 'r+ i 4N10 �� 1 e T . o 71 "t *� a �` \ 4, \ y L j i 0 i if(1 16 \ ) ALEA:41111C-k....061,,,Ww- IL' g° '.,p- _ % \\i;I:,,'e r1, lg 7 ' Iti , N '`,, ii.e1V*TOr 2°El „,g6 r'' ?1,; \ \` ' 44'\ V1 o z { is l 8 rn N k-- N W.'' \ Vi444014 f21 y pi ,e o o w,- m \ � j I Q1 40'I\\\: / ;,,' '' / :ft,M Wr A#SNI go �k � \ " ♦I 1vv m moo . /r 8 m�- / (fq , -,,,,,-, ,,,;, ` / �A ‘, z;,\gNd v\ \8 , ! ; 1 / . q ti -?, , ,„. , g\ 1! mo � 0'I m m A g;p r� 11 ,i it l'11111% I — o m$ ss ;D -,il :::_l, m x . Im 1t, . . 11 m gg,o 1 \ oo ��11' 'ems -——® — f�v Ny �� m°a�0� � r e N� I ao mo 1 1 y .tet _• Pi A ®�- Li.�: ‘:,'\- , \ No 1 i '1 - \ e 9 1 49 7`i age•. �m _� � � 8h µ — I e Ale „� 1/0 .m®r \ \ T I 00 m m� ---1 --- g% 1 • 6 R m 41kL -. ' I. ro 4 "46* 201 / /� 2; ° " m / / i - • ti,_ \ MA C L 'E DL OWING SHEET �a IR ®� 6111111111 lir kilo,., j% ii I 1 0 141 k$ ! � • � ',PI o IIIIII;° k ''' . ‘,, N n / \ � 1 �Y\N SBg,e acg voit / / N0� : ' ,ic ' . itik _.__..„....„,,,, ,.... „..„/ ..,,. ,„„„„................,,,,, 16i...A ,,,b;g / ?!--1. Atir t Gr. Ar........: ,t4,4„, 40)..-. ----_,11 - AiwitawarAwsvo , 41 ; 1; ) r° � � 4040. �/ � o40 • LA/ ." `i mtIA -mixtimmammaNNE 3 4 4,4444k., 00-4441I,f0Atifitilitna,,,,,,,mmiita '• 41/4 a a Hi I.oo F in a'b / : � A y -:-,\ .`,./1, i__ i , \ ---,----,.. — -40.1117*4 -0- viummr_ , 1\4' ft 1%1\1:. °g E 11.11111. --- 1 ' 4 clipi o, VQo \ \ \ *tietS,4ietil \'-s ' ' \ '--- /% i ip.6 ktiliarb 44 REVISIONS 4E131 COLLINS ENGINEERING DATE REVISION DESCRIPTION DATE REVISION DESCRIPTION 0,0 4 C i 4/14/14 INITIAL SUBMITTAL 6 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT P . S PROTECT 8/26/14 REVISED PER COUNTY COMMENT m .p,2 O wa ti g WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 1"14/14 REVISED FOR SIGNATURE SET ; T 0 , CU n o VINl 9c 8 N SHEET TOLE GRADING PLAN&OVERLOT GRADING PLAN e the eaduelw p many of CDLLINS ENgNEERING an •uaeE la y ppTpaa wM1oteoevn,incluaiw,but nol IimlleG to conatrucbon,bbeinq,me/or conatrucuon ato g itM1out Ue exp eea mitten cpnwnt ai CMDNS ENGINEERING. 111pWrio‘ 1r�� • A qri r.3 ;181 \ \- I Offr 9 irril k ., "M 1! h/ ill le7.7'‘A\ 19 r N - / . ep �, �.` 'tip i I. ° 1 I �1 /, , i sal'' `�a8 __ \\ \\ \,\ mo e . 11 rel ft* ,"„'-1 Amo �I ; _ __ 4 , aE i 11,\ y I 1 \\ i.9 333 F N A ,/ ��( rN ® �\ �, , � pro, \,._:asp® o° — - 09 Waes�► tesso � 2, \ anti �� \ go e`\ � 0-��� . . . ....,,�.► \ • / �. Ogr(Tj' . gm �� ` _- �'� I �o . 8/.—A"II�" —. — \ / aDA �1 C\ / / — N� _ m / i goy T -� „ ii,fir ,� 8•® _ A!41 \ o J � Nm N A III .. (�. oN& p \ s / / / j 1r ° 4 N !,-:, 4°11. 1 , 1 0® rW4!t_y ATC LI :- - I.,USSHET --'�__ n i400,41, ,),L wl �� '' HSA ,,.... L____ _ ____„.. /# „„/ o ,\,...- ,.. r. lie a N..:__ —\11 > g o os rz_- : T,-.. l ,., ,w. ______- 'Es .�- . , 2A. g�� � S � �.. � NO Tom' T�.. /�o :#$.'*\,,‘"i2'7't -� / 1Ifi I O Lir � - ”- T� •� _ / -. .A l/ oa�� ��•© Vie/ 7 ./ i rN ©0 hit rimitr,.........44.‘� �am .&N s��/ \i4 —eJ e��/ 11T byea,,,,,, „,1/4....,,,,,,, �µ �...„ cm TW ‘ itsiwWwAgastawritozw_mwsimi ,,aw- rim,..„,, ,,,,. ,,,,,- I --- ,r„, AdinD, ...,,,,,...,117-40.4.4:AL .2 A I 1 — - — II 'AVMS" P.:4-k/4,w44. ilttst&O,,esti flimamot") witelerN -. W 44,itt 4;o0410%,- Er, i / / T'o A �4 "- { . i/ 2 b,IkePA148* ID “ ---•------'' 11 1 20 t?'-- 8*. ‘141 ,,, ,.„ JJJ/ Nlimpj ------t' / 8 \ ia i _ I. / +� 'ig r0 y:.. — ��\� \iD Nomiro‘ Viell...,' ,� _ gg j r ---- \ 7-----:- w i irer/Avirf r „, \ \ _ ,4.,\ ,,--... \ a w y e o ° 1 gl n W$ -!-C," m m€A %, 6 41 \\ N T v qq • . ' a ';‘,,:g c 0 l�! JV [.] g DN. -0. \ , m Oy �� ` � yA a -. u a 8 '' : a -- .e .1000 4 a /� Yom'' I,\,:\ \ � \v • �,iI( ..r� , e -.11,,,„ Vv 2,_ m a r \ \ 7 \ g xA To { ./ _ ,\ \ cw 2�� / gym F A� ®� o m x - m � m �� *jamv — - 2P 1 + \ \\\E* �iBi w b m m; 1 `I 90 * /K / J / ge ,\\,, m `,. op y 1 1 Tw !/ \ I --0-I O D, q Damao{ - IW - Nr \ - \ - 1 -. \ \ /- ' 2NE 2.. S } i2 ilKT s =" iw 1 ;7.,,n W., /1 Hg a` ' "Hi — ' / � o /, /1 � � � � �=s � - � � oxO - kgsrg ig=s � F v o---: _ 0 gg� o m t _ _ -----____\ , .,., -- ° , / / K C = COLLINS ENGINEERING REVISIONS DALE REVISION DESCRIPTION DATE REVISION DESCRIPTION 0,0 COM,yO 4/14/14 INITIAL SUBMITTAL 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNT/COMMENT 0 0 x 8/26/14 REVISED PER COUNTY COMMENT 1 a' I,, o 6 DPRI� WESTLAKE HILLS PHASE II, III, &IV WPO PLAN °/'°"° REVISED PoRSIGNA SIGNATURE SE b Pq m z �`3 VIM a N SNEETTTTLF GRADING PLAN&OVERLOT GRADING PLAN am o I / ./ / / uy D 'aG-IDsv-.4.ger s v D__N'_// \ \;zi\j/ ai d �� P' m iz: _._ I a o i D 1$$&1111113 s ig = o o nA \ \ as o�q ��� itiIIj y\ 1. 111E `) . ffi- i' m $ 8 U a " 80 / I a$v i 1 1 cs$ti / q ' 8 y _ CI N m ''' / 111 // /� go &A *o 0Rggoee � o dol -_.-� _ �■/ \ 41114111 • gas , Z" $ 6 pV 's t an/' • gg "a $ R v m s woo \ Mpg E ' t1. ,4, ///Fi g-g q.:5 :, y a" / / / $ am i /"/_ e : ,..-------- aa I I a �� v- a at 3'8 qt : aa♦♦♦ \ ♦ 1 ;gym & a� ♦ ♦•♦ Do • ‘ f ■ ♦♦ 1 • \ t m f<;! • 4 ------ _._/ f ♦ ♦•♦♦• 00• \\ ♦• ♦ \\ \ \\ ;� i • o _ • 0000♦ ' •• \ • • 0.000 ,/ • i \ \ \ g E i • •♦ �°\ A o-_% r'' •■• �� • r• A A \ ■ 0 2W o � ,� • A \ \ ■// „odd • `t - mz"ox ♦• I ♦�-� \\\ \ Id' Tln n D51 �+ 4 i \. 1 ■• �Zny ZK. ( ♦• 1 ♦ - v,`. ASO-IZ" • da \.- \•♦ \\ \ , 0 "m ` '� ■♦♦♦ v♦ n )i • � \\\ ♦♦■• ♦ • • • • r r • +••• r • •nznn: • f• \ • kJ ✓ ♦� � • 0:Y 1♦ ♦• • \ • •■ �•• ♦ ) �••••+ ••••••♦♦ \• \ \\ L\ • ■ ♦ \ —- 1 •••�/ 22ND /•♦♦ • • ' 09 agzy : •• .... \\\ ` _ V • ♦ -.� � �•• \ azi of£ : .•• • A�.\ �\ 1 ■ -� s r / ♦♦ 1 .a_0 0 ■ \ ice' i • \ • le ♦, I V $moi' • ■ \ • ■ 1/ 0000 ♦•• i• � mzooF^. ` I ----- \ / _. `r,.-'' \ / ••• . ♦♦ - „ i,,',04-11- •• ) 1 4. • \Y \ / ^ • \ • a' � •• •• f il i l \ ♦ • • • a 0 0 \ ■ \ £ \iii \ 6 • m FL' o a -gag.1 g 01» o ..� \i. ■ `-•-'.21i a eT£ £ D s�• .. ), \�\::+-, \ \'i t. 1, \ \o\ !•• . - / 000••• F ' e S.”s � i 3 'asoi v c � o =' a A . 1, c - 1•■■ 00• / . x' , ■ 00 / i 8i ` 1 is V1 / i C = COLLINS ENGINEERINGREVISIONS CO DATE REVISION OE6[RIPRON GATE REVISION DESCRIPTION 4/14/14 INITIAL SUBMITTAL e 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 =ECM REVISED PER COUNTY COMMENT i ,,a PROJECT 8/16/14 _ REVISED PER COUNTY COMMENT O 10/14/t9 REVISED FOR SIGNATURE SET m 1 0, II o m WESTLAKE HILLS PHASE II, III, &IV WPO PLAN ----- yn"'eR n/Nt�.a�° N°SHEET TITLE STORMWATER MANAGEMENT PLAN(PRE-DEVELOPMENT) :Z:0.w,. 7,.d,o 1;,"C„o'. R 7.,`Z.,=,t0 9 ,°„ .,R,....t: caL° L .V.',.ro e"ed "R Ras= \ tom. ... _ _ ^ $ iip ei ai> A\ �•''' i i 17. °S 8 v.^ R °I 6/w.. 3 T\ \ "'��r' .+... � L W L n A '� �R Vie, 5 �V: o ` \ \ \ r' aaaaavvaat� a _ a° F ,� ..... a - ' aiaai , d[111F 3 i it 00000 g t... 8 d \ s� 6 _ .,,, GF'6 E E F F GE F F F Is a , �a.� t a / 1( 1 1i1) 11 € 1111€11t a 3 wg9� y /� F., iJ!- '`�isRS+ � .� s'gs. ^e.v^�. d 3 / / P ! F , 8$118 I PartA I \ xM: H, --- --- -VI F F I V a r --___------ W88 &� 1 P W9r L''"p"aytI caa°:asmsa.Tss waasacxa:sa:tga 4 a \ /x r ;s $eNg�W MA i t'1 F \\ I /�11- i_ 'f6 Ea YS8:8L8. 8r8ki;98 8F C8 2111 / //r_' a qs -''''-'0,1A .-- oil D8.. s � f r " eee. .N.W,.^ � 6'.d ii ji II, ■ ♦ a p IIHII X "IR pa' gg■ ``:'• A 1 1 ` _;e1R • i 3E38$ 3 i ��I 3 yozaz" • ♦♦♦♦ - \ A..5// 111 i - _ 2 e a�'�- / ij'Y Et)0�\�� •""♦ • ZI E aa• P : P s Y1 P Y �, r, ao 4\ _ / 'l AA \ r e ;rift ca1;! a o _ „,....,-,..,..--,--2-',-.,--- go , s„"a ���Ii00���/� `. \ , H - * 's u e i i ..a=8.S i/' / 8� ar ►.�.�%:`010 0° !�/%`1 a4 \\\ 11 ; \\ 1 n tviAl 'P ) 408 of 11011-1-1.100,''' :,” 3 1 AO 4 "7- • ..-- \\ \ _ vo •J '5,1- �o . ag q zDom,'.r,-,n- \ \ , �� �� A Re i\ � �Dn i. c. 1 au ® ,- Vi ��� \ oz Y \• \ 8 Pa"i6i ;Eltli:s ii i� !I ,v ill° a.t/ 1/.c R-. i'5", '\ = �� \ _ orf : •\\�, � �O ,/,,,)t T �p� '` ,1\ \_ \\.\ . , s 8�y81 Qa+g;• F a9 Iiio qll i s" $ G a ■ , ,,,,,i( \ ,,,v,.. frt./i 7.,,,„ � L bl zwo � � �.r.sc:+raw•rm. � w N w u V• s. s � 4. so„� vs '. msa+aaR... 1',�. •� � �a�R��; �S�ae;�� �� s� l ist - 6 R '■ o:. , .'`, I�Sd-1eR4�•'I �.., • — • ♦ \\•� d;zz''y Baia a"F R' q • � \ E R a ttl*-11 1 4-Viall-•••111_,.,-. .'''.1 .'P-- \ \ ss /♦ ♦ �N�. I rr R x 1 ♦♦ ♦♦ • ael ■■�.•• illd- ,--,:\ yelp , ss, 15 \its\ ik.•*11*•***•••or••4,41,4,og ) R. P P P 16‘ \‘, i um. iiiii• ____— \Its __....„_}" c/`\,,,, 6,,,,,,4,..,""•016,\ \ \ ,,, ... 100040.11, dh\,..,. \\\\\N:::':::: —.....,:!! , ..., i17.,1 i , ,, , ..1/ ,,,, , 1\ 14 k-1 11\111 I 171 idillt \ \,..,r''' , / r- V , .. ( %PI Sktillik. iijig‘lit 7/ ! ••• \ - - :0 s it WI it-1 ) ,,,, LI,,,.. )„,11.4.1.......4,,, ,,,./. . , v, qV ' ,Y, =:;:r ♦ ‘00110111......09". ii, •rZ �� a4 P P -N -A,A ` ! ax y aP D g ♦•` �l'��®4G41.410. Is °ft •'..�. � ar R''.e .4 _ R R e ' _ q �y La ��� 1"� , ■ &";6;e!'"'" a=��Ps 4 _ 4 w � es_ —�-* l a^. za 111 .. 1411( -,...1 li F.d \ \ •• \, �` ?� >o*2 4if 10/4 01 rititt �• a=w b00 ,,, :2 g '... Z @ g }', „^,aa as ix„r32z, :',,ii°, Vt. */ '' •O :1 T 4y as - \4¢ll7,1 �� - -n O \ h 'i' N 974 -1 O O O I I 1,14,e4.''', I \ \ ' *-N Icallit a 4 oo^ i' \ \\(,,,..,\-- ',,,,,,,,_6 ,_,,,)j)\'\I 'li' ,,,,,,g ktitimakiiii0001 8.:., \ • -- -,3 --\ ,s- V.." .,-.:.7., .• k /7 - Pr' iii ♦ __---- - aa? -$1;r$. /// VA\4� _ V v , / CE COLLINS ENGINEERING REVISIONS DATE REVISION DESCRIPTION DATE REVISION DESCRIPf10N odd 1/11/31 INTTIpL SUBMITTAL m , 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/11 REVISED PER COUNTY COMMENT p = PROJECT B/26/14 REVISED PER COUNTY COMMENT n o O „ o a WESTLAKE HILLS PHASE II, III, &IV WPO PLAN °"°"° REVISE0FORSIGNRIORESET = \c 6 p N SNEET TITIF STORMWATER MANAGEMENT PLAN(POST-DEVELOPMENT) "..1.,.V., ro.,.e.,.. m,.d,....7r.=ea 9.,deo,,o„,. , 9 ,.a,..,....,.n..—.,GOWNS EN°NEENNG. � Zx 1(.... \ Zm3 JE II \ %, : '-'7 *ZOF %,' ! 1 ,61 1 ‘ , ,, OZn a : t S's—zm n co „ , \ \ ,\ ,: Li it, .,rtoy;1 L :,,.,1 i riz./.. $72: , . i ,.//:,,,,'2 ;.:; ::,::, ) ) >z: \4,r' '‘, ' 'n'P 4 41 ♦ t w{i� t !i I e{ �/ / o 11 rrir 3 iiii 1 T 'Ai \,,, . s i \\, § , �I Ill 99 ‘,\ s 1 k fN iii f �V iA d s �{ 1 011 C71 I R. , . ,...../ F,,-. i (lit Y , E - v� .. t ':11 `� mel, � ►'� p .'i Li pyo= ire � � € 5 i I II i �a m 'jf;liii._ fi _,,1,711,1,_.,._1 III 1111 y5 0 4/'r p. f 1 $i NNSN2 Ayitl Rq3 ¢ 1111.1 I' �� �� \\\ \ SS p SSS z GS Il ; I'M d[ I� I III- \ EF -\\H-A\\ O V r§ l` b NN ug;za I II D 2 I1li: o E E \ �' P $ i� i �� III=- 1 m mag , / d "=7„tet ;� IlI �� .i II u9.R ir 'am-r�m I. ,a .I #$ gg� I / SSI p. I k\ } ''�! / \ �\ / a gmya5F, i as y' € I _ , m agn� % p I OII m 22 6459 �� $ pyo - iV 4J QY y x E 59900 i 3, 50 I '11'\(3, 4z , i . `q1 H m m - ma "i' 1 z I II ` "q + � 4,• 0 ol xF r y ti. m=3 i �€ I II 5146 y e m .+I 0 g 8 i "'; r4 c y m � i�$ / xmo � I II da s ♦♦ °: kla. 8< ;n mmo � 4 88r m p D g5 gp z mpo,+ j omc4 S $ 48ye L ?g Wil EE.�', I & I o "F” P�i so., 4 N y /i I /J 1 II I 559.25? O j � ie PZ Trgz s `iI ;dl ff° azs g03 'm 54,.9 / III n¢ F. 11 -R AD ' y N w �...y <:: I _ : ov s 3 in I : I ::: ! s t o► i e°sq l3 } 0mv "'v �1'4eJ u '' SI200 0p / 8 may c yN, ~ m N 8 t 0;;,-.y o PI" ? F 5"' Ng; y gro g p = m F.ii p , A 558 -ozmy I $ TP,9, s P8 �. 3 � al Iii m 8 e 11 R L $ X009g" MI P a t it .-1 5 N a Z � - L _ g x FNF SFa ooa. ?R'g $%�&$' 321 2. ga g W W - ,Y8S1 4 b" Y� syl. $1 3x s eg Vi 903 o r _ 5120 xy w F. y §- VII AA fR%= " z,A . d I. �.g" a M ssz.e � �z �.�+ as0 8 N g g$= 1 8- m ,-, I ,.w 3 ii, m ' - -I 8 rL _ WW - 22 t $} g9 $ 4%q3o s $'" m 3131 YM ,did 1 / 011 1 "'E1p d12.4 ! d 0 b"..L'i — — I/ -. �` Z Egg , Ay o g 1 Pt $o -fig<g 51-4°311. " gg a'= @ HIP mu gg N .d 88 g N 0 z, ; QQ \ Q_ W `� F� F// 1 g,i ra $ § q'g' i"8281;; 8-.9 iS 3 0 N ~ l o Orr *0m y Z S 'i'c; AP $$33 55 Ca 8 a m _ a � did 3' 8_ a 6 813. c '�� / Z�m a 2< s .,„ g Q s 9�s o m-n D / 79 to a " Id!! 3y ,s k7 3 c ,`Q 1(1 Z r l 7.1=4 -'16, 'D'4 _�s3s O r $�F � - 9 d 1, .1i s to" $ t 4/4 R R jRa• A ca i 31182 Z ,g ai ill Jsj 3x 1 1.141!1!-21 2 28n f* � N r 8 :sE § ?8886<5_i d8a ?aa Oa =;-,,,. agip,si f all a' $ a . " _ as _" . yx a a a "b z .x ,..,g-,,,' Ag.x R g a -q1 fill s >e-_< { v _ D n z F g '� ° P----"' 17 �' O n£D0 . as 8 1 g 3t. 3 " t - 8 i i g3 g . F 8 '' 5 11 4 .$$81111111 W $ gm n `��' S `��' o 2 e J i 9 11,411W11!a5P .R3°if x E 319 "-R'3 F „ - . �a$R' 11$ € �o cNq 1 g't: g5 m °G � 11 3E- g m ; .'F E2 d 5 ppg _. ,ii$` Y 8 F �2 pC ao@ F ' $x i ® $ F �' q. ' e = i^S g `�a a 'd 354 .5 �,'i � X3'1,' 3 $ ,' 1. r �R ':o 3�+ } `5tr �° "n_x $ xE� p ✓'� 'a x ° A r grxa E A _ u 3y g-- " d " i . ". $ f $i"' 3 ggv 1 889888 9 v S $ agffi@4 5dd $- e 8888 a & m � s �'1 _,-2 a s s ' €g ��"° pp 5 m _K -s - 5"" M m 8 X a� 0-i , i ` a 82 oai t 1 -g o f , c § 9aa9ss8e♦ o ---I Ni. " I I ` 5 $ao ` I ° IoI I r # a NV 4, .211, TO , yp s Z 'i r ' a o o s A _ ii D.4/ 2 p 3c; �'''^X- s aj ,'$e,4 � O „„,i° 'a_ d p i a a s $ xa f �C °1 § e? p ry e �' x' § A -p s 8 8 gyp@8{d' s$"4/'g C� _ °BAR°fl a m °9 4 8 ,N-, >� g $ d 0* W'” F 4/ •k °Uffg"iil c 1 iiig�iai !gill G i ;_; , - 1 _ m T 111 11 I i Ell r. 5 Ve K. 6' ?�3 ^9 4x � 333 �^s y£ Y G � Ig'�0 III ^f. •d O(- q; _1--1 1 4 -- ¢� T--i f $ 8-a 841-zi "8 4 a Z V y o- a € s , $ v S 313-C 31,, 8g §" $ " y2. 88$g8�"9i a 88illg �f'l " 3� gg x a 3 ii N omT CSB a g E . . I i8i K 5 Z.I °' , . gf P84 Rl. i. r$7i $fid - Cal COLLINS ENGINEERING REVISIONS DATE REVISION DESCRIPTION PATE REVISION DESCRIPTION �d CO 4/14/14 INITIAL 555411101 4'' 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT , C '' 00.01111 5/26/14 REVISED PER COUNTY COMMENT 01, o C°> + 10/14/14 REVISED FOR SIGNATURE SET o m WESTLAKE HILLS PHASE II, III, &IV WPO PLAN '�fR e/4/," $ f 0< SHEET TITLE z STORMWATER MANAGEMENT DETAILS // / °a2°a v VI GY2 .9S mm3 Q fl m C� . , ,, Jff "s sOZf1 �lii, w aL �� mp —Irn> Z b `3 D� n a vm v a g2 yr pe° ° Zvo i 13 ,-m 1 g 1 �0lpv-c p ® x1� • 0p,11 y ?' p / v w 5s� FEg Ss ' , 2- ::" ' / ( 157 '', IN \,1 ' -i''''m \, �� $ 4 dmfs ' . •' m 3rciCrg / --\ kilo Nim -:'-' 4'''T-2 - IN ggl -''"'L. : ,. ''}.H F \ m o \ \ ( ci len • m m O L -- 2 23 v ♦ off! o�'z - < Alit o I"4 '. Igo I ° �, 22..1 i f; h pmt / / D._., �I 3��E a lir;.i _fes 0%'' / $ 12 st 3 as a�Q E:— \ g a - a 2 sw'?ffi'&�"a a a o...---PE t e i g� \� 688Gk8 / 0 e 888888$ 4 g, m ;I in 2' d.� ® �� j , . a 1; s '"a ltl" � gn'a'a .'a:".°° 5 y8` a< • 3 $ V '''' v .e MI 3 tsti '&9=$ §i m , Ra a ,. - 1 - a op(J1* a s a 22g02�m '1 g WI a " $4 a 8 as 1 " �tl�m PCN ° I °` a a ,- m $ a?1 I1.;n /69692293 3IA Rg14;g N I old_ i 1 .3-11'5,;..4 &gal,• ' S IT 3 g'g 17',i2 g reii.3 1d es n m xes r' x a£a fg D N im PF 423 >'3 Z D 1 {' P 88 " n fm OE zt z 8 €g ° —n ii z` a 3`"z'6a@ " 1-"atg 5 t. , egsa sso.s � tg6 Dan,� s sac ,R ag 3 d >as' $ R $�3°3 ,gp3� Q. $ F l'----..::::: �� mY♦^.D3lge.s9 a Or rrl _ __ ,. S' '" r `:P8o '�' ��y >22 5 x 0.3e Z� SF�; 8 8888885 m y8`4P v -8 scP s"°P F- eo€° 9Rj 8 g Q o m x N q MI 3;3➢ "r3" Z i s 3 111 :iI : I i:111:11'12 11 ' n €ea e z m w i $• g g as 3 v Z mTo p CC^C^ „4, . Ai is - A) W . 8 v 0 $ 54200 i ::Eq Irr, p t Fm o ""- �.5%i yL I IR: Ai 3a i2 3iat +r4 a < R ,3j° ,2,� R 1 $ - _1 K 0 8°P$`"•R '2a fp, -.. "J{= s4].s ye ;AW! 13a -=/#9 1122111" :x � a.$ i a. ri all- a� 3' a E t so _ o m T m �- '1 FE g8' 3 @ria ,� .v3 a .SiA ?a a ? _ 1i$ 11 i� ? iii ; : int ! _ ? y ' D Og"�� i a aR a'.a :t"t -aa --a_;1,-?. - -FR � 3 3a - 161 3a3a0 73� "=30 3;=iWeg lly = n ooS g gp 8 1 Z W Z $ sesa3 N cof��� x44 c,- e A v co rii! � °o `o.0=p Vo a ? N D v I '2 O,mi,�$F n 9 is #R ` i1. , s R; $ £gym � 8 Ya a Z z,-P IS u, I u, u, u, ' "� o N o off' o ° i—ci1 - fi i - gam a w — N N m 04 gar. s m § sssz �c�i 2 o 9 - :Big >x UI s Yx s : „go P1 f m P Paapp X 80228 IC P; $ i $8� E88� �VW� -41 yjs F ~ Yp> Ir V q rn o ,�,. foo \ /' oP a$ J ??17 1aa = N I y"; E E m I . o " z Q a8nyyF,Q ° m " O m Fa 42 m0 pp 0 587.4 Fn O. 4 _�.- <,un<< '`�r 00y 5)8.18 __ -m fi '.2-i'l .ga:.... as 8 411 �m m/ m mD mg g rn S §P N"-I / PA - Z _ § nP� 1 . 1S8 O 8g1-d8 7 E ,71 OP gF' m E -_ I s)4] f m D m 1\ _ no ** P_ p IMO va 2• ' agar;VOD9n� RE. $m"0 Wii ` �, a D [ 1�G . III I t`,§ 1 a F m P °»-app o> +pa[ a I g s rU a" Ap<-°»-oq— n.i i 1 2 411; 4� 1P'1 a P . U U1 �n g g a ,,,, $" P s _ s,g g3 - y, a - ? gg 5 P g .. �'-q a nm sBg � c ��, _'„50, - 3 ” 1 a is 18 1q it m ° 8; e e n $ ,",R 3 F v 8 R < c, 8 P f i 8 v m $ m u y9 j gqt i f 1 1 €fl e a 9 e 9 �Aqu $I "9 s qa Pz L L s 3 g_ di c�� S £ s, r 14-'a 4/ a ' 1 i f 1 ! H ed i H x "r G F 1- . o - r ap $g `� W W F �. o 0 o a i 1 1 • 1 9, to i• - _KE3 g 1 ' I 2� a 5. 22 g5 7/ X a. ,r/ ,,.-- 55 1 ri ! ° °%d S° ay �RMR°P3 Qr8° �8 '� P �g ° ill IJ 1' s ti d N $i! o l _t o- " $gym Pu . ao " D sy rt�; x'T xe1 Pr g a aal t8 lI 7' } 9 f. BixiGjIIiiq 1§81 4C4EE 3 @ I Ef iE/till -- E EP $ d i 'S a ehaia 55 t`a x!i a s t k 4. or EFL E n fF x% ' r L g N R o EL tia � � \` i angn8 a g ! t 8 f F , ti & ° moi :6 ° ° C . COLLINS ENGINEERINGREVISIONS DATE REVISION DESCRIPTION DATE REVISION DESCRIPTION Club, ._.... +/1+/la mmusuenmu 6 1. 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT . A s 8/26/14 REVISED PER COUNTY COMMENT 11 601 _g N vi ill PROJECT WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 10/14/14 REVISED FCRSIGUVRESET N E ' Nl-,•\' 5 N SHEET E STORMWATER MANAGEMENT DETAILS q551.8 GRADE BREAK STA=10y00.00 g 550.18 _ ELEV=550.18] Ia . QpGtun 551.8 • §T. i551.85 §:,...,J ................ X 8m S 555.3 a 553.52 i , GRADE BREAK STA 12.5080 ELEV=556.352 3 r,. 558.8 _.<IS e n t= 857.34 • _ 0 z z ° __ 5",8 R C .G s' K n 9 Z r. 564.8 A. 583.31 t - Z r n _ D /v i _R z m .F.3n F f c $z 'j'• 571.0 __.. _._... $ F Z — 549.28 ,. 1-,N d P a s 3s F. _ i i E u ` ' s Nm 5]9.0 f _.�a _ F p 8 O � 5]5.25 9 _ '../5 Q_ 3 5828 #E _ E 581 z2 GRADE BREAK STA=17.22.00 ggg i:._. y GO ` ELEV=582.538 gg g. cec 11 o Ea.s 592.3 g 589.91 ti - ci a ` A ii 601.4 $ 599.43 m `B GRADE BREAK STA=19.83.16 ` E.EV=80].344 N E E o E o N o N E IR Io U I§ IN Io REVISIONS COLLINS ENGINEERING DATE REVISION DESCRIPTION DATE REVISION DESCRIPTIONCOM14 4/14/14 INITIAL SUBMITTAL 6raD I. 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT cc' A = > 8/25/14 ED PER COUNTY COMMENT M PROJECT 10/14/14 REVIISED FOR SIGNATURE SET 4 m p, _ o s WESTLAKE HILLS PHASE II, III, &IV WPO PLAN , ro �`o VIN1 f N SMEETTITLE STORMWATER MANAGEMENT DETAILS 2 CCLLMS ENCINEERNG a may n not be uwtl br y p rpoae wbalaoewr,incluaw.Out nal limbeb b c°netruc<bn.bltl g, nE/a c°newc[lan eto 9 tnwt Me p a vrNtm consent of COLLINS ENWNFERINC. 11 P. OEi,ii ti' H� Pirl g < U B3 i C ga. ; ® ® ® ® ®®®O®®®®O®O®© I I t, 2 m �� 111, u.,- K I R a e I IICIHI T0 j sp€�T E s pp QQ x C p p T 2 r 1 z' Fr.m 0 IF , Y _ _ _ 1!il a g 'al R N �. 4 i g iY h ii a ° a 11��' 'S Si f a F€ kCE i n l l 1 1 n 1 Q I * I M I si q ' 82- 0 '� iM F W 4 ; E Q N� f 2 E � ` � F i E y R 4 girij 2 SS iLi il f q>2 Y ri NAR ! ,�, m R G A % q 0 h h 1+ h h h . h h h h h h h h 0 L AI° 8 N -- - -- m . 8 t; v 0 8 8 3 4 a Y " m n e€ "F $ zn g a > w" a ^t q"> n c a> a" t'j . _oor.� l .. � � �a� � �� �$ �g� , � E i� a ; N� ' _ > �e" aa, " s esp s" OAR 1 WNq a 4 Al, g '4c8 ?"4 Ri !TIT 8 a a^ O g m ' � � � � � �'"�,� `�< � 4�° F za zm C7 7" �'�° °z o o' R3 g , 'i ' s g<1 2'g s g .. ? f'q 'mom s 4, iia " FR a s <,'g, ! c € �y� qg w°fg;�4 g�a�g � � � l3ma �� qg ��= � �� ' �4��d' cif �>o x n4 ��� �$'^'_ � � �� � �a�� � wg t N n w F". g €a fey x Pik,--41 z € I' a 1 �,> 4 '0 " N8"mq h fag R Xv ; a3R^ 1 6� a m g e : n R �� � " a1�� s �i���� � � � ;�> �� fR •� fg n "+_ � ^.= s= g��4q of ffa�g q� N s� ��`� �'iRs$ �`. x' ' � �4 ' "h Fa $' €e R= c a af.. f f am INR5 z I� w 8,�° q< a w ^ F $[ ,� $ e �s g g � w� eF. s$ co ,g i O' w "aa0' 0 a! g a eg l � 0 s gm 8" a gq fi _1g ge -> c a w �, Er".. �� go �` �'£>� � s g � f �`Oa ag a�� $€�7 w��¢,""'. �g ��� g � ��"� �R<� � F ��,F �_ " °�10 R� ^ k54 2%,T a$ a ,1 ° iINR; PI �I!4 a a4," °w RR Fg wa g4 bo al m¢� "�; a ayre a f e az 04 g e61g 8 14 ^wR � ', agsgt a_.1 M k el w, o "_. „$g g $ '< F€"� g „! a gagf [ nl� � i X06. zag mi +qF a h 1 006Ra6 g 2 � w 4�$ i RT I e g AQ0 eN in qlh g N NN g� ci x g ,n 4R"R mi I ' a a" 8m 6 1 ” M 141 4 iP, F idg4e Eq PI! 1K gR - $ , gg a �� if is , a q� Wqegi6' � $ IV �a I POP R7mg 8a a a " a. d g 4. a g} n g' ,, 1 .g g 6 €, RQ R 'R 4 40 rRA # aw f �'� qt ;40 1 �f,aq i, a ti^ o oasw � � $ x a< a ! ! w"a gA8 �z s egg "/ a R w a "6 4 E "s g:Xi €N .4, e w pag ' Q d ' y P 5qM.€ 4 w �$ agR -e � '1' -.t ' t'e €� -'- z . a� " c o �P I R R q 91154 aa e e " °', n,f f sa�aag t ap "f" g@ F o 6� �$ � �$c�w � �� ���ed e o � � E��,w F����g m$16)a�� ���� =,��-w� � � � $m r, s � $ ���� > $ F e a a R R R^'8 1 P 4°w ^'q8 g dP4i a XM z f $ $Re i , %... �qF64V4 $ Rgf� eta ae` 9NNte p $ 4a8 @x a 6A, ' ' $ ;a a s 4 a$ 3 ' ' 5 R< 8 aR, Rgwi 20 " '4;6 A qq M air g m a a R. e e m C y " " t - S- - -- pm ' ' '' yy_ tzi aAs >a a [� a [� i Min ! mai! ma> ! 'g �3 O EY a 1-F a+^ W8- A g �8VRO �!"'@'>Aq RW AI'�"�i� APA Q n �NRg kl . P , w N • M gR g�=_g N =_$ � fig^s gee g = g 'gR f �„ Y ' i 7Z7ggx „ g €1i) � h r� N „ g , 55 Rf° $w'a wwmLo o 4 $ F '6€ gE E E"4 Or 4 '!2. a r c" q !`"' ,,1 pp O 8'gn l �" ' t,',W3,, -.3.a.zTg6 Few gNm a5a'8x 9202!:9 0 , ,,g6 �i§.,86 g b g la's-s ag, 0€ z; > ; esu ^0- 3 '-^g waa ga lg a Ng g �<� $a's4 g! $ �g.af.281a eta a x°pg_.p gen "° � m,°gf „. .,, cil ,aF a , g, #o ea, _04,7, 20,5„ RRO seta, iai, . .4 0., ORA §§84, 4i o"Rggd=MU ;: PD‘PR''''''R"''' "8W° A'o€°' � ille '-''2`>g54.- PW r g `4"RV' 49"i6- Egif A�'ig14 a igPAq a� .a rA.-- Ra =,"tENm' > a:'€�F -! -K " ;w n)Rgq m'gg „gg <g>' ' gg m ,g 4' "vn'a n `� \\, — I w a n : §g AO P g' o ". .la'"2f P6 a a$' %gAg- x M 4 1w it . bw, 5s. f6At g > 0F° " o j , F ^w" $w g a� lg13a� § °° b e $< 40 g €g 1 to "=; NFw Y $g F� V Nim 4 ' g § �� z �' f " c€ z oma a� z a a€ cmc zf `. F�_m �.mB 8 7 � �" �` / ° � � � �V� � L �� �"a � �� l�ig� �R� B a g 64 �' 4 �e z An $ Q z y �' 1^�' g& � >� x,IA ! �4�iaa gw€".IP nza 4R° �FBo ,y F8 a" 8 '� R w N ��>dFg `9zY q^ w" ` Fg a v � R," g, b y `1 �� o�m� s'f�: s>o��9 : ga =°Q p a � i a a � � a���f:,w o� 8�� g a � �,> � � q��y � ��g7"7 aPa .q� � " ,^8�g�a����&�� $"�"� R� �R� z �z ���� N�n�d��i Q ".a�� � wf 4 °, ,gmw ,w a i fig; gaa$ Aea �' �o q$ 2 M ii lw A l w ''� w F 4 a 1 R :,. o sg a x l a,[, i''—\' �° a' � gr-4 g� � n 4 '14' � �"�� � e � g q ���a ,� a a a 4 � �g ��� `����� f � � � �a� �< s � €� �� �Inse�gN a�� g�>N,��g �^F o \\1\' aY s " n a g;w°Yw4-, i E 1. Raw Q _e gag0 a 40 a, ti e, ,h:l ei ! fz gm it O 8 e' r, �1 ' wE a ppawq= 4gna � € °9fca °$>>" og7, 94 .'4$ "z "$wF RjF 4 ,a awn8s qaf q�F ^ pqy 1 !0: F€€�q' :<RR ORO � ,€ � - gi w a B q'a 4 �0" € f .f �� In t NE2 f 8 FN ! It) N �€i��= ¢ °a q < >° °e o 4 4 � H nN Ac � € z w� 4 � � O � � i �s� w � ° �a� a `1.R �&°�� dg; 4 �" F 4�04�� � a R � � .E g a w ��� 4 � � R � a=N �<N �,� "� � y ,, \� ''� N �F g_ As a a w $ ° I. ,w4 " .'2, ,a ca ^� pro plg gA M° a a 00 p 1 sa N R�' ana 1 w w' $' € -2 w a 4 a� 6 : a Di[4 4 2:= 7 �� �• 6''4 R sal" f `g Q R" agg@ wg� Se 4q � 01 a" w3 � waag, x 'a ' g rqg� g m4p g ;a - ;a He gL %^,z R 4'0 , 'r8g R a„ ,§ 4 a n. ,of ;n a 4 g, s i_ 1 .;mKN Ili!" L ! di w� a''' z 6n < '4-4 q f a .'% § a �.I u'X" [ f R lz . F$ a$ � � QR Q "R a 4 4 -F" F R , 8 d f R,° � `' a� � RRoy ��f�� � �� � s� 70� s �xa�- ���'� �° �€' a �� p �e � gg �A w � ,g°� � �" � _ ��_! f � � a a $=��<111P � h ¢ anoesoigg oig� �3 4Ngsa € � ��� 4R���� � !�� ��� bac '� WR � R�L �� �< e� 46��� � ��� z �4'c� �-,t7,">^ R w � � R6�goa I :aiiN Q ! x c p o L o o < z' a ! w w�" h w w g € B a 4/ E a ig \s 'TR x-< R� _< ° '1$ P,AL " o " e ns ao"€[ > -1 �lAi r; g` a '% a E $ a � 4 424 g a o �> � „, 5 4 \� I"anr� R m F q a 24 ! 4 N ;;fig ,!3 4 Q g - 2' 62402 56 � A LV A a gi g x f 4' k 4 est 0, R 4 g . w ; q., f 10 R o m R $ a a 0 R tiiim Aa'4'AfA l O m h 2 b y hNh h h h 4 h h t �-e,`�==_- gCa' �" Fh ie € a f'° f Yg nb �� o �g �w[� wnR�:9� ing gsR owRgg s; E � ""� gws � 2020-� y n \ g . 4 `,IT � ogoga-Sa gr- d. ER f , g �la i 1,. . y.P.a, ,ggf948; x m a "-- 2Ph ' ,gz w� i$ F� � a�a�24s a ala ge q� w ., 1 "R. ,Vii, € g � � � Qf ��� g � w � eaq =�.. h i w ,,,w iic a 4= 4 "z4"�"+or `Fa'ng 4 FOF!RFa,a4'a sa 'f:8€ ;i EI ^ � ag� g �� w �� , w;s w"n aio1 \\ , _ , : w �" w �'� yam �� 7 " am £ " 4�4 R � 07 '� ` � zgR�0 ))� ; m> _ SEs gFs ,F ° gyw w ? � ="e oII ads < - <wqoR a � � 4w�F�ggR' RR a ;�g � �', ��, g"Qa4 w F � € n "r'' m a"es ,� ;, 3 Lmk"=' R! \� 4 o p 0 F E F g"" R z''g m a g . -- wG 4F f4 " li.'< zY:. cia 1 14" _ a: E ga w~a aa � w >s ilii n *. w f , a. m a �° wd a"" g h"�z 4.a o R 5a.a:.:c f N a ��F" ama F �4� € F 2t, N ��4 w 4 2Yr: °F g� w zi z R \� g°w x a wg€< �NE Fw'g 4g F c a s"" g�sagN f % aFf� O �\ �� Ai R- SR '4g �aR €d m $$ o t A-g 6w�E' _.< Fwm ▪ > mai 4 an B :" oeo� �E a w s R° gw a n a gg< oRn c 4ga w mw w ° E " >< F � Q4 is 4 m44A g°4/4 2 g q 1 4 64 a 4 sg" "� E` ■\, 1 • l ,. �.F�� z IrT ^w z ag a i;d F s q F ag RFaF c - ! Am ga x 62/WW�Fa Ae w? ! w w g g - � eA' >6 Wm .a A. " b \)I k, _ n,g�? � gig g n R R aR ". wad 4 <s, 44 ! s a w" N a2 �E▪- m6 6 aFg p"g R y "° Q _...-.. i M N o ep "m H ' h M. g,A' g�qqS 2 m !nm E'A .�' " 2,w Ta N[N' ni Pp4 z"F R eg4A 8° cQ zz n" WC= 4 F a s \� ,t 4Q '�'g,4,8w FFRa^' k >gzi'gF`''�. ,,.f�o.'m'Plq$'.°° ' s8 El; " $ O \V s o ae 6 ,�q as = swaF��gP RR' " R wc, s "RADIA e8a A, n o " "wa fR;'�r�fB m 0tggR � F`�Y''o'z$n ��'< ..� g xn" ", x> .p0 ga .> f> t3 x'" g r, 4 " '6 R mi"tq'z��F�g�4A<mR-z" � Rg�N<€a ??"g��N�g'w�ygv �� � q" o°, a Nq 552<� oaRgR,-t!R� % " Ott P".6!4 W R; $w; .p yy > gas gt 5 .tl. a.e fl "a a n r :o n Z C a" '' ago Ri;b AWa6 °n SFR q ' N n� ,RA t4 26 4$ ag " € A of !_a " / 4 is � w n7 '' O mgg � a ��>�a �4-w�"'��'" ��Fi w� F�zc a �' 4� 4 0,- , f�s r 1 0 8"gq' F,wlFw° g;p bia R g gag as h 0 �g z n ��0 gg 4, 00X g �.;''F rr gg n Ag 8` t.- ! e „ 24igin4.;a�go=NE R awf tam x, ° ''Ia!a";"6gw"g f 9Rq 4 a z ° aTI g" ",6 0,4 °t' t- a4Pg xR§wzgr491 a c�a gF wF o gd 5 s yap NS Q ' � � oggnsa ��R 'wo �ogg � "„ "g wg� J ^ a' lq a= , R R ca m• F wc" gg m ( Al f 5m�0> w f F� q n° R•'8° � -m R” o I . l�g�> �°c nz R g g g f �g �F,, .., F a: �z,,. . w F �d � ,8 �a 4 w4 NEN" zm 4 N"Fa, "' zT a g 1 ° hb R fli4$ $N t ,q °g N ^ n 1 A 1 g 4RR" m0 g n wa -nh tN 64,h, sr fgffg,', a °f'2 Rn2 �''4 w a 'IA 3 Ew at„ a €"af0<ma 4 94" w god %4 "a aA " 4,:', a te; 1 a 1•— a1'w. W-R €e,2 -n ' A°2"4gR4 ^ a E g' " g ;' �� s I , ° a'F w - "ti . ..aYa gg A'6' g" w R, gg eiT p 4 oP �4R� 4_ 3" g 4R ti I 1 ! ,r / wiz -2Ne- NP 0 s Ttr,4A Ra/ `i > pa fff Pu �g�Nca 4 ^<w" R RF a�q nR,s l z 2�'. 0 FA 00p4Tc Ngs 2' 4,t a a g 6 , MAT s RF �� ng�" m g X ?Mt . S w V 0 } I r "r V ED F - �� — ,a1, fl M , a I U� 1 � r, m IAa4€ 1!1 !:! 7 ; 1 ; i' 1 11 " + * 'fYS n '1 -A A'� , , SA iti 'gI • +F B 4, A 8: 7 =rI '4i14d 3+ e Iiii € a i �O+ 1i'i 1 +� Z 1 i'... U� '� 1 ® COLLINS ENGINEERING REVISIONS MTF REVISION DESCRIPTION DATE REVISION DESCRIPTION ,,,,4 COaAG 4/14/14 INRULL R�L SUOMI 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/7/14 REVISED PER COUNTY COMMEN. NT ` ' s PROJECT 4/16/14 REVISED PER COUNTY COMMENT '2 o 10/14/14 REVISED FOR SIGNATURE SET - a T 0 8 WESTLAKE HILLS PHASE II, III, &IV WPO PLAN %, - e bl N1 a o N SHEETTITIE EROSION&SEDIMENT CONTROL NARRATIVE&DETAILS CIX1iN5 E NEERiNG m •ww for y pu pp e .not.oewr,ineluai.e,eut no,umi,.0,o emnrue,m,eIE N. ne/w em.4ueNan.10 g tnwt 1M q •nittm eanaent of eoLLin. n�.nF Ealne. i I / �; / }} �l // // /1 $Ngo I gmm 2$ 0,1,m>E, 1 i / A^ 2mmg=p // rt s Rio uJI � , >"no ' 1 m4C'..e-....---'''''''..,,,1 \ g 1 \ 1 o } &8 ill g$m �1 f " Wim , 1 >N EF , g. \ \ \ s �__N ® 9 u \ 1 \ / j< %-\ �d II 1 \ U. >m g y A 0, yi _,, \, 9 \ \ t ri _.. ' s 1' v v♦, rl ' �\ ' ,3. jig o `�'' \ \ J (� g '$ 1 17 / ' i' _ �— } ' �" , G14 10 off$\ \ � / g 2 um `i.,' ob\ \ , 711 t )' I I 20 / • �i l g / o \ , \ 9 1 1 9� , $ ao »f6 1 1. #,A2 o _ & \Img L''.. 6 lit\ . -- 8 i / 7,q,-7 8 $ v T,1','; 4\k',.....,—,/f!i. , .... — ='m5 oq •g` ��?gym \. - 0 o I` ' 0* _ �� Ar ��m o� '`I A r 32 u / o /-011--/ P ;� LW A "'�,'�J sats goo � '/ ?o-7,'"-',"•,. ," �► R� I A \\ �,., P > a, Tim T g 5 : o 7 ; \. I as 00 a �^ n =m 2,V3 ` noo I i i E' i. I i . -� i t I. 1`‘♦ ;.,Jr`s, 1 ® II �n io _ _gam \ \ a �: c, / ,fir, , ` Fo # , \ �_ �> /Y ND om ; s N� I 3 1 ,. A S \ 1. ' , r 7 y gra l 0 44 1 A ® \ \ i �X99 p o $ / ¢ Ii \ Sia . , 0 g.$ gm Fo 1 �bF o � P k Ac. p____ 0 m � as '_no Pi gy. N AA \ \ o. A tnig ?,161.1 ...'"-. '\ '''.. S ..--......' ' --....------( 518rg : ..9 5 1 ' :'''':4 1.g: /\ � \ \ O � .8Mm _ �` • ,` ,. ^ // ' \\ soN ? • bo E. g F m a $ s` , ga � ` gy pl, `.t 1 i__,000000€1000 Eooeo0©0 EA o A m o � ' aP v p'\ 1 i � TrnZn \ ':,,‘\ / — sl r _____7_\\._\ ; i i 1 i I ; ; : : v , C '" COLLINS ENGINEERING REVISIONS DATE REVISION DESCRIPTION DATE REVISION DESCRIPTION '� C,Oh{� 4/14/14 INITIAL SUBMITTAL .''� r, 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT '<-,, _ PROJECT 8/26/14 REVISED PER COUNTY COMMENT O ti x WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 10/14/14 REVISED EDNBIDNAURESE °,HFe m 7 u1' xb1 N\`.>�� ti SHEET TITLE EROSION&SEDIMENT CONTROL PLAN PHASE I \ /1 I v, / ��'i /' / � / i / / I /' /j/ //. ,,,,,,,,, , K \_ _ , . - , 7 . _z - �i } 0 -� �,-• / / J,_i • i / } \ / / / i J / 4 , / / ,•_ // r ` y$ l =2 / a ,-1'\. "-$\ r= --------. ' o. , \ \ ~ V A � kap v O NI I . ...\.,,,,. , , - lr 4) \ -='''"6, + –__./ o / /� ''\\ 1 r .g \\ \ a g .'\ 6 _.°,0,\i !, g egoA \\ F,„3?„, \I-, ..---44 g \ \ I� qS Li J )181,0k \ \ ......,A ._pab.• ,, \ y • / 0 -'' I Iti 1, ..„,,./ \ > m , \ _Ail''''' ..,..off) MO ,akila Wtrs>400 \Nit, % „, \ \ \\ \ –-- vs .1 Orit 000.–',..iitIrv...0-1--...ii—mr-------, ,• .,-•-•,:;'. \ li i r-----1' \ I I ..,' 1 41/t - r Z 0.0'illyrovpar---,* 0 f -, ''':1,; 1,4- It V\ :14 \\ I ,.., f i '") 1,‘,. .0*,00,T.i...04,00k,–,pe- ( , . . .,:..,,I-' Ittli, 1 1 • ‘,,r0, 1,4..... ,H\k., , \ , Pr, ir6 irt104,4.0111 ''''' s I\ '4.' L"•''''-2 Aiiiiia. 41 ite '' 1 F.g g!!'12 g;AEo°\\ ..• i I 7 i‘ii . ,; fl%4..%MAI 0 -; \ `,,';;i.::_rj!I'• OPP.'lyiii \ 'I.I, ..- 1 I,,1,i 4,4!;:g4 \\ \\ AI, \\ A b-- 1 , o �c` ► 1D T _ \ ���\1 iiitioiii- 'I' 31VII t; ;I et r 'i. �,. . \ \ A m �' N � C \ e I g J �� � \ m p " , VI S $ Fp Ili I n V h .e6/ ,., `m- - o x maa o\ gk 6/'z T �� � .��►fA •`'+.A' \�. vves 4 3 ;... P. �\9\ I2m N \""" i� '� �4'111°r� - '*'!%®31� .atka _ 11 ", /'• II e` :190 m g=p9 'r ------- t...-.._,---__-,0 /Ii ,.a �a.�.v. 0 •� ,f;1I°r \ I P, to lW3*i:rit_,.....„-..- .7-,710-if,1 "r"L 8\';'''-'- 1, elk)''l ):1' ' -.."!. .or "*.- ' '''''''r'' itiiill'ar(imilattirtg-11",,A1VOi-'-'7"1— A �X 't� .� 4 , a=., V 1, i 0 Olt �'] �$ i /, l $ C� e��� S illitit s A - 9t A �, �\ s <NA m J � �� o ' Mr '> o\\v/ , v , A te` /, ,(4J © i fid\` 1(!t _vico,T49 ht......--,---- itp, g9; `\8\ N� � 70 0 is A n " A m lir, m s 1), �< g 9 e E , mao P ® lir / �.. 8. " �.° ..ice 01 $ fir \ m T' rg r `Ta +'ire A ell a" _ \,.._ \\ m m n t 44 i �.il ` �.'. b *'' I. i'L� �e�9%% t+ �4,01:44 i' � t ��4� �± �'AIs� y ? \ \\\ FN ,\,,,, \, 7 ici;:,;::::rr.0j:___-' O t44,"...14_141..:21....;;;EA, ''\,-\ \\ (\,) ® sor /r o " Ic' 6 . \ ! !S''' 's ..4'\ s\ e‘. ® 19 \ 117-01*A16941:; .4°' -7-----\-----_T-1-1-.-----7-,\-2, n \ IP tC,iiiii IW/1 '----"-:'''g..§,. 4k \, .-;/ / ) 11 , \ F ' \' .C4.2' 4" ' 19' \641 iiik:11)*iirk 1 IP:11Z:. V! tat // (I 2 \ 0 '; '\ ) 1° \NW.)------ / l'i,tra, 4/ tfro , , , \ • pisl /'I " V\ \ \ o x A � �� * o ®m 1 g .1-em / gf to � 3A14 soo I1 < 4 *6ji\ \ n o " m\ ' . �744pVD .Q \ - Al> b f \dm \ I ' • g -,ay ( g -L / :40,, g \ \ q „noo2 = `. „* - G •#1' is j. \ \ : Eovn / ; g / V .r.2, „1\ ...,-- -------- ,,/ ° A I El t i,,i 1 gi B \ \ _ 1 $•i a /®OO OO®OOAAA m u m v s N z i C � COLLINS ENGINEERING REVISIONS DATE REVISION DESCRIPTION DALE REVISION DESCRIPTION �4 C0 4/14/14 INITIAL SUBMITTAL I 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNCOMMENT P v IY 0/26/14 REVISED PER COUNTY COMMENT ' PROJECT 10/14/14 REVISED Po0.SIGNATURE SET `E N o WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 'R �\ n2 i a S o o blNl`J o p N SNEETTRIE EROSION&SEDIMENT CONTROL PLAN PHASE II III 33 E6 C/1 c4 �, e . � e P We it I 1 O • F � N _ a rill a `41,§ o y /o jI � � I to gQ:-.3\ \\‘ '. .,,: • g \ I t\ vl oi fps '♦ I , , / JP/ - .--, \ ,, ,,,\ ‘ c,, 100077) , N., ‘ ,, 0 :‹ • l4i ' �_ - 4 \ \ �f� r I . ' t li '1 I II IIS 14111147 t ,,'N'' ♦ •`♦ w X I X g ; , Vi;� �1 ` ��! I X _ - ��� ---7 6 , ', ...... , '' '-', l'llir/l g4 +ao 14T---€9.-'o_� ` + �, fig• „ ` _p A ` It r� • ` ' ' VB mm I .. ! sk:\ : sg - Iii egg11 E R r3€1aga ?ag $a Writ y3E gg malki a WWII 'N • ,,,§ 6i!i "� ° t?& a § s & d s s d i 3 k $ $ WII R fuss' 311.18 s @1g III'i a ow t'a � " �0 1 a aQ 1$ gE g§t1 ; 24 =e a 1r M- ag _�� . iiii .�a� s _&' ' '3 = ease= P = e E�aa g & s ssasas5 g 5a a �y g a 1, 1,6 .Fa''3 Y1 91,1,65 °° y o " meas"a>s *Nma 406116 gOin9g9 ,1.444°3 "'W eexrs t,gki=' b No ilx' _Es ie' g °- s m ssa:s msm se ee „,!1 ,'13i E 5 9 19.111_7 ill R ill 1 �� q �� e 3 �a�a;20 gg `' •1 g A "�$ AA4A fi4 H 3 k ltl $ 3w m� E.A� , R$§" n gw't lil R3^Eg ' q"-"° el; 3,.4& ' 1 � Iii'd " aSaa ss ,0 s$1a 5. 4411 1aaass ss $� 1"644 . ET .. a , g- g1! $s ` Ol ga 11 i`: q $n$i' snR a 4111,-so a' = M' ”1-.5. g8 3 �- R . a :5 g —1 , 1 -6- o —1 , Mei I. Pk ii Hi II e9 ! @la Ni t IR iv AE '4t- f0, v N"aq Vse' __ aoaa tiil s� ggg a se�oa� �� �' �g8 seas es�s:y �Wa��ey �Wsy �'^_'�"seas N 2._11 1o$ ,N E 657.1 T5,0 P s 658.28 °P Vm� q 519.2 R ° - Iv , , S <@1 I ', G z m°g a 122 r 4P E mgm2 ` 's :° ' s s °Tyl .k .i 8a s `? 2 : NNS r o p i SSIB Yt7i02 °� ; *� -t !i ti .-Z 2 U - m E 515.00 r�i< ,7i '' 5«.5 n moi; M u G ��^�D J n g 638.00 ®i4 ' F n p 1 v, � ��mVpil s VN m 1- �p N < ' ; „E� isn mc. ym o m_.; Z u2 P - > mo tI -- 12,9ii m`� 2g ��r2 N 3 rI T 0"' '$.,8g- • 644.01 'm +. Fv, "i '' °Ag =1,i-' 2 w °o 0'02 off° y < 24 1 ; ° ° US 11 'm o � °'m"2a o£ O 2m!$°$ a 513.5 ^� I 2 � FF $ mA538.1 'd ' m 7u 4a ..°4-.M...'" `'.¢i ter$ 1,m°$ ��g sy F,41 `d •$ gy A $°g. cYzng 111112 R :i N ' 1m` z - m Oy FmA 07 ' 4E IR 1E E Id a P 3 ' -3 o H E E 1 N 9 CiEll COLLINS ENGINEERINGREVISIONSco DATE REVISION DESCRIPTION mm REVISION DESQIP. � L c�� 9/11/19 INIIULLSUmmx 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/11 REVISED PER COUNTY COMMENTu 0 s 8/26/11 REVISED PER COUNTY COMMENT �3 PROJECT 10/14431 REVISED FO0.SIGNATURE SET 'E, m C CI N g WESTLAKE HILLS PHASE II, III, &IV WPO PLANA �.� m€ o N SHEET TITLE 4'IN19 • EROSION&SEDIMENT CONTROL DETAILS OLLINS Enot ba uasE!o' Y"r""wbotaoanr.Nel.7 Gut not,7,7 <o 1`.17- : GitlEing.',.`enaW E s<akmg 2°,07',,r.,==.7;'.=1"14,7,V ENGINEERING. Iii , Ior 41, \ r,. , , t..1 \, -\ / I o4 g = \ m 0 '9 \L E1 p py P ♦ • ♦ o Eo. ° .` .1 I �Urg I a / P G° go \ m \ c/a 44 i x1 ��! \ .s t.tdik:;: R, ig! 011: \ '. _ m \ off.. , J a nft, �/r, \ ,........,,,,...,.......144 „'„'-'411k \ \ ' L.......__________.:0.-,0---------- 44!\..,-- : -- -------t ,'• ill '\\I ittikl . - , . 10 .„ : 1"-k f illt ' \ ,. • , tfr ,\ \* ,., _ 5. ://ON\ .i \ , --,„ 18 \,,„7. ID ' Y � \II II DD % i3onrT, cnz n V n '/ ' ev, " :.::,k, ss 0E0 - , 0 7:1 —I sS_ �` , I '' Ego `� ; 1\8g ar o 5 p\\ \ jr, r CDid• .♦ p T g‘ - -- MillMillilli r ' . 101,4*''''-"->^,...r • ® p _O /27\7 gr,14' ao14 4 i 6/g i"l ;.75--°2 ,;.” iEmil ..ii"--4 1.3 4 k fi '$ l ".& 5 I a &g �., ; ;p $- 511oas m m ll F °^ 3SA $ .,, N Fait§ffi ng. '�#3 . oRS mt ' 4 ��e� � aa. � g € s 0/g€s -g's �R g' s � 8.. s` i 8880/ x 0 $a�gl6 5 $l$ §§ as M" '8 = $ s$$m$ .� g Nk 9 a a - `= s'8m888o a EAU 411 �E iSngV, T a v s g 's"- 3. >Y ''g Y �R.p.=? n .,s _ s88'ss8a$} g• 3!1-3 a As 1 i m v y E d' _ N _ _ 3: _ V2! 1 ,mow mW o�o� > 000$ ig ? 11os o0/ a 444111 &� asp as es8� omes> sm�o_> v _wtsag2tn14 >b W _tvrbks g66io9os 6 q - Illg gga y $ 1;g 11 4y 94 N S 5 5.1111g¢¢. & $3 B Z.�1q �3X`11p 01 I g& i R )}4} !Will y p }v WWI g0/ ry9Q 5 cY _pR a5I- a 0/3,1-3 E-Zaaa b 3 sg � T 13' �. ry.d 9 ma E pg Q,S 'Ep G iY §3 $ gs`g I� oda' - �, a3s 8 ZR sss _s 11;01,-.33330/°E j 0 mgqi I Isy �a 3m 1-, 0"p'-1 \ YI i ..p° .1 au.11 g00EA33 .8 gg 14 $ "pi'''- _ -�° -s5'"3 .1si N =3v A� ]>',}4:.1.-17, 4z it $ '1-4 n gz' moi n1 s. li n IP r3- _ LI SAI f'MEW I 3- 5 1 VI tkitill it' t g�� � ' G Ili ��� q, som " 6/ m . eg ' b N * skx _, gs i iN 'Ja _ y ,-.1,.. .n3=ny ,uaa" y aa -'4888 ,...3m r 7_N F c - . m EGE. S E 5 FGEIF/ 1 to H E E 6 i ' Ig � YS 2 g4 I. 6:26 rti 511.]2 $ 2 EE , ;°_ �P i gooio . 1 Vo m°$oom [1' 1 Ao oo, m $ g �m7 55].4 mgs t$O a 333 In *g ,-2:9a§s & n § 5]5.50 ., g 5 2 8 H......t n 510.4Pi,' ° a ,- W gm ~ $ EM. I-/ 585.20 8 x m z / D a x a - �_ to m �a Y2 f 11k _,,,, Q Z �� Z d xdw 1 $6$s= 't x` la E a$ i 't�pu: -1 moeq u-i5 °� =v n4.] �> IR $o ;� gsp 1 0/9 : 1 - Zo0 5]5.25 R22�� `,",'n'-'±' 55].5 n� I- Fo �sM�iy �a .m ;Ig. &Zxm o doom" I. .g x R ::'11-:51.4p;,, gm�o m=, 8 s 17.x2 P5 ni aez `ggx n�gm mi: o1 i Q �� °WSJ- y 0. 4 iD E F � 51� m9 • -,A _Q? 1 'NI a . ,,o ,m ,gum wpm „p N 1 iE aml �pn 2,,,,,,.., t n1 S1 Gm COLLINS ENGINEERINGREVISIONS GATE REVISION DESCRIPTION DATE REVISION DEsauPMON COV/0 4/14/14 INITIALSUBMITTAL 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 6/2/14 REVISED PER COUNTY COMMENT ' PROJECT 6/26/14 REVISED PER COUNTY COMMENT 9 �+ o a o g WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 10/14/14 REVISED FOR SIGNATURE SET S E �� 0 'P bINl'AI € o N$SHEETTIIIE EROSION&SEDIMENT CONTROL DETAILS \_ , , . s : ....____ 7- ,i ;ai, V�z \A. 1 ...:.4.,, . /' OIa . . \ � �y c��„l ao go �aAli I {'im^o \ ao 1 -p Et,� �: ° :Y °urp w j11y,4 10/ w r � _ — jj - _ — — %1"� 1�" I % (AA(a 3NSt •_ .Iwo — �� , : ,, / .� � 38 '/ Z '/ � if v 1 1. a Nr � 5 F/ NO IIS j �I �s. f t l v�A,r°v:'sNar♦ �� '>4 'moil u. I I -.o I l �',�eErv.,ae'�r/ ° 07.. > ym rR.o '4?"'' .. i I,� ti !. it j`v lrp+,;$:�i'rw.°�lA. ' ,/\&//.// " ��o {,1� �"- ;� ''m o I, '' � , t-1 / ' / '•S'*,i**.x•ss sse*, 'q Ivo \.. t 4 r1 S .r, / �s,��iaob•,+�fSTO,,ae�' ,_/ I i / \ --,--1.4/ `� 11 0 zR 6 Y41 ( { < 1 Jr. , o\ 1 \ � 7= � o0 �, vm "� _�y � �Sao or 1.41 -1, /< � _ 'j �� 7 ma ,— Ariro. / ti ro P8 9w IIV2 I A,� �� 2 Hwy I g° 00 r;!, m a ---".",-- R. 5?--' I \ ' k , o r xo • . do � To a � ` O ° , y / I s - ri. I _� owe:* `�j a�i`1✓a�a+��✓ fir. ay \ I 1 �i �� as N° \; iL li \\, \_ �✓ f' `li�sr a�a�'•�R;1�,�•��, gm;m i \\� -- / :r'J/ __- ___,,,t4:32-__;____ ' 4 `,.. I,1 m 7 ,ee i 2.. A A � a �_� / ^ m I / Jam= \,\ ,„ \ „__-_!.,_____ - ,,,y4,- - \ \ \ / , , y ;A os w ' v ` �v ti T�. ,� �' • \�: v v \ \ 11'$,`,I / / , \ t 1 ———_ S' F , d Y7 x' -- _� / I . . 1 S^ v v 4/ / oma° _----- fn ///p,,,'—''',', .1 ,v 1. 'i -ii 1I. \ \i sk c,.��\\ �,•� may\a,. �E I I, It _- '.q/ , \\\ 'oo8�r m�o`£ °m°.�R°, o $ m� i �±`F.\� �' a g�. I @,m..a._ ^..c. `� Imo °!rod opo >°N°, mmg ` - -o 9 - % E , Ill ' \\ wr z� p HCA6A sy° 8 €m _ p~mM M� n8 m > NM mm °OAm�OO S ° ° M i \.,, g0 I I I AzyA�° < �M r ,` I 1, / �- m�m CA�rOOPai�v. ya o / I ,= ;41! !zbbiiM gq ! \ `N ( i NgNmRg°nFNFmT Eazm / �/ N. azi =1 ~6"amO ">zRm Aim'EF „R 8,7'4.'86.11 mA m n ',,j ;r \ mm ° =3`o mm �Of P,6" z 'zoio $L i Ato=m im = A,!,, 500 1 \,k T �,•S� v ,, mN z m m ° � .• r w c , yy M o0 �,,, mmg m55 Elio i 14 'fmg� $ 1 z a .r ; j ��.. �\ 1'\. H11 Soma wP z ° °€ _�_ N g ° Hm� � zg= °gym oosm b =m � mo�y ��=41 oho N ate` N� \ \ u' \' o0 a2A ;A .1.p g2?,g, 24 w�X,/gm e. s y ` Amo \ \ \ mp s Z � � mN ° ° °moo t m 5rT,T o mR'a y n; /o 8 $ tP $ �,• ',',if. Rs : ® COLLINS ENGINEERINGREVISIONS DALE REVISION DESCRIPTION DATE REVISION OESCRIPIION -+, p o 4/14/14 INITIALSUNMRTAI t, 1 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 E/2/14 REVISED PER COUNTY COMMENT PROJECT8/36/14 REVISED PER COUNTY COMMENT . b 'in 9Ss A o WESTLAKE HILLS PHASE II, III, &IV WPO PLAN 0/14/14 0.EVSEDFq SIGNATURE SET % /N`A1C a o N SHEET TITLE MITIGATION PLAN property o1 COWus ENGINEE.n:c e used Ix Y perp ae •hatwewr.IncWew,but not ilmM1etl la canelructkn,bitl g, ntl/«coneWet,an et g Mein Me p wrlttw consent of CGEUNs ENGINEERING. \\\ \ :---- 1 : \ \ i ; il g' F•F..; I \ \ i I A 4"-l _i_, ,14!,, E 4i 1 \ \ \ I • ,------- — i .,—------— ---, 4 if ialli 4":24 i ;PI.V'it$ I f;;.1 p'tAl tx.A5 ' 41q2ift 9?, °../. ar I..111 \\\\\\ \ 4 I1 ."' 10‘\ e-01-1-1110---'O1:rdi#. ll0 :.R00 \ , I • \i -II " 1,11 \ \ \ (1/4 ,1 ! > „,1,,,,gi \ \ •,,, ' r-1 F37,-0-1,1 al \ \ -, • ; F ggggi \ \ \ 0 0 idifitIol 214P' .41„1 1 ' I '6. 17<i I \ \ \ 4 1 1't i:liiti .5P'II 4tg '“till !,'t!?,:1 4t ^. \ \ \ a •-.a. f . 1 i......,,, ,! lig: i . t 4' ,,, ,,,,,,,,, \ \ \ I-141.i; t'''41111 Ue. t;`A V.. ; \ \ \ '', \ 317,§ -1(ti.:1 1 il 1 ; o ' \ \ \ \ ----_.,Ni \ \ , \ -11 1 Ji g j1 i 5 .'' '' 111 I 01,1 11 I :83 6.,, \ \ V-----_, I Id' )" =,liai , Ill tiitt 0 fIl 32"A. . 1 e F. tii,4111i !T, i Ilf,fligt q I lirittliA ,,i; 12 1 1 --— 411-111412i210 gli114: 91int 4121il. illiti- - \ \ \---—_ r.-- „ , , I ------,--- 4 1 r.,,1 %•°"'el",w ztAgo.,,-"p,,-,, ' lt,"/.1t0.-",i,°,%. t 3 (:) \ 11\ \ 0 ' V 111 .41171,,S; \ rn \ \ ' \ \\...:T ..!..1,7ii.""•\11:•,,, IL ;,'32,., m \. , ' ,\ ,of\ .,-- _----_,--•=''''.----- 1! 113 z - r,o co . .. . . ... , . . i', 72 --„_,,,,_____p , 111/\'‘:;.„,:•,/ "0 c-,.„. .0 " ' > ` W,--- I 2 s'i,''f, '. .•- -. :.?t.r, e -- :---' !PJ z ,W8 P .. f I 81 •/,;24 ) gP" G) ' 4FA r- IA,- ,, •;, 1 I I A, • I i , 21) -——-- ,;.'F.- g m / A--2Z.' • / fi ' I ,. / i • / ," I / cog',_. m , 1 f P I / ' 4 SI ''' ? - I - g _ I I 1 0 M i ,...-..r---- 1001)..."--- :I E- I ., It .-u i ,. c.il II st•'' : 1 Mit 2 12_ . ,7--__•,,. • M .t' A: ' 3 liAMIN 2 /g?°•-:-' i eeopti r•- 0000' lif ' 5/8°F i 'Ilea g- 000 1 100 0 P. % ?afi° • h > (1 ''f,,, \1 iiil fl 4 II a 5 ,re3 ., FM OA R 1 Ili! 1 1.',4 , • . i k g- § * 'ii 4.,.?.! . r4 i lEin 1 R !Pi , 11nD -,'41 c .0 -,-;,•80,---6, K 14i Ir ! i;:i I ' 4i E a fl 2g,a ' quy2' 14 Iii" SU 1 a ,$, $ te? 'U4' 1 R ii.„2cp m 4 T4 ::i'l L'1,1 , k,.,`?, --I , I I d % , . ..., 0. 2 rn 'i R i vi 1 ,, 2 1 z , . . . : z i :I I F \- -• i t#,.._ <<a, i il tRF ii f,' '°,:• 4•, 'C P ,,‘.,. 2. tE, O4 io .-,-,,; --",-- 11 '-- i't 'i "t9 .-3 M i 1! ip 1 1 i ,0 4, ; i ii: E.t f li 11 il ..to 4 P il 1 R 2 1 I tt i t ------.D rx 2 .14 11 KI r' 1;4.3- ''' g'4 :el 6 1 - 1 § ,,,, .1ri .g. 1 i ''./ '1 "'''''' ig t t/ - • F ' r _ .;,. ,. i T-- f` t P-11,1 o I *- 3, !.;LI, -A ::: rsigg.(1 t 4 t ...„, pi A6.F 1 .i4A e ..:. .--;ri 1.1 t ' -..._ - - ,4 •, -AP 1 ' 4 :., r.-4. •.•,e2 -., 1 r H t 0 —t- FIT i L ' ' 1 2 , itg , , / • ',",„ , 1 4, -'et iii i g.g r, ' ,, i ,,„ s ,,' ,— ,•, . ;:, 1 9 1 F I ON ., 1 ..''... ..-,- C ---- COLLINS ENGINEERING ... MUE REVISMNDESCRIMON REVISIONS DATE REVISION DESCRIPTION ,,cop,,,, 1/30/14 INITIAL SUBMITTAL 31 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 PROJECT -- I.,, WESTLAKE HILLS PHASE I WPO AMENDMENT 4 ' i 8'VI ra'A\ 3 ;Li 0 .'•...1 SHEET TITLE STORMWATER MANAGEMENT DETAILS . . T< ' 1 N -2" Z____________ v _ \ rgr; ., fc (2„, / / / / �> N. \ `J \ 9 T--"-.- N / \ = 1 2 / v - T ff; - __ ____ \ $ / 2 / .- .- .—•• ' k`f - $ / ii I t- e A \ ,g/ f , A' l \� \� / \ \ f 1 \ -\ sok / N 1 w `` �� o2 t\ �' '3 \ / / ( I i — � 1 8 i i \ R `ate , 02 9 g Fr I R y 1 1 I\ , i.,_\ 'V m rv' \ 1 \ r < I I 2® '\ \ - $ ea�'x .NI 8 V A ) (4 ` ' Mourn';. A \ i 1 (1 A ' 3ecnim'i l �\ \ \1 / S y r. \ , V 1 a ' 9 0 \\ \ Ex \ Re 1 I • m g 2 rgN .. c9 \ a \\ s �1I 9 I< zrm�" ;) T (titAN VI ` .I f .. z 1, 3.8i; z 2 / /— '`.,.. / 'i; ' '11 in \ 0 il.le ----J \ r T a= t. \ 1 g: r fi1.g \� \ \ Pr 9 ,� ��� \\ �\�\ sem\ oo } " \� P Pc. a Ix -- fo � pa AA xm . 1 '2.9•47g - p T . 9 � f7 : i ¢ g girl �q S o 4 l'' 7 - (-.. ..."--g---"-- 55 5 'I 1 'I'A E o /1 . .. tide mow VCtA41,_.) D \\ z Q9!' \4 '��� 3eAmy r ,•• o b SR m • �A$ Z #1° _ ‘,..,__,/ •\ T \ O m m. \ \ �N 1, ��£W D D O. l°n� ,Q r SF \ y �p>m. a .---\ \; '"y../—4 " \ / , 1 m m 71 aA 9$ g T 'di' ,,.,,.„ NV,.\ ir g \, a.. ,� J_,,- / ^-.hx — gl gi°Irl§R1 n rn P, 100a000000p, a 51-rP t 11, Ad g1 . 1 i r I I > i3ii § s (i„i-`" ,,.n,_,,t ,,,,;<. \ .., ) -, REVISIONS o ,..., ,. .„, DATE REVISION DESCIUPTION DATE REVISION DESCRIPTION COLLINS ENGINEERING .' _ - +,,WEig*X4 k I/29/10 INITIRL SUBMITTAL 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 PROJECT O D o m WESTLAKE HILLS PHASE I WPO AMENDMENT -4,:T t,I- „,•, J 3 p N SHEET TITLE EROSION&SEDIMENT CONTROL PLAN PHASE I oparty o(C a uaed,�. y p p e vnateoewr,inoluviw.Eut not limRedlto conklrvctbn�tl g. nd/a ttnatrvclbn atek 9 1nou,the exp ess wntten con�en,o!COLLINs En6iNEERING as� iF ' �� yax O ' x d -a- 0.1'...0 4 g i 1 c' a _ *VIII. g d m S S E a 8888883 .ec'. a ebo �i A \ • ly 0, ,,_____. ._._ .,...- k A AN A-0 ---jr....,•••Nsamv_sti roP 000. .. —------1,1irw?""'0710.1%>7: 41 -9 " \8*. \ 4- ,_"- ..„-11111,' h ,:::, \ n VI Pi s s Vii$ ��� �� criro;‘\ 1•1 d,' mo °_ ® /� Ipilli r X • F It °ate Xpt ]J{ / I i illiP d3 P 3. \ \ ` \A,r Xi 3 `.X� :„ y�\ , NA S \ ' \ Ngo s \1 I & ! • •. — Aa0 1 Pk `o Am\ �f Ni m\ 42 m " w , 10 "• I° ; itr") it , a= zNI��a 7 t- / 1 of •I II ,N 11 I 1 \� r, t, 1 m° i 0 \ \0 A ,,,i,R, It' \ 1 t, ti t : > g a ,, ® m 1, 1117 Iii g9p �m� . H A « goS:1 1 ° X, g a: I ,,-„,,q 1 I L \\.; I� I So '.�, g:g. j c` ua ms 1 ' \ :: . :. tii'.. *.')A'41'' ' • • \ .. 1 i' ,t I 1 g \ , 1 \ m 1.41! ,.---------- - 4/°), I yyg , fin 1 , i \.... , /10 b -- IP i ISif "Ir''q' — AV'4`',., ‘ /. 4 m f 1 or/A4/` to \. .i...4.11%..., , ,4-.44.,riff t ..r x _ OIL 11 ip \ e ;:04,./ifofr g aC� Fozam 40 41107/4":*, / Ale 404, iff *et/ I 0: o F'm1 ' -ce mew to / _...,,,,e--0,,,,,,,,o,,,,,, ® a fig" y� ° o. I /rA�ss ��ao ®�` I9 ° �� ��� \`'' v \ \ rear s, •Ty��N �1• ` disv b 1 mg m 2u o5 ��.-' 3'2- r X / i:!"tO v. ///i 101 Rm NNu ri, - \ .. ,..... litt„,.............„.. ... ,..1111P.aill Aeok: , 1 5 A.'5 \ troi „ ,„„,1 ,.., . ..... . I !- apt, �4� ._ ® — ° r I k \. ,°10Ai& . .IiiL;�r�'vr►�► 9 �°�` t 1:.(-t, \ rte, i ., k, , _ ..... .....9,.. _.:,,,-,Arii.,--itti,,,,„,,,,,,,,:, . \ 4 d��• ` r— BNI� �i �� _ Ids® '. ° m '\( ms:,711040....1,0-he4-01:.•torio,--0- .r 0 Zit. , . : 7. „_______ :,,,,,,\ -0 , , __ .. ' \,‘,,,,,,,.„0. 6.• :,:/:1,, ;m II ! 7 \ ♦ Fv \ ticX .,.., 1 1. s„ ; ihI \ o \ \: \ /z D I l;j,' • � � _ \ ® 1 '-',-,,, V -- I U •` • - 1do N. � CO o U o r� o � ,,1-�cAN \ ,,k,44\_:.6\_. •t'"7771,e. -',, -... \\..., . is _ -,„ .. 1 , $ 'mo = & �Xt� g 6 i .1 ::: ; : A::::0:§1:i:m ) u, . 5710 '\,, SV.E-i 2. iZ R1q3 iRi e 8 'F' 2) � g can g \11 88N 81 a u m ,..: c ,,, r o Ny ° / 5765 _ .',.� "S a/ >�°-I11 57598 II 10 N� '..` OA©O©©© m q m3 m rn ,c,t -r-ifi:,, ;,--, / v' 2 585 8 X F O=P. � 0 �` z / i H 8 583 69 z- a R u > u mm” IIa �Sp m + 5916 4‘0,,,a„, ? 1 . M I '� Y S ii 1 I g 590 89 GOS° 1 5 i 1 ! I IIIIP ,,, m kY g I 1 Gel COLLINS ENGINEERINGREVISIONS �o DATE REVISION DESCRIPTION DATE REVISION DESCRIPTION 1/29/14 INITIAL SUBMITTAL 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 = 2 PROJECT _.. _ q6 m c 4? w a- WESTLAKE HILLS PHASE I WPO AMENDMENT %p b/Nro.'1•c € N SNEETTITLE EROSION&SEDIMENT CONTROL PLAN PHASE II Thsss p GNEERING m not be'"''any Pumosa wnataoerer inclusve,but not I�mitee to eanafrueeren me 9, ne/orCconaweeron at g fnauf tn.a p s wntten consent of COLLINS NGINEERING. 4 $a�" 3. � e� g lqIaP 1e [ !a;.swab 3602 l.” pupa 1a \.\ 1 mill l 19 1 °UUU is 1,i1111; 3 a? �u H �aS a •\ ` age wo 44 �#� 3 Q i® a a8 &d,3 A s #Q!' 0.1! � i •1" n �'"� C. M iiia Q mail 11 ^i;1s.R -----\ � =a $^ RB moR �" I�oi$ I& ,I n gag 8 4s? 11i Ipl a — �a;is Rwt— EMM ; g !W Tp )>,(7,0 — �aII E R p0 ;;;;; t - 5a s ?-5,1a1R gi :8;;:ii $ 0 Ll 20 t O 22M; &',, w HIM! 1 „ t..1 I---. masgsaa x,> oo-s '48-.�io s,,&0O- V88t88N es=N 000s. oi�m8s8 �i33$bog 8 (—.:C\. ` o I I : n Y' S S Y g H \ N. > �,, cil - tu i $ �?s� $g 8{ ;E Olin v iii � �I rkti gl "fid 1 1 0 \ \ �� 333,2 4aa4 d4' 3 lm Nigg �€ w3 Q 3$3 3 gEa SEI.. q3 g 33� i I f �• \. ♦ C BSag & - ag,tg i N..1-a^ At �a a^$i r.3aa '1 'gsg Ru aB'i Ail �' �� �\ �. ♦♦ad�t2 F$ g if Rma 1a3 Asa igX68 'a9 gf_ �a� _ �j 1 \. 9 2 dHi iq� 1 _ 3 14� I iii — �� - gg� rP � ''‘\%. may b 7 t . -__ al is, R It gy p•, yacm \.�i u # as>is6 4,-as"'8O 'Eo. �48888 ! �6xm�m =�$ Ymmm ='a8N8u o;o '; •"♦. _ �^�• 1... Hm W pQz• i '''' ••• ' . 8 T.2 , • r .0 • t \ '; . .„ z ..c , . v3 4)__, ° mz y / 4'd, N ozrp o9 \..........\. \I''i, /.,moi♦ ♦ ol.}.o_ • " $IIIIIIA s ' 2.'z .> q b 8' ik .--00,-• m a a c1.m 1v. 4 �i rip ti -, -* IQ n4 u2 Q 1� V' 2 m Rr Obi�"� U ; ,\�'; /�.SI� iN �0 a00 0R;'R `� Itx1 ,t„' " -03 -1 Rh. Rt'J I ._ice♦.♦•♦ ';r u MZq v'i'a 8 $ y. • o ,ori ?. , `1 o y y♦• V O N�A O n n .-I N '�1 8 r�`A n I-I o • O ° r= = ! � z'' 11 jII1 f' tli 00'2 a '''''q2 4 aA0 7;... y gK a `IIPFd o+ 8 $ ^^ 1 11 i !PURR maegefl�"s, a§�ya ,�¢a if I. oi3 t-) C") fl r—�t�=i yay41ii w . 1 !IRA 3'x ,383 flr �w i~te oy ogigi `a 3 3Rs = a ;a 88888$z� 0 z RiWO g 6 Qti a �3 $ a g 4 ,2A . O c; IRS 10 w s It-i sr $ oo ao c 8a ro./ `I ` O\ yb s. a ��qt o �] ;0.2 0 -g 1ti G. 2 - I? 3t• Warb^ s c2 a' z v _ 808 _1-808 i ti ._ 4 \_. czy < • ;II o p a>sessxs 'scmN eves" BeNu _mamNe_ : g • .l , /' �� ice ; 33 ] iII ium fail W 1..1 $ ;S m II p ..!-• .• � \. � � • ��• � �� I!i2 xx � \ I � szR � ^�� im�a4, 0,5 a a!gq, a q^' a '�i� [[r • ♦ 1 r i 4- s ,rye. n 'a 2 _ is 111 F 1 v g.p, 09,' g O^ a s 44 ? �� _i -° i gsli I ° m- til 0E gx m /� 1.1 A ti 8 e R 1.I a y �,� a i,aR ;isR ___sass aa w ".q .5? �" is II $wile HII iE \ n \ \ yww M ww �-OI0� \ T"f \ h nEQg¢ 4e ¢¢ sk4 i} 1gi \ b \ °1,f'` DLI li a � e3 011 H ti 4` ♦ 404 -!lit 1114 8 ^$ $ $ 6 a f1 U c 2,'x\ ♦ tzJ $'$ gs��§ Itag iu��:JJ ao ti p uR� \�°2 ♦♦ f,T u`� 1 ts' sass= a as 'k5 = sssss= S Ni o y 9 rag \ o y -- • a" \ nlzJ Y ' PF s y $ 3 \ Co _ £ b s '� 'Z a m r.' • m ut F s • p 8'9 8.,R* o o 01, W \1.t' ,moa Nog — '3 i r' ;,o sof y 'a\ �+ tu o a l e a i W kA l m . N 5 `\ • \ m ��♦ • 1 g X 1 3 i ,'o 0. • 1 a 8 1 g 1 _ m ' : 411 \•. g: . a DRi ♦ . �1 ! 's E q f, 104* o� al COLLINS ENGINEERINGREVISIONS p11E REVISION DESCRIPTION DATE REVISION DESCRIPTION e WMu SUBMITTAL 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 D o a °WKT ESTLAKE HILLS PHASE I WPO AMENDMENT erH\��.„.4 N SHEETTIRE EROSION&SEDIMENT CONTROL CALCULATIONS r,;=, ' n�cmmte me 1be eac uaw property of cOLLINS ENGINEEFn. ' ::«hole a M port o'aM10 not ba Nae'Ipr my purpeee ,. hmM1eE Ie conetrueban btl g, ntl/ar eonrtruet an ata y .. sent al eIXLNS ENGINEER Ne. B \ 1 1 1 / / ) 1 I / < P r / 1 / 3v ; , / do B b / 1 m NI8 00 \\ $o / I iii rm �� N „yam \-- `. ' ' I '` (� � / ° � J VAllalirpftfrillaiMailliff1111111111111109111,....,,,,,gt. „.•Iratea , m r•�� iaw_— Mauro rii/u'� I , �N II I�---» L11 �A :rJj �,../l/1/ q r //r(( ,( ( • oI I A 1 1\ r1, N'1,,\N,\ V _ 3 '�A. --. ,`,',4', v E, /s, , - w�� -\ 11L_� �� 1. -�s. -- _ _I '-'- �� ''' '''. \i"\*,4°\;',“..,-.1*4014,N, , . ; Fl�tsirt I / F .�< ' i -ate i * . sYi Ii *• y 1 8.,� m i i')_i*** f y / /1 4$*//'• 9 /, ****T7 % g // ** $** I No moo �" K l . .t,' l l JP i r ' /. r =e (vl I < / / i I I J,... T; ). l 1' I I , / / / P - I / l .I 1 ,. II I < l l j l 1 / , ` {/ / / / „may I9 €ii 6 W, moym 8moAimmF, S$1,,M0° gg 8 g 9 $ ky'mno=E8!19,"m800a"1z Ept,�9m.. z a1 Aoy.-$ > ..oI2g,',°4 ozy o iso A om °ma V" g ° ; yog�mAo= t oD�y�i$�5z� A ° $P z �mA� S� o"g i��m�im "C SS mp =,.o 5,4, °°yrr or ' mi i �i 90 F '11118 f.,mmm 1=��H oifnmo° 8`° °-, y� � o m 'g8 °oo m°8 _4i °° $ ri 'ill yg" s P ng Fno �m°9~Tc o,$1,4 V;' o05 °mme =�ioig zy cn= £ ai'xa i, §.F. Pim mF-< 99 oom''"yAo°s I'm off; z .i Un ,lgA 1,o gimlp g1, a o $ i mzAZo � N ; 7° a= a o°z� m� o`n2m $m �zz� � ' i� Ex ' Plg 1,P 1111 oy€i ° m SI -<m OXg lnp mypl2 2 174 1,`'m y N dog Ai and : Hili F€-, 1F Ay S �m yon oA il p7 Ao o =g> wpm o 0 _§ 1, m 'l = orb- A g� 2 — 2 p 61 61 a€ 0 o m l 61$E Al o §,F m gm MOM COLLINS ENGINEERINGmot REVISIONS �aCOy��� DATE 0.ENS10N OESORIR110N DALE REVISION DESCRIPTION y�'AJ 1/]9/10 INmAL SUBMITTAL y a 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 ° a a_ Ww 7 m N PRO]ECT WESTLAKE HILLS PHASE I WPO AMENDMENT F■ ■ . & o' "bf NI - a N SHEET TLE MITIGATION PLANMMIMMMO .a„o,�. �s,,.o,,, a,,m«d,o os,. ,.o.e a ,. �a�o, e„� o „a 9 «o ,Ee e.�.,,,.�,, a,�,o,�«,� E���EER-�� , ,ea o• r o P , Iv 47n it .r`� y F o- V ', ' A n \ ; - \ _ i l" -K -- 'r r ,, NAD B9 \ F. MM MM0 � � D � r � m 1- 1 1i c O �� � ,o \r / , r <� „ " 7) 0 f \ , V ` In Z < T. Z (n U zi /� l rY., ° ( ( 0_1 j �j g / * \I I > p A 0 �• . N m m .+► fix •♦• .� . �" J \ p_ c� `• o • K l I w In \ i m rn C Z i \ II Z n 0 co Gil m I Iy I • Z 23 D 23 +�I \ ® ,,• Nm70 -\' ,,i(j: Z > M \ - . ... .....___44, _ ... __\ r �\ z \` m O\ m , I* _ ,,,, 0 o 1 (-/11111* m I c-o* pv 23 rZ D_O z� z-00 m V in / n W_OOm w \• m IN p / C1le D AY ,.% a m ' •mo Eoil zz , GA z mm 3. A O G7 O I, \_K_. \\ N D m m mI O nO cn IS , - '-'44444'-) '''-‘3„`',„„ c Gymm—IF D D I 11.\., t,4cl'''--:t,' ,<: s5 o° 0co rn z. \\\.c `' .Z�1 0 m '�'. C �`' m :;-' ‘:iP'''''''''''.4, mmr-v)........1 ±-1 'i''''''51 .> -4 0 of +�AA. .c • s Z Y"`, \ - _ 0 ' 'J,b, _ cy .,\ 1: / N'*".``r,r4,c'si4:441"4‘)„, ,,„x '�V nIii _ �� i -.`u-T . r ,tb,,, i tilZt / _ t \ 1-] f� ! Z • O o0 > = Or --< = 7:1 > I0 = � i•- ( cn�o OrDDZ mM _Imrm " 8.� , ' x� O Om • rDON CrmT1 (�nr -10 "" �'" (.11 FAF01'...11‘,..11 (Zj � (n10Z -‹ rp -nDz --i 2 F 11 C m � c � m ZG23co -17J to � , � m = m ODO = v) D E,1 Z23NmN D = —ID00 `` � :::2 D � � olz _ � rrlmrnK �U OO Ix OnDrr * w8c)0 T12 p p� mz �7pmZDz � y � Z7p _1G) m r- U � �0 r 0 > 1 m --1 ,-,-, -0 C Z Z / `' rnm =0 or• ma zi KpZD - F , ` cl 0 KZmrF.1xi W 0 — v) <Tl0 a..Ro.::. 12: `\ \ S p�x � Or -171r = k. 5 t> ` mZn - r DD * Dm /14 /\ -- fdCHI- Zm = — —I � j > < rf- = � ( p m0Wr • MC \ Nm-1 ttt 1 Ooom02D 7:1 _ = 0 ii; illf-1-4 �om c � CJ1m 0 DDZm N \` _ m moo � , m � piC = � Z r =� p I I. p 1 II N� 7� O mr � � m W ��hi �\\ tai m Z r p � ., . \ \\ / \ \ ,I , _ 1 . 4g.... .___ „,v.._v_.,„\, 0 I / \ ‘ ,„\ \ z> — \ \\A'\ \\\\‘\\, \ \1 ( 1 s \\ \/ ,,,--- \ / , i , 7 ‘ ‘ \ , , , \ J i).\\ i ,i \ , ‘ , NAD 89 _ --- ' \ \ \ 1 \\ \ -- A \____ s \ s , / \I 1\,,,s,s\„( i \ --- --1 s- s 1 \ sl\ \ \ 1 k , -, .i.,, ‘'‘ ' \ ,„„----- -'c--- \ 1 1 \ , R 1 ' \ ''' rri r `, d \ / ' , , i \ ..„,,,,,-----'- ....--- ,s- \ \ \ , _ ___, _,-- \„...---- s \ . - i \ \ ,:„---,-- ', ....----- ,---:: =,\ \ ,-- \ \ <0, m xi O GI 2 -----1---.-*\ \ ,- ---/ X s s \ s s I - O m - ', 1 —1 \ -,, / \ ' j) ' \ \ z > \ ,,,,,, ,,,,-, ,„2,'",/-1,'\,_ n c ro \\ s > r_ \ \ 0 i 13 UN \ \ \ \ , ..-- , - -- ,: — r- ...A \ \ .re9 Z _ kJ , Z - - '\ \ ° I s \ X ' s _------ / ----k's -:::2-1.--N,_ __ —u--7 ------: --- / -‹ ---' , -- „,,, s-- ---- „-- --'-- --- / •---- r — - - , _1 I „,- / --rn---. 1 ' \ (.. t , \ 2 M c I \1 .... - -2-i Z / l''''. ''''- ,,,,C'''' ,- ''" /1-\\'--..-' --- --: m ..." /// 7' ,,,z.'. ' ''''''.M .-'''''' V \ '" -- N 3,"' ,..--'"'" / , / - -1-- OI 0 ' ' 0 \ \ .......0.0.407.11 \ , / , :,x-- ,, -- _..../ , - \ / \ K s Z C 0 s I ( / / / / / / \ N • z 0 1\ ,‘, , 1 / --\ --- / / / I \\ \ tv / \ 0. ' /---- I / . \ ii\N‘ -T 1 , I / / 73 \ 1 f I // / 0/ A 0 \ 0 M , / \\ / 551 / ‘ , 0 ( ( \ \ \ I M ,e1,,. f Os. =if ' \ irtt rI----'/ I I I \ \ \ ihr \ ,---- \ \ ------ toe / \ \ .....-41:1- 7D \ \ I C> \ \ I / ° \ 0 -0 1 \ .-. W ------- ____--- '-: v•-•-',,Th„;`4, I m 1-11 \ 0 \ \ NTIlt \ \ \ Cn \ \ \ a Illiv N \ \ M M \ \ 1 , 0 0 \ I \0- \ \ a , \ , 1 \ / z \ , , 5:5 a) --I \ ‘ I I , ---I \ s -,''' \ ' > -o . ?3 1 )6 >g -53 :),‘1 ..."' _1 \ \ 1 , M t I , s I i ' -s 73',. \Si, 1-4 griA , ., ,, 7,1 Cf)(1;8 ,,,,,5 '",,12', 0 0 /4. ..„,„..1" yA, *1 1 1 '4 ==c-gtrg r ' fki.S:' " \ i. ,,.> ,, 52 m , *- '6,,v, \ , \\ ,, cr).A'c, W4 \ 0 v FM") x,, II ) -14 • ‘ -.& • - i i >< k t1/4.\\C.0.• • % • '.. ... woo \ c.....**n; .,,,, s , A .<0.• Iii \ ' a.. . \\ 7J r- • \ 18 2 :). C>)F-I 2 '„•, —_,-,-, 5> 1 • , 1 - • ) , \ " \ . > — m i • , CZ z 0 z , \ 0 0 co. c \ •11.0000e- • -,,,,, \ -n m o 0 m -r , 4Ik '0 I vi 0 - ,;- (,•, 0) 0) * * Fj) Z , l .. .• Z \ \ \ Z U1 (/)* _ t s \ 1 , \ m I 64, c:, •--4 \ \ \ 1 , \\ \ \ \ \ 'It., 1 -i n • P co M > \ 0 E I Z K 0- •-•-•Z \ ' \ \\\\ \\\''' \\:, \ ut \ 'Ed .• ,':-1 0 • i m \ \ \ \ (IA 73 \ >C)1 O —toxi0E -< ix > moili.) e2 ,1== > > :! rn M _1 pi r- rn • _. 'PA rn rn r- • M \ \ am E: • r- ), „ r- \ Q \ „ 0 r, __ ,1/42. NJ c: rn co --I CD \ \ ZZ ' - 710 * > z I xi \ o A N --0 trIP ,M -• ril rT, rri 11 FrriloDOT (n > , \ 0 0,A H t 0 o 1- -< -13 K 0 iiiiiii \ , \ m M A 0 m I-' -I --I * m --I \ 1- .....1Zrri23i(j) Z1`).. Zmi > 0 i \ \ \ " > > 7:11- c) M rnp-iK -F•• v) 70 > m c Z 0 0 > r- E 0 CO 0 0- ,F.:1 i \ 0 \ ' -- 0 rn _I co p z pi * CD ,_kj > 7Jom 2 > zzK- ci- m H __, X CD :71 c) rn F: 60 60 c) I \ \ , 7) . > r- --I K \ 1 cn 2 co :) ,••,, 0 _, rn _ o 0 _I - Tic - zz z H ,„,,Ir \ 03 X '7' M c`5, M m 1 F —C) Ns , , z 71 r- 73 -,'.21 7' rn 0 rn CD K w m 0 r- - 0 CD X rn rn z 2 co T> C: • -ID , 2 • o -.-Iz -IF) 0 , r- I > 1-r1 .2U) rn(nr-- > > MT> 4 1 '. I , Z c _1 (A -1) 0 _1 m--I xi ; \ 1 I gliiiiiiiiii , —0 \ 1 IT' 5 P co = (,,? .....° F.:1 '?' g 19 1 < , < -iimm > , .- w u) , I , , , / (,) • o 1 \ , F, P F-r9 rn CD 2 :E 2:1 , _-•• ---, , 7.„ (,) -1-1 1 J, 71 M C M 0 > > C n (1) 0 \ (53° • 1 , m i < -'.r. > I-- > -C CD CO I ' • • \\ rri -11 i— 0 1 Z 0 C, ' C D..-F--F• > —1 i , ii, 0-0 . f II 1 A Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, Ill, & IV '-~~~~-----'- ----~---~^-~-- Appendix B-Copy of 2012 CGP Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be signed by the appropriate person associated with this operator.) Name: PIEDMONT NEIGHBORHOODS, LP Contact: JEREMY SWINK Mailing Address: 200 GARRETT STREET,SUITE B City: CHARLOTTESVILLE State: VA Zip: 22902 Phone: 434.975.7445 Email address(if available): swinkjw@stanleymartin.com Indicate if DEQ may transmit general permit correspondence electronically: Yes El No n 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name: WESTLAKE HILLS-PHASES I, II, Ill,&IV Address(if available): TERMINUS OF JONNA STREET&WESTHALL DRIVE City: CROZET State: VA Zip: 22932 County(if not located within a City): ALBEMARLE COUNTY Latitude(decimal degrees): 38.060094 Longitude(decimal degrees): -78.685532 Name and Location of all Off-site Support Activities to be covered under the general permit: Name: Address(if available): City: State: Zip: County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): 4. Status of the Construction Activity(check only one): Federal❑ State(— Public❑ Private El 5. Nature of the Construction Activity(e.g.,commercial, industrial, residential,agricultural,oil and gas,etc.): RESIDENTIAL 6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC): Name: MECHUMS RIVER-BEAVER CREEK Name: HUC: HUC12(020802040102) HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: 8. Estimated Project Start and Completion Date: Start Date(mm/ddlyyyy): 07/01/2014 Completion Date(mm/dd/yyyy): 12/01/2017 9. Total Land Area of Development(to the nearest one-hundredth acre): 139.93 AC Estimated Area to be Disturbed(to the nearest one-hundredth acre): 78.78 AC 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑ No[I] 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for nowing violations" Printed Name: t S.f.�j Title: 0.,..t( r dF L Signature: .�r(�- Date: ID(24(11 (Please si INK. This Certification must be signed by the appropriate person associated with the operator identified in Item#1. 01/2014 Page 1 of 1 Instructions for Completing the Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) GENERAL stormwater pollution prevention plan or comply with other permit conditions). A.Coverage Under this General Permit. The entities that are considered operators will commonly consist of the Any operator applying for coverage under this general permit who is owner or developer of a project(the party with control of project plans required to submit a Registration Statement (see Section B below) and specifications)or the general contractor(the party with day to day must submit a complete Registration Statement to the Department. operational control of the activities at the project site which are The Registration Statement serves as a Notice of Intent for coverage necessary to ensure compliance with the general permit). under the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10). Provide the legal name(do not use a colloquial name),contact,mailing address, telephone number, and email address (if available) of the B.Single-family Residences. construction activity operator;general permit coverage will be issued to this operator. Indicate if the Department may transmit general permit Operators with an existing stormwater discharge or proposing a new correspondence electronically. stormwater discharge associated with the construction of a single- family residence separately built, disturbing less than one acre and Item 2:Existing General Permit Registration Number. part of a larger common plan of development or sale is not required to submit a Registration Statement, provided that the stormwater For reapplications only, provide the existing general permit registration management plan for the larger common plan of development provides number for the construction activity. This item does not need to be permanent control measures (i.e., stormwater management facilities) completed for new construction activities applying for general permit encompassing the single family residence, coverage. Operators of these types of discharges are authorized to discharge Item 3: Name and Location of the Construction Activity under this general permit immediately upon the general permit's Information. effective date of July 1,2014. Provide the official name,street address(if available),city or county(if C.To Apply for Permit Coverage. not located within a City)of the construction activity. Also,provide the latitude and longitude in decimal degrees of the approximate center of 1. New Construction Activities. Any operator proposing a new the construction activity(e.g., N 37.5000,W 77.5000). stormwater discharge from construction activities shall submit a complete Registration Statement to the Department prior to the Name and Location of Off-site Support Activity Information. commencement of land disturbance, unless exempted by Section B above. Any operator proposing a new stormwater discharge from This general permit also authorizes stormwater discharges from construction activities in response to a public emergency where the support activities (e.g., concrete or asphalt batch plants, equipment related work requires immediate authorization to avoid imminent staging yards, material storage areas, excavated material disposal endangerment to human health or the environment is immediately areas, borrow areas) located on-site or off-site provided that (i) the authorized to discharge under this general permit and must submit a support activity is directly related to a construction activity that is complete Registration Statement to the Department no later than 30 required to have general permit coverage; (ii)the support activity is not days after commencing land disturbance; documentation to a commercial operation, nor does it serve multiple unrelated substantiate the occurrence of the public emergency must construction activities by different operators; (iii) the support activity accompany the Registration Statement. does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the registration 2. Existing Construction Activities. Any operator that was statement at the time of general permit coverage; (v) appropriate authorized to discharge under the general permit issued in 2009, control measures are identified in a SWPPP and implemented to and who intends to continue coverage under this general permit, address the discharges from the support activity areas; and (vi) all shall submit a complete Registration Statement to the Department applicable state, federal, and local approvals are obtained for the on or before June 1,2014,unless exempted by Section B above. support activity. D.Where to Submit Registration Statements. Provide the official name,street address(if available),City and County (if not located within a City) of all off-site support activities to be All Registration Statements should be submitted to: covered under this general permit. Also, provide the latitude and longitude in decimal degrees of the approximate center of the off-site Department of Environmental Quality support activities (e.g., N 37.5000, W 77.5000). Also, if an off-site Office of Stormwater Management,10th Floor support activity is going to be covered under this general permit the P.O.Box 1105 total land area of the off-site support activity and the estimated area to Richmond,VA 23218 be disturbed by the off-site support activity need to be included in Item #9. LINE-BY-LINE INSTRUCTIONS Item 4:Status of the Construction Activity. Item 1:Construction Activity Operator Information. Indicate the appropriate status (Federal, State, Public, or Private) of "Operator" means the owner or operator of any facility or activity the construction activity. subject to the Stormwater Management Act and regulations. In the context of stormwater associated with a large or small construction Item 5:Nature of the Construction Activity. activity, operator means any person associated with a construction project that meets either of the following two criteria:(i)the person has Provide a brief description of the construction activity, such as direct operational control over construction plans and specifications, commercial, residential, agricultural, oil and gas, etc. This list is not all including the ability to make modifications to those plans and inclusive. specifications or (ii)the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance Item 6:Receiving Waters(s)and HUC Information. with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions(i.e.,they are authorized to Provide the name of the receiving water(s)and corresponding HUC for direct workers at a site to carry out activities required by the all stormwater discharges including any stormwater discharges from off-site support activities to be covered under this general permit. 01/2014 Page 1 of 2 Hydrologic Unit Code or HUC is a watershed unit established in the gather complete and accurate information for permit application most recent version of Virginia's e order national watershed boundary requirements; and where authority to sign documents has been dataset. assigned or delegated to the manager in accordance with corporate procedures. Item 7:MS4 Information. b. For a partnership or sole proprietorship: by a general partner or If stormwater is discharged through a municipal separate storm sewer the proprietor,respectively. system(MS4),provide the name of the MS4 operator.The name of the MS4 operator is generally the Town, City, County, Institute or Federal c. For a municipality,state, federal, or other public agency: by either facility where the construction activity is located. a principal executive officer or ranking elected official. For purposes of this part,a principal executive officer of a public agency includes: Item 8: Construction Activity Start and Completion Date Information. (i)The chief executive officer of the agency,or Provide the estimated start date (month/day/year) of the construction (ii)A senior executive officer having responsibility for the overall activity. Provide the estimated completion date (month/day/year) of operations of a principal geographic unit of the agency. the construction activity. Item 9:Construction Activity Area Information. Provide the total area (to the nearest one-hundredth acre) of the development (i.e.., the total acreage of the larger common plan of development or sale). Include the total acreage of any off-site support activity to be covered under this general permit. Provide the estimated area (to the nearest one-hundredth acre)to be disturbed by the construction activity. Include the estimated area of land disturbance that will occur at any off-site support activity to be covered under this general permit. Item 10:Common Plan of Development or Sale Information. Indicate if the area to be disturbed by the construction activity is part of a larger common plan of development or sale. Larger common plan of development or sale is defined as a contiguous area where separate and distinct construction may be taking place at different times on different schedules. Plan is broadly defined as any announcement or documentation, including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, etc., or physical demarcation such as boundary signs, lot stakes, or surveyor markings indicating that construction activities may occur. Item 11:Stormwater Pollution Prevention Plan(SWPPP). A Stormwater Pollution Prevention Plan(SWPPP)must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10)prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. Item 12:Certification. A properly authorized individual associated with the operator identified in Item 1 of the Registration Statement is responsible for certifying and signing the Registration Statement. Please sign the Registration Statement in INK. State statutes provide for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this part,a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation,or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to 01/2014 Page 2 of 2 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES |' II, Ill, & IV Appendix C-CopymfNOI and EPA Authorization email Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES |' II, U|' & IV Appendix D-Copy of Inspection Form Inspection Report Template - Field Version Purpose This Inspection Report Template (or"template") was designed to assist you in preparing inspection reports for EPA's 2012 Construction General Permit (CGP). If you are covered under the 2012 CGP, this template will enable you to create an inspection report form that is customized to the specific circumstances of your project and that complies with the minimum reporting requirements of Part 4.1.7 of the permit. Note that the use of this form is optional;you may use your own inspection report form provided it includes the minimum information required in Part 4.1.7 of the CGP. If you are covered under a state CGP,this template may be helpful in developing a form that can be used for that permit; however it will need to be modified to meet the specific requirements of that permit. If your permitting authority requires you to use a specific inspection report form,you should not use this form. Notes: While EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Inspection Report Template, the actual obligations of regulated construction activities are determined by the relevant provisions of the permit, not by the template. In the event of a conflict between the Inspection Report Template and any corresponding provision of the 2012 CGP,you must abide by the requirements in the permit. EPA welcomes comments on the Inspection Report Template at any time and will consider those comments in any future revision of this document. You may contact EPA for CGP-related inquiries at cgp@epa.gov. Overview of Inspection Requirements Construction operators covered under the 2012 CGP are subject to the following requirements in Part 4: Inspection Frequency(see Part 4.1.4) You are required to conduct inspections either: • Once every 7 calendar days;or • Once every 14 calendar days and within 24 hours of a storm event of 0.25 inches or greater. Your inspection frequency is increased if the site discharges to a sensitive water.See Part 4.1.3.Your inspection frequency may be decreased to account for stabilized areas,or for arid,semi-arid, or drought-stricken conditions,or for frozen conditions.See Part 4.1.4. Areas That Need to Be Inspected(see Part 4.1.5) During each inspection,you must inspect the following areas of your site: • Cleared,graded, or excavated areas of the site; • Stormwater controls (e.g., perimeter controls, sediment basins, inlets, exit points etc.) and pollution prevention practices (e.g., pollution prevention practices for vehicle fueling/maintenance and washing, construction product storage, handling,and disposal,etc.) at the site; • Material,waste,or borrow areas covered by the permit, and equipment storage and maintenance areas; • Areas where stormwater flows within the site; • Stormwater discharge points;and • Areas where stabilization has been implemented. What to Check For During Your Inspection (see Part 4.1.6) During your site inspection,you are required to check: • Whether stormwater controls or pollution prevention practices require maintenance or corrective action, or whether new or modified controls are required; • For the presence of conditions that could lead to spills,leaks,or other pollutant accumulations and discharges; • Whether there are visible signs of erosion and sediment accumulation at points of discharge and to the channels and streambanks that are in the immediate vicinity of the discharge; • If a stormwater discharge is occurring at the time of the inspection, whether there are obvious, visual signs of pollutant discharges;and • If any permit violations have occurred on the site. Inspection Reports(see Part 4.1.7) Within 24 hours of completing each inspection,you are required to complete an inspection report that includes: • Date of inspection; • Names and titles of persons conducting the inspection; • Summary of inspection findings; • Rain gauge or weather station readings if your inspection is triggered by the 0.25 inch storm threshold;and • If you determine that a portion of your site is unsafe to access for the inspection,documentation of what conditions prevented the inspection and where these conditions occurred on the site Instructions for Using This Template This Field Version of the Inspection Report Template is intended to be used in the field and filled out by hand. If you will be filling out the Inspection Report Template electronically (i.e., you will be typing in your findings), please use the Electronic Version of the Inspection Report Template available at www.epa.gov/npdes/stormwater/swppp.The Electronic Version includes text fields with instructions for what to enter. Keep in mind that this document is a template and not an "off-the-shelf" inspection report that is ready to use without some modification. You must first customize this form to include the specifics of your project in order for it to be useable for your inspection reports. Once you have entered all of your site-specific information into these fields, you may print out this form for use in the field to complete inspection reports. The following tips for using this template will help you ensure that the minimum permit requirements are met: • Review the inspection requirements. Before you start developing your inspection report form, read the CGP's Part 4 inspection requirements.This will ensure that you have a working understanding of the permit's underlying inspection requirements. • Complete all required text fields. Fill out all text fields. Only by filling out all fields will the template be compliant with the requirements of the permit. (Note: Where you do not need the number of rows provided in the template form for your inspection, you may leave those rows blank. Or, if you need more space to document your findings,you may add an additional sheet.) • Use your site map to document inspection findings. In several places in the template, you are directed to specify the location of certain features of your site, including where stormwater controls are installed and where you will be stabilizing exposed soil. You are also asked to fill in location information for unsafe conditions and the locations of any discharges occurring during your inspections. Where you are asked for location information, EPA encourages you to reference the point on your SWPPP site map that corresponds to the requested location on the inspection form. Using the site map as a tool in this way will help you conduct efficient inspections,will assist you in evaluating problems found, and will ensure proper documentation. • Sign and certify each inspection report. Each inspection report must be signed and certified by the permittee to be considered complete. Where your inspections are carried out by a contractor or subcontractor, it is recommended that you also have the form signed and certified by the inspector, in addition to the signature and certification required of the permitted operator.The template includes a signature block for both parties. • Include the inspection form with your SWPPP. Once your form is complete, make sure to include a copy of the inspection form in your SWPPP in accordance with Part 7.2.12.4 of the CGP. • Retain copies of all inspection reports with your records. You must also retain in your records copies of all inspection reports in accordance with the requirements in Part 4.1.7.3 of the 2012 CGP.These reports must be retained for at least 3 years from the date your permit coverage expires or is terminated. Section-by-Section Instructions You will find specific instructions corresponding to each section of the report form on the reverse side of each page.These instructions provide you with more details in terms of what EPA expects to be documented in these reports. Ln 0 Nnailli 12 `<` ,< - v o O OD ,_u,: Eg 3 co n. d.S-n_ 13 O a t¢ 0) ttim o t i 2 ":7 yr fi^t`` -0 1,E "1 ;' p 0) eicall 3 C `w,a e N -0 .0= O a p t 16F--41 f. ty it C CD 3_x =g a N Q �y#t Itk.t • CI5 :y.,.t,,f;:':,, C c -0 O T aRtr tO ); E C itfigili Q Q N O C a E p ON illib -0— ,..r! 03 krsQ 7 Z U C ❑ t O) p •• d Qi L N N C I° = I ' p O O T O N ...Ne[ ' C TrcaNAN -C 11El N - O O).c U) C a (V o O Q O C . ; N 'O 92 Na0 . 0 p (, N 144 p V a Z i .� U 8 ` t C N r O U W O. C r #4 •2 o -,:o p i O U N N N v) O7 a) �= O) 'tittle it U — __ ,tky 12..: N o M O O O y U 4ny � 3 oar pN Z C [a I = o 0 -0 o ❑.c .>_ C U C J O _.� 1 p h •- O C •1 0 he ` - Q O -c •� �' W H U E liati c 0 N N _ N N O C O a4 a C O N ❑ 1L C y +i 0 0 N p o 4 _'x N (V 0 _c y• y C OC 3 T Vokmed > O N O 3 W i� p •tJ a O= -�y5r O W C ti i C p W y C chavm u❑ pp b' .2 oar a ? 2 a) >"0 £ ,� a) C o a) N ' a. orat• -Q o N p r C O O - 3 IgnIASSIN C Na a) C W N w.. 0)0 W N N 3 ff ddv3 t I"s a° N W p O 6❑ o) o O o illi YI t£ Q a O. o d CDU O . -- 1.5 N y � 34)aa o o o tN ilarieg U 0E ccCEEE ) c Cam caa >4 (I)i . ` E ) vl c` > > N O N •- O • OdC O CS cpEyo �, , - dvv : F 0 O Cp) Ca ; aa } z o aau51) a. a ' te � _ •°av ",tie:fug*Ngu.Toodm O � � d V 0 0 0 C. 02 V N N N Z .0 C M � y, 3 O p — a. O O o O - O C 0 ❑❑❑ N rn O o >o_ ' t PAM, E ac C U0 ?•oJ uv U y ;'c > - F, a N 'U N -0 d y E ae I , , ` '� 1- 8 G '`r° yo m h0. QpaC a o N a `' '< ' z CU d E. .c �.0 o S.c 3 N L O= 0 D U O w > o 0 13 U0 Q) '.C5 -0oX C b- a U N C > N p >' > O •C a) ,, aU > ^` Oo •c: O—o � O 0- N o o Na • -C � � j, C o 0 "E ' s C a 0 -0 N >- o C o 0 o) a p 5 '3 -O_o o C O O o r O o O C O _ a) > >. O — o O - U) 3 O CoO O '5 p •- o N -CC D 0 ` > - .0 N -C >-. O N o NU o° o0 13 C N0 O C , ` N Q = _ O 1 U) U C oO O .,tp NU U >` Doc •p -aNN 'a O o -0' E 3 o :- '- o r- C • 0 C • a O-r) ,-. "- o o •N h C w o 0 N 12 O '0 ° � •- .- C o U U 'o o o)- C Lr) O = .0 o C 0 0 -O o CC -o CO O N o _ o p U ni 3 a.c o C a) , : 0 U o U p a N C o a O p v, a) O _^ v) Q Cp •' b C '0 tri, p C O C CL .0 O N C 4-- o O O U o O 0 0 '- O 0 3 O U (� O C N ,2 h t f C C 0 o N D o _5 o = 0 .ma 3 U_ o Oo . a U)o -c O o a >.•U, o ; - u N o � 0 0 c U a N O N oCNo o > t _CQ U ° o O ,N 0� o° o ' • ° °C aa) ac0 >. 3 , ('-) o C 0 a V- o N C N• S U 7 a o c0) N C O O 2 N a — p C 7 •> 'o p C o O A O 0 0- U e U) 0 O N .o N .0 p C o N 0 o .O C Q' C ° U U O U) 0 ''' C O N O C N p O Q O p O C O U +-•• E 0 0 y 0) o ,C .- O U) C vU O U) o 3 o' CO N C 0 C 0 " ° > o U � o a C ° C o a� 3 0 >O 00 • •O : -0 O= � ,p a) a O j O 0 a'O a) N >'" ° ,O N 2 to O N oO (9-, -6- 0o ai00 92 0 0) `) o a Q - • E 5 fi ° o f o 0 ca . ° _ v OC a ° c' - - o_ OOT4) ^ >. 0 " '0 • tU a Q }O N _c -C) o 3 0 •SOC LP oU a 0UU -0Q ao N VI 0 0 O N • N C O a o 4.) O V. O o O N = U O - 0 ate — pQ o _V a aair O �UCv ` � � t 0 . �� oo 4' jo 0o > O N oOn0O C o ° CO 1.1.1 - 2 1. } 3N m0c z oD > 3ob� " a) caa � . c p • o0 UU ; a o (DN o 0 o _) .c O O• „ 7 .- ", o O E ,N 0 c •N >' ED c 0 () 0' H U) > ic v▪) � Uoi o) COO a) a) O 3 0 U (y) -0 a) ,..t- O O ,�C T• v O p N a-O O cC _ N O C C OC = U O o o O NO O o w op ,6OCU c) NU) aaao00 o o }a) a im acc � o a 6 a) c E 3 C 0- ag �n .3 •° �'• •� 0 o 'Q � N ....= '^ N C O N O N O o C `2 ,c o • O � d2' ar N E N o 2 •C 3 a '0 0 oma •- ,, o000 _ 3 0 �' 0_ ° ° ° = aoi o o NDC ° - _ .0▪ 3 z 3 O a C o U C U) O C a O a O N 0 2 a) U D C j • . ° ° V 0 E a) o 8 ° 0 ,r 3 o a`) o a� Q,.,_ ' •c = c P U 2 O 5_'+ N N >`N a) 0 .0 rn j •- 4_ 0 ,O ° � � ° c0 DaC) >•� oo •� ° O �03 � a��io >0 COai o o �" o U 0 U o N 00 oc o a) 2o .§ ,i ® 0 2' a y o a) '8 02 U o z . W >• ai E - O n 0 .c >' � x 0 30 -01-t .Q U O C o C L Q a o O p c p G p 0 C a N J U O -0 Q U oCL a) C. N•° O C ° O c 2 .� _ -0 Z } o s .U) _ 'o a, = o - "p' N d O c N a p C O Q O C0) G o U a) o o O a. O O o -C •5:,— (.) 0 _,• o a) 0 h N V O 3 C m P.- - u AUA� o �� =A� a Au� � TDS t..) -v > 0 3U °0 r 3 _c a� os ° N D L 0 • "� 0 N W O S. O C W N ~ N m a O c O c a o C9 C C C C O O d � _ >. p C .0 N2 � 2 N O a d o LED C O) , O zW UW iu n_ c i .E 0 U •�, 00Doa 3 -.- 3 LS0 '2 "- O MU L() a) O C Q p a) r O ,, a) a) a. oao �a0 a) c v U C 7 0 C O O o 5101.00, O D N U C a) a) OO O Hd N N ,-CD_C .j O) 0 5 CT• O- C a) 0 a) O Ng,i k t 92 U r O :4tttn i H O o O _ o CO - � 0) "p ,lt,• 'kti O C 0 0).c 0 C 1##.4011 kaa) O O 3 - _• 92 ~ a) o o O o o C > c N E 7 O ._ OC 4, UO > •H • O{: Oa4,_ - ) ..- 102.161 O ch WaUna) O -> N c • Okk' t . O O a 0 C `p 0 .- N M' "E .4 •H � • •N � C O O ,., 5 O N C _ 0 i.'-` 4t C:' 0- 0)= 5 N a) a_.e N ._ 5 -0 a) D Do 'CQ N t t *kN� ms t O3O •• O • • 01 Z O O N E - a 0 _ I tn 3t ri C p p �- 0 4. O C a) o 01. p .., aS'. U a r. C O .0 C Q o , , a) > .- 17, • - CWc••• C C N ( 3 a > 'akO p M a ak a,2 C C = 01,- - C -0 d QOp h0) C"_ i d •C C a 5 O 3 0 a8d � c >� �- .C > 'G * U � ,, o -, o '5 p O N� U O -p • a• • ,:,...1.w. N 5 N C •- O ,, . : 0 0 0 0 0 0 0 0 0 0 ,- 0- •0 jvz Z Z Z Z Z Z Z Z Z Z 0) maCo ;' > `.' ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ - 3 a) o $4E TIM tit ili0 O h^` Nv, �^^n`` ^` w H H^' HHa s 8 0 92 0 W a] a) W a) N W � a) c C H;3" O U y >- >- >- >- >- >- >- >- >- o -0 o 181 Dane ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EFEo -o 0 p 2 .2 -0 —.C_ C 5 N a) +- j 1 a o O o 0 0 0 o O O O o O- o E Q U Z Z Z Z Z Z Z Z ZZCU2r G nn ' g .. ❑ ❑ ❑ ❑ ❑ 0 0 ❑ ❑ 0 0 °)QaQO € o . c� Q tag • N a)C _ Qaw M1n{ aa) C N N N N tao NN NN aN) N) C aa O o it CLC •a >- >- >- >- >- >- r >- >- >- a- -a oImpirmaloy ka e3soeO * z 1E1 El El ❑ ❑ ❑ ❑ ❑ ❑ ❑ oovo � H 9, ^ kk N •> •c 0 kkt -ci pNUp aucio U p t .€ h+ ? O C o "' a) Ct .wUd aC N o — > O o ssyGk,h0•3•3303.0'7 H C 3233332322$ .3 ILIa o oa O13 a 1:4400.1Qi } 7... CO C "O N OEpC6j •mt rt 4° k. C "0 O UOUci0 U ` te Qa3 E oH0 2daa � , 2uoo6 � 0oO 4 o C h - - . 0 QU —1 .0N ~ ' NO O a Nj - coN •v •• f aa0 irgyo Qao 5 " C r 6 v 1 •o COco: zo0a0r __ oT * — c .4 c m 0) .+ a as o °' 3 -C 0) D 0 c 0 A E O U a O Li= 0 O :Q •� 5 � O� � .� z � O � N i a a) " U CU � O -6Ua N E .a a 0 0, o 0 o E o Dry 3 Ev) c o .� a a -t H N U O E _M df U E N 0 E O a) U =., VU- 5 -0 0 U 6 —.(NI N > a) c > O 0) U a) O E ° a) 0 a> •t >'. a) a o O ai a) c U Q c Q 0 .C Q) 0 a 0 ` ,�, p a H L 3 a) O H0 Q) H y o a c a) c a> 00_ 3 3 0'° 0 0) 3 � 3 ,o m E a ° O a _c _c a o a . � ,o C o O U ° > T Q 3 a) `—' C O O a) N O C -a o '^ a) a) U D a"- E ,n o O 0 O a U a O H } o 8 .D O- a) m a) a C j a)-0 -0 U 0 - 7-= O U o a) c O I-- a E � o E o o a) 0 5 � • aN 0 0 3 > v p O C U O } O w O N •`- N a a 0 c 0 QO a ° a=• E - OaOU oaa) O c U 0- Q 0 0 ca> o a a .5 > m E o Ems> } a v m a � ° a � ° 0C0aE ao` a0 � � U a) ap F _ ? 0 N 0 N t E a a) a .' a) O > H O c N Q Em > � � a � 0 '� 0 � EUoa> o � ,( o o E o 0 ._ C J U P U c - o U Lci O w U 0 a) 0 c _. q:: U O aNOQC o 0 � c a 6' -c - c E ` E EOa> a 0 3 a) .� op >° -= � a)c o � 0 0 E c a o o a>> c 0 a) -0 'a N c a ' N O a O c p a _ O c E > O U a) C _ cof >.. 0 0 . T E 00 ca) La a o o a .� �, E (5. CSN o c �3 0 0 ° ai ago 0- up U — U o a`> 0 . N a) O U a U L U a � ., o :8 0 a-0 0 C -00) c 3 _ 2- U o o a) o a 3 a a a) O a a o_ 0 Q a s N 70 0 i >. > _ C N � O U a g-. a> c O N 0 ° N c N c c a ~ o C o "- 3QE .aa a.5 .c ooS ° 3 ° a) 04 •a ,a H Q0p0) p 'a (Ni '5„, Qa, a> a o .o Co a) NO a OP 32caU pON -' aa o pNL) NN U a) Q � 0 - 0 E — c d Q — U O a) U .0 r o > 2 O N U O O a .c _c O O t _c 0 c a -C Ua .5c c 3 c a 5 ON 3 c a "- � � aci o o a) '5 o 0 GIw o - w t 'S E a> a o _c 5 0 U c a -0w m a a CD "i"0 :N c 2 --c _c a a c 3 E a _ 0) T.Q,c O 0-U a a) -c 0,() � a - E > 3 tix a- clel a H o c } •= C � Q Q0 E O O O E 0c .§- '''' 3 cUw N ° ° N °'. ,� U N N c N oo He c a 3 0)E.--; > 3 ,.. - O � 0 _0 o 0) a 0 a) O N o 0 i 0 O a)v) O 0 N O 0 ,.; a)5 o 'p C •o N U C GI C U C .0 N a) C H a> c1-3 > U U c O c O 0 a = _c a) . .00 - 0O 0C - a CU E Q 0 Q ._ v Q a) Q c a) .,-L, °j a o > ,-) — c = a) O O r T 0 a) _ p a a _ 0 0 c o U > dj h a) O 'O . = �, a r h a) >, C 0 a c a)) p N c a) ,n H > dS w U a 0 a a) a) 'a• i U o 9 o } C 'a .c m E a • >, ° a ' • m5 O c .0 w a) E -ca 0 E '� o a o N -a U c ° a a ° � ° E .�.c � '� ° or � ° o a) ° �v ° c �= U 3U 3 �� o � � a 3 a) > c � 'S 8 a� E v a_.) 2' a> v> 0 a) _N O a C O 0 a D. 0 C 0 U r 000 0- p 0 h 0 o 0 0 .N C E E O §- a- 0Z o 2 - 77' 4 — oO c ° a)C a N C a 2 'C p .. a S O N o 0 • d `p E — 0 C N N _ N c0 .Q j ,E o O P• a E a) N " o o a ; > c a) a) 0 3 — U o a 5 • ° � •> a 2 'FpN " � 0 m m a 0 °? � U .p c a 3 — U ° a E o 0 - v) 0 ° �' a m 0 a 3 a N � = � � 'O Q O N � Q O o P N (Ni e -(3 s w � > p) a � a N a c _ 'a -t O _'� O d a • n N X U O _0 d' O O O a >, c T c 0 a a t• � L � .. `" N N O D Z a) a t ( a) N a U a U U •U p 0 'U N O O o O .0 0 3 .0 N p p > Q O ,> .0 N H a a d 3 O O a) 0 a Oa�-. C 0 3 0 C O V aUo� ° iBI � � u � a s` c ° ` � oO -- a U '0 ifi N E a 3 c .c coD30cw � oacC - 00 '' �' 3 cai '° .- o a,,> 3 0 � 0 Cou) c >, 0 a0 :. O0a 0 .- z .- S'. 00 .0 Cc0 T26c. 00 o c 0 -0 cE >, O a ° U 0 — } * t o a0 ti 0) c '5c Ua • ° ° c c � U ° E a a) E ° o � •_ a' O O C +- � _ a> O O T O O 0 c ,N C a) O a p ,c p 'a _N O ,,; a) O c O O N Oa_ a) 0 t _N a D a) 0 N = U _ p a O U '0 O N _O a C a) d. C ° C U o o a o ` 0 c o a J — O30 a 00 � , a 'N0 '^ aai0) 0a0i � • s } 'c W •`='' c a> aoEao> oo aU 3O c ac a> ca ,,, o = c 3 a 45 E 0 ;>_ = X o a 3 a) _cc a .2 E73 '6 •- H &) a) i Oi3 0 0 0 •> 0_ 1.-_, u •a 3 0 E acs 0 aLI) a c 0 0 O . a y a � a ° off 9(„' z° W W c a a o a a 3 > •= 0 Q S - c\i ri v vi -.o is -Q a> a a U °z U 0 Q. O C O U ° O a O c n n p 0 _^ O a a) a) www 0 a� N tn aeQ .,_ a o U E a UQ .2a ` 3 in 8..- z 2 N E w D w- a 'C 4 in h000lhh, U C 4- E C O U N U M O Q c _, Q O v f O Na) Na- a) d4 Aziiimill! CO o O C O w a C N C - U h 'ts: O E N a) O s- O r 3 N U U a) Cr%.7_ 3 N 6 C r 4 ,„ N a) Q) O O N O loomo C N a 2 O N ` Y f t 1. a) onE C � LO_. _QO O).c O C heohoia) UU3E >h•- H O O O 3 C N j 0 C O O O iliol O O O O tolihtU N w U 6 — 00-5. cPPli E1N ONo t > > O t U a) N N CO o. N hi t, 0 � � 0 N •N N l C U O N o 4 C .N •C 0) Pit it) ' 'f 7 • o i • h or� O C OCS C D O O a) Q4 Vit, a) N O O a) 2 _O } C 0 0 0 0 c C O r + U GI V 'o C > ,, a) U it z U Q 92C O a) ,C C N o d M -C C _ E N o p ' a) ' � - � � tyo p _ U • N G * UuiC T t C > N0N o3o NU OC • -von4 Q ` O€ O O O O 0 O O O O O N D• z z z z z z z Z Z Z 6.- O • 3 o1❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ c (1)z,. u N s N N N N N N N N N N Cr p p ufe:fiiltip - i rs U Q ce ❑ CI 1:1 CI CI ❑ ❑ ❑ ❑ C .� a) s- a) .Cr O O L 0 0 0 0 0 0 0 0 0 0 0 -5O C7a) Q E yo U Z Z Z Z Z Z Z Z Z Z c U 2 � 0L 3 ❑ 1=1 ❑ ❑ 1=1 ❑ ❑ OU ;Am '� ipdo _d UcQ -b . a•�- ` O C Q O h E } Oo W C N hi hi N QN N N N N a) a) N f O O a aL ' W >- >- >- >- >- >- >- >- >- >- a'o O p — :.. listrolinx _ ❑tiC O Z CI CI ❑ ❑ ❑ 111 ❑ ❑ ❑ -5 ,y, 4 C tV ,_ C't t p U O N UpoNU `y U h o N foC } OUt N _ _ N V D }tl 4r C O O C N 5 .> p �, C JS A` :Iu X113 wingi'f = 3 0 U M v a) •O 0 0 - Q o 0 3 N t'flf o o -C .°V .- a) 0 � 1:1 (3o040 . �.o0j" 0v) >= � mO 0 � t a >, , ai • cCi • raoo 1— QC ,_ Z ao o . 0 a O N E aL 0 a)� ° 0Qca o 3 °' -Q Da • a O L O a — C •3N O p N W a <) a ° USD `03 :o a 0 '0 c 'L- a p • e N C E Q aL p Ca '2a > a- a > ' ac D -0 N cei O a) N N M c C d i - 0 3 00 p U c a N N a, a a � U N 3 6 � '6 n U -c UE 3 ., p3 - 3 ' Eo c a • >2 a Q) O ;= 0 O c- C a , 00 " � 3 a) aa) a2i a) 0 .- a s a). 3 c 0 a) a o UN .` - NC C o CT `o v v a • a0 • a� : i o o -cO 0 - o a L- a) a) a 0 75 0 ai o ✓ L � a ^ Z, N a0 Q. �Vi9' t).- (j,), a i -0 O :-.F_ -0 = � aa a � c O a) Q. O a) c a) O a)y �J a N o U o_ a L a aD 'a> - 'p) O o a) n. a 0 3 ^ ago z i 0 32o o Oma. 'a U a) O ,a NS o a U U Lri U L a ,� � 0 .o aECO •: 3 + aD aa>ia m o0 ..13. N a a- a) -0 C 3 O C a 0 a) D N U () C N a20 ccQa) o N .- a) NU Ea) 00 N t U L o C E 0 U > N O Q) p O L W NO p a) O a) w a U a� ° ? ao a 5 0 c 3 C N C 3 a) U a) LI) -^ •� C � •, a C E � a 2 n o — 0 7 a 0 a`, r p 'a N *C- -ca O 2 a a) a> E C a) 0 a a) H a) L', O 'N N . C pa a a U U o 7- N -o - on 0 7 m o .0 o m 0 a° � aa> > > a p '5 _ND • a) N 00 N a) a O O p0, > a 0 `+ a) O C c a U a c O Q c Q) a C p > a s N O a 0 C -a d a 3a> ONp0 0• C = N Oa ^ Oa) �_ a p C N O N j n .0 N a) 0 OU o (1). 0 ,N a Q•a ° O a) N 0) E 0 3 CO 0 .555 3 0 0 3 0 } '5o a E a c C a 3 0) a) = 3 0 'c x a� a5- C0 0 .0 Wj a O C E a> •0 ate) 0 O 0 N O) a) C C O C ° p CO a a -5U O N? C --cQ C a > • Ua 0 0 -0 o C 4-0- ° Oo >. . v >'cC U a Z2 m a ,- > N � 'EE v s 0 C 5 C D Uaa op 2 " � ° ` ma � oo "a- a o m � .� CAo o � N N a) - 7 0 c U NN ' U O 7 a a.O U NC a p a Ca s N U . O C0 a" U UO .NC • Ea a 0 O O 0 ° Z o ja o c � a 7 N a U U j O o' a Co O a. Cs O U . aaC - ca O N OaO C -o N a) T C a U C t, a N .0 0 0 .. -:- <-D a o 3o ooE �. oa E o •c_ c Q) f > 20so _ _° aa) a) a >; U0NN a p U0 •O aa) o - U3 > . � 09aaacP O a> ( NO aoo ) . t O C a y V ' � U QpC . 2 a 0 c ,C a0 aaYU • U . . ,n + a - E u c 3 a 0..._0'O a N ,C a -0 o NU .oddcc a1 O >,p0 6c 0- 0 00C .aa N O --o- O , C 0 0 C 0 Ca HIas Og '=_aa () OU ow d C N a) da) O C U -a N ) NQO a •2-2 a) g o a> Oa s -S_ 0O � UO + 0 .- s o 0 o .E p o a) ca ° - N . cU o aN 0Qa ao u . o _ o � ou -0 • a0_u_ ,_ E> o °v a mi ` ,.>" c .'•- Q > m -0O E o = "'_C L. ( a 63 0 7. O 7" i a) C U a) 000 U a O N a U � U a Q W Q E N L 0 0 0 a 3 0 0 3 0 x .L a) C G) a � o v a o d '> a N O a) 5 • 0 a) > >, N M V. Lc; ,d a-o U �a -o ooe ¢ ° U o .� c � z ° a v _cc t O O f " " gm > O > O MOM '' >. _c Tto o as O O a O c -,-„ o.. Z Z mm N N a_ ,- a O q O " 0 N ,.., 0 }-sa 's: O >_ '5 o >_ -g mom { .Mitdo U N• a .0 N• a otom > O > O _ O N a) C O a) C I O O -bo 3 .L L O t- C 3,:moo O N N 2 a) O t`3 timE{; Z Et o , E t O ai T O •- li!f-, .- LO r co N copitiME N O N ❑ QO Q O " .i:} y 0 -6 o oo aura 0 Rlilisz 2.2 13 0o;,€ acmO OO k a - 0 -g31o*ffifif O0 3a) O0 a mail 0 0 0 0 0 oO C It 11 00000 flio 0 0 , 6 'a> 6 ai ai 00 00nc ,., 0 0 _ 00 ,c, -6 O o �i t1B C) 6 0 0 0 O 4.iel6 C O > C O > 3 t = O O O a) O ��»- c ° L c ° a' 0 c c 7 7 7 a O U U O U ti„, tglit OO O OO U o oC = O O y ao a 5 Nv) a a (, aNa , a : ; OO " O aO " O ' jU o zE O ai>- ") >- " r O >- O r ,On O aCaligail >.❑ T ❑ T ❑ TT T P "Cc -0 -0 " UCO 7C w "_ w I C7 6 O O O 6 O O a '�si 0 05 08 T O a C.� O O 2.2•C O 2)=6 O iimi • # ,s r ,,tt c w H - o 3 O H r0 3 o ' a :o ' 2c O E ' C O E bp t j 'arra' O a O F3 O " a) O '6 73 .2 a) o " ' o " " -mamma c 5 u . ao"i aE �o , aC a) o O u y0 0 Q •� w E a Q .a) E a O a M u fi _ mons ac 0 to a Nom itgaiN1 -12 E _ O E" � C a PURA AM giimcm C to C .3 y irtmo C7 O c +w . al O wmC7 d 3s zoliam d ._ mialu = o N y N mow v m met a a o 0 ,�t� L } a o a o E _, - 1a �'S ,k' oa — to ,=3 , o-` N 4ti, N C , = ate `aa r; .0 m H = sa vac r 6 4 Lei Amm3 o ..5 cV O. C o cC a ;_ a) iA• N � 0 N - m a � cu o v, 8 ° 0 i ) > H 3 o ° a m a) c Q 0 Ti a) 0 m o ' ° 0 0 C a) N -0 0 = •>0 U a O U �OO a D •= 0 _a . - 3 0 ,E D0 a)0 ° O 0 C N O U U C a. a n 0 0 D -Ci .5 ...c. 0 O = a) �)03 U 4) 0 H N 0 a) O ° > C 2>, N 0 •.- C 0 C '0 T o O ° } (� E 5 •N m 0 '`-c; 0 c - 0 a) ^ a U• N ,t O N p 00 •° Q 6 E ° 0 0 0 0 0 a) 0 N aE L.: •C O 0 o C O 0 Q) 0 0 •O - a � Y � a) o ° � h 0 Oa a) 0 0 0 : c O ' 0 Co �t o E O o 0 ° = U 0 ° 0 o .E ~ 0 a 0 a) 0 - i C O C 4 P O C h o N !a�) -°-,, .0 0 ' N a) 0 a) a) ,,, AD N U C D O 73 C ° 01 O a) 0 C � � o 0) 0 0 Q ) N �• o 0 3oa) U 00 E0 C2. a) Q N -a 0 >' rn C C C C U 0 0 -0 c W a CO C ..--, O G _° H - ;� - -C _O ..� 0 ^ 0 C C .r. U t a) 0 ° N O O O o - O N '^ o a) c�• 0 3 0 a -0 a) _ N = 0 N -0 O 0 c a C N O ", (1) o N C 0 � C o C •y2 ° 0 0 0 -�- -0 0 L C a O C 0 0 G. a) d a) ~ O O 0 Q N _ 1 0 a) ,0 0 'U .0 en p N..0 0) 0) . N O C ;4- a •- a) C 0 N m c U 0 0 a y �e > O N t U a) _N N O '0 0 — o u. E a) o U h _ 0 O 3 a t a) 0 0 0 0) N C 2 _b C DC a) C C 0 �"' o a) p 0 0 00 O O 0 J D 7 .0 a N � pP N U 0) U p o •" O 0 0 � O 0 . N „co > > > w N p °) E 0) 0) F 0 N VU aE _, ,- N 0 N OC f a;N o = D a °- ° -0 0 U U > ii U ate) oLb ►�. U a) ....7 " C N N 0 TO 0 3 0 o t D aj •p -c Q o _ }E 0 N C Uv, 0 C 0 a) O O ° 0 s C cc C 0 o O a) -C C ° ,O 0 :F. } O U 3 0 00 .� N _SD _C) a) � D 0 0 0w- `-' D (1) O _ a) •�, U C N 0) C -0 2 N D U a) P E _1) C 0 " o a) L a) O y `" o .0 a) N 0 0 5- O a 4) C .Q CO CO c 0 5 0 >,U U 0 3 3 •a o 2 .D. a) ,12 4= �- ca� - a •Na o � � b0 v ° Co N 0 'C a) C `^ O C `^ C C a) ° _ N o Cmc o a) } oE .4 ' ° •oEd _ o h 0 0 0 a) a 0 N �a` 0) w o '� C N N _ _ > N " _� N _0 .0 C1CC 0p0 V _O a) N • �' o -Q 0 C 0 � a� N U O a) o o U 0 0 0 —_ 0 0 0 c a s si N 0 0 h _C U N C ~L 0 3 O C 0 N V 0 a) O L a) 0 S O •0) C o • N m o .N m � 0 0 a) �. C } 0) m •o o U o ° - o _ a) °� a O . N a > o o0 E O N 0 a s Ea> O 0 VE Ts H O a N3 oo ° IV 0 , CZ. ° o > �- 2 0 O 0 H U0 G O ,O •� C a) o 73 C 0 "0 0 a O H '5 .- U o 0 0 C -CC N .0 a` 3T�S � � o � 0 � a = aa�i —0 ,,,a_ 00, 00 aC m ° > E O O N - 0 0 0 N O p O O O o J O N D N > a O m _ 0 0 0 ° o U ° U 0 .0 0 a) a) H >•0 C1 0 > N — U 0 a0 N0 do in 0 a, a� a� N " 0 0 ° a ° o30 ° -ca•"= ° t 0 0 oo 0 0 Q 0 O C 73 o 0 '5 0 y 8 `o c a) ° .0 a) C0 Vf J — N Ll = U Z LL Z N o >- 3 0 0 Q J N o c2 < 3 +-C- E Ln 0 E E c v C �_ ttO (22 Eilillif N aCS 0 0 g ihiga mm E o am o ' C _a '=i' C _a N o a) o C figaltill U ,o UoaE E •- • saltilfli ° O • O° 0)6 .0 •N = o .c• N 0) a) - 0) 0 0 2 0 ° yy_ 0 2 p 0 E ° o E o o L^ D 0 L iZik U o 73 o 2 U 0 o H ° ° v,_,. o Q o a1 ' - � C �.. f DCE 'N. _ Irt. °a ° o a� o �» a) a- o N N 6 .p w- -c 0 N .° � > ° ° -o c Noo '''''-c-"">' aL' , Q • 0 N C a g .0 . 2o2c a) Lc9, a) 2E- D 0 0 U Q) "" D 0 NO a . U lohiv C a U U c a- 0 na) O0o p ) N N o 0 .)` aL L - ` aL V V N >. 0 0 N _ Q 0 0 ° a) o ° ` 0 "_ r _0 0 ° -•- r _0 0 -° N -0 C a) 0 -° C ° D g c L ° h 0 ° 0 iFisilmil > 0 mu .� "- c - a ° o E a0 _c ° N c o 0 MITTO3 p C �-c 3 0 0 >-� a c oEQ ° 2 c ° E5w � `= o TS a ooaoc .. �; a H L h V o = >.N L N D Q w. W 0 N C .o U U Q ° N c _o U d w Q iiggialt C 0 0 0 ••C C . C 0 p 0n _c .0 oe a� 0 O a a= a) C a 0 a 4, o ao :S2 v �, a) 3 ao .o di a, ° o 'N E ° E 0 -c ' E ° s E ° o 00o F z � Oc o o 12z �'- •- a0 O .2• - a � aLp ,0 � ° � � _ u0 - nc) 00- �Gd° C o )) d - C H 0 I:;h T3L °) a) •E ° o C O ° C a) C ° 2 ao0 0 ° pa U - a O p , 7) O Z' •N 5.. E a > c a p O a > O '4 C N pO r U C O U O a a) pa C N •� U CO 0 i 3 E 3 a 3 N Ln _C C ° 'a c O ° a) p j O H C C • O a > ° T a) c C U C LE '5 •> O a a Of O E <, U ta a 0a) oC ° p aaEc OO N a 8aO O a U O r+- >, D a) ° ° U a) a CCP- a D 5 0 N 0 a) C oa o co _ O ° • 0 °at aE . acaX c a 0 ° aE ° ° a '6 ° 3 .0 o 0 -6 m o a . .> E ° 2 No a) c°: ° ° 'E maoa N Oc .= O 0)_c -0 C t C a) r� ' 3 •VU. E OO a) r - N = U c aa 6 -6 a -c a Op °pXC _ •Q O O a o c ° c Y O ` - C O O Q,C a ° O ao p a 0) pW O an ° -0 U 6 ° a) 2 C ° 12 >; 2 ° D w t c-g ° •C a.c D O ° c 0 N _c p O a ,_ O C O ° E CQO2 O U 0 ° N 0- - a N ° N - O a a • E0 Qj co ° aC O 017, � QO = 0 �0 4- > _Q- N c UC > ar -0 pd • a o a , O ° 0 a) o -6 _ a ED_ iii a) - a t EO - N U •= a NO • ° H g a � ° -0 c 0 0 -a •as _0 a2 E a Enc —a) a ° X > C O ° 373 a 0 - 0 E 0 .-0 >, T� U N 7.' 1-5 O U acaN 0 O N oa � QO . U a s 3 c oE Na) -c E a V 2Q ._S _c r t Q- apa' -0 N ° 0) N N Q aE 0) 1-0 -ca ' Q c . o LL) - CcCD 2 o o N � C U N L ° = CC 7 ap L ° - O 0 15 C U C..... - N 5 0 E `OOUi N O ° _• aNo D0a a)U 0N p Q 0 . 00 ° 0E p ° 0 O U_Q a) O C ° ° U U 0 ° U> aa ° a O >-..z ° p ,CO p a oa -c -, cQca > ao a o ° E p O oE0, ° °) - N . o u 0 N ° z ° o a a) ..s C N 0) Q '° L p p 3 C ° °Eca c a) a E > a ° c Q ` o � aN• WO 7 Q ° . ° _ O . a> a)L- QM () D -Q Oa) T a C c cp N N a 0) C a C N �c ° ' a O ° a ° C a 2c C a 0 .2 m ' V • ° _ 0 3 a 0 "- 0 F. 6 ° •a L. E. ° Ti •. 0 C-0 a) N92 m E C ° c c °C _ ° a 0) t a s OC o 0 p /3 o a N c ° ° c 0• °c a, 0 ° 3 ° Eaoo � oc .N � ° ' a ° a ` ° : }Q •a) ) a>= ° dNpNON 8 � OC • 3N p) N O ° i O D 'U O o a o0 m ° 3 ° a9 ¢ ° CE o ° o as ai ca ° ac L. EEaE .= oE ur .2 (Du ° c E ° - a • c cE ° v aN ° U _, a) ° o -c o 5 ° a ° ° o -0 pCO a uN O ° a > a) N a .0 i .Q. ° ° a) _ _a o � a C a •E. >, Q p O p a °) N ° U X N N a, • = _ f ° ° o ) co ov � 3oa� � 3 ° 3 .c .° Z a ^ o E ° 0 E 'Qa6 0 o a ` o c E4 o a = L) TE 6 a a2 o o a � ca ° ° C °• � oQa )- ° � .g Q. a a 1- a ' N u C ° - .. E ° N N `c ° C c 0 - ° ° • • • r° US 0 HQ °' – Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES [ II, Ill, & IV _ Appendix E-Copy of Corrective Action Form Corrective Action Report Form - Field Version Purpose This Corrective Action Report Form is designed to assist you in preparing corrective action reports for EPA's 2012 Construction General Permit (CGP). If you are covered under EPA's 2012 CGP, this form will enable you to create a corrective action report that complies with the minimum reporting requirements of Part 5.4 of the permit. You are only required to fill out this form if one of the corrective action triggering conditions in Part 5.2.1 or 5.3 occurs on your site. Routine maintenance and repairs are generally not considered to be a corrective action triggering condition. Corrective actions are triggered only for specific, more serious conditions that are identified below in the "Overview of Corrective Action Requirements." If you are covered under a state CGP, this form may be helpful in developing a report that can be used for that permit; however it will need to be modified to meet the specific requirements of the permit. If your permitting authority requires you to use a specific corrective action report form, you should not use this form. Notes While EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Corrective Action Report Form, the actual obligations of regulated construction activities are determined by the relevant provisions of the permit, not by the form. In the event of a conflict between the Corrective Action Report Form and any corresponding provision of the 2012 CGP, you must abide by the requirements in the permit. EPA welcomes comments on the Corrective Action Report Form at any time and will consider those comments in any future revision of this document. You may contact EPA for CGP-related inquiries at cgp@epa.gov. Overview of Corrective Action Requirements Construction operators covered under the 2012 CGP are required to conduct corrective actions and report on progress made in correcting the problem condition(s) in accordance with the following requirements: Corrective Action Triggering Conditions(Parts 5.2.1 and 5.3) Corrective action is required whenever any of the following conditions occur at your site: • A required stormwater control was never installed,was installed incorrectly,or not in accordance with the requirements in Part 2 and/or 3; • The stormwater controls (e.g.,erosion and sediment controls or pollution prevention controls) that have been installed and maintained are not effective enough for the discharge to meet applicable water quality standards or applicable requirements in Part 3.1 of the permit; • A Part 2.3.1 prohibited discharge has occurred or is occurring;or • Any corrective actions required by EPA as a result of permit violations found during an inspection carried out under Part 4.2. Deadlines for Completing Corrective Actions(Part 5.2.1) You must complete corrective action (e.g.,installing and making operational any new or modified control, correcting errors in installation,preventing, mitigating,or cleaning up spills or leaks making repairs) by no later than 7 calendar days from the time of discovery of the condition. If infeasible to complete the installation or repair within 7 calendar days,you must document why it is infeasible and document your schedule for completing the corrective action as soon as practicable. Deadlines for Documenting Corrective Actions in a Report(Part 5.4) You are required to complete a corrective action report for each of corrective action you take in accordance with the following deadlines. • Within 24 hours of discovering the occurrence of a corrective action triggering condition,you must document the following: - The condition identified at your site; - The nature of the condition identified;and - The date and time of the condition identified and how it was identified • Within 7 calendar days of discovering a triggering condition,you must document the following: - Any follow-up actions taken to review the design,installation, and maintenance of stormwater controls, including the dates such actions occurred; - A summary of stormwater controls modifications taken or to be taken,including a schedule of activities necessary to implement changes,and the date the modifications are completed or expected to be completed;and - Notice of whether SWPPP modifications are required as a result of the condition identified or corrective action. Instructions for Using This Report Form This Field Version of the Corrective Action Report Form is intended to be used in the field and filled out by hand. If you will be filling out the Corrective Action Report Form electronically (i.e., you will be typing in your findings), please use the Electronic Version of the Corrective Action Report Form available at www.eaa.gov/npdes/stormwater/swppp.The Electronic Version includes text fields with instructions for what to enter. The following tips for using this form will help you ensure that the minimum permit requirements are met: • Review the corrective action requirements. Before you fill out this corrective action report form, read the CGP's Part 5 corrective action requirements.This will ensure that you have a working understanding of the permit's underlying corrective action requirements. • Complete a separate report for each condition that triggers corrective action. For each triggering condition on your site,you will need to fill out a separate corrective action report form. • Complete all required text fields. Fill out all text fields. Only by filling out all fields will the form be compliant with the requirements of the permit. (Note: Where you do not need the number of rows provided in the corrective action report form,you leave those rows blank. Or, if you need more space to document your findings,you may add an additional sheet.) • Sign and certify each corrective action report. Each corrective action report form must be signed and certified by the permittee to be considered complete. Where your corrective actions are carried out by a contractor or subcontractor,it is recommended that you also have the form signed and certified by the inspector, in addition to the signature and certification required of the permitted operator.The form includes a signature block for both parties. • Include the corrective action report form with your SWPPP. Once your form is complete, make sure to include a copy of the corrective action report form in your SWPPP in accordance with Part 7.2.12.4 of the CGP. • Retain copies of all corrective action reports with your records. You must retain copies of your corrective action reports in your records in accordance with the requirements in Part 5.4.4 of the 2012 CGP.These reports must be retained for at least 3 years from the date your permit coverage expires or is terminated. Section-by-Section Instructions You will find specific instructions corresponding to each section of the report form on the reverse side of each page.These instructions were written in order to provide you with more details in terms of what EPA expects to be documented in these reports. ii yt , 0 } e t' ¢t N� Si �filF jficitik ,..,�r �,:, ., r. Q t th( S SI# wtthtr 4 s:of,° 1°O' . . tptditlon h r r'errd o o ., w,€ ., ,v , Name of Project CGP Tracking No. 1 Today's Date Date Problem First Discovered Time Problem First Discovered Name and Contact Information of Individual Completing this Form What site conditions triggered the requirement to conduct corrective action (check the box that applies): ❑ A required stormwater control was never installed,was installed incorrectly, or not in accordance with the requirements in Part 2 and/or 3 O The stormwater controls that have been installed and maintained are not effective enough for the discharge to meet applicable water quality standards or applicable requirements in Part 3.1 of the permit O A Part 2.3.1 prohibited discharge has occurred or is occurring O EPA requires corrective action as a result of permit violations found during an EPA inspection carried out under Part 4.2 Provide a description of the problem: Deadline for completing corrective action (Enter date that is either: (1) no more than 7 calendar days after the date you discovered the problem, or(2) if it is infeasible to complete work within the first 7 days, enter the date that is as soon as practicable following the 7th day): If your estimated date of completion falls after the 7-day deadline,explain(1)why you believe it is infeasible to complete work within 7 days,and(2)why the date you have established for making the new or modified stormwater control operational is the soonest practicable timeframe: 11:0111:4111111111111,111r t t Ft g .,,, a t r q ®r�est r{ 3t 9 r1a t t fiot tt9®i et + t 1 Cause(s)of Problem How This Was Determined and the Date You Determined (Add an additional sheet if necessary) the Cause 1. 1. 2. 2. ' anis` M hi hflplementea to 61 $hey P b List of Stormwater Control Modification(s) Date of SWPPP Update Notes Needed to Correct Problem Completion Necessary? (Add an additional sheet if necessary) 1. [Nes ❑No If yes,provide date SWPPP modified: 2. ❑Yes ❑No If yes,provide date SWPPP modified: Page 1 of 2 Instructions for Filling Out the Initial Report(Section A) You must complete Section A of the report form within 24 hours of discovering the condition that triggered corrective action Name of Project Enter the name for the project. CGP Tracking No. Enter the tracking number that was assigned to your NOI application for permit coverage. Today's Date Enter the date you completed this form. Date/Time Problem First Discovered Specify the date on which the triggering condition was first discovered.Also specify the time of the discovery. Name/Contact Information Provide the individual's name,title,and contact information as directed in the form. Site Condition That Triggered Corrective Action Under the CGP,corrective action is required when one of 3 triggering conditions occurs at your site.See CGP Parts 5.2.1 and 5.3.Check the box that corresponds to the condition that triggered this corrective action. Description of the Site Condition Provide a summary description of the condition you found that triggered corrective action under CGP Part 5.2.1 and the specific location where it was found. Be as specific as possible about the location;it is recommended that you refer to a precise point on your site map. If you have already provided this explanation in an inspection report,you can refer to that report. Deadline for Completing Corrective Action This deadline is fixed in CGP Part 5.2.1. For all projects,the deadline is either: (1) no more than 7 calendar days after the date you discovered the problem,or(2) if it is infeasible to complete work within the first 7 days, as soon as practicable following the 7th day. If your estimated date of completion falls after the 7-day deadline consistent with (2),above, explain (a)why you believe it is infeasible to complete work within 7 days,and (b)why the date you have established for making the new or modified stormwater control operational is the soonest practicable timeframe: Instructions for Filling Out the Corrective Action Progress Table(Section B) You must complete Section B of the report form no later than 7 calendar days after discovering the condition that triggered corrective action. Section B.1 -Why the Problem Occurred After you have had the opportunity to examine the problem more closely,provide details as to what you believe to be the cause of the problem,and specify the follow-up actions you took (along with the dates of such actions) to diagnose the problem.This is consistent with CGP Part 5.4.2.1. Section B.2-Stormwater Control Modifications to be Implemented Provide a list of modifications you plan to make to your stormwater controls to correct the problem and the date you completed such work. Keep in mind that your work must be completed within the timeline specified in Section A for the completion of corrective action work. Also,if a SWPPP modification is necessary consistent with Part 7.4.1.1 in order to reflect changes implemented at your site,indicate the date you modified your SWPPP. Keep in mind that SWPPP changes must be made within 7 days of discovering the problem that triggered this corrective action. Space is provided for you to include additional notes or observations regarding the change that you implemented at your site to correct the problem. Section C'=Certification and Sign tur (CGI'.Pailt 8 4 3) ecf t C ittcci ton and Signs tiure by Contra tof or Svb nEtra for "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." Signature of Contractor or Subcontractor: Date: Printed Name and Affiliation: Section C 2-Certitico lit n;arid'Signature`by'Pert `. "I certify under penalty of law that I have read and understand this document and that this document all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations." Signature of Permittee or "Duly Authorized Representative": Date: Printed Name and Affiliation: Page 2 of 2 Instructions for Signature and Certification (Section C) Each corrective action report must be signed and certified to be considered complete. Section C.1 -Contractor or Subcontractor Signature and Certification Where a contractor or subcontractor is relied on to complete this report and the associated corrective action,you should require the individual(s) to sign and certify each report. Note that this does not relieve you of the requirement to sign and certify the report as well. Section C.2-Signature and Certification by Permittee At a minimum,the corrective action report form must be signed by either(1) the person who signed the NOI,or(2) a duly authorized representative of that person.The following requirements apply to scenarios (1) and (2): If the signatory will be the person who signed the NOI for permit coverage,as a reminder,that person must be one of the following types of individuals: • For a corporation:A responsible corporate officer. For the purpose of this subsection,a responsible corporate officer means: (i) a president,secretary,treasurer,or vice-president of the corporation in charge of a principal business function,or any other person who performs similar policy-or decision-making functions for the corporation,or(ii) the manager of one or more manufacturing, production, or operating facilities, provided,the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations,and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements;and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. • For a partnership or sole proprietorship:A general partner or the proprietor,respectively. • For a municipality,state, federal, or other public agency: Either a principal executive officer or ranking elected official.For purposes of this subsection,a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or(ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). If the signatory will be a duly authorized representative,the following requirements must be met: • The authorization is made in writing by the person who signed the NOI (see above); • The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field,superintendent, position of equivalent responsibility,or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position);and • The signed and dated written authorization is included in the SWPPP.A copy must be submitted to EPA,if requested. Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Appendix F-SWPPP Amendment Log No. Description of the Amendment Date of Amendment Prepared by Amendment [Name(s) and Title] Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, Ill, & IV Appendix G-Subcontractor Certifications/Agreements SUBCONTRACTOR CERTIFICATION STORMWATER POLLUTION PREVENTION PLAN Project Number: Project Title: Operator(s): As a subcontractor, you are required to comply with the Stormwater Pollution Prevention Plan (SWPPP) for any work that you perform on-site. Any person or group who violates any condition of the SWPPP may be subject to substantial penalties or loss of contract. You are encouraged to advise each of your employees working on this project of the requirements of the SWPPP. A copy of the SWPPP is available for your review at the office trailer. Each subcontractor engaged in activities at the construction site that could impact stormwater must be identified and sign the following certification statement: I certify under the penalty of law that I have read and understand the terms and conditions of the SWPPP for the above designated project and agree to follow the practices described in the SWPPP. This certification is hereby signed in reference to the above named project: Company: Address: Telephone Number: Type of construction service to be provided: Signature: Title: Date: > o 3 = C p m 44 UJ d .Q a a cQ o'ad = care, g C � m � NJ 0 ' C a ¢ 'v' C Lij o C • N a C 0 a Nr a Q 40) ICIC C) a rn 0 Q II 0 a' X e C N a 0. Q c. 4" 4r1) 0v D Ua_ Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, Ill, & IV Appendix I-SWPPP Training Log Stormwater Pollution Prevention Training Log Project Name: Project Location: Instructor's Name(s): Instructor's Title(s): Course Location: Date: Course Length (hours): Stormwater Training Topic: (check as appropriate) U Sediment and Erosion U Emergency Procedures Controls U Stabilization Controls U Inspections/Corrective Actions U Pollution Prevention Measures Specific Training Objective: Attendee Roster: (attach additional pages as necessary) No. Name of Attendee Company 1 2 3 4 5 6 7 8 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS- PHASES I, II, III, & IV Appendix J- Delegation of Authority Form Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in Appendix I of EPA's Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative" as set forth in Appendix I. I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Company: Title: Signature: Date: Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Appendix K- Endangered Species Documentation U.S. Fish and Wildlife Service Trust Resources List This resource list is to be used for planning purposes only—it is not an official species list. Endangered Species Act species list information for your project is available online and listed below for the following FWS Field Offices: Virginia Ecological Services Field Office 6669 SHORT LANE GLOUCESTER,VA 23061 (804)693-6694 http://www.fws.gov/northeast/virginiafield/ Project Name: Westlake Hills 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 1 of 6 Version 1.4 rax4.1&4a,v2U.S. Fish and Wildlife Service sanvlos Trust Resources List Project Location Map: y u pd, Jai na,I c`t7 4F, ;,, q 0 :v fi"' '14117 ` .stown c /1 G f (fir) t 300 m tt 100044 ''''''''''1:1gr. Project Counties: Albemarle,VA Geographic coordinates (Open Geospatial Consortium Well-Known Text, NAD83): MULTIPOLYGON(((-78.676654 38.0633673, -78.6738216 38.0611355, -78.6732208 38.0595812, -78.6753236 38.0587381, -78.6778127 38.0573189, -78.6798297 38.0566751, -78.6829196 38.0564741, -78.6850654 38.0601556, -78.6873399 38.0597839, -78.687297 38.0628587, -78.6859237 38.0629939, -78.6845933 38.0622843, -78.6837779 38.0613382, -78.6824476 38.0611693, -78.676654 38.0633673))) Project Type: Development 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 2 of 6 Version 1.4 %ft ' U.S. Fish and Wildlife Service SU%a► Trust Resources List Endangered Species Act Species List (USFWS Endangered Species Program). There are a total of 1 threatened or endangered species on your species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area.For example,certain fishes may appear on the species list because a project could cause downstream effects on the species. Critical habitats listed under the Has Critical Habitat column may or may not lie within your project area. See the Critical habitats within your project area section below for critical habitat that lies within your project area.Please contact the designated FWS office if you have questions. Species that should be considered in an effects analysis for your project: Clams Status Has Critical Habitat Contact James spinymussel Endangered species Virginia Ecological (Pleurobema collina) info Services Field Office Population:Entire Critical habitats within your project area: There are no critical habitats within your project area. FWS National Wildlife Refuges (USFWS National Wildlife Refuges Program). There are no refuges found within the vicinity of your project. FWS Migratory Birds (USFWS Migratory Bird Program). The protection of birds is regulated by the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA). Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. For more information regarding these Acts see: http://www.fws.gov/migratorybirds/RegulationsandPolicies.html. All project proponents are responsible for complying with the appropriate regulations protecting birds when planning and developing a project. To meet these conservation obligations, proponents should identify potential or existing project-related impacts to migratory birds and their habitat and develop and implement conservation measures that avoid, minimize, or compensate for these impacts. The Service's Birds of Conservation Concern 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 3 of 6 Version 1.4 Pint*itai U.S. Fish and Wildlife Service OE Trust Resources List (2008) report identifies species, subspecies, and populations of all migratory nongame birds that, without additional conservation actions, are likely to become listed under the Endangered Species Act as amended (16 U.S.0 1531 et seq.). For information about Birds of Conservation Concern, go to: http://www.fws.gov/migratorybirds/CurrentBirdlssues/Management/BCC.html. To search and view summaries of year-round bird occurrence data within your project area, go to the Avian Knowledge Network Histogram Tool links in the Bird Conservation Tools section at: http://www.fws.gov/ migratorybirds/CCMB2.htm. For information about conservation measures that help avoid or minimize impacts to birds, please visit: http://www.fws.gov/migratorybirds/CCMB2.htm. Migratory birds of concern that may be affected by your project: There are 15 birds on your Migratory birds of concern list. The underlying data layers used to generate the migratory bird list of concern will continue to be updated regularly as new and better information is obtained. User feedback is one method of identifying any needed improvements. Therefore, users are encouraged to submit comments about any questions regarding species ranges (e.g., a bird on the USFWS BCC list you know does not occur in the specified location appears on the list, or a BCC species that you know does occur there is not appearing on the list). Comments should be sent to the ECOS Help Desk. Species Name Bird of Conservation Species Seasonal Occurrence in Concern(BCC) Profile Project Area Bald eagle (Haliaeetus leucocephalus) Yes ... „ s_.u.. � � species info Year-round Black-billed Cuckoo (Coccyzus Yes species info Breeding erythropthalmus) Blue-winged Warbler (Vermivora Yes species info Breeding pinus) cerulean warbler (Dendroica cerulea) Yes species info Breeding Fox Sparrow (Passerella liaca) Yes species info Wintering Kentucky Warbler (Oporornis Yes species info Breeding formosus) Loggerhead Shrike (Lanius Yes species info Year-round ludovicianus) 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 4 of 6 Version 1.4 nsitc ups U.S. Fish and Wildlife Service mono Trust Resources List Pied-billed Grebe (Podilymbus Yes species info Breeding podiceps) Prairie Warbler (Dendroica discolor) Yes species info Breeding Prothonotary Warbler (Protonotaria Yes species info Breeding . citrea) Red-headed Woodpecker (Melanerpes Yes species info Year-round erythrocephalus) Rusty Blackbird (Euphagus carolinus) Yes species info y Wintering Short-eared Owl (Asio flammeus) Yes species info Wintering Wood Thrush (Hylocichla mustelina) Yes species info 3 Breeding Worm eating Warbler (Helmitheros Yes species info p Breeding vermivorum) NWI Wetlands (USFWS National Wetlands Inventory). The U.S. Fish and Wildlife Service is the principal Federal agency that provides information on the extent and status of wetlands in the U.S., via the National Wetlands Inventory Program (NWI). In addition to impacts to wetlands within your immediate project area, wetlands outside of your project area may need to be considered in any evaluation of project impacts, due to the hydrologic nature of wetlands (for example, project activities may affect local hydrology within, and outside of, your immediate project area). It may be helpful to refer to the USFWS National Wetland Inventory website. The designated FWS office can also assist you. Impacts to wetlands and other aquatic habitats from your project may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal Statutes. Project Proponents should discuss the relationship of these requirements to their project with the Regulatory Program of the appropriate U.S. Army Corps of Engineers District. Data Limitations,Exclusions and Precautions The Service's objective of mapping wetlands and deepwater habitats is to produce reconnaissance level information on the location, type and size of these resources. The maps are prepared from the analysis of high altitude imagery. Wetlands are identified based on vegetation, visible hydrology and geography. A margin of error is inherent in the use of imagery; thus, detailed on-the-ground inspection of any particular site may result in revision of the wetland boundaries or classification established through image analysis. 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 5 of 6 Version 1.4 nsmaltount U.S. Fish and Wildlife Service .1. '1/4.----:''''' .,.• Trust Resources List The accuracy of image interpretation depends on the quality of the imagery, the experience of the image analysts, the amount and quality of the collateral data and the amount of ground truth verification work conducted. Metadata should be consulted to determine the date of the source imagery used and any mapping problems. Wetlands or other mapped features may have changed since the date of the imagery and/or field work. There may be occasional differences in polygon boundaries or classifications between the information depicted on the map and the actual conditions on site. Exclusions - Certain wetland habitats are excluded from the National mapping program because of the limitations of aerial imagery as the primary data source used to detect wetlands. These habitats include seagrasses or submerged aquatic vegetation that are found in the intertidal and subtidal zones of estuaries and nearshore coastal waters. Some deepwater reef communities (coral or tuberficid worm reefs) have also been excluded from the inventory. These habitats, because of their depth, go undetected by aerial imagery. Precautions - Federal, state, and local regulatory agencies with jurisdiction over wetlands may define and describe wetlands in a different manner than that used in this inventory. There is no attempt, in either the design or products of this inventory, to define the limits of proprietary jurisdiction of any Federal, state, or local government or to establish the geographical scope of the regulatory programs of government agencies. Persons intending to engage in activities involving modifications within or adjacent to wetland areas should seek the advice of appropriate federal, state, or local agencies concerning specified agency regulatory programs and proprietary jurisdictions that may affect such activities. The following wetland types intersect your project area in one or more locations: Wetland Types NWI Classification Code Total Acres Freshwater Emergent Wetland PEMI/FO1A 2.8716 � Freshwater Emergent Wetland PEM1A 0.3362 Freshwater Pond PUBHh 1.4825 10/13/2014 Information,Planning,and Conservation System(IPAC) Page 6 of 6 Version 1.4 Stormwater Pollution Prevention Plan (SWPPP) WESTLAKE HILLS-PHASES I, II, III, & IV Appendix L- Historic Properties Documentation