Loading...
HomeMy WebLinkAboutARB201600159 Review Comments 2017-01-20 APPLICATION REVIEW HISTORY ARB #/Name_201600159, DQ Grill & Chill, Sign AC' '1 `DAT] ua NOT"E y ;/4,,W40,6'1 . . County received application 12-20-2016 Corresponding submittal 12-27-2016 deadline deadline/ARB meeting date 02-06-16 meeting Transfer from intake to ARB Staff 12-21-2016 12-28-2016 (to Brent) First ARB staff review 01-04-2016 Comments to applicant 01-17-2017 Email/mail Resubmittal received by staff 01-17-2017 Resubmittal reviewed by staff 01-19-2017 Were all comments addressed? No Comments to applicant 01-19-2017 Resubmittal received by staff 01-18-2017 Resubmittal reviewed by staff 01-19-2017 Were all comments addressed? Yes Comments to applicant Resubmittal received Resubmittal reviewed Approval letter sent 01-20-2017 Email/mail ARB meeting date ARB action 0 ALg� JRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 17, 2017 Sid Tripathi 1435 Parkside Place Earlysville, VA 22936-2822 RE: ARB -2016-159: Dairy Queen Sign TMP 03200-00-00-042HO Dear Mr. Tripathi, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. 1. Revise the sign drawing to indicate whether or not the existing light bulb type in the sign cabinet is to change. If it is and LED is proposed, revise the sign drawing to include the following note limiting the intensity of the LED illumination: "The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. " 2. Provide sign drawings in color. Only black and white drawings were provided with the original submission. 3. Provide a revision date on the revised sign drawings. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 - day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Senior Planner cc: Stewart Wright, Senior Zoning Permit Planner (via email) ARB File