HomeMy WebLinkAboutARB201600159 Review Comments 2017-01-20 APPLICATION REVIEW HISTORY
ARB #/Name_201600159, DQ Grill & Chill, Sign
AC' '1 `DAT] ua NOT"E y ;/4,,W40,6'1
. .
County received application 12-20-2016
Corresponding submittal 12-27-2016 deadline
deadline/ARB meeting date 02-06-16 meeting
Transfer from intake to ARB Staff 12-21-2016
12-28-2016 (to Brent)
First ARB staff review 01-04-2016
Comments to applicant 01-17-2017 Email/mail
Resubmittal received by staff 01-17-2017
Resubmittal reviewed by staff 01-19-2017
Were all comments addressed? No
Comments to applicant 01-19-2017
Resubmittal received by staff 01-18-2017
Resubmittal reviewed by staff 01-19-2017
Were all comments addressed? Yes
Comments to applicant
Resubmittal received
Resubmittal reviewed
Approval letter sent 01-20-2017 Email/mail
ARB meeting date
ARB action
0 ALg�
JRGINZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
January 17, 2017
Sid Tripathi
1435 Parkside Place
Earlysville, VA
22936-2822
RE: ARB -2016-159: Dairy Queen Sign
TMP 03200-00-00-042HO
Dear Mr. Tripathi,
I have reviewed the above -noted sign application. The following revisions are requested to
make the proposal consistent with the Entrance Corridor Sign Guidelines.
1. Revise the sign drawing to indicate whether or not the existing light bulb type in the sign
cabinet is to change. If it is and LED is proposed, revise the sign drawing to include the
following note limiting the intensity of the LED illumination:
"The level of illumination provided by the LED lights will not exceed the illumination
produced by a single stroke of 30 milliamp (ma) neon. "
2. Provide sign drawings in color. Only black and white drawings were provided with the
original submission.
3. Provide a revision date on the revised sign drawings.
Please respond by email within 15 days of the date of this letter indicating whether you will or
will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -
day review period associated with your original submittal. If you choose to complete the
revisions, please email the revised drawings to me. If you choose not to proceed with these
revisions, staff will be unable to approve your application. Failure to respond to this letter shall
be presumed to be a request to proceed to action on the application without further revisions.
If you have any questions about this action, please contact me as soon as possible. I look
forward to receiving your revisions and completing this review with an approval letter.
Sincerely,
Brent Nelson
Senior Planner
cc: Stewart Wright, Senior Zoning Permit Planner (via email)
ARB File