Loading...
HomeMy WebLinkAboutZMA201300017 Study 2014-01-21SPRING HILL VILLAGE Traffic study EPREPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 TO: VITO CETTA, AIA ORGANIZATION- --- PHONE NUMBER: .IC,r.....- RE: TRAFFIC STUDY FOR SPRING.....-..-_H.-.I_L-.L VILLAGE FROM: BILL WUENSCH, PE, PTOE DATE: JULY 2013 SENDER'S REFERENCE NUMBER: YOUR REFERENCE NUMBER: MEMORANDUM ❑URGENT ❑ FOP REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY X FOR YOUR USE Traffic Operation Study - for Spring Hill Village 1. Purpose The purpose of this report is to provide a brief summary of a traffic operations study at the proposed Spring Hill Village development. The objective of the study is to report the existing traffic volumes in the study area, calculate new trips associated with the development, and then identify related traffic impacts and recommendations to mitigate the impacts. Specifically, this study evaluates traffic operations at two locations: On Route 20, just south of Parham Construction (the proposed site entrance 1) and on Avon Street Extended just north of Arden Drive (the proposed site entrance 2). This report includes analyses of existing conditions, future no build conditions, and future build conditions for the 2015 and 2021 planning horizon year. 2. Description of site, site plan, and the study intersections The site of the Spring Hill Village development is located three miles southwest of the Charlottesville City limits in Albemarle County Virginia. The site is 12.63 acres and is currently an undeveloped parcel of grass and small trees. The property has road frontage on two state roads, Route 20 (Scottsville Road) and Avon Street Extended (SR 742). The parcel of land is situated south of Avon Street Extended and North of Route 20. (See Figure 1) The Spring Hill Village development will consist of 58 townhouses, 26 single-family detached units, 20,000 square feet of office space, and 36 apartments. It is assumed that the site will be constructed and occupied within approximately two years in 2015. % r3 At ., iwl M 40 _[I - l ► A v Figure 4 Existing Traffic Volumes 1 Fr�l�r M. - 2 Figure 5 2015 No Build Traffic Volumes 0 V W N N Figure 6 2021 No Build Traffic Volumes Cv ML. EPREPR, P.C. "ENGINEERING 8. PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Table 1 Site Trip Generation Spring Hill Development AM PM Use Description ITE I Qty Daily in out in out Apartment 220 36 342 6 16 22 15 Single Family Detached 210 26 304 7 23 21 12 Commercial: General Office 710 20,000 386 46 7 17 84 Residential Condos 230 58 400 6 26 35 21 Total 1,432 65 72 95 132 internal capture 19 1 0 1 2 Total Site Trips After Reductions 1,413 64 72 94 130 Total Trips 1,413 64 72 94 130 total peak 1 1413 1 136 224 6. Site trip distribution and assignment To evaluate traffic operations at the study intersections, the estimated site -generated trips were distributed through the roadway network. Distribution percentages used to assign site trips were based on existing traffic patterns and knowledge of concentration of destinations within the City of Charlottesville and Albemarle County. A significant proportion was expected via the site entrance 1 on Route 20. Inbound AM and PM site traffic were expected to have similar percentages with the largest variations occurring with ingress left turns on Avon Street and ingress right turns on Route 20. Outbound AM and PM site traffic were expected to have similar percentages with the exception of egress right turns onto Avon and egress left turns onto Route 20. A number of factors were used to determine the anticipated traffic distribution of the Spring Hill development. A large portion of the development is residential and for this reason more traffic is expected to be headed towards the city of Charlottesville and Interstate 64 in the morning than towards Scottsville as residents make their daily work commutes. The office space in the development accounts for the majority of right turns from Route 20 in the AM peak hour as commuters will be headed into the development to work presumably from 1-64. The office space also accounts for a majority of egress left turns onto Route 20 in the PM peak hour as most workers will head towards 1-64 in the afternoon. Traffic flowing Southbound towards Scottsville is expected to be relatively light in comparison to northbound traffic as the majority of traffic will be headed Northbound towards 1-64 or the city of Charlottesville as most destinations such as schools, retail stores, and workplaces are accessed by driving north of the site. Most of the trips corning from south of the site will be commuters headed to work in the development or residents headed into the subdivision. The ratio of vehicles expected to use the Route 20 entrance in comparison to the Avon Street Extended entrance is based on the proximity of each entrance to 1-64, retail stores, the city of Charlottesville, and schools, along with the proximity of buildings in respect to each of the entrances. See Figure 7 for the illustration of the assumed trip distribution percentages and Figure 8 for the illustration of trips assigned to the network. Figure 7 Site Trip Distribution Percentages Figure 8 Site Trips Distribution .,& 'k , I 22 7/1; 7AL! -Ot EPR, P.C. "ENGINEERING & PLANNING RESOURCES" EPR 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 7. Build conditions The trips generated from the development, calculated and assigned to the roadway network as documented in the previous sections, were added to the background No Build 2015 and 2021 traffic volumes. See Figure 9 and Figure 10 for the illustrations of the build traffic volumes in 2015 and 2021. 8. Analysis results This report leads to the following principal analysis results: (1) Turn lane analyses Turn lane needs for the intersection of Route 20 at site entrance 1 and the intersection of Avon Street at site entrance 2 were evaluated using VDOT turn lane warrants for both AM and PM peak hours in the year 2015 and 2021 and are provided in Table 2. Table 2 Turn Lane Analyses Year 2013 Intersection Year 2015 Year 2021 AM PM AM PM Route 20 at site NBL 100' Storage No turn lane 100' Storage No turn lane entrance 1 SBR Radius Taper Radius Taper Avon Street at NBL No turn lane No turn lane No turn lane No turn lane site entrance 2 SBR Radius Radius Radius Radius The analysis results indicate that a northbound left turn lane (100' storage) at the intersection of Route 20 at site entrance 1 is required along with a southbound right turn taper at the intersection of Route 20 at site entrance 1 for both the year 2015 and 2021. The intersection of Avon Street at site entrance 2 requires no turn lanes for year 2015 or 2021. See Appendix B for detailed turn lane analyses. (2) Turn Lane Threshold Testing Additional analyses were performed to explore how many turns along Avon Street Extended would have to occur to meet the turn lane warranting conditions. (see Appendix C) This threshold exercise was performed as an additional check to verify if we are close to needing turn lanes on Avon Street. Summary - Left Turn: In 2015 AM Peak Hour, 64 left turns will be the worst -case scenario, which does not require a left turn lane. Figure 9 2015 Build Traffic Volumes Figure 10 2021 Build Traffic Volumes M v CN CD Cn 01, CO LO IRI=PR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 In 2015 PM Peak Hour, 94 left turns will be the worst -case scenario, which does require a 100' storage left turn lane. The maximum left turns without requiring a left turn lane in 2015 PM Peak Hour is 83. In 2021 AM Peak Hour, 64 left turns will be the worst -case scenario, which does not require a left turn lane. In 2021 PM Peak Hour, 94 left turns will be the worst -case scenario, which does require a 100' storage left turn lane. The maximum left turns without requiring a left turn lane in 2021 PM Peak Hour is 72. Per the preceding analyses, in both 2015 and 2021 AM Peak Hours, even all 64 ingress trips turning left at the intersection of Avon Street Extended and site entrance 2, a left turn lane is not required. In the year 2015 and 2021 PM Peak Hours, if all 94 ingress trips turning left at the intersection of Avon Street Extended and site entrance 2, a 100' storage left turn lane will be required, and the turns needed in each scenario is 83 (approximately 90% of all ingress trips) in 2015 PM Peak Hour and 72 (approximately 75% of all ingress trips) in 2021 PM Peak Hour. It appears there is little chance that more than 75% of all ingress trips will use just that one movement, thus it is not likely that a left turn lane would be required in the future. Summary - Right Turn: In 2015 AM Peak Hour, 64 right turns will be the worst -case scenario (Le all site trips enter by this movement), which does not require a right turn lane. In 2015 PM Peak Hour, 94 right turns will be the worst -case scenario, which does not require a right turn lane. In 2021 AM Peak Hour, 64 right turns will be the worst -case scenario, which does not require a right turn lane. In 2021 PM Peak Hour, 94 right turns will be the worst -case scenario, which does not require a right turn lane. Per the preceding analyses, in all four scenarios, 2015 AM and PM Peak Hours and 2021 AM and PM Peak Hours, there is little chance that a right turn lane would be required in the future. (3) The analysis results indicate: In build conditions, with the required turn lanes and taper along Route 20, per the turn lane warrant analyses, all movements at the intersection of Route 20 and site entrance 1 and the intersection of Avon Street Extended and site entrance 2 will operate at acceptable levels of service (LOS C or better). (See Appendix D for Synchro sheets) On Route 20, the northbound left -turn lane and southbound right -turn lane proved ample in the Synchro 7 with 951h percentile queues of less than one car. The EPREPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 eastbound egress turn lane queued 27'. This is a worst -case scenario as this model used only one egress turn -lane serving both EBL and EBW traffic. EPREPR, P.C. YEWOMEERING & PLANNING RESOURCES" . 637 BERKMAR-CIRCLE, CHARLOTTESVILLE, VA 22901 Figures = Figure 1 - Site location Figure 2 - Study intersection Figure 3 - Traffic counts Figure 4 - Existing traffic volumes Figure 5 - 2015 no build traffic volumes Figure 6 -- 2021 no build traffic volumes Figure 7 - Site trip distribution percentages Figure 8 - Site trips distribution Figure 9 - 2015 build traffic volumes Figure 10 - 2021 build traffic volumes Tables -• Table 1 - Site Trip Generation Table 2 -Turn Lane Analyses Appendices - Appendix A - Traffic Count Worksheets Appendix B - Turn Lane Warrant Appendix C - Turn Lane Threshold Testing Appendix D - Synchro Reports EPREPR. P.C. "ENGINEERING &PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendices EPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix A - Traffic Count Worksheets Turn Count Summary Location: Scottsville Rd at Entrance, Charlottesville VA GPS Coordinates: N=37.987333, W=-78502458 Date: 2013-05-15 Day of vie&: Wednesday Weather: Analyst: Total vehicle traffic Sauml3ound I Westbound Northbound Eastbound Total Inlet starts Leff Ttnu RIgM Lett Thru RfgfR left Thru RtgM Left Thru RIgM 06:5g 0 0 0 0 0 0 0 0 0 0 0 0 0 07:00 0 78 4 0 C 1 0 1 61 0 2 0 0 88 0715 0 29 4 p 0 0 0 154 0 2 0 0 189 07:30 0 34 1 0 0 0 0 124 0 2 0 1 162 0745 D 29 3 0 0 0 1 119 0 a 0 0 155 08:00 0 27 1 0 0 0 1 97 0 t 0 0 127 00:15 0 44 1 D 0 0 1 87 0 0 D 1 194 aB 0 44 0 0 0 0 0 105 0 1 0 D 150 08:45 0 00 0 1 84 0 0 009:00 0 SE 0 0 0 0 0 0 0 0 0 0 Car traffic Sou[hBourdI Weslbnund Nortrbound Easbound Total Interval stars Lest TEvu RlgM LaR Thru Ri91i Lett Thru Right Left TMu Right 06M 0 0 I 0 0 D 6-1-o-T 0 0 0 0 0 C 07510 0 16 4 0 0 0 1 1 59 0 2 1 0 0 82 07:15 0 25 4 0 0 0 0 147 0 1 0 0 — 07:30 0 31 1 0 0 0 0 lie 0 2 0 0 152 07:45 0 22 3 D 0 0 1 116 D 2 0 0 144 0 24 1 0 0 0 1 91 0 0 0 0 117 0 33 1 0 a 0 1 84 0 0 0 1 120 E 0 37 0 0 0 0 0 g8 0 1 00 55 0 0 0 0 1 78 0 00 0 134 0 p 0 p a p 0 0 0 0 0 o p Truck traffic Souih9aurd Westbound Naamound Eastbound Total Interval darts Left Thru Rlotol Left Thru Rlghl Lett I Thru Right Left Thru RI®ht 06:59 0 a 0 0 a 0 0 0 0 0 D 0 0 07t0 0 2 0 0 0 0 a 2 0 0 0 D 4 07:15 C 4 0 0 0 0 0 7 0 1 0 0 t2 07:90 0 3 0 0 0 0 0 1 6 0 0 0 1 10 07:45 0 7 0 0 0 0 0 3 0 1 0 0 11 OHM 0 3 0 D 0 0 0 6 0 1 0 0 10 08:15 D 11 0 0 0 0 0 3 0 0 0 0 14 08:30 0 7 D 1 0 1 0 0 0 7 0 1 0 1 0 C 14 D8A5 0 11 0 0 0 0 0 6 0 VO 1 0 0 17 09t0 0 0 D 0 0 0 0 0 0 0 0 0 D Pedestrian volumes NE NW SW SE Total Loll Right Total Lett Total Left Right Total Interval starts p6:59 0 —0 —0 0 0 0 0 a 0 07:00 0 D 0 0 T,rtT,,Io 0 0 D 0 0 07:15 0 0 0 0 T a 0 C 0 0 D72D a 0 0 0 0 0 0 007:45 0 0 0 0 a 0H Coto 0 0 0 D 0 0 0 068:15 a 0 0 0 a 0 0 0 0 00830 0 0 0 D D0 0 0 0 U08:45 0 D a 0 0 0 0 0 0 0ateD o a D D p p o D D Intersection Peak Hour 07:15 - 08:15 SouthBound Westbound Northbou IEastbou ITotal Lest Thru Right Left Thru I Right Left Thru Right Left Thru Right Vehicle Total 0 119 9 Q 0 D 2 494 D 8 0 1 633 Factor 0.00 0.88 0.56 0.00 0.00 0.00 0.50 0.80 0.00 0.67 0.00 0.25 0.84 nnmar-h far:tor I 0.91 0.00 0.81 0.75 Peak Hour Vehicle Summary SouthBound Westbound Northbound I Eastbound Total Vehicle Left Thru Right Left Thru Right Left Thru Right Left Thru Right Car 0 102 9 0 0 0 2 472 0 5 0 0 590 Truck 0 17 0 0 0 0 0 22 D 3 0 1 43 Peak Hour Pedestrians Pedestrians NE NW SW SE Left Right 0 0 Total 0 Left 0 Right 0 Total D Left 0 I Right 0 Total D Left 0 Right 0 Total 0 Total 0 Intersection Peak Hour Location: Scottsville Rd at Entrance, Charlottesville VA GPS Coordinates: N = 37.987333, W=-78.502458 Date: 2013-05-15 Day of week: Wednesday Weather: Analyst: Vehicle Total Factor pproach tactai Intersection Peak Hour 07:15 - 08:15 5outhBound Westbound Northbound Eastbound Left Thru Right Left Thru I Right Left Thru Right Left IThru Right 0 119 9 0 0 0 2 494 0 8 0 1 0A0 0.88 0.56 0.00 0.00 0.00 0.50 0.80 0.00 0.67 1 0.00 0.25 0.91 0.00 0.81 0.75 Total 633 0.84 Turn Count Summary Location: Scottsville Rd at Entrance, Charlottesville VA GPS Coordinates: N = 38.024369, W=-78.468313 Date: 2013-05-14 Day of week: Tuesday Weather: Analyst: Total vehicle traffic Interval starts SOuthBound Westbound Northbound Eastbound Total Lett Thru Rlgfttj Left Thru Right Left Thru I Right Left Thru Right 16:00 0 82 2 1 0 0 10 0 52 1 0 0 0 0 136 16:15 0 98 1 0 0 0 0 45 1 0 1 0 1 146 16n0 0175 3 a 0 0 a 48 0 1 0 a 127 16:45 1 0 0 0 0 45 a 1 0 0 149 1700 17:15 D 0 0 0 0 0 0 0 a 1 34 45 0 0 2 0 0 0 1 0 143 167 17:30 2 0 0 a 1 41 0 3 0 1 144 17.45 1 0 0 a 0 42 0 2 a 3 141 1"0 0 0 4 0 0 0 0 0 0 0 0 Car traffic SouthBound Westbound Northbound Eastbound Total In�rvee Left Thru I Right Lett Thru I Right Let Thru Right Lett Thru Right 16:00 0 80 1 1 0 0 0 0 50 0 0 0 0 131 16:15 D 0 1 0 0 0 0 37 0 1 0 1 130 1630 0 2 1 0 0 0 0 43 0 1 0 0 117 16:45 0 4 [119 1 0 0 0 0 43 0 1 0 0 139 17:00 D 4 0 0 0 0 0 33 0 1 0 1 139 17:15 D 0 0 0 0 1 43 0 0 0 0 163 17-30 0 90 2 0 1 0 1 0 1 39 0 3 0 1 186 17:45 0 91 1 0 0 0 0 40 0 2 0 3 137 18:00 0 0 0 0 0 0 D 0 0 0 0 0 D Truck traffic Interval scads SouthBo I Westbound Northbound Eastbound Total Leff Thru I RIgM Let Thru Right Let Thru Right Left Thru R%IG 10:00 0 2 1 1 D 0 0 0 2 0 0 0 0 5 16:16 16�0 0 0 6 9 0 2 0 0 ❑ 0 O 0 D 0 8 5 0 0 0 0 D 0 0 0 16 10 16:45 0 8 0 0 0 0 0 2 0 0 0 0 10 17:00 D 2 0 0 0 0 0 1 0 1 0 0 4 17:15 17:3D 0 D 2 6 0 0 a 0 0 0 0 0 0 0 2 2 0 0 a 0 0 0 0 0 4 a 17:45 0 2 D 0 0 0 0 2 0 0 0 0 4 1ao0 a o o ❑ a o o 1 ❑ D D ❑ a o Pedestrian volumes Interval starts NE Nw Sw SE Total Left Right Total Lett Right Total Lett Right Total Lett Right Total 16:00 0 0 0 0 0 0 0 0 0 0 0 0 0 16:15 0 0 0 a 0 0 0 0 0 0 0 0 0 16:0 0 0 0 0 0 0 0 0 0 0 0 0 0 16AS 0 0 0 0 a 0 0 ❑ D 0 0 0 0 17700 0 0 0 0 0 0 0 0 0 0 0 0 0 17:15 0 0 0 0 0 0 0 0 0 0 0 0 a 17:30 0 0 D 0 0 D 0 0 0 0 0 0 0 17-46 0 0 0 0 0 0 0 0 0 0 0 0 0 1&00 0 0 0 0 0 0 0 0 0 0 a 0 0 Vehicle Total Factor pproach facto Intersection Peak Hour 16:45 - 17:45 SouthBound Westbound Northbound Eastbound Left Thru Right Left I Thru inht Left Thru Right Left I Thru I Right 0 425 3 D 0 0 2 165 0 fi 0 2 O.00 0.88 0.38 0.00 0.00 0.00 0.50 0.92 0.00 0.50 O.OD 0.50 0.88 0.00 0.91 0.50 Peak Hour Vehicle Summary Vehicle Car Truck SouthBound Westbound Northbound Eastbound Left Thru Right Left Thru Right Left Thru Right Left Thru Right 0 407 3 0 0 0 2 158 0 5 0 2 0 18 0 O 0 0 0 7 0 1 0 0 Total 603 0.90 Total 577 26 Peak Hour Pedestrians NE NW SW SE Total Left Right Total Left Right ITOtallLeft Right Total Left lRight Total Pedestrians 1 0 0 0 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 Intersection Peak Hour Location: Scottsville Rd at Entrance, Charlottesville VA GPS Coordinates: N = 38.024369, W=-78.468313 Date: 2013-05-14 Day of week: Tuesday Weather: Analyst: Intersection Peak Hour 16:45 - 17:45 SouthBound Westbound Northbound IEastbound Total Left Thru Right Left Thru flight Left Thru Right I Left Thru Right Vehicle Total 0 425 3 0 0 0 2 165 0 6 0 2 603 Factor 0.00 0.88 0.38 0.00 0.00 0.00 0.50 0.92 0.00 0.50 0.00 0.50 0.90 ooroach factor 0.88 0.00 0.91 0.50 EPR, EPR P.C.c.,- _.,E{>i'�i.^.� Ps• .h •'.: i.'E:h,.T�'sS� r 637 BERKMAR Z;F, HI Tr- �� •I 4 Traffic Count for intersection of Avon Street Extended and Arden Drive HeaWnaf MDunt %"eavTTmfffc Cumulative HOWTvtai TraffmOGUrit Cumulative HourHewffmrflc count e o% 2 2.0% 1 0.4YK 1 L23X 313 U pX 333 2 4 e.91196 293 T 1 1.69% m OEM ilea ,Tr:r,:C,�;,,[%NeavyT:zfiu Cumuirtiva Hour Tote+TrafHri.aunt Lumulatue xcUr Heaw Traft+c Ceunt 2 3 3m% a 2A1X LM 329 e 0% 311 1 0.09% 342 1 Ls4z 33s � EPREPR, P.C. "ENGINEERING & ?CANNING RESOURCES' 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix B — Turn Lane Warrant WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: Intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak Hour: AM Peak Peak Hour Left Turns (VL): 6 vph Advancing Volume (VA): 61 vph (Southbound Approach) Opposing Volume (VJ: 282 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (L): 10% (Calculated Value: 9.8%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reclulred WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 9 Spring Hill Village - Avon Street Extended and Entrance 800 700 v 600 sW 500 a 400 O z W300 p 200 0 y 100 0 0 S a� X 282 No Left -Turn Lane Required 200 2013 2013 2015 Grade, Unsignalized Intersections L = % Left Turns in VA S = Storage Length Required V=50mph L=10% 400 _ 600 800 1,000 1,200 VA ADVANCING VOLUME (VPFQ AM Peak - Southbound Source: Highway Research Record Number 211 - Figure 9 GUIDELINES FOR RIGHT --TURN TREATMENTS ON 2-LANE HIGHWAYS Project_ Intersection: Approach Direction: Peak Hour: PHV Right Turns: PHV Approach Total: Spring HdI Viili r} - Avon Street Extended and Entrance Nonhwund AM Peak 10 vPh 232 v;s" CONCLUSION: RIGHT -TURN RADIUS REQUIRED 140 3 0 120 • _ 100 s 9 80 bj 60 H 2 40 It 20 FE 0 Analysis Date: 2013 Data Date: 2013 Projection Year: 2015 GUIDELINES FOR RIGHT TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance FULL-WIDTHTURN-LANE REQUIRED TAPER REQUIRED 42 RADIUS REQUIRED 10 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Intersection: Route 20 and Entrance Approach Direction: Northbound Peak Hour: AM Peak Peak Hour Left Turns (VL): 7 vph Advancing Volume (VA): 513 vph (Northbound Approach) Opposing Volume (Vo): 163 vph (Southbound Approach) Operating/Design Speed (V): 60 mph % Left Turns in VA (L): 5% (Calculated Value: 1.41k) Optional % Lett Turn Override: Analysis Date: 2013 Data Date: 2013 Projection Year: 2015 (75, storage required based on chart) % Trucks in VL: 10% (25' additional storage for trucks) CONCLUSION: 100' LEFT -TURN STORAGE REQUIRED WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 14 Spring Hill Village - Route 20 and Entrance 800 _ 700 s a 600 Z 500 0 0 C5 goo a? °1� z c 300 i d No 0 200 Lett Turn 163 Lane 100 Required 0 200 400 600 800 VA ADVANCING VOLUME (VPH) AM Peak - Northbound Source: Highway Research Record Number 211 - Figure 14 Grade, Unsignalized Intersections L = % Left Turns in VA S = Storage Length Required V=60mph cA� L = 5% 1,000 1,200 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Spring Mill Villas Intersection: Rode 20 aM Entrance Approach Direction: Sal thbourxl Anmlysls Date Peak Hour: AM Peak Data Date: PHV Right Turns: 41 %,Pb Projection Year: PHV Approach Total: i s of CONCLUSION: RIGHT -TURN RADIUS REQUIRED 140 3 O m 120 a an m 100 u t 80 ui 60 ' 40 is 20 a 0 — 0 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Route 20 and Entrance FULL-WIDTHTURN-LANE REQUIRED TAPER REQUIRED x 41 RADIUS REQUIRED 2013 2013 2015 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Southbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: Intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak Hour: PM Peak Peak Flour Left Turns (VJ: 23 vph Advancing Volume (VA): 273 vph (Southbound Approach) Opposing Volume (Vo): 99 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (L): 10% (Calculated Value: 8.4%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reguired WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 9 Spring Hill Village - Avon Street Extended and Entrance BM 700 i 916 r it 600 c1' w 500 > 400 (9 z C 300 ° p 200 1 No Left-Tum a Lane 100 i Required 0 0 S �T s 99 200 _ 400 600 SOD VA ADVANCING VOLUME (VPH) PM Peak - Southbound Source: Highway Research Record Number 211 - Figure 9 2013 2013 2015 1 Grade, Unsignaiized Intersections L = % Left Turns in VA S = Storage Length Required i V = -- L= 1 1,000 1,200 GUIDELINES FOR RIGHT TURN TREATMENTS ON 2-LANE HIGHWAY5 Project: Spri gHillVHige Intersection: Avon Sues# Extended and Entrar,:;S Approach Direction: Nanh boLubd Ana]Vsis Date 2013 Peak Hour: PM Paai Data Date: 2013 PHV Right Turns: IV vpht Projection Year: 2015 PHV Approach Total: 99 VPh CONCLUSION: RIGHT -TURN RADIUS REQUIRED GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance 140 0 = 12{} k FULL -WIDTH TURN -LANE REQUIRED i$ 10 100 o ~. y 80 TAPER REQUIRED � I 60 6 f c= 40 a RADIUS REQUIRED > 20 K 12 0 0 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour PM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Intersection: Route 20 and Entrance Approach Direction: Northbound Peak Hour: PM Peak Peak Hour Left Turns (VJ: 12 Advancing Volume (VA): 182 Opposing Volume (Vo): 483 Operating/Design Speed (V): 60 % Left Turns in VA (L): 5% Optional % Left Turn Override: Analysis Date: Data Date: Projection Year: vph vph (Northbound Approach) vph (Southbound Approach) mph (Calculated Value: 6.6%) (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reguilred WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Spring Hill Village - Route 20 and Entrance Figure 14 2013 2013 2015 Grade, Unsignalized Intersections L = °A Left Turns in VA 700 S = Storage Length Required a ' le. 600 V = 60 mph ua \ 500 \/ 483 �a L = 5% � 400 i` rn 300 No ., O 200 Le{ -Turn Lane 100 Required 0 - 0 200 400 600 000 V,4 ADVANCING VOLUME (VPM PM Peak- Northbound Source: Highway Research Record Number 211 - Figure 14 1,000 1,200 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Intersection: Approach Direction: Peak Hour: PHV Right Turns: PHV Approach Total y 140 3 D 120 a 100 > 80 ei 60 H = 40 20 Sprro Hill Village paoe 20 and Entrance Sourthbound PNI Peak 47 vph 3 vph CONCLUSION: RIGHT -TURN TAPER REQUIRED Analysis Date: 2013 Data Date: 2013 Projection Year: 2016 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Route 20 and Entrance TAPER REQUIRED RADIUS REQUIRED FULL-WIDTHTURN-LANE REQUIRED 0 — 0 100 200 300 400 500 i 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour PM Peak - Southbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STO GE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: Intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak Hour: AM Peak Peak Hour Left Turns (VJ: Advancing Volume (VA): Opposing Volume (Vo): Operating/Design Speed (V) % Left Turns in VA (L) Optional % Left Turn Override: 6 vph 64 vph (Southbound Approach) 299 vph (Northbound Approach) 50 mph 10% (Calculated Value. 9.4%) (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Required WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 9 Spring Hill Village - Avon Street Extended and Entrance 800 700 _ x Z 500 ep W >Ss. 500 400 z O 300 X 299 IL p 200 No Left-Tum y° Lane 100 Required o ` 0 2013 2013 2021 Grade. Unsignalized Intersections L= % Left Turns in VA S = Storage Length Required V=50mph L=10% t I 200 400�600 800 1.000 1,200 VA ADVANCING VOLUME(VPH) AM Peak - Southbound Source: Highway Research Record Number 211 - Figure 9 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Intersection: Approach Direction: Peak Hour: PHV Right Turns: PHV Approach Total: Spring HIII Village Avon Street Extended snr, _ntraime No thbounil AM Perak 10 00 299 vph CONCLUSION: RIGHT -TURN RADIUS REQUIRED Analysis Date: 2013 Data Date: 2013 Projection Year: 2021 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance ,- 140 120 FULL-WIDTHTURN-LANE REQUIRED 100 u t $0 80 .,� TAPER REQUIRED 60 �,... F �s7 40 aZ RADIUS REQUIRED a 20 iE X io 0 0 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Intersection: Route 20 and Entrance Approach Direction: Northbound Peak Hour: AM Peak Peak Hour Left Turns (VJ: 7 Advancing Volume (VA): 544 Opposing Volume (Vo): 171 Operating/Design Speed (V): 60 % Left Turns in VA (L): 5% Optional % Left Turn Override: Analysis Date: Data Date: Projection Year: vph vph (Northbound Approach) vph (Souhbound Approach) mph (Calculated Value: 1.3%) (75, storage required based on chart) % Trucks in VL: 10% (25' additional storage for trucks) CONCLUSION: 100' LEFT -TURN STORAGE REQUIRED 2013 2013 2021 WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 14 Spring Hill Village - Route 20 and Entrance B00 °- '� Grade, Unsignalized Intersections L = % Left Turns in VA 700 S = Storage Length Required a Z 600 V = 60 mph 4J + 500 I' S'� L=5% 0 s s, ' a 400 0? Z i �' 0 300 IL tln ar 0 200 Latt.Tµrn x 171 y° Lane 100 j Required 0 000 1,200 0 200 400 600 800 1 VA ADVANCING VOLUME (VPH) AM Peak - Northbound Source: Highway Research Record Number 211 - Figure 14 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Intersection: Approach Direction: Peak Hour: PHV Right Turns: PHV Approach Total Spring Hill Vilage Route 2D and Entrance Soutwound AM Peek 41 vph c 171 Vph CONCLUSION: RIGHT -TURN RADIUS REQUIRED Analysis Date: 2013 Data Date: 2013 Projection Year: 2021 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Route 20 and Entrance 140 0 120 FULL -WIDTH TURN -LANE REQUIRED 100 d -- y 80 TAPER REQUIRED B0� 53 = 40 41 __ c RADIUS REQUIRED 7x 20 a q 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Southbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN JIgEME LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak dour: PM Peak Peak Hour Left Turns (VJ: 23 vph Advancing Volume (VA): 288 vph (Southbound Approach) Opposing Volume (Vo): 104 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (L): 10% (Calculated Value: 8%) optional % Left Turn Override: (01 storage required based on chart) % Trucks in VL: 100k (0- additional storage for trucks) CONCLUSION: No Left -Turn Lane Fl9guired WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 9 Spring Hill Village - Avon Street Extended and Entrance 000 700 IL 600 w S'. 500 E a 400 z C 300 a i No O 200 ; Left -Turn C) ` Lane 100 Required 0 0 S� 104 200 - 400 600 800 VA ADVANCING VOLUME (VPK) PAIL Peak - Southbound Source: Highway Research Record Number 211 - Figure 9 2013 2013 2021 Grade, Unsignalized Intersections L = % Left Turns in VA S = Storage Length Required i V=50mph L =10% 1,000 1,200 GUIDELINES FOR RIGHT TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Siprmg Hill Village Intersection: Avon SU eet Extended and Er mnC0 Approach Direction: Noribbound Analysis Date: 2013 Peak Hour: PM Peak 11 Data Date: 2013 PHV Right Turns: 12 vph Projection Year: 2021 PHV Approach Total: 104 vph CONCLUSION: RIGHT -TURN RADIUS REQUIRED GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance 140 r 120 �_ FULL-WIDTHTURN-LANE REQUIRED II 1o0 80 Y TAPER REQUIRED ci7c7 40— aZ RADIUS REQUIRED 20 12 0 100 200 300 400 500 600 700 800 900 1000 PHV APPFIOACK TOTAL, vvehlcles per hour PM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Intersection: Route 20 and Entrance Approach Direction: Northbound Peak Hour: PM Peak Peak Hour Left Turns (VL): 12 Advancing Volume (VA): 193 Opposing Volume (Vo): 509 Operating/Design Speed (V): 60 % Left Turns in VA (L): 5% Optional % Left Turn Override: vph vph (Northbound Approach) vph (Southbound Approach) mph (Calculated Value: 6.2%) Analysis Date Data Date Projection Year (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left Turn Lane Reguilred WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 14 Spring Hill Village - Route 20 and Entrance 800 700 600 w 500 x 509 O > 400 t s� Z h 300 a No 0 200 Left -Turn o y Lane 100 1 Required 2013 2013 2021 Grade, Unsignalized Intersections L = % Lek Turns in VA S = Storage Length Required V=60mph tf'a L = 5% Sg 7 w N 0 200 400 600 800 1,000 1,200 VA ADVANCING VOLUME (VPH) PM Peak - Northbound Source: Highway Research Record Number 211 - Figure 14 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Spring HE Village Intersection: Route 20 anra Entra Approach Direction: SouthbGund Analysis Date: Pu P data Date: Peak Hour: PHV Right Turns: 47 tph Projection Year: PHV Approach Total: 509 VNIi 140 3 O L 120 100 s 8o N 60 1— = 40 1 7> 20 0 0 CONCLUSION: RIGHT -TURN TAPER REQUIRED GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Route 20 and Entrance FULL-WIDTHTURN-LANE REQUIRED TAPER REQUIRED 2013 2013 2021 47- RADIUS REQUIRED 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour PM Peak - Southbound Source: VDOT Minimum Standards of Entrances to State Highways • Figure 5 EPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix C - Turn Lane Threshold Testing WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: 2013 Intersection: Avon Street Extended and Entrance Data Date: 2013 Approach Direction: Southbound Projection Year: 2015 Peak Hour: AM Peak Peak Hour Left Turns (VJ: 64 vph Advancing Volume (VA): 119 vph (Southbound Approach) Opposing Volume (Vo): 272 vph (Northbound Approach) operating/Design Speed (V): 50 mph % Left Turns in VA (Q. 40% (Calculated Value: 53.8%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reaulred WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure Spring Hill Village - Avon Street Extended and Entrance B00 _ 700 = 1y z 600 W s `saw 500 " � S� d a 400 e? eA 2 rQ 300 x 272 No G 200 Left -Turn 7 Lane Grade, Unsignalized Intersections L = % Left Turns in VA S = Storage Length Required I V = 50 mph L = 40% 100 Required 0 0 200 _ 400 600 800 1.000 -1,200 VA ADVANCING VOLUME (VPH) AM Peak - Southbound Source: Highway Research Record Number 211 - Figure 13 WARRANT FOR LEFT -TURN -STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: Intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak Hour: PM Peak Peak Hour Left Turns (V,_): 94 vph Advancing Volume (VA): 344 vph (Southbound Approach) Opposing Volume (Vo): 87 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (L): 30% (Calculated Value: 27.3%) Optional % Left Turn Override: (75' storage required based on chart) % Trucks in VL: 10% (25' additional storage for trucks) CONCLUSION: 100- LEFT -TURN STORAGE REQUIRED i WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 12 Spring Hill Village - Avon Street Extended and Entrance 2013 2013 2015 800 Grade, Unsignalized Intersections 700 i L = % Left Turns in VA S = Storage Length Required d Z 600 V = 50 mph w a 2 500 L = 30% 400 300 CL No O 200 Left - Turn > Lane y 100 I Required 87 0 200 400 600 800 1,000 1,200 VA ADVANCING VOLUME (VPH) i PM Peak - Southbound Source: Highway Research Record Number 211 - Figure 12 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: 2013 Intersection: Avon Street Extended and Entrance Data Date: 20i3 Approach Direction: Southbound Projection Year: 2015 Peak Hour: PM Peak Peak Hour Left Turns (VJ: 83 vph Advancing Volume (VA): 333 vph (Southbound Approach) Opposing Volume (Vo): 87 vph (Northbound Approach) operating/Design Speed (V): so mph % Left Turns in VA (L), 20% (Calculated Value: 24.9%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 1 00/0 (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reguired WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Fiaure 11 Spring Hill Village - Avon Street Extended and Entrance aao 1 Grade, Unsignalized Intersections L= % Left Turns in VA 700 , S = Storage Length Required Z 600 I V = 50 mph W a 50Dkti L = 20% r ` 400 s rn 300 a No p 200 Left -Turn Lane 100 ' Required 87 0- 0 200 400 600 Boo VA ADVANCING VOLUME (VPM PM Peak - Southbound Source: Highway Research Record Number 211 - Figure 11 1,000 1,200 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: 2013 Intersection: Avon Street Extended and Entrance Data Date: 2013 Approach Direction: Southbound Projection Year: 2021 Peak Hour: AM Peak Peak Hour Left Turns (VL): 64 vph Advancing Volume (VA): 122 vph (Southbound Approach) Opposing Volume (Vo): 289 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (L): 40% (Calculated Value: 52.5%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 10% (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Required WARRANT FOR LEFT TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 13 i Spring Hill Village - Avon Street Extended and Entrance 800 700 CL 600 w 500 a 400 O 300 a a p 200 0 100 0 0 a X 2 No Left -Turn Lane Required 200 Grade, Unsignalized Intersections L. = % Left Turns in VA S = Storage Length Required i V=50mph L = 40% cn \s 400 600 800 1,000 1,200 VA ADVANCING VOLUME (VPH) AM Peak - Southbound Source: Highway Research Record Number 211 - Figure 13 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: Intersection: Avon Street Extended and Entrance Data Date: Approach Direction: Southbound Projection Year: Peak Hour: PM Peak Peak Hour Left Turns (VL): 94 vph Advancing Volume (VA): 359 vph (Southbound Approach) Opposing Volume (Vo): 92 vph (Northbound Approach) Operating/Design Speed (V): 50 mph % Left Turns in VA (Q: 30% (Calculated Value: 26.2%) Optional % Left Turn Override: (75' storage required based on chart) % Trucks in VL: 10% (25' additional storage for trucks) CONCLUSION: 100' LEFT -TURN STORAGE REQUIRED WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 12 Spring Hill Village - Avon Street Extended and Entrance 800 700 Y rL 600 Z 414 w M 500 4. S o� 400 I , f� O 30o IL No 4 200 Left -Turn 7 Lane 100 Required X 92 J rade, Unsignalized Intersections = % Left Turns in VA = Storage Length Required i i V=50mph L=30% 2013 2013 2021 o 0 200 400 600 800 1,000 1,200 VA ADVANCING VOLUME (VPH) PM Peak - Southbound Source: Highway Research Record Number 211 - Figure 12 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAYS Project: Spring Hill Village Analysis Date: 2013 Intersection: Avon Street Extended and Entrance Data Date: 2013 Approach Direction: Southbound Projection Year: 2021 Peak Hour: PM Peak Peak Hour Left Turns (VJ: 72 vph Advancing Volume (VA): 337 vph (Southbound Approach) Opposing Volume (Vo): 92 vph (Northbound Approach) Operating/Design Speed (V): s0 mph % Left Turns in VA (L): 20% (Calculated Value: 21.4%) Optional % Left Turn Override: (0' storage required based on chart) % Trucks in VL: 10°/0 (0' additional storage for trucks) CONCLUSION: No Left -Turn Lane Reaulred WARRANT FOR LEFT -TURN STORAGE LANES ON 2-LANE HIGHWAYS Figure 11 Spring Hill Village - Avon Street Extended and Entrance 800 C 700 T ? 600 m S` g 500 s� xtid� a�. SSA o - 400 r Q 300 i IL G 200 Left -Turn Le ft Turn � Lane 100 Required 92 0 200 400 600 800 V,4 ADVANCING VOLUME (VPH) PM Peak - Southbound Source: Highway Research Record Number 211 - Figure 11 Grade, Unsignalized Intersections L = % Left Turns in VA s = Storage Length Required V=50mph L = 20% 1,000 1,200 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: I ntersection: Approach Direction: Peak Hour: PHV Right Tums: PHV Approach Total: Spdgg Hall Vlllt e Avon Street Extencfert and Er}lranrps Morlhbound AM Peak 64 - vph 335 %'Phi CONCLUSION: RIGHT -TURN TAPER REQUIRED Analysis Date: 2013 Data Date: 2013 Projection Year: 2015 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance 140 5 0 120 FULL-WIDTHTURN-LANE REQUIRED v 100 s 80 rq TAPER REQUIRED 75 7d 60::.. 64 r- = 40 RADIUS REQUIRED 20 _ 0 - 0 100 200 300 400 500 600 700 800 000 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - figure 5 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-lANE HIGHWAYS Project: Spring Hill Vilkw, Intersection: Avon Street Exteride+d and Erltmance Approach Direction: North -b ulnd Analysis Date: 2013 Peak Hour: PM Peak Data Date: 2013 PHV Right Turns: 94 vph Projection Year: 2015 PHV Approach Total: ! 181 vph CONCLUSION: RIGHT -TURN TAPER REQUIRED GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Eidended and Entrance 140 3 O 20 FULL-WIDTHTURN-LANE REQUIRED 1100 96 4 80 vJ i TAPER REQUIRED 60 40 I S RADIUS REQUIRED _ 20 iE 0 100 200 900 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour PM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-1ANE HIGHWAYS Project: `ypfhg Dill Village 9 Intersection: Avon Street F_>cten+ied and EMrance Approach Direction: I�orthb4iind Analysis Date: Peak Hour: AM Peak Data Date: PHV Right Turns: _ 64 vph Projection Year: PHV Approach Total: 3514 1+rph CONCLUSION: RIGHT -TURN TAPER REQUIRED GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village Avon Street Extended and Entrance 140 0 120 FULL -WIDTH TURN -LANE REQUIRED 100 E 80 TAPER REQUIRED 73 ' t4 .-�- 60 H _ _ 40 8 RADIUS REQUIRED 20 a �- 0 0 100 2013 2013 2021 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicles per hour AM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 GUIDELINES FOR RIGHT -TURN TREATMENTS ON 2-LANE HIGHWAYS Project: Intersection: Approach Direction: Peak Hour.- PHV Right Turns: PHV Approach Total Spring Hill Village Avon Street Extanrted and E=ntrartwe nowt# bouna RM Psak 94 vph 1136 vph CONCLUSION: RIGHT -TURN TAPER REQUIRED Analysis Date: 2013 Data Date: 2013 Projection Year: 2021 GUIDELINES FOR RIGHT -TURN TREATMENTS 2-LANE HIGHWAYS Spring Hill Village - Avon Street Extended and Entrance L 140 7 0 m 120 FULL-WIDTHTURN-LANE REQUIRED a. 100 95 94 80 TAPER REQUIRED cc 60 �s40 i I RADIUS REQUIRED 20 0 — 0 100 200 300 400 500 600 700 800 900 1000 PHV APPROACH TOTAL, vehicle- per hour PM Peak - Northbound Source: VDOT Minimum Standards of Entrances to State Highways - Figure 5 ENIMIM EPR, P.C. "ENGINEERING & PLANNING RESOURCES" 637 SERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 Appendix D - Synchro Reports HCM Unsignalized Intersection Capacity Analysis 3: Entrance & Avon St Extended 7/3/2013 t 1 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vehlh) 14 29 272 10 6 55 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 15 32 296 11 7 60 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 374 301 307 vC1, stage 1 conf vol vC2, stage 2 conf Vol vCu, unblocked vol 374 301 307 tC, single (s) 6A 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 98 96 99 cM capacity (vehlh) 624 739 1254 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 47 307 66 Volume Left 15 0 7 Volume Right 32 11 0 cSH 697 1700 1254 Volume to Capacity 0.07 0.18 0.01 Queue Length 95th (ft) 5 0 0 Control Delay (s) %5 0.0 0.8 Lane LOS B A Approach Delay (s) 10.5 0.0 0.8 Approach LOS B Intersection Summary Average Delay Intersection Capacity Utilization 1.3 24.9% ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2015 Build AM Synchro 7 Report Page 1 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 7/312013 6: Entrance & Route 20 4,� 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vehlh) 22 7 7 506 122 41 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 24 8 8 550 133 45 Pedestrians Lane Width (ft) Walking Speed ON Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 720 155 177 vC1, stage 1 conf Vol vC2, stage 2 canf Vol vCu, unblocked Vol 720 155 177 tC, single (s) 6.4 6-2 4.1 tC, 2 stage (s) tF (s) 3.5 33 2.2 p0 queue free % 94 99 99 cM capacity (vehlh) 392 891 1399 Direction, Lane # EB 1 NB 1 NB 2 SB 1 Volume Total 32 8 550 177 Volume Left 24 8 0 0 Volume Right 8 0 0 45 cSH 454 1399 1700 1700 Volume to Capacity 0.07 0.01 0.32 010 Queue Length 95th A 6 0 0 0 Control Delay (s) 135 76 0.0 0.0 Lane LOS B A Approach Delay (s) 13.5 01 0.0 Approach LOS B Intersection Summary Average Delay Intersection Capacity Utilization 0.6 36.6% ICU Level of Service A Analysis Period (min) 15 S hro 7 - Re art ync p Spring Hill Village 2015 Build AM Page 2 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 3: Entrance & Avon St Extended 7/3/2013 { A- t Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T 4 Volume (vehlh) 12 21 87 12 23 250 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 13 23 95 13 25 272 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 423 101 108 vC1, stage 1 conf vol vC2, stage 2 conf voll vCu, unblocked vol 423 101 106 tC, single (s) 6-4 6.2 4-1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 98 98 98 cM capacity (vehlh) 578 954 1483 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 36 108 297 Volume Left 13 0 25 Volume Right 23 13 0 cSH 771 1700 1483 Volume to Capacity 0.05 0.06 0.02 Queue Length 95th (ft) 4 0 1 Control Delay (s) 9.9 0.0 0.8 Lane LOS A A Approach Delay (s) 9.9 0.0 0.8 Approach LOS A Intersection Summary Average Delay Intersection Capacity Utilization 1.3 31.1 % ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2015 Build PM Synchro 7 - Report Page 1 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 713/2013 6: Entrance & Route 20 '-r '\ t Movement EBL EBR NBL NBT SBT SBR Lane Configurations ' t ` Volume (vehlh) 85 12 12 170 436 47 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate NO) 92 13 13 185 474 51 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type Alone None Median storage veh) Upstream signal (ft) pX, platoon unblocked VC, conflicting volume 710 499 525 vC1, stage 1 conf vol vC2, stage 2 oonf vol vCu, unblocked vol 710 499 525 tC, single (s) 6.4 62 41 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 77 98 99 cM capacity (vehlh) 395 571 1042 Direction, Lane# EB 1 NB 1 NB 2 SB 1 Volume Total 105 13 185 525 Volume Left 92 13 0 0 Volume Right 13 0 0 51 cSH 411 1042 1700 1700 Volume to Capacity 0.26 0-01 011 0.31 Queue Length 95th (ft) 25 1 0 0 Control Delay (s) 16.8 8.5 0.0 0.0 Lane LOS C A Approach Delay (s) 16.8 0.6 0.0 Approach LOS C Intersection Summary Average Delay Intersection Capacity Utilization 2.3 37.9% ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2015 Build PM Synchro 7 -Report Page 2 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 3: Entrance & Avon St Extended 713/2013 4,- t Movement WBL WBR NBT NBR SBL SBT Lane Configurations e�rqr '* 4 Volume (vehlh) 14 29 289 10 6 58 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 15 32 314 11 7 63 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 396 320 325 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 396 320 325 tC, single (s) 6A 6.2 41 tC, 2 stage (s) tF (s) 3.5 3.3 2 2 p0 queue free % 97 96 99 cM capacity (vehlh) 606 721 1235 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 47 325 70 Volume Left 15 0 7 Volume Right 32 11 0 cSH 679 1700 1235 Volume to Capacity 0.07 019 001 Queue Length 95th (ft) 6 0 0 Control Delay (s) 10.7 0.0 0.8 Lane LOS B A Approach Delay (s) 10.7 0.0 0.8 Approach LOS B Intersection Summary Average Delay Intersection Capacity Utilization 1.3 25.8% ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2021 Build AM Synchro 7 - Report EPR, P.C. Page 1 HCM Unsignalized Intersection Capacity Analysis 6: Entrance & Route 20 7/312013 --# t Movement EBL EBR NBL NBT SBT SBR Lane Configurations 1? i Is - Volume (vehlh) 22 7 7 537 130 41 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 24 8 8 584 141 45 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 762 164 186 vC1, stage 1 confvol vC2, stage 2 conf vol vCu, unblocked vol 762 164 186 tC, single (s) 6A 6-2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 94 99 99 cM capacity (veh1h) 371 881 1389 Direction, Lane # EB 1 NB 1 NB 2 SB 1 Volume Total 32 8 584 186 Volume Left 24 8 0 0 Volume Right 8 0 0 45 cSH 431 1389 1700 1700 Volume to Capacity 0.07 0.01 0.34 011 Queue Length 95th (ft) 6 0 0 0 Control Delay (s) 14.0 7.6 0.0 0.0 Lane LOS B A Approach Delay (s) 14.0 0.1 0.0 Approach LOS B Intersection Summary Average Delay Intersection Capacity Utilization 0.6 38.3% ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2021 Build AM Synchro 7 -Report Page 2 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 71312013 3: Entrance & Avon St Extended ,e- k T Movement WBL WBR NBT NBR SBL SBT Lane Configurations Volume (vehm) 12 21 92 12 23 265 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 13 23 100 13 25 288 Pedestrians Lane Width (ft) Walking Speed (fl1s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 445 107 113 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 445 107 113 tC, single (s) 64 6.2 41 tC, 2 stage (s) 2 2 tF (s) 3.5 3.3 p0 queue free % 98 98 98 cM capacity (vehlh) 561 948 1476 Direction, Lane # WB 1 NB 1 SB 1 Volume Total 36 113 313 Volume Left 13 0 25 Volume Right 23 13 0 cSH 758 1700 1476 Volume to Capacity 0.05 0.07 0.02 Queue Length 95th (ft) 4 0 1 Control Delay (s) 10.0 0.0 0.7 Lane LOS A A Approach Delay (s) 10.0 0.0 0.7 Approach LOS A Intersection Summary Average Delay Intersection Capacity Utilization 1.3 31.9% ICU Level of Service A Analysis Period (min) 15 Spring Hill Village 2021 Build PM Synchro 7 - ReportPage 1 EPR, P.C. HCM Unsignalized Intersection Capacity Analysis 6: Entrance & Route 20 713I2013 -A N 4% EBL EBR SBT SBR Lane Configurations � Volume (vehlh) 85 12 12 181 462 47 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 92 13 13 197 502 51 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 751 528 553 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 751 528 553 tC, single (s) 6.4 6-2 41 tC, 2 stage (s) tF(s) 3.5 33 22 p0 queue free % 75 98 99 cM capacity (vehlh) 374 551 1017 Direction, Lane # EB 1 NB 'I NB 2 SB 1 Volume Total 105 13 197 653 Volume Left 92 13 0 0 Volume Right 13 0 0 51 cSH 389 1017 1700 1700 Volume to Capacity 0.27 0.01 012 0.33 Queue Length 95th (ft) 27 1 0 0 Control Delay (s) 17.6 8.6 0.0 0.0 Lane LOS C A Approach Delay (s) 176 0.5 0.0 Approach LOS C Intersection Summary Average Delay 2•3 A Intersection Capacity Utilization 39 3% ICU Level of Service Analysis Period (min) 15 Spring Hill Village 2021 Build PM Synchro 7 - Report EPR, P.C. Page 2 FXNTW� zM71i r--r-I f6 VIL . I EPR, P.C. "ENGINEERING $ PLANNING RESOURCES" I 'F M 637 BERKMAR CIRCLE, CHARLOTTESVILLE, VA 22901 There will be two full access entrances to the Spring Hill Village development because it has ample frontage and site distance on two primary state roads. These entrances will be on Avon Street Extended (SR 742) and Route 20 (Scottsville Road). For this study, traffic operations at two intersections, as follows, will be examined: (See Figure 2) Route 20 at site entrance 1; Avon Street Extended at site entrance 2. 3. Existing conditions To facilitate the study, traffic counts were obtained for the AM and PM peak hours of a typical weekday. The traffic count for AM and PM peak hour trips at the intersection of Route 20 at Parham Construction was performed on Tuesday, May 14, 2013. The traffic count for AM and PM peak hour trips at the intersection of Avon Street Extended and Arden Drive was performed on Thursday, May 16, 2013. The counts for AM were performed between 7 AM and 9 AM, and the counts for the PM were performed between 413M and 6PM on a typical weekday. See Figure 3 for the illustration of the traffic counts at the counted intersections, and Figure 4 for the illustration of the existing traffic volumes at the study intersections. The traffic count worksheets are provided in Appendix A. 4. No build conditions A 1 % per year background growth rate was used to increase the background traffic volumes to the build year 2015 and planning horizon year 2021. See Figure 5 and Figure 6 for the illustrations of the no build traffic volumes in 2015 and 2021. 5. Site trip generation The Spring Hill development was analyzed as one phase of build -out, to be completed in approximately two years in 2015, consisting of four different land use types: townhomeslcondos, office space, apartments, and single-family detached homes. Per ITE Generation 9th Edition, this study will analyze them with land use code 230 for town homestoondos, land use code 710 for office space, land use code 220 for apartments, and 210 for single-family detached homes. According to VDOT's Traffic Impact Analysis Regulations Administrative Guidelines, the internal capture rates for this development are 5% for AM and PM peak hours as well as 24- hour traffic, and the pass -by rates are 0%. Internal capture credit was given to the residential and office trips, pending whichever use generated the fewest trips during peak hour. Table 1 provides the summaries of the trip generation with internal captures for this development. Figure 3 Traffic Counts -Awl, imloa. ' ,BJAA A 'I LO N Cn 8/6 1 /2, Ln 1L A'T. It I