Loading...
HomeMy WebLinkAboutSDP201500059 Review Comments 2015-04-09Short Review Comments Report for: SDP201500008 SubApplication Type: Mechum's Trestle - Initial Initial Site Plan Date Completed:04/02/2015 Reviewer:Megan Yaniglos CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/06/2015 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:The ARB took the following action on April 6, 2015 CONSENT AGENDA a. ARB-2015-24: Mechum’s Trestle Initial Plan - Initial Site Development Plan (TM/Parcel 057000000031A0) Proposal: To construct a 4,000 sf restaurant with associated site improvements and a request to place required frontage landscaping in the right-of-way. Location: 4294 Three Notch’d Road, at the northwest corner of the intersection of Routes 240 (Three Notch’d Road), 250 (Ivy Road) and 680 (Browns Gap Turnpike) Motion to Approve Consent Agenda: Motion: Mr. Missel moved to approve the consent agenda and forward the recommendations outlined in the staff report to the Agent for the Site Review Committee, as follows: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5): 1. In areas where wooded area to remain is used to meet perimeter parking lot tree requirements, identify existing individual large shade trees on the plan by size and species to show that the minimum requirement can be met. 2. Revise the landscape plan to show a sufficient quantity of trees – proposed and existing to remain – distributed as necessary throughout the site, to meet frontage, interior parking lot and perimeter parking lot quantity requirements. 3. Provide 2 additional large shade trees in close proximity to the Rt. 240 property line. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. 1. Revise the demolition plan to coordinate with proposed construction and planting along Rt. 680. Identify all trees to be removed. 2. Revise the plan to make all existing tree identifications legible. 3. Show tree protection fencing on the plans. 4. Revise the plan to show a treatment for the retaining wall that is coordinated with the proposed building. 5. Add the standard plant health note to the plan: “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” 6. Provide a complete plant schedule for review. 7. In areas where wooded area to remain is used to meet perimeter parking lot tree requirements, identify existing individual large shade trees on the plan by size and species to show that the minimum requirement can be met. 8. Revise the landscape plan to show a sufficient quantity of trees – proposed and existing to remain – distributed as necessary throughout the site, to meet frontage, interior parking lot and perimeter parking lot quantity requirements. 9. Add a medium tree, 2 ½” caliper at planting, in the vicinity of the north end of the sidewalk near the dumpster. 10. Indicate the height of the electric line that runs along the Rt. 240 side of the property. For those trees close to the line, choose a species whose mature height will not interfere with the electric line. 11. Provide 2 additional large shade trees in close proximity to the Rt. 240 property line. 12. Show all proposed site and building-mounted light fixtures on a lighting plan and provide all related details for review. 13. Add the standard mechanical equipment note to both the architectural and site plans: “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 14. Show the locations of proposed mechanical equipment – both ground- and building-mounted – and show how visibility of the equipment will be eliminated. Note that the preference is to locate equipment so that visibility is eliminated without the need to add screening. If/when screening is needed, it should be fully coordinated with the architecture of the building. 15. Include a dumpster enclosure detail in the plan. Coordinate the material of the enclosure with the material of the building. 16. Provide architectural designs for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Show adequate tree protection fencing on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. Mr. Lebo seconded the motion. The motion carried by a vote of 4:0. Division: Page:1 of 3 County of Albemarle Printed On:January 31, 2017 7. In areas where wooded area to remain is used to meet perimeter parking lot tree requirements, identify existing individual large shade trees on the plan by size and species to show that the minimum requirement can be met. 8. Revise the landscape plan to show a sufficient quantity of trees – proposed and existing to remain – distributed as necessary throughout the site, to meet frontage, interior parking lot and perimeter parking lot quantity requirements. 9. Add a medium tree, 2 ½” caliper at planting, in the vicinity of the north end of the sidewalk near the dumpster. 10. Indicate the height of the electric line that runs along the Rt. 240 side of the property. For those trees close to the line, choose a species whose mature height will not interfere with the electric line. 11. Provide 2 additional large shade trees in close proximity to the Rt. 240 property line. 12. Show all proposed site and building-mounted light fixtures on a lighting plan and provide all related details for review. 13. Add the standard mechanical equipment note to both the architectural and site plans: “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 14. Show the locations of proposed mechanical equipment – both ground- and building-mounted – and show how visibility of the equipment will be eliminated. Note that the preference is to locate equipment so that visibility is eliminated without the need to add screening. If/when screening is needed, it should be fully coordinated with the architecture of the building. 15. Include a dumpster enclosure detail in the plan. Coordinate the material of the enclosure with the material of the building. 16. Provide architectural designs for review. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Show adequate tree protection fencing on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. Mr. Lebo seconded the motion. The motion carried by a vote of 4:0. Date Completed:03/03/2015 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated February 17, 2015. No comments or conditions. Division: Date Completed:03/10/2015 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:Requested Changes Reviews Comments:Based on plans dated 2/17/15 1. The travel lane in the parking lot shall maintain 20 ft clear travel way with a minimum radius of 25 ft. The radius of concern is the 10 ft radii on the island located near the dumpster pad. Division: Date Completed:03/27/2015 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:•ACSA Jurisdictional Area Designation: Limited Service for sanitary sewer through the use of a pump station and associated force main to serve the existing use (restaurant plus associated apartment for employee), existing structure (with the exception of façade treatment and those expansions which do not require variances or modifications to the ordinance), and existing capacity (equivalent of 100 seat restaurant generating no more than 5,000 gallons per day only). •RWSA approval is required for the force main connection. •The applicant shall show a private water meter on the waterline from the well on the site plan. Notes shall be added that the final location shall be approved by the ACSA. The water meter, installed by the applicant, shall be compatible with the ACSA’s meter reading equipment. For more information the applicant should contact Kenny Barrow at 434-977-4511, ext. 151. Division: Page:2 of 3 County of Albemarle Printed On:January 31, 2017 the applicant should contact Kenny Barrow at 434-977-4511, ext. 151. Date Completed:04/01/2015 Reviewer:Troy Austin VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/30/2015 Reviewer:Steve Watson Albemarle County Police Dept Review Status:See Recommendations Reviews Comments: Division: Date Completed:04/07/2015 Reviewer:Michelle Roberge CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/09/2015 Reviewer:Victoria Fort RWSA Review Status:Requested Changes Reviews Comments:1. The proposed development is within the Beaver Creek Dam Inundation Zone for a 12-hour PMF with a dam breach. The dam was recently upgraded to high-hazard based on an analysis of inundation areas, and it was determined that the spillway will require upgrades to meet current DCR Dam Safety Regulations. 2. The proposed development is downstream of the Lickinghole Creek Dam; however, a recent dam breach analysis (currently under review by DCR) showed that a culvert under the CSX railroad downstream of the dam (upstream of the proposed restaurant) limits the amount of flow that passes downstream. Due to this constriction and the relatively small size of the impounded reservoir, a breach of the dam would have a negligible impact on flooding during a 100-year storm and would not flood any existing or proposed structures in the event of a sunny day breach. 3. The existing force main must be pressure tested and approved prior to the development going online. 4. From available information, it is unclear whether the previous owner obtained an easement for the 4” force main when it was installed. The applicant should obtain easements as necessary to operate and maintain the sewer force main. Division: Page:3 of 3 County of Albemarle Printed On:January 31, 2017 0 A l i ffflj mew COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 2/2/2016 Alan Franklin 427 Cranberry Lane Crozet,VA 22902 RE:SDP2015-59 Spring Hill Village—Initial Site Development Plan Dear Mr. Franklin: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan. This approval shall be valid for a period of five(5)years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one(1)year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle,and thereafter diligently pursues approval of the final site plan. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A fee of$1,613 Please submit 8 copies of the final plans to the Community Development Department.The assigned Lead Reviewer will then distribute the plans to all reviewing agencies(for ACSA,please submit 3 copies of construction plans directly to them,as stated in their comments).Once you receive the first set of comments on the final site plan, please work with each reviewer individually to satisfy their requirements. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the attached conditions from the following agencies/reviewers have been obtained: SRC Members: Albemarle County Planning Services(Planner)-2 copies [Rachel Falkenstein, rfalkenstein@albemarle.org] Albemarle County Engineering Services-1 copy[Matt Wentland, mwentlandPalbemarle.org] Albemarle County Information Services(E911)-1 copy[Andy Slack,aslack@albemarle.org] Albemarle County Planning Services (ARB)-1 copy [Margaret Maliszewski, mmaliszewski@albemarle.org] 1 Now Nose Albemarle County Building Inspections—1 copy[Jay Schlothauer, ischlothauerPalbemarle.org] Albemarle County Department of Fire Rescue-1 copy[Robbie Gilmer, rgilmer@albemarle.org] Albemarle County Service Authority-[Alex Morrison,amorrison@serviceauthority.org] Virginia Department of Transportation-1 copy[Troy Austin,nathran.austin@vdot.virginia.gov] If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 3273, rfalkenstein@albemarle.org. Sincerely, eaCO P-A-kt`17 ) Rachel Falkenstein Senior Planner 2 �''�c. Itriew ►'nacirnA County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA,22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Alan Franklin(alan@alanfrankinpe.com) From: Rachel Falkenstein,Senior Planner Division: Planning Date: January 19,2016 Subject: SDP 2015-59 Spring Hill Village—Initial Site Development Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference,which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment]This application was reviewed against Site Development Plan requirements only.Any subdivision related comments are provided for reference only(unless necessary for site plan approval),and to convey the issues that will arise when/if a new subdivision plat and road plans are submitted. 2. [32.5.2(a)]Zoning district and magisterial district are switched in notes on sheet 2. Please revise. 3. [32.5.2(a)] Include Entrance Corridor(EC) in zoning designation. 4. [32.5.2(a)] If any waivers or special exceptions were previously approved with the rezoning application, list them on the plan with approved conditions, if any. 5. [32.5.2(a)]Some setbacks shown on the plan are not consistent with the Code of Development. Please amend or submit variation request for the change.The following inconsistencies were found: Block A shows a 10'front setback adjacent to Route 20; COD requires 25' Block A shows a 10' rear setback; COD requires 15' Block D shows 20' rear setback(sheet 2 only);COD requires 15' Bock E shows a 15'front setback;COD requires 5' Block F shows a 15'front setback; COD requires 5' 6. [32.5.2(a)] Label rear setback for Block C(COD requires 32'setback). 7. [32.5.2(b)] Provide acreages of all proposed lots. 8. [32.5.2(b)]Amend density note to include proposed density in addition to permitted density. 9. [32.5.2(b)] List maximum height of all structures. 10. [32.5.2(c)]The phasing plan shows Block C as part of phase 2,yet site plan sheets appear to show this block as part of the phase 1 improvements.Please clarify. A variation may be needed to change from phasing approved on the application plan. 11. [32.5.2(d)]Slopes on existing conditions sheet should be relabeled as"managed steep slopes." 12. [32.5.2(d)] Provide additional contour labels on grading sheets. 13. [32.5.2(i)] Show boundaries and label width of proposed alley easements. 14. [32.5.2(n)]Show locations of any proposed outdoor lighting. Include cut sheets and a photometric plan with final site plan. 15. [32.5.2(p)] Landscape calculations and schedule provided appear to be for a different project and do not match the landscape plan sheets.Provide calculations and plant schedule matching the plan shown. Include signed conservation checklist with landscape plan. 16. [32.5.2(p)] Label width of landscaping and maintenance easements along northern and southern property lines. 17. [32.5.2(u)and COD] Provide building elevations for proposed structures. List number of stories for buildings proposed along Avon Street(COD requires 3 stories). 18. [32.7.7] Provide more information about the proposed recreation areas on site including proposed facilities and total square footage. Recreation areas shall be provided as required by section 4.16 19. [32.7.9.8]The minimum tree canopy required for the residential portions of this site is twenty(20) percent. Provide calculations to show tree canopy requirement will be met for phase 1. 20. [32.7.2.2&14-409]All streets within the development shall be extended to abutting property lines to provide vehicular and pedestrian interconnections to future development on adjoining lands. Extend streets as close as possible to property lines and provide right of way to property lines for future extensions. 21. [Comment]There seem to be a number of site distance conflicts at proposed intersections.These will need to be resolved to the satisfaction of VDOT and engineering staff prior to final approval. 22. [Comment]Off-site easements must be approved and recorded prior to final site plan approval including easements for offsite utility connections and temporary construction easements if site work will encroach upon neighboring properties. Please contact Rachel Falkenstein in the Planning Division by using rfalkenstein(a albemarle.orq or 434-296- 5832 ext.3272 for further information. Rachel Falkenstein From: Margaret Maliszewski Sent: Thursday,January 21,2016 4:06 PM To: Rachel Falkenstein Subject: ARB action on Spring Hill Village b. ARB-2015-148: Spring Hill Village Initial Site Plan-Blocks C—G(TM/Parcel 09000000002800) Proposal: To establish Blocks C through G of a mixed-use development, including attached and detached dwelling units. Location: 1776 Scottsville Road, on the west side of Rt. 20, and east of Avon Street Extended (Rt. 742), between Arden Drive and Stony Creek Drive Regarding the initial site plan design: Motion: Mr. Lebo moved that the ARB forward the recommendations outlined in the staff report to the Agent for the Site Review Committee,as follows: • Regarding requirements to satisfy the design guidelines as per§ 18-30.6.4c(2),(3)and (5): 1. Remove the footprints of future phase buildings from the plan. 2. A screening fence detail indicating size,material and color is needed in the plan.Vinyl with a shiny surface is not an appropriate material for this fence. 3. Add the standard mechanical equipment note to both the site and architectural plans. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 4. Revise the landscape plan to key the trees on the plan to the plant schedule. 5. Revise the spacing of large shade trees along the ECs to 35' on center. 6. Intersperse ornamental trees among the large shade trees that are proposed along the ECs. 7. Revise the plans to clearly show all utility lines with their associated easements. Provide sufficient planting area,free of utilities and easements,along both ECs. 8. Clarify the extent of tree removal and tree replacement planned with off-site work along the ECs. 9. Revise the landscape plan to space the interior road trees no greater than 40' apart. Show how an appropriate appearance for the EC will be maintained. 10. Provide shrubs, minimum 24" high at planting, on the south side of the parking lot at Road C, to screen the parked cars as viewed from the EC. 11. Adjust the locations of trees south of lots 42-53 to remain outside of the sewer casement. 12. Add the standard plant health note to the plan."All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 13. Provide material and color samples for the retaining walls.Indicate material and color on the site plan. 14. Revise the plan to show a temporary landscape treatment for the sediment basin located at the southeast corner of the property to establish an appropriate appearance for the EC. 15. Clarify phasing on the plan,including related landscape development. • Regarding recommendations on the plan as it relates to the guidelines: 1. Note for future submittals that the Block A building will need to address EC Guidelines requirements for scale, proportion,massing,detailing,lack of blankness, etc.A"back of building"appearance will not be appropriate for elevations visible from Rt.20. 2. The ARB is supportive of mixed uses/commercial uses along the Entrance Corridor • Regarding recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. 1. Remove the footprints of future phase buildings from the plan. 1 2. Revise the plans to clearly show all utility lines with their associated easements. Provide sufficient planting area,free of utilities and easements,along both ECs. 3. Revise the plan to show a temporary landscape treatment for the sediment basin located at the southeast corner of the property to establish an appropriate appearance for the EC. 4. Clarify phasing on the plan,including related landscape development. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. Mr. Missel seconded the motion. The motion carried by a vote of 4:0. Margaret M.Maliszewski,Principal Planner Albemarle County Department of Community Development 401 McIntire Road,Charlottesville,VA 22902 434-296-5832 x3276 2 Alhe I le County ServiceAuth r „6-r...,yrfrorfj TO: Rachel Falkenstein FROM: Alexander J. Morrison, P.E., Civil Engineer DATE: January 19, 2016 RE: Site Plan Technical Review for: SDP201500059: Spring Hill Village— Initial Site Plan The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 12 inch water line is located approximately 25' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 2,350' (proposed connection) distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting final site plan approval. 11. Final site plan may/may not be signed. 12. RWSA approval for water and/or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: A portion of the proposed sanitary sewer infrastructure may qualify for off-site development credits. If the applicant wishes to pursue off-site development credits, please contact Alexander Morrison, PE, at amorrisonserviceauthority.org, for more information on the process. The applicant shall coordinate with Avinity Estates for the proposed sewer connection (the proposed connection point will be constructed under the Avinity Estates site plan). 168 Spotnap Road • Charlottesville•VA 22911 •Tel (434)977-4511 • Fax(434)979-0698 www.serviceauthority.org Albemarle Comity Service Autherity At the final site plan stage that applicant shall submit 3 copies of the utility plan, along with water and sewer data sheets, to the ACSA, Attn: Michael Vieira, PE, for construction review and approval. During the construction review process the ACSA will review future sewer easement on portions of your property to facilitate a sewer extension to serve the proposed grinder pumps at Avon Park II. 168 Spotnap Road • Charlottesville•VA 22911 •Tel(434)977-4511 • Fax(434)979-0698 www.serviceauthority.org NI/ 4.41001 11: iet‘ti 'g COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 orange Road Culpeper,Wairia 2270, Charles A. Kilpatrick,P.E. Commissioner January 27,2016 Ms. Rachel Falkenstein Senior Planner County of Albemarle 401 McIntire Road Charlottesville,VA 22902 Re: SDP-2015-00059 Spring Hill Village Initial Site Plan Dear Ms. Falkenstein, We have reviewed the initial site plan for Spring Hill Village dated 12/7/15 as submitted by Terra Concepts and offer the following comments: 1. A sight line easement needs to be provided on the commercial parcel located at the intersection Roads A and C. 2. A sight line easement needs to be provided on the main park parcel located at the intersection of Roads A and C. It appears that several trees will obstruct available sight distance as currently designed. 3. Has Emergency Services approved the 35' radius for the cul-de-sac of Road B? 4. A sight line easement needs to be provided across Lot 70 and Pocket Park#3 to ensure adequate sight distance for the intersection of Roads B and C. 5. A sight line profile needs to be provided to show the impact of the retaining walls on the available sight distance at the intersection of Roads B and C. 6. Pavement design calculations need to be provided for review. 7. The typical street section for Road B shows an option for on-street parking on one side of the road. The plan should indicate which side of the road parking will be allowed. 8. The road profiles should show the station and elevation of each intersecting roadway. 9. The K-values for crest and sag curves do not meet the minimum K-values for a design speed of 25 mph. 10. It appears that standard CD-1's are required at approximately stations 10+50, 10+60, 16+80, and 18+60 of Road A. 11. It appears that standard CD-1's are required at approximately stations 10+30, 11+40, and 16+50 of Road B. 12. There appears to be low area in the curb and gutter at the intersection of Roads A and C that will not drain. The area is on the northern side of the intersection going into the parking area in front of lots 42-53. 13. Storm structure B2 does not appear to be located at the low point based on contours provided. 14, Spot elevations should be provided along the curb and centerline of Avon Street Extended at the intersection with Road A to better define where surface runoff will flow to. 15. The waterline in the intersection of Roads A and C currently call for 2 bends. Can the waterline be aligned differently to eliminate the need for one of the bends? Each bend creates the potential for a leak to develop in the future. 16. Can the valves to the fire hydrant assemblies be located behind the curb or in the planting strip? 17. Hydraulic calculations and storm sewer profiles need to be provided for review. If you need additional information concerning this project,please do not hesitate to contact me at (434)422-9782. Sincerely, //1/ 4.61k Troy Austin,P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING ori` ��QFp,� AL ,,, irrli -w tInGrO COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 January 19,2015 Alan Franklin 427 Cranberry Lane Crozet,VA 22902 RE: SDP2015-59 Spring Hill Village—Initial Site Development Plan Dear Mr.Franklin: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) Albemarle County Information Services (E911) Albemarle County Building Inspections Albemarle County Planning Services (Architectural Review Board) (to be provided after ARB meeting 1/21/2015) Albemarle County Department of Fire Rescue Albemarle County Service Authority (to be forwarded upon receipt) Virginia Department of Transportation (to be forwarded upon receipt) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval.The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, k04-04-Q PIVI/ D Rachel Falkenstein Senior Planner Planning Services %.,..- „....0 .0„,„ .,4ti.)„,., %.. 41*,,,-, 1,0,,.,,, County of of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA, 22902 Phone 434-296-5832 Fax 434-972-4126 Memorandum To: Alan Franklin (alan@alanfrankinpe.com) From: Rachel Falkenstein,Senior Planner Division: Planning Date: January 19, 2016 Subject: SDP 2015-59 Spring Hill Village—Initial Site Development Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment]This application was reviewed against Site Development Plan requirements only. Any subdivision related comments are provided for reference only(unless necessary for site plan approval), and to convey the issues that will arise when/if a new subdivision plat and road plans are submitted. 2. [32.5.2(a)]Zoning district and magisterial district are switched in notes on sheet 2. Please revise. 3. [32.5.2(a)] Include Entrance Corridor(EC) in zoning designation. 4. [32.5.2(a)] If any waivers or special exceptions were previously approved with the rezoning application, list them on the plan with approved conditions, if any. 5. [32.5.2(a)]Some setbacks shown on the plan are not consistent with the Code of Development. Please amend or submit variation request for the change.The following inconsistencies were found: • Block A shows a 10'front setback adjacent to Route 20; COD requires 25' • Block A shows a 10' rear setback; COD requires 15' • Block D shows 20' rear setback(sheet 2 only); COD requires 15' • Bock E shows a 15'front setback; COD requires 5' • Block F shows a 15' front setback; COD requires 5' 6. [32.5.2(a)] Label rear setback for Block C(COD requires 32' setback). 7. [32.5.2(b)] Provide acreages of all proposed lots. 8. [32.5.2(b)] Amend density note to include proposed density in addition to permitted density. 9. [32.5.2(b)] List maximum height of all structures. Niko" ‘4610, 10. [32.5.2(c)]The phasing plan shows Block C as part of phase 2,yet site plan sheets appear to show this block as part of the phase 1 improvements. Please clarify. A variation may be needed to change from phasing approved on the application plan. 11. [32.5.2(d)]Slopes on existing conditions sheet should be relabeled as"managed steep slopes." 12. [32.5.2(d)] Provide additional contour labels on grading sheets. 13. [32.5.2(i)] Show boundaries and label width of proposed alley easements. 14. [32.5.2(n)]Show locations of any proposed outdoor lighting. Include cut sheets and a photometric plan with final site plan. 15. [32.5.2(p)] Landscape calculations and schedule provided appear to be for a different project and do not match the landscape plan sheets. Provide calculations and plant schedule matching the plan shown. Include signed conservation checklist with landscape plan. 16. [32.5.2(p)] Label width of landscaping and maintenance easements along northern and southern property lines. 17. [32.5.2(u)and COD] Provide building elevations for proposed structures. List number of stories for buildings proposed along Avon Street(COD requires 3 stories). 18. [32.7.7] Provide more information about the proposed recreation areas on site including proposed facilities and total square footage. Recreation areas shall be provided as required by section 4.16 19. [32.7.9.8]The minimum tree canopy required for the residential portions of this site is twenty(20) percent. Provide calculations to show tree canopy requirement will be met for phase 1. 20. [32.7.2.2&14-409]All streets within the development shall be extended to abutting property lines to provide vehicular and pedestrian interconnections to future development on adjoining lands. Extend streets as close as possible to property lines and provide right of way to property lines for future extensions. 21. [Comment]There seem to be a number of site distance conflicts at proposed intersections.These will need to be resolved to the satisfaction of VDOT and engineering staff prior to final approval. 22. [Comment]Off-site easements must be approved and recorded prior to final site plan approval including easements for offsite utility connections and temporary construction easements if site work will encroach upon neighboring properties. Please contact Rachel Falkenstein in the Planning Division by using rfalkenstein@albemarle.orq or 434-296- 5832 ext. 3272 for further information. ( (ki,,t VN1 5itt (- o Iry(lore_ e bui1ditm55 5Po ��� t i' �� comy.4 c vOY1 tip S rr-fi (v' U c d6- 'ortItt5t Ilk. Jc1la)