Loading...
HomeMy WebLinkAboutSDP201600021 Review Comments 2017-01-12Short Review Comments Report for: SDP201600021 SubApplication Type: Chapman Grove Baptist Church - Major Major Amendment Date Completed:05/19/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/05/2016 Reviewer:John Anderson CDD Engineering Review Status:No Objection Reviews Comments:Area of disturbance estimated <5,000 ft2. Activity is not subject to the VESCP or VSMP [17-300.A.; 17-302.A, respectively], and is not required to prepare an Erosion and Sediment Control, or SWM plan. A Tier 3 groundwater assessment is required -ref. 17-1003 [sample Tier 3 GW Assessment Attached]. Show stream buffer on site plan. Avoid stream buffer (ref. GIS image). (JTN - this comment taken from JA's SP201600007 comments) Division: Date Completed:04/07/2016 Reviewer:Andrew Slack CDD E911 Review Status:No Objection Reviews Comments:No objection. Division: Date Completed:05/02/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:Requested Changes Reviews Comments:Based on plans dated March 1, 2016. Due to the total number of parking spaces, two of them must be barrier-free. Provide two barrier-free parking spaces on the ramp side of the building. One of these spaces must be van-accessible. Division: Date Completed:05/11/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:1. Add the standard mechanical equipment note to the site and architectural plans. “Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.” 2. Submit the manufacturer’s cut sheet for the proposed wall fixtures. Identify choices for all the lighting options. 3. Add the standard lighting note to the site plan. “Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle.” 4. Correct the plan regarding existing trees on site. Show that existing trees meet or exceed frontage requirements or add trees to meet required quantities and sizes, with species and spacing compatible with the character of the rural area. 5. Accurately show existing trees and shrubs on the site plan. Clearly identify all trees and shrubs to be removed. 6. Add a tree and/or shrubs at the east end of the parking row located just north of the building. 7. Add a plant schedule to the site plan. 8. Add the standard plant health note to the plan. “All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” 9. Clarify the terrace and sidewalk connections on the site plan. 10. Revise the site plan to show the existing tree located near the front sidewalk. Show that it will be protected with fencing during construction. Division: Page:1 of 3 County of Albemarle Printed On:February 03, 2017 allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant.” 9. Clarify the terrace and sidewalk connections on the site plan. 10. Revise the site plan to show the existing tree located near the front sidewalk. Show that it will be protected with fencing during construction. Date Completed:05/18/2016 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:05/19/2016 Reviewer:Joel DeNunzio VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:07/27/2016 Reviewer:Johnathan Newberry CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:07/05/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Requested Changes Reviews Comments:Please revise the plan to make the entire plan legible. Division: Date Completed:07/15/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans revised June 20, 2016. No further comments or conditions. Division: Date Completed:07/15/2016 Reviewer:Max Greene CDD Engineering Review Status:See Recommendations Reviews Comments:The Site plan may require a VSMP plan submitted for approval due to the Virginia State requirements for projects considered "part of a larger common plan of development". A determination is underway for the definition of a "Greater Plan of Development". Division: Date Completed:07/06/2016 Reviewer:Adam Moore VDOT Review Status:See Recommendations Reviews Comments:"We find this revision to be generally acceptable, provided that the following concerns are addressed on the signature planset." (The concerns related to standard VDOT info like ADT, route number, etc., and also to sight distance, where additional grading may be required.) Division: Date Completed:08/02/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:Approved Reviews Comments:no further comments Division: Date Completed:09/01/2016 Max GreenePage:2 of 3 County of Albemarle Printed On:February 03, 2017 Reviewer:Max Greene CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:12/22/2016 Reviewer:Adam Moore VDOT Review Status:Approved Reviews Comments: Division: Date Completed:01/04/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments: Division: Date Completed:01/06/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments: Division: Date Completed:01/12/2017 Reviewer:Johnathan Newberry CDD Planning Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:February 03, 2017 COUNTY OF ALBEMARLE °f ALks Department Community Development Planning Services Division 4.10 401 McIntire Road North Wing• Charlottesville, Virginia 22902-4596 Phone: (434) 296-5823 • Fax: (434)972-4035 Transmittal From: JT Newberry Date: 08/24/16 To: Engineering — Ao►.. (er uv.e. 0 0 (*Ka, •b•tc Sieh 0 0 `� 0 0 0 0 0 JOB #/FILE NAME:SP-2016-0007 Chapman Grove Baptist Church and SDP201600021 Chapman Grove Baptist Church (Major) We are sending you the following items: N Attached or n Under separate cover n Copy of Letter E Prints F Plans ❑ Plats ❑ Specifications n Other # of Date Description Copies 1 6/20/16 Sheets SP1 (Site Plan),A-1 (Phasing Plan) 1 8/1/16 Tier 3 Groundwater Assessment These are transmitted as checked below: ® For review and comments ® For approval n Other Remarks: Please see the enclosed correspondence from the applicant. John Anderson required the Tier 3 report as part of his review of the Major Amendment for this site (SDP201600021). Please let me know if Engineering requests any changes to the concept plan/amendment plan as a result of the information shown in the Tier 3 report. The Planning Commission unanimously recommended approval of the special use permit to the Board of Supervisors with Condition#4 being that "No building permit shall be approved without approval from the Virginia Department of Health." Finally, please return these materials to me after your review. This is the only copy I have. Thanks. Comments are due in City View or email by: 9/16/16 Signature: JT Newberry .4400, Johnathan Newberry From: Stephen von Storch <svonstorch@s-vs.com> Sent: Tuesday, August 23, 2016 10:45 AM To: Johnathan Newberry Cc: Gale Brown Subject: FW:tier 3 chapman groves Attachments: Chapman Groves Baptist Church Tier 3 assessment v 8 1 16.pdf JT It has been hectic here and I want to be sure I had forwarded this to you. As Gooch predicted we are OK for Phase One with work needed for Phase Two. Steve From: olddomeng@ntelos.net [mailto:olddomeng@ntelos.net] Sent: Monday, August 01, 2016 8:42 AM To: Stephen von Storch Subject: RE: tier 3 chapman groves Stephen, Attached is Tier 3 Report. Just a couple notes for you: Unless they want to do a daycare or school they should not be classified as a "public water system". With that being said the well is in a horrible place (without a lot of good options for a new well). We are recommending some testing be done on the well to make sure the water quality is good and that the water quantity is verified before phase 2. Doesn't look like septic needs to be changed till phase 2. It will be an engineered system with time dosing for sure for phase 2. I tried to write the tier 3 so it would be applicable for both phase 1 and phase 2. We might have to write an update memo. Best, Mike On Fri, 29 Jul 2016 20:13:22 +0000, Stephen von Storch<svonstorch@s-vs.com> wrote: i Sounds good. Have a good weekend. Original Message From: olddomeng@ntelos.net [mailto:olddomeng@ntelos.net] Sent: Friday, July 29, 2016 4:04 PM To: Stephen von Storch Subject: tier 3 chapman groves Stephen, We are in the process of proofreading the tier 3 for Chapman groves. It will go out to you on Monday. Typically we send pdfs to the agent who then submits it to the engineering department. After engineering review and revision we print out hard copies for all parties. Is this OK? Best, Mike Craun Old Dominion Engineering 2 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner July 6, 2016 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: J.T. Newberry Re: Chapman Grove Baptist Church SDP -2016-00021 — Major Site Plan Amendment SP -2016-00007 — Special Use Permit Review #2 Dear Mr. Newberry: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted Stoneking Von Storch, last revised 20 June 2016, and find it to be generally acceptable, provided that the following concerns are addressed on the signature planset. Note that revisions may be submitted via email if the applicant wishes to address these concerns prior to producing signature copies. 1. PIease show and label VDOT right of way, ADT, and design speed on plans in addition to route number. 2. Please note that intersection sight distance may be evaluated in an as -built scenario at the completion of construction as it appears that because of low clearance, additional grading may be required. Upon submission of the appropriate signed and sealed approval copies this office will perform a final review and, if acceptable, sign the plans. Please allow for this office to obtain two signature copies. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired please contact Justin Deel at (434) 422-9894. Sincerely, A9044- . iqav�' Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT_org WE KEEP VIRGINIA MOVING OF AI,ti. 4z? aCa te Ilk! 4: Oft l'tRcmnV' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 May 19,2016 Stephen von Storch P.O.Box 1332 Charlottesville,VA 22902 svonstorch(a}s-vs.com RE: SDP201600021 Chapman Grove Baptist Church—Major Site Plan Amendment Dear Mr.von Storch: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services(Planner) Albemarle County Engineering Services (Engineer) Albemarle County Information Services(E911) Albemarle County Building Inspections Albemarle County Zoning Services Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue (to be forwarded upon receipt) Virginia Department of Transportation (to be forwarded upon receipt) Virginia Department of Health(to be forwarded upon receipt) Comments reflect information available at the time the development proposal was reviewed,and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to final approval of the Major Amendment. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, a,4 - NA.Qte/wer J.T.Newberry Planner CC: Chapman Grove Baptist Church c/o Gale Brown 2064 Stony Point Road Charlottesville,VA 22911 gddent(ayahoo.com '44001e Norio0 Albemarle County Planning Services(Planner)—J.T.Newberry,jnewberrv(a)albemarle.org 1. Please show the following changes on Sheet SP 1: a. Section 32.5.2(a)—Please add the following general information: i. The magisterial district(Rivanna District); ii. Label or note the setback lines(Front—75 ft, Side—25 ft,Rear—35 ft); iii. Note the property lies in the Entrance Corridor(EC)Overlay district; iv. Descriptions of the previously approved special use permit and variances and their conditions thereof. In this case,it may be easiest to add a second sheet to the major amendment showing.PDFs of the approval letters for VA1992-030,VA2000-031 and SP2000-061. Alternatively,you can add a note with this information. b. Section 32.5.2(b)—Please add a note to clearly indicate the proposed use(e.g. "Church addition in two phases amending SDP2000-129.") c. Section 32.5.2(c)—Please update the total building and disturbed areas for each phase once the final design is determined. d. Section 32.5.2(m)—Please show the distance to the centerline of State Route 20 from the entrance. e. Section 32.5.2(n)/32.6.2(i)—Please note the material for the new parking spaces. f. Section 32.5.2(p)—If existing landscaping does not meet minimum requirements,then please submit a landscape plan that complies with Section 32.7.9. g. Section 32.6.2(h)—Please add a signature panel for signature by each member of the site review committee. Albemarle County Engineering Services(Engineer)—John Anderson, j`anderson2cd?albemarllee.orrg 1. Area of disturbance estimated<5,000 ft2. Activity is not subject to the VESCP or VSMP [17-300.A.; 17-302.A,respectively],and is not required to prepare an Erosion and Sediment Control,or SWM plan. 2. A Tier 3 groundwater assessment is required-ref. 17-1003 [sample Tier 3 GW Assessment]. 3. Show stream buffer on site plan. Avoid stream buffer(ref.GIS image). Albemarle County Information Services(E911)—Andy Slack,aslack(a)albemarle.org—No objection Albemarle County Building Inspections,Jay Schlothauer,jschloth@i2albemarle.org 1. Due to the total number of parking spaces,two of them must be barrier-free. Provide two barrier-free parking spaces on the ramp side of the building. One of these spaces must be van-accessible. Albemarle County Zoning Services(E911)—Ron Higgins,rhigginsp)albemarle.org 1. Parking area is labeled as having "43 spaces"where there are only 39 spaces total on site.Please revise this label and the note above it to be consistent with the parking shown. 2. Parking analysis is acceptable for pre&post expansion parking,both of which work out to slightly more than one parking space per three seats. 3. Additional landscaping may be required for revised parking area frontage plantings. 4. VAR2000-031 included a condition that any new additions meet the front setbacks at the time of proposal.Therefore,new additions will require a front setback of 75 feet. Albemarle County Architectural Review Board—Margaret Maliszewski,mmaliszewski ?albemarle.org 1. Add the standard mechanical equipment note to the site and architectural plans."Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 2. Submit the manufacturer's cut sheet for the proposed wall fixtures. Identify choices for all the lighting options. 3. Add the standard lighting note to the site plan."Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 4. Correct the plan regarding existing trees on site. Show that existing trees meet or exceed frontage requirements or add trees to meet required quantities and sizes,with species and spacing compatible ,44.00 Nitrirt with the character of the rural area. 5. Accurately show existing trees and shrubs on the site plan. Clearly identify all trees and shrubs to be removed. 6. Add a tree and/or shrubs at the east end of the parking row located just north of the building. 7. Add a plant schedule to the site plan. 8. Add the standard plant health note to the plan."All site plantings of trees and shrubs shall be allowed to reach,and be maintained at,mature height;the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 9. Clarify the terrace and sidewalk connections on the site plan. 10. Revise the site plan to show the existing tree located near the front sidewalk. Show that it will be protected with fencing during construction. Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmer(th,albemarle.org 1. No comments were provided,but their approval will be required prior to final approval(JTN). Virginia Department of Transportation 1. No comments were provided,but their approval will be required prior to final approval(JTN). Virginia Department of Health 1. No comments were provided,but their approval will be required prior to final approval(JTN). COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner May 19, 2016 Mr. J.T. Newberry County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP -2016-00021 Chapman Grove Baptist Church — Major Site Plan Amendment SP -2016-00007 Chapman Grove Baptist Church — Special Use Permit Dear Mr. Newberry: We have reviewed the Chapman Grove Baptist Church Major Site Plan Amendment and Special Use Permit applications, dated March 1, 2016, as submitted by Stoneking Von Storch Architects, and have the following comment; The Virginia Access Management Regulations (24VAC30-73-110) states that commercial entrances may be reviewed and reconstruction, relocations, consolidation, upgrading, or a combination of these may be required if any of the following occur; 1) the property is being considered for rezoning or other local legislative action that involves a change in use, 2) if the property is subject to a site plan or subdivision plat reviw, 3) there is a change (increase) in commercial use, or 4) circulation between adjoining properties becomes available. It appears that there may not be adequate sight distance at this entrance. Please show sight distance lines (Road Design Manual, Appendix F) and provided sight line easements if necessary. If additional information is needed concerning this project, please do not hesitate to contact me at (434) 422-9373. Sincere Joel DeNunzio, P.E. Resident Engineer Culpeper District low" Nrige Z-5 ik,211r111- All lar' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 May 19,2016 Stephen von Storch P.O. Box 1332 Charlottesville, VA 22902 svonstorch@s-vs.com RE: SDP201600021 Chapman Grove Baptist Church—Major Site Plan Amendment Dear Mr. von Storch: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable,are attached: Albemarle County Planning Services(Planner) Albemarle County Engineering Services(Engineer) Albemarle County Information Services(E911) Albemarle County Building Inspections Albemarle County Zoning Services Albemarle County Architectural Review Board Albemarle County Department of Fire Rescue (to be forwarded upon receipt) Virginia Department of Transportation (to be forwarded upon receipt) Virginia Department of Health (to be forwarded upon receipt) Comments reflect information available at the time the development proposal was reviewed,and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to final approval of the Major Amendment. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, ' V14,4A4,6 Taw• •X a,4 - Y\WAKAAA5" AiatA 61A4",t,,,a, ., „&tuA).0..A 5/11 e 4r--- J.T.Newberry Planner CC: Chapman Grove Baptist Church 1'19, 4c Z W,; _ n ear 6-4-a..44-‘414-6,Ac/o Gale Brown 2064 Stony Point Road V11-1 A4 situ 4 ; Charlottesville, VA 22911 gddent@yahoo.com 7 vrrr Albemarle County Planning Services(Planner)—J.T.Newberry,jnewberry@albemarle.org 1. Please show the following changes on Sheet SP1: a. Section 32.5.2(a)—Please add the following general information: i. The magisterial district(Rivanna District); ii. Label or note the setback lines(Front—75 ft, Side—25 ft,Rear—35 ft); iii. Note the property lies in the Entrance Corridor(EC)Overlay district; iv. Descriptions of the previously approved special use permit and variances and their conditions thereof. In this case,it may be easiest to add a second sheet to the major amendment showing.PDFs of the approval letters for VA 1992-030, VA2000-031 and SP2000-061.Alternatively,you can add a note with this information. b. Section 32.5.2(b)—Please add a note to clearly indicate the proposed use(e.g. "Church addition in two phases amending SDP2000-1 29.") c. Section 32.5.2(c)—Please update the total building and disturbed areas for each phase once the final design is determined. d. Section 32.5.2(m)—Please show the distance to the centerline of State Route 20 from the entrance. e. Section 32.5.2(n)/32.6.2(i)—Please note the material for the new parking spaces. f. Section 32.5.2(p)—If existing landscaping does not meet minimum requirements,then please submit a landscape plan that complies with Section 32.7.9. g. Section 32.6.2(h)—Please add a signature panel for signature by each member of the site review committee. Albemarle County Engineering Services(Engineer)—John Anderson,janderson2@albemarle.org 1. Area of disturbance estimated<5,000 ft2. Activity is not subject to the VESCP or VSMP[17-300.A.; 17-302.A, respectively],and is not required to prepare an Erosion and Sediment Control,or SWM plan. 2. A Tier 3 groundwater assessment is required-ref. 17-1003 [sample Tier 3 GW Assessment]. 3. Show stream buffer on site plan. Avoid stream buffer(ref. GIS image). Albemarle County Information Services(E911)—Andy Slack, aslack@albemarle.org—No objection Albemarle County Building Inspections,Jay Schlothauer,jschloth@albemarle.org 1. Due to the total number of parking spaces,two of them must be barrier-free. Provide two barrier-free parking spaces on the ramp side of the building. One of these spaces must be van-accessible. Albemarle County Zoning Services(E911)—Ron Higgins,rhiggins@albemarle.org 1. Parking area is labeled as having"43 spaces" where there are only 39 spaces total on site. Please revise this label and the note above it to be consistent with the parking shown. 2. Parking analysis is acceptable for pre&post expansion parking,both of which work out to slightly more than one parking space per three seats. 3. Additional landscaping may be required for revised parking area frontage plantings. 4. VAR2000-031 included a condition that any new additions meet the front setbacks at the time of proposal. Therefore,new additions will require a front setback of 75 feet. Albemarle County Architectural Review Board—Margaret Maliszewski,mmaliszewski@albemarle.org 1. Add the standard mechanical equipment note to the site and architectural plans. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 2. Submit the manufacturer's cut sheet for the proposed wall fixtures. Identify choices for all the lighting options. 3. Add the standard lighting note to the site plan. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 4. Correct the plan regarding existing trees on site. Show that existing trees meet or exceed frontage requirements or add trees to meet required quantities and sizes,with species and spacing compatible with the character of the rural area. 5. Accurately show existing trees and shrubs on the site plan. Clearly identify all trees and shrubs to be removed. 6. Add a tree and/or shrubs at the east end of the parking row located just north of the building. 7. Add a plant schedule to the site plan. 8. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach,and be maintained at,mature height;the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 9. Clarify the terrace and sidewalk connections on the site plan. 10. Revise the site plan to show the existing tree located near the front sidewalk. Show that it will be protected with fencing during construction. Albemarle County Department of Fire Rescue—Robbie Gilmer,rgilmer(&albemarle.org 1. No comments were provided,but their approval will be required prior to final approval(JTN). Virginia Department of Transportation 1. No comments were provided,but their approval will be required prior to final approval(JTN). Virginia Department of Health 1. No comments were provided,but their approval will be required prior to final approval (JTN). Ai; COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 160i Orange Firma Culoeper%/Imo I 227D1 Charles A. Kilpatrick,P.E. Commissioner May 19, 2016 Mr. J.T. Newberry County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Re: SDP-2016-00021 Chapman Grove Baptist Church—Major Site Plan Amendment SP-2016-00007 Chapman Grove Baptist Church—Special Use Permit Dear Mr. Newberry: We have reviewed the Chapman Grove Baptist Church Major Site Plan Amendment and Special Use Permit applications,dated March 1, 2016, as submitted by Stoneking Von Storch Architects, and have the following comment; • The Virginia Access Management Regulations(24VAC30-73-110) states that commercial entrances may be reviewed and reconstruction,relocations, consolidation, upgrading, or a combination of these may be required if any of the following occur; 1) the property is being considered for rezoning or other local legislative action that involves a change in use, 2) if the property is subject to a site plan or subdivision plat reviw,3) there is a change (increase) in commercial use,or 4)circulation between adjoining properties becomes available. • It appears that there may not be adequate sight distance at this entrance. Please show sight distance lines (Road Design Manual, Appendix F)and provided sight line easements if necessary. If additional information is needed concerning this project, please do not hesitate to contact me at (434)422-9373. Sincere / Joel DeNunzio, P.E. Resident Engineer Culpeper District 11�:iL31 IV 04' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Memorandum To: Ms,Gale Brown From: Scott Clark, Senior Planner; e *n,;) 2:70A, J lrea,k, Date: 7/28/14 Subject: Chapman Grove Pre-application Meeting, 7/12/2014 The following are County staff comments regarding the above noted pre-application meeting. This meeting satisfies the requirement for a pre-application meeting prior to submittal of your special use permit application The purpose of for the meeting is summarized below: The purposes for a pre-application meeting are to:(i)provide the applicant and the county a common understanding of the proposed project;(ii)inform the applicant about the proposed project's consistency with the comprehensive plan, other relevant policies, and county regulations;(iii)broadly identify the planning, zoning and other issues raised by the application that need to be addressed by the applicant;(iv)inform the applicant about the applicable procedure;and(v)allow the director to identify the information the applicant must submit with the application, including the supplemental information delineated in subsection(c). Receiving the relevant supplemental information will allow the application to be comprehensively and efficiently reviewed_ The following are staff comments: (ii)Consistency with the Comprehensive Plan: • As discussed in the meeting, Comprehensive Plan issues will mainly involve the appropriateness of the'new scale of use in the Rural Areas. (iii)broadly identify the planning, zoning and other issues raised by the application that need to be addressed by the applicant • VDOT will need to verify that the entrance is acceptable, or comment on necessary improvements.This will happen during the review. • Parking needs must be addressed.As discussed at the meeting,the church will need to provide a parking study with the application. • Zoning will need to review the existing setback issue and determine if it creates any problem for the proposed use, and if the proposed driveway can legally fit within the remaining space. (iv)applicable procedures • Community Meeting—the applicant is required by ordinance to undertake a community meeting process as part of the review of the rezoning request. This meeting should be held, if possible, within 30 days from the date the application is submitted,and can be held prior to the submittal of 1 the application. Adjacent property owners and neighborhoods(and the Coordinating Reviewer/planner)should receive advance notification of this meeting (date/time/location). Staff can provide a mailing list for this meeting. • ARB review,Ag-Forestal District reviews • Need for special exceptions (v) Identify the information the applicant must submit with the application,including the supplemental information • Parking study,as noted above. • An conceptual plan should be submitted with the special use permit application. • Floorplans and elevations for the existing and proposed structures. • See attached pre-application checklist for other required information. This checklist will need to be filled in, signed and submitted with the ZMA application. If you have any further questions, please contact me. Sincerely, Scott Clark Senior Planners, Rural Areas 2 Johnathan Newberry From: Johnathan Newberry Sent: Tuesday, April 05, 2016 6:11 PM To: 'svonstorch@s-vs.com' Cc: 'gddent@yahoo.com'; John Anderson; Margaret Maliszewski; Elaine Echols Subject: Special Use Permit and Major Site Plan Amendment Applications Attachments: Review Timeline - SP201600007.pdf; Planning Application Review for SDP201600021 Chapman Grove Baptist Church - Major. Hi Stephen, My name is J.T. Newberry and I am coordinating the review of the special use permit and major site plan amendment applications for Chapman Grove Baptist Church. I'm sending this email to you because your name is listed as the contact person and I would like to share some important upcoming dates. Special Use Permit — SP201600007 Please see the attached review timeline. Comments will be provided on 5/6/2016. The public hearing date with the Planning Commission is scheduled to happen no earlier than the 6/7/16 meeting. Major Site Plan Amendment — SDP201600022 Comments will be provided on 5/16/2016. The Site Review Committee (SRC) meeting will be held on 5/19/16 at 10am in Room 246 of the County Office Building. There's a chance that I may contact you for additional copies of the site plan and phasing plan, but I'm trying to work it where the reviewers can use just the one set of plans you've already submitted to review both SP201600007 and SDP201600021. I'll let you know if additional copies are needed. Finally, although all of the available site plan comments will be provided on 5/16/16, I've attached the comment from the Engineering Division because I anticipate it will take some time to address it. In part, it states that a Tier 3 Groundwater Assessment is required. John Anderson, P.E. (ext. 3069) provided an example report of this type of assessment from another church that was recently reviewed, which can be viewed here: http://www.albemarle.org/weblink/`O/doc/240113/Pagel.aspx He also provided contact information for the author of the report. Please let me know if you have any questions. Thanks, J.T. Newberry Planner County of Albemarle, Planning Division 434-296-5832, ext. 3270 Johnathan Newberry From: John Anderson Sent: Tuesday, April 05, 2016 3:27 AM To: Johnathan Newberry Subject: Planning Application Review for SDP201600021 Chapman Grove Baptist Church - Major. The Review for the following application has been completed: Application Number=SDP201600021 Reviewer=John Anderson Review Status = No Objection Completed Date = 04/05/2016 Thanks for your patience. CV comments have not been shared with Applicant. CV comments: "Area of disturbance estimated<5,000 ft2. Activity is not subject to the VESCP or VSMP [17-300.A.; 17-302.A, respectively], and is not required to prepare an Erosion and Sediment Control or SWM plan. A Tier 3 groundwater assessment is required-ref. 17-1003 [sample Tier 3 GW Assessment Attached]." -x3069 [Tier 3 Author: Mike Craun,PE/Waynesboro,VA/540-255-1700] 1