HomeMy WebLinkAboutWPO201700009 Bond Estimates 2017-02-06Project Name: Hollymeade Town Center Building O WPO file number: 2017-00009 Erosion and Sediment Control Bond Estimate Item Item Number stabl Lion (PS, TS) silt fence (SF) safety fence(SAF) diversion (DD, FD, RWD) temporary slope dram (TSD) pipe length earthwork for trap/basin height of dam et toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (mtal fill voume) length of spillway width of spillway structures for basin riser height riser diameter barrel length barrel diameter sill fence inlet protection (IP) stone inlet protection (IP) cutlet protection (OP) length channel (SCC, matted) length check dam depth in charms instruction entrance (CE) wash rack paved construction entrance np-rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 ft pipe diameter 15 in 0 ft out at high side 0 ft 0 ft out at face 0 ft 0 ft length of out 0 ft 0 ft width of out 0 ft 0 at (area below transition) 0 sf 0 ft (total width of cut) 0 ft 0 ft (depth below tranabor 0 ft 0 at (area above transition) 0 at 0.0 cy (total fill volume) 0.0 cy 5 ft (TOAL CV estimate) 0 cy 10 ft (spillway stone tons) 2.9 tons Oft 0 in (,is.,unit price) $0.00 0 ft base plate a fdn 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft 15 ft width 10 ft 1 ft width 10 ft 1 ft channel width 10 ft 0 ft length 1.0 ft 0.0 0 traps and basins 0 No. Unit Unit Cost Cost nstalled 0.0 acres $5,000,00 $0.00 630.0 ft $5,00 $3,150.00 0.0 ft $5,00 $0.00 80 ft $13,00 $1,040.00 $35,00 $0.00 $13.00 $0.00 $50.00 $145.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 3 $200.00 $600.00 0 $675.00 $0.00 $13.00 0 $225.00 $0.00 0 $2,000.00 $0.00 0 $2,000.00 $0.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $0.00 $500.00 $0.00 cost sum $8,948.00 contingency $894.80 Total $9,850 2/6/2017 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2.1 for simplicty Cut at High Side h2 Height of Fill at Face h1 %, w Width of Cut Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut Top I-w transitic h1 Cut at Fa liment traps and basins Width ►n point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)