Loading...
HomeMy WebLinkAboutSDP201600023 Review Comments 2016-05-31Short Review Comments Report for: SDP201600023 SubApplication Type: Harvest Moon - Phase 1 - Final Final Plat Date Completed:08/11/2016 Reviewer:Max Greene Review Status:See Recommendations Reviews Comments:Plat does not match the site plan for storm drain easement section E-8 on the plat last revision date 08-02-16. I called Dustin Greene from Dominion Engineering and he stated the field survey for the plat was correct and the site and VSMP plans will be adjusted to match the field conditions. Division: Date Completed:04/29/2016 Reviewer:Megan Yaniglos CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/30/2016 Reviewer:John Anderson CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:04/15/2016 Reviewer:Andrew Slack CDD E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:04/20/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated March 31, 2016. No comments or conditions. Division: Date Completed:05/03/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:Requested Changes Reviews Comments: Based on plans dated 3/31/16. 1. Please add a note "Knox box required, Please contact the Albemarle County Fire Marshal office for location." Division: Date Completed:05/18/2016 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/12/2016 Reviewer:Joel DeNunzio VDOT Review Status:No Objection Reviews Comments: Division: Page:1 of 2 County of Albemarle Printed On:February 09, 2017 Date Completed:06/08/2016 Reviewer:Megan Yaniglos CDD Planning Review Status:Requested Changes Reviews Comments:Plat needs to be approved prior to site plan approval. Division: Date Completed:05/29/2016 Reviewer:John Anderson CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:05/31/2016 Reviewer:Robbie Gilmer Fire Rescue Admin Review Status:No Objection Reviews Comments:Based on plans dated 5/17/16. No comments or objections. Division: Page:2 of 2 County of Albemarle Printed On:February 09, 2017 Project: Plan preparer Owner or rep. Plan received date: (FSP) (Rev. 2) Date of comments: (FSP) (Rev. 2) Reviewer: Project Coordinator: 4OF A� a -n vfRG7N7P County of Albemarle Department of Community Development Final Site Plan for Harvest Moon —Phase I Mike Myers, Dominion Engineering [172 S. Pantops Drive Charlottesville, VA 22911, mmyers(a-dominionene coml Harvest Moon Catering Co./Mark Hahn 946 Grady Ave/Ste. 11, Charlottesville, VA 22901 17 Feb 2016 (Initial Site Plan; SDP201600004) 12 Apr 2016 23 May 2016 26 Feb 2016 (ISP) 30 Apr 2016 29 May 2016 John Anderson Megan Yaniglos SDP201600023 (See Also SDP201600004) Phase I Engineering plan review comments have been addressed with this or prior submittal No objection to Plan. Note several comments relate to future Phase II SP -2 —Check Impervious Area Summary table: Bld 1 /Travelway values, Phase 1 v. Phase 1 & 2 differ. Confirm values are accurate. (Rev. 1) Addressed. SP -2 —Check Impervious Area Summary table/Phase 1 & 2: Include building 4. (Rev. 1) Addressed. SP -3 —There are dissimilarities of existing condition features between this plan and VSMP/WPO Plan (WP0201600011). For example: Ex. Shed, Ex. Trailer, Existing Ditch (SP3) are labelled Cinder block building, Cinder block building, and Intermittent Stream (WPO/sheet SW3). Please reconcile, especially stream/ditch. Provide evidence to support proper description of this feature (intermittent stream v. ditch). (Rev. 1) Addressed. Existing storm drain/SDMH 203 —Ensure design will support high -frequency truck traffic. (Rev. 1) Addressed. SP -4 5. Provide pavement design relative to high -frequency truck traffic, appropriate to proposed use. [Ref. VDOT Pavement Design Guide] (Rev. 1) Addressed. 6. Please turn off (SP3) existing conditions layer. Underlying existing features obscure details on this sheet. (Rev. 1) Addressed. 7. At top of hill/New 20' -wide paved access down to building 1: Provide auto -turn for vehicles anticipated to serve catering business; recommend consider extended length vehicles/fire rescue vehicles (Ref. Attached ACF&R .xls/wheelbase length). Recommend remove west half of north -most parking lot raised island, and add yellow No parking' striping to the north -most parking space, west row of Ex. parking lot —that is, sacrifice a parking space. Auto -turn may help inform design decisions at this location. (Rev. 1) Addressed. 8. Given approx. 6% grade, steeper in places (16 -ft vertical: Ex. parking adjacent to Berkmar Drive to parking spaces in front of building 1), recommend a storm inlet midway down this portion of access. If opt for inlet midway down, specify CG -6 as opposed to CG -2. (Rev. 1) Addressed. As follow-up: Recommend spot elevation at inlet 3B to ensure positive drainage. Continue CG -6 through 15' R curve. Transition 2' gutter to flat /slight reverse slope prior to dumpster. Do not want gutter runoff at this location to reach dumpster enclosure. Do not want curbless pavement at this location (fracture). Current design may release runoff contained in gutter, north and off -pavement. This poses both storm management and erosion concerns. (Rev. 2) Addressed. 9. Please revise rain garden labels to read `Potential phase II SWM (rain garden).' (Rev. 1) Addressed. Engineering Review Comments Page 2 of 3 10. Engineering recommends Title of Site Plan reference (or Planning process/Planning site plan approval explicitly limit approval to) Phase 1. WP0201600011 only covers Phase 1. Engineering defers to Planning. (Rev. 1) Addressed. 11. Recommend design (and design note) end Phase 1 paving at edge of building 1 parking/loading area. (Rev. 1) Addressed. 12. Recommend curb cut at future phase II access, building 1 loading area to future building 3, to avoid expense of curb demolition. (Rev. 1) Addressed. 13. Future access, building 3 —recommend stop bars, speed bumps, mirrors, signs, or other safety/speed control measures to assist vehicles navigate blind corner at SE edge of building 1, whether approaching or leaving building 3. (Rev. 1) Addressed /comment applies to future Phase II. 14. Compare NW corner, building 1, with short section of retaining wall, WP0201600011, sheet SW6. Show retaining wall, if retaining wall proposed. Label 80 IF building retaining wall (see SW6), if design detail applies. (Rev. 1) Addressed. Asfollow-up (gabion basket design): shift baskets to avoid deck. Also, recommend gabion basket detail specify wire lacing and basket wire gauge. (Rev. 2) Addressed. 15. Label all curb radii, including small radius (curb) nose at top of the hill, at site access (existing parking lot). (Rev. 1) Addressed. 16. Label /provide minimum 6' -wide sidewalk in front of building 1. (Rev. 1) Addressed. 17. Show/provide hardscape access for building 2 (walk/parking, if any). Revise Impervious Area Summary table to include building 2 walkway —be mindful of sidewalk maximum grade/ADA requirements. [Maximum grade is 5% -VDOT Road Design Manual, Appendix A, p. A-121' (Rev. 1) Addressed /comment applies to future Phase II. 18. Reference building 1 outline, WP0201600011, SW6 —front office/lobby FF =489; rest of building FF =487.00. Please show lobby/main building architectural interface. Plans should match. (Rev. 1) Addressed. 19. Apply SP4 storm drain design to WP0201600011, sheets SW6, SW8, SW9, with storm pipe connecting inlet 3E and inlet IA. (Rev. 1) Addressed. 20. Label inlets (inlet ID). (Rev. 1) Addressed. 21. Label storm pipes (#). (Rev. 1) Addressed. 22. Include WP0201600011, sheet SW9 (revised; ref. #19) as separate site plan sheet. Drainage should accompany site plan details, since no road plan. (Rev. 1) Addressed. 23. Include demolition details/sheet with site plan. (Rev. 1) Addressed. 24. Provide additional existing contour labels. (Rev. 1) Addressed. SP5 25. Access/additional: a. Show proposed grades; grade differential approaches 16' top/bottom. (Rev. 1) Addressed. b. Tie proposed grades to existing grades that border access, left/right. (Rev. 1) Addressed. 26. Provide additional existing grade labels. (Rev. 1) Addressed. 27. Extend existing contour lines at least 50 -ft beyond property lines. (Rev. 1) Addressed. 28. Acquire temporary construction easement, as necessary, from TMP45-112G1 (Medical spa) to construct proposed grades/improvements. (Rev. 1) Addressed /easement not required. "No disturbance will occur on this property" [1 -Apr 2016 Applicant response letter]. 29. Provide fine grade/spot elevations at SDMH 203 to ensure MH top/new Access pavement align. (Rev. 1) Addressed. 30. Ensure site plan /WPO plan proposed grades match on west side of building 1. (Rev. 1) Addressed. 31. Turn off existing conditions layer. (Rev. 1) Addressed. SP6 32. Please show (realistic) conceptual design location for proposed phase 2 150 LF 60" DIA detention pipe which should be sited in location to receive runoff from all additional impervious added with Phase II. (Rev. 1) Addressed /comment applies to future Phase II. 33. Revise Preliminary Stormwater Management Narrative to state approximately 3,050 cubic feet. Figure may change if Impervious Area Summary Table is revised to include building 4/building 2 sidewalk. (Rev. 1) Addressed /Narrative revised, reference to Phase II removed. Engineering Review Comments Page 3 of 3 34. Please revise (insert text in) SWM Narrative (toward end) "...both Phase 1 and Phase 2 to show that an adequate channel exists to convey site or off-site water that transits the site to the existing Kegler's pond." (Rev. 1) Addressed. 35. Ref Attached 11/5/15 email to Mike Myers re. As -built survey of Kegler's pond. All items appear to have been considered with WPO201600011 design, except item #1. WPO plan review comment will request a Construction Record Drawing of `Kegler's Pond' to determine true dimensions and capacity; basin outfall structures must be included." [11/5; 9/2/15 email] WPO plan approval is required for site plan approval. (Rev. 1) Addressed. 36. Turn off existing conditions layer. (Rev. 1) Addressed. 37. SP8• SP9 —Recommend copy Impervious Area Summary table from SP2 to these sheets; revise table if necessary. (Rev. 1) Recommendation not accepted. 38. SP9 —Recommend revise Summary Note to state impervious area with phase 1 also includes removal of Go -Kart track. (Rev. 1) Addressed. 39. Please confirm whether Ex. Drainage Easement, DB 1454/PG637 is sufficient to convey site runoff to Kegler's pond. Existing contours in area of outfall 1 (WPO/SW6) appear to show site runoff will discharge to adjacent property, not necessarily a defined channel, or will be confined to Ex. drainage easement. "There can be no off-site impact due to re -development of TMP 45-112G." [11/5; 9/2/15 email -Attached] Demonstrate site runoff will reach Kegler's pond. Acquire additional Drainage Easement if necessary. (Rev. 1) Addressed. L�.I'b Tp Tel' Ca•ShT•L"ayW •\ S C T.4.de n,o asuotl..�sS uyiTea . I ♦RTtiE•[•.ra,w yr/.•i9'TYE�A4,ii' iljlll oe•r'w r,» oTc�,,�n,c.e t.•ncw..a.l..es.,e•J �� T.NS4 A'�F'r� � �R, �$e e�•g1Fs CDwSbY+„sT•w G•M,np' 1M •e-rra R`Y.Tp}.5p'.L•ap.lp' ce.o.a-AI'dv,a M!N xCLVH lA[tYexTt C..OAp' eupVe 'A' He,te4+p [O IT ORA,4wLE E44EY•�FjjY Aeslwe'r �.u.�.w: sc rr Ia.ws,ee sa eY RHI W e 'c e.a..ss Ip Ir R4pNT-01• WAY pnglx/,L R1UICeL a a,aat.le ep pT T_" ea,lee.Yr ep Tr STunRO T fir\ K �aHNlXY M[! CCD RG4RL' ATeMTXIx ppxp [AHXIYT a,HL1a f0 IT �� �M �'wZ wATlRLIN[ [N!YlxT'A• 1,e0eJa ep rT WAT[RLlxe eAe[Ml NT'0' 9.IH,ee tp IT yli•+4'4SY-yl,lp' AlxApt IaHYlNr •A• [I,ar ep pT pRAIN[Y[Y[XT'e' T,Hr.H i0-pT DLYInAnQTy P(]110 pRA"aIXAp[ eyeY[NT'C' -KMEIST �.O• -^—IRAHY[NT�p' ZL4 =T, ON—A0.eA[eY[Xr'e• etwT ap n M uzLw,'tiT•x-L�.as' •L f pVypRAIL Wewxr'A• Gepee fp R = avMeRAa uHY[xT •s• A I +`? / +'+C .LCRS OF C'NLRCMT^S•n E 9 � YY+•aa"Oaf•a-LS.C1pr YN[ oS px:ATOx wap cpxveYaXce pr pNppeRT,. RIONT pI. Y'AY ANO e4[YLX Te AI eNpwx N[a[pN 1e wITN TN[ IR[[ COx[eNT M9 IN T[ a H��_01 iyEyyp[A[IpXep gwNe R1, Contact John Anderson, Engineering Dept., if any questions. janderson2a,albemarle.ore / 434-296-5832 —0069 Thank you File: SDP201600023_Harvest Moon FSP_ph.I 052916 No objection Megan Yaniglos From: Alexander Morrison<amorrison@serviceauthority.org> Sent: Wednesday, May 18, 2016 10:23 AM To: Megan Yaniglos Subject: SDP2016023: Harvest moon - Phase 1 Final Megan, The above referenced plan is currently under Construction Plan Review at the ACSA. Michael Vieira is the reviewer. I will advise once approval has been granted. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 4OF A� a -n vfRG7N7P County of Albemarle Department of Community Development Project: Final Site Plan for Harvest Moon —Phase I Plan preparer: Mike Myers, Dominion Engineering [172 S. Pantops Drive Charlottesville, VA 22911, mmyers(&dominionene coral Owner or rep.: Harvest Moon Catering Co./Mark Hahn 946 Grady Ave/Ste. 11, Charlottesville, VA 22901 Plan received date: 17 Feb 2016 (Initial Site Plan; SDP201600004) (FSP) 12 Apr 2016 Date of comments: 26 Feb 2016 (ISP) (FSP) 30 Apr 2016 Reviewer: John Anderson Project Coordinator: Megan Yaniglos SDP201600023 (See Also SDP201600004) 1. SP -2 —Check Impervious Area Summary table: Bld 1/Travelway values, Phase 1 v. Phase 1 & 2 differ. Confirm values are accurate. (Rev. 1) Addressed. 2. SP -2 —Check Impervious Area Summary table/Phase 1 & 2: Include building 4. (Rev. 1) Addressed. 3. SP -3 —There are dissimilarities of existing condition features between this plan and VSMP/WPO Plan (WP0201600011). For example: Ex. Shed, Ex. Trailer, Existing Ditch (SP3) are labelled Cinder block building, Cinder block building, and Intermittent Stream (WPO/sheet SW3). Please reconcile, especially stream/ditch. Provide evidence to support proper description of this feature (intermittent stream v. ditch). (Rev. 1) Addressed. 4. sting storm drain/SDMH 203 —Ensure design will support high -frequency truck traffic. (Rev. 1) Addressed. SP -4 5. Provide pavement design relative to high -frequency truck traffic, appropriate to proposed use. [Ref. VDOT Pavement Design Guide] (Rev. 1) Addressed. 6. Please turn off (SP3) existing conditions layer. Underlying existing features obscure details on this sheet. (Rev. 1) Addressed. 7. At top of hill/New 20' -wide paved access down to building 1: Provide auto -turn for vehicles anticipated to serve catering business; recommend consider extended length vehicles/fire rescue vehicles (Ref. Attached ACF&R .xls/wheelbase length). Recommend remove west half of north -most parking lot raised island, and add yellow No parking' striping to the north -most parking space, west row of Ex. parking lot —that is, sacrifice a parking space. Auto -turn may help inform design decisions at this location. (Rev. 1) Addressed. 8. Given approx. 6% grade, steeper in places (16 -ft vertical: Ex. parking adjacent to Berkmar Drive to parking spaces in front of building 1), recommend a storm inlet midway down this portion of access. If opt for inlet midway down, specify CG -6 as opposed to CG -2. (Rev. 1) Addressed. As follow-up: Recommend spot elevation at inlet 3B to ensure positive drainage. Continue CG -6 through 15' R curve. Transition 2' gutter to flat /slight reverse slope prior to dumpster. Do not want gutter runoff at this location to reach dumpster enclosure. Do not want curbless pavement at this location (fracture). Current design may release runoff contained in gutter, north and off -pavement. This poses both storm management and erosion concerns. 9. Please revise rain garden labels to read `Potential phase II SWM (rain garden).' (Rev. 1) Addressed. 10. Engineering recommends Title of Site Plan reference (or Planning process/Planning site plan approval explicitly limit approval to) Phase 1. WP0201600011 only covers Phase 1. Engineering defers to Planning. (Rev. 1) Addressed. 11. Recommend design (and design note) end Phase 1 paving at edge of building 1 parking/loading area. (Rev. 1) Addressed. Engineering Review Comments Page 2 of 3 12. Recommend curb cut at future phase II access, building 1 loading area to future building 3, to avoid expense of curb demolition. (Rev. 1) Addressed. 13. Future access, building 3 —recommend stop bars, speed bumps, mirrors, signs, or other safety/speed control measures to assist vehicles navigate blind corner at SE edge of building 1, whether approaching or leaving building 3. (Rev. 1) Addressed /comment applies to future Phase II. 14. Compare NW corner, building 1, with short section of retaining wall, WP0201600011, sheet SW6. Show retaining wall, if retaining wall proposed. Label 80 IF building retaining wall (see SW6), if design detail applies. (Rev. 1) Addressed. Asfollow-up (gabion basket design): shift baskets to avoid deck. Also, recommend gabion basket detail specify wire lacing and basket wire gauge. 15. Label all curb radii, including small radius (curb) nose at top of the hill, at site access (existing parking lot). (Rev. 1) Addressed. 16. Label /provide minimum 6' -wide sidewalk in front of building 1. (Rev. 1) Addressed. 17. Show/provide hardscape access for building 2 (walk/parking, if any). Revise Impervious Area Summary table to include building 2 walkway —be mindful of sidewalk maximum grade/ADA requirements. [Maximum grade is 5% -VDOT Road Design Manual, Appendix A, p. A-121]. (Rev. 1) Addressed /comment applies to future Phase II. 18. Reference building 1 outline, WP0201600011, SW6 —front office/lobby FF =489; rest of building FF =487.00. Please show lobby/main building architectural interface. Plans should match. (Rev. 1) Addressed. 19. Apply SP4 storm drain design to WP0201600011, sheets SW6, SW8, SW9, with storm pipe connecting inlet 3E and inlet IA. (Rev. 1) Addressed. 20. Label inlets (inlet ID). (Rev. 1) Addressed. 21. Label storm pipes (#). (Rev. 1) Addressed. 22. Include WP0201600011, sheet SW9 (revised; ref. #19) as separate site plan sheet. Drainage should accompany site plan details, since no road plan. (Rev. 1) Addressed. 23. Include demolition details/sheet with site plan. (Rev. 1) Addressed. 24. Provide additional existing contour labels. (Rev. 1) Addressed. SP5 25. Access/additional: a. Show proposed grades; grade differential approaches 16' top/bottom. (Rev. 1) Addressed. b. Tie proposed grades to existing grades that border access, left/right. (Rev. 1) Addressed. 26. Provide additional existing grade labels. (Rev. 1) Addressed. 27. Extend existing contour lines at least 50 -ft beyond property lines. (Rev. 1) Addressed. 28. Acquire temporary construction easement, as necessary, from TMP45-112G1 (Medical spa) to construct proposed grades/improvements. (Rev. 1) Addressed /easement not required. "No disturbance will occur on this property" [1 -Apr 2016 Applicant response letter]. 29. Provide fine grade/spot elevations at SDMH 203 to ensure MH top/new Access pavement align. (Rev. 1) Addressed. 30. Ensure site plan /WPO plan proposed grades match on west side of building 1. (Rev. 1) Addressed. 31. Turn off existing conditions layer. (Rev. 1) Addressed. SP6 32. Please show (realistic) conceptual design location for proposed phase 2 150 LF 60" DIA detention pipe which should be sited in location to receive runoff from all additional impervious added with Phase II. (Rev. 1) Addressed /comment applies to future Phase II. 33. Revise Preliminary Stormwater Management Narrative to state approximately 3,050 cubic feet. Figure may change if Impervious Area Summary Table is revised to include building 4/building 2 sidewalk. (Rev. 1) Addressed /Narrative revised, reference to Phase II removed. 34. Please revise (insert text in) SWM Narrative (toward end) "...both Phase 1 and Phase 2 to show that an adequate channel exists to convey site or off-site water that transits the site to the existing Kegler's pond." (Rev. 1) Addressed. 35. Ref Attached 11/5/15 email to Mike Myers re. As -built survey of Kegler's pond. All items appear to have been considered with WP0201600011 design, except item #1. WPO plan review comment will request a Construction Record Drawing of `Kegler's Pond' to determine true dimensions and capacity; basin outfall Engineering Review Comments Page 3 of 3 structures must be included." [11/5; 9/2/15 email] WPO plan approval is required for site plan approval. (Rev. 1) Addressed. 36. Turn off existing conditions layer. (Rev. 1) Addressed. 37. SP8, SP9 —Recommend copy Impervious Area Summary table from SP2 to these sheets; revise table if necessary. (Rev. 1) Recommendation not accepted. 38. SP9 —Recommend revise Summary Note to state impervious area with phase 1 also includes removal of Go -Kart track. (Rev. 1) Addressed. 39. Please confirm whether Ex. Drainage Easement, DB 1454/PG637 is sufficient to convey site runoff to Kegler's pond. Existing contours in area of outfall I (WPO/SW6) appear to show site runoff will discharge to adjacent property, not necessarily a defined channel, or will be confined to Ex. drainage easement. "There can be no off-site impact due to re -development of TMP 45-112G." [11/5; 9/2/15 email -Attached] Demonstrate site runoff will reach Kegler's pond. Acquire additional Drainage Easement if necessary. (Rev. 1) Addressed. T3T ws-1ne � •i� c R10 45SCIClATES 4M5TCD YlST4�TCw455• 96Y/ 1`IyY Ol{454 0.bE F.b.SEMf•.4-f 'ti 0.�S54LE`q' T•+ V.AS Y4 rt ��L5 x,5.50 meq^ Contact John Anderson, Engineering Dept, if any questions. ianderson2galbemarle.org / 434-296-5832 —x3069 Thank you File: SDP201600023_Harvest Moon_FSP_ph.I 043016 CE•9+6'ii'yYV Mey 5xt �uW [YtMaxT[ 4.4e.'•O, RSHOvt 'A MOM,: aO IT OR451Jl�E E44ET4C.1.T R[FIWa'a' 40R Y.4¢L.A 1C�4 x[alWa'C' xroxr-er-war eeAAt aO IT MgIx4 rA[C[L • r a4 R ra•a [• �'Y5 ♦y-112 [ a[ SYVISAD n d11 4 MAt�C 6T4C Aim paT[xTgx Ppxe [Ae[YaxT AT[xtlxt [,yard MT'A• e,a-a.0 so R fi4041• VtlOb WATt[LIx[ t14l Ml a0 TT -,405.3[ tC R V lt•+L'4TM-3110 deAixAOt ."oft- -1 -1 e[,J5 a0 rT .:=1 ."a.eIT'[' T,aR,a[ f0'rT ELt'Y101i PpLLp 4 OxAxAPt CAa[M[.T •C' t.•[4.aa t0 R £4�1`"r•iF..>•SZ '��'t8.4'C � FT ==944H D[ArxApa [Ate M[x T'0'T.ft OxAIxAO[ [NeM[MT'C. [O rT-!.•T Y-lt'M.'4T•+,f-LS. pei' •i? E A ­—All T•A• aC R 411A AIL MAa[M[xT -I- 40,13 [C n • C*S..Rt1 TT^Sv1u.e f �'3A'49'OT-•C-2Ti.G10� wnpx wxD cOxy[rwxC[ Dr PROP[xnY, !we[Yt4T- Al exDwy x[e[0x 1a 1 rx[! 4c MOOT-OI-wAY Gpx[-xT AN9 m '''D' Ty{yy0[x4�0x-0 pwM[tf, Cly�x[�- �Or Contact John Anderson, Engineering Dept, if any questions. ianderson2galbemarle.org / 434-296-5832 —x3069 Thank you File: SDP201600023_Harvest Moon_FSP_ph.I 043016 County of Albemarle Department of Community Development Memorandum To: Dustin Green (dgreen@dominioneng.com) From: Megan Yaniglos, AICP- Principal Planner Division: Planning Services Date: April 29, 2016 Subject: SDP -2016-023 Harvest Moon- Phase I- Final Site Plan The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Requirements: 1. [32.5.2(1)] A plat and associated deeds will be required for all easements prior to final site plan approval. 2. [32.7.9.4(b)(1 and 2)] Since you are using existing landscaping for your tree canopy calculation, you need to show the limits of clearing and location and type of protective fencing on the landscape plan. In addition, a conservation plan checklist to be filled out and signed by the owner needs to be added to the plans. Also, indicate the type of existing wooded areas, evergreen, deciduous, or mix. 3. [32.7.9.5] Street trees are required to be provided along existing streets. Provide trees in accordance with this section along the frontage of Berkmar. In addition, shrubs also need to be provided for screening along the existing parking area in accordance with this section. If there are existing trees or shrubs that meet this requirement, show them on the plan. 4. [32.7.9.6] Kousa Dogwood is not a large or medium shade tree as required for parking lot tree per this section. Provide a large or medium shade tree from the recommended plant list. http://www.albemarle.org/upload/images/forms center/departments/Community Dev elopment/forms/applications/Plant List Approved Species 04 21 03.pdf 5. [32.7.9.7] The plant legend states that the plants for screening along the property line in the buffer are Ilex glabra, however the table lists Cryptomeria. These are two different plants. Clarify and provide landscaping that is from the recommended list for screening. In addition, screening should be provided all along the travelway and to the dumpster since the adjacent parcel is zoned residential, as screening is required for commercial uses. Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext. 3004 for further information. a t Nome .4600, ♦c e o%s o,` e'40.0 Dominion any`1 , Engineering 172 South Pantops Drive Charlottesville, VA 22911 t�� IP& 434.979.8121 (p) 447Oer e s 434.979.1681 (f) cts DominionEng.com April 1, 2016 Ms. Megan Yaniglos Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Harvest Moon Final Site Plan Dear Megan, Please see our response below to County comments dated 7 March 2016 on the referenced plan. John Anderson, Civil Engineer II Engineering 1. SP-2—Check Impervious Area Summary table:Bid 1/Travelway values,Phase 1 v. Phase I&2 differ. Confirm values are accurate. Response: The proposed Impervious Area Summary Table is up to date and accurate. 2. SP-2—Check Impervious Area Summary Table/Phase 1 &2: Include building 4. Response: (WPO response) Building 4 has been included in our impervious calculations. For clarification of impervious area please note that the difference in EX Impervious area to remain is 3,000 sf less in Phase 2 because Building 4 is replacing impervious parking. 3. SP-3—There are dissimilarities of existing condition features between this plan and VSMP/WPO Plan(WPO2O 1600011).For example: Ex. Shed,Ex.Trailer,Existing Ditch(SP3)are labelled Cinder block building,Cinder block building,and Intermittent Stream(WPOlshcet SW3).Please reconcile,especially stream/ditch. Provide evidence to support proper description of this feature(intermittent stream v.ditch). Response: SP3 has been updated to reflect field conditions. The intermittent streams have been labeled as such and we have included a letter from Environmental Scientist David Powell confirming this. Stream#2 is labeled as non-perennial in his report but after discussion with Mr. Powell, I confirmed that Stream#2 is intermittent. 4. Existing storm drain/SDMH 203 --Ensure design will support high-frequency truck traffic. Response: SDMH 203 is to be replaced with a VDOT std. DI-1,which is designed to withstand HS-20 loading. The DI-1 is labeled as structure#4. 5. Provide pavement design relative to high-frequency truck traffic,appropriate to proposed use. [Ref. VDOT Pavement Design Guide] Response: The proposed pavement design as provided by the geotechnical engineer is shown on sheet SP4. Please see geotechnical report and email from geotechnical engineer updating TYPE II Section using geogrid. NOW %s s oe 410O%s 3, %40 ►s) Dominion any`I IP h. Engineering 172 South Pantops Drive Awl Charlottesville, VA 22911 , s 434.979.8121 (p) 4lte ers 434.979.1681 (f) its DominionEng.com 6. Please turn off(SP3)existing conditions layer.Underlying existing features obscure details on this sheet. Response: Existing layers have been turned off for clarity on SP4 and SP5. 7.At top of hill/New 20'-wide paved access down to building 1: Provide auto-turn for vehicles anticipated to serve catering business;recommend consider extended length vehicles/fire rescue vehicles(Ref.Attached ACF&R .xls/wheelbase length). Recommend remove west half of north-most parking lot raised island,and add yellow 'No parking' striping to the north-most parking space,west row of Ex.parking lot—that is, sacrifice a parking space. Auto-turn may help inform design decisions at this location. Response: Autoturn exhibit has been added to sheet SP4. 8.Given approx.6%grade, steeper in places(16-fl vertical: Ex.parking adjacent to Berkmar Drive to parking spaces in front of building 1),recommend a storm inlet midway down this portion of access. If opt for inlet midway down,specify CG-6 as opposed to CG-2. Response: Inlet 4A has been added to the storm sewer schedule with CG-6 designation. 9.Please revise rain garden labels to read`Potential phase II SWM(rain garden).' Response: Phase II SWM design is to be provided with Phase II WPO plans. 10.Engineering recommends Title of Site Plan reference(or Planning process/Planning site plan approval explicitly limit approval to)Phase 1. WPO2O 1600011 covers Phase 1.Engineering defers to Planning. Response: Reference to WPO 2016-00011 has been added to cover sheet. 11.Recommend design(and design note)end Phase I paving at edge of building I parking/loading area. Response: The design has been revised so the paving ends at the edge of Building 1. 12.Recommend curb cut at future phase II access,building 1 loading area to future building 3,to avoid expense of curb demolition. Response: A curb cut has is no longer needed since the paving now ends at the building. See response to comment 11. 13.Future access,building 3—recommend stop bars, speed bumps,mirrors, signs,or other safety/speed control measures to assist vehicles navigate blind corner at SE edge of building 1,whether approaching or leaving building 3. Response: Final Site Plan Building 3 is a part of Phase II. Comment will be addressed with Phase II submittal. 14. Compare NW corner,building 1,with short section of retaining wall,WP0201600011,sheet SW6. Show retaining wall,if retaining wall proposed.Label 80 LF building retaining nail(see SW6), if design detail applies. 2 of 8 ;s �s cents �,�440 Dominion a yi i hi Engineering 172 South Pantops Drive i Charlottesville, VA 22911 "ads % Wi 434.979.8121 (p) 4' *e 434.979.1681 (f) Bets DominionEng.com Response: Plan has been revised to provide 3'x3'x3'gabion baskets to serve as retaining wall at NW corner of building. See fine grading sheet SP6 and detail sheet SP11. 15. Label all curb radii, including small radius(curb)nose at top of the hill,at site access(existing parking lot). Response: All curb radii has been labeled on sheet SP4. 16.Label/provide minimum 6'-wide sidewalk in front of building 1. Response: 6'-wide sidewalk has been labeled in front of Building 1. 17. Show/provide hardscape access for building 2(walk/parking,if any).Revise Impervious Area Summary table to include building 2 walkway—be mindful of sidewalk maximum grade/ADA requirements. [Maximum grade is 5% -VDOT Road Design Manual,Appendix A,p.A-121]. Response: Hardscape access for Building 2 will be provided with Phase II. 18.Reference building 1 outline,WP0201600011, SW6—front office/lobby FF=489;rest of building FF=487.00. Please show lobby/main building architectural interface. Plans should match. Response: The building outline has been revised to match building plans. 19.Apply SP4 storm drain design to WP201600011 ,sheets SW6,SW8, SW9,with storm pipe connecting inlet 3E and inlet IA. Response: The storm sewer design has been updated and shown on all pertinent sheets of the Final Site Plan. The WPO plan will be revised with the approved submission. 20. Label inlets(inlet ID). Response: The inlet ID's have been labeled. 21. Label storm pipes(#). Response: The storm pipe numbers have been labeled. 22. Include WPO201600011,sheet SW9(revised ref.#19)as separate site plan sheet. Drainage should accompany site plan details, since no road plan. Response: Drainage information has been provided on sheet SP9. 23. Include demolition details/sheet with site plan. Response: The demo plan has been provided on sheet SP3. 24.Provide additional existing contour labels. 3 of 8 ce a1s �46 4010 Dominion ir' 111. Engineering 172 South Pantops Drive Charlottesville, VA 22911 oe'4% 'I, k " � 434.979.8121 e ers ' 434.979.1681 (f) cts DominionEng.com Response: Additional existing contour labels have been provided with this submittal. 25.Access/additional: a. Show proposed grades;grade differential approaches 16'top/bottom. b.Tie proposed grades to existing grades that border access, left/right. Response: The proposed grades and tie-ins have been shown on this submittal. 26.Provide additional existing grade labels. Response: See response 24. 27. Extend existing contour lines at least 50-ft beyond property lines. Response: The existing contour lines have been extended 50-ft+from the property line. 28.Acquire temporary construction easement,as necessary,from TMP45-112G1 (Medical spa)to construct proposed grades/improvements. Response: A temporary construction easement will not be necessary from TMP 45-112G1. No disturbance will occur on this property. A note has been added to sheet SP5. 29.Provide fine grade/spot elevations at SDMH 203 to ensure MH top/new Access pavement align. Response: A spot shot has been provided in the plan view and the profile labeled accordingly. 30. Ensure site plan/WPO plan proposed grades match on west side of building 1. Response: The proposed grades match the WPO plan. 31.Turn off existing conditions layer. Response: The existing conditions layer has been turned off on the Site sheets. SP6 32.Please show(realistic)conceptual design location for proposed phase 2 150 LF 60"DIA detention pipe which should be sited in location to receive runoff from all additional impervious added with Phase II. Response: The proposed conceptual design location for phase II will be shown with the phase II Site Plan. 33.Revise Preliminary Stormwater Management Narrative to state approximately 3,050 cubic feet.Figure may change if Impervious Area Summary Table is revised to include building 4/building 2 sidewalk. 4 of 8 Avow et S moil%40,•1 Dominion 0 ( y Engineering 172 South Pantops Drive Charlottesville, VA 22911 t),%tea 0111 ' 434.979.8121 (p) 4_ �e 434.979.1681 ects DominionEng.com Response: The Stormwater Narrative has been updated but does not include anything concerning phase II. 34.Please revise(insert text in)SWM Narrative(toward end)". . .both Phase 1 and Phase 2 to show that an adequate channel exists to convey site or off-site water that transits the site to the existing Kegler's pond." Response: The text has been updated in the Stormwater Management Narrative. 35. Ref.Attached 11/5/15 email to Mike Myers re.As-built survey of Kegler's pond.All items appear to have been considered with WP020160001 I design,except item#1. WPO plan review comment will request a Construction Record Drawing of'Kegler's Pond'to determine true dimensions and capacity;basin outfall structures must he included." [11/5;9/2/15 email] WPO plan approval is required for site plan approval. Response: The Kegler's Pond Construction Record drawing was submitted with WPO 20160011 on 3/18/16. 36.Turn off existing conditions layer. Response: The existing conditions layer has been turned off on the Site plan sheets. 37. SP8, SP9—Recommend copy Impervious Area Summary table from SP2 to these sheets;revise table if necessary. Response: For clarity,the impervious area summary is only located on Sheet SP2. 38. SP9—Recommend revise Summary Note to state impervious area with phase I also includes removal of Go- Kart track. Response: Summary note added to SP2. 39.Please confirm whether Ex.Drainage Easement,DB 1 454/PG637 is sufficient to convey site runoff to Kegler's pond.Existing contours in area of outfall 1 (WPO/SW6)appear to show site runoff will discharge to adjacent property,not necessarily a defined channel,or will be confined to Ex.drainage easement."There can be no off-site impact due to re-development of TMP 45-1 12G." [11/5;9/2/15 email-Attached]Demonstrate site runoff will reach Kegler's pond.Acquire additional Drainage Easement if necessary. Response: Additional easement will not be necessary for this project since there is an existing drainage easement at DB 1119 PG 577. Mr. Andrew Slack, GIS Specialist II 1. The applicant should contact this office with a list of(3)proposed road names for approval. This site will require a private road name with four addressable structures located on the site. Please contact this office with any questions. Response: The approved street name is Harvest Moon Lane. 5 of 8 ts ceras es4et jl Dominion an ` L Engineering 172 South Pantops Drive Charlottesville, VA 22911 0.0:04 � Fir 434.979.8121 (p) �'e�e ers 434.979.1681 (f) its DominionEng.com Mr. Alexander Morrison, P.E. Civil Engineer ACSA 1. Construction review and approval by the ACSA will be required prior to final site plan approval. Submit 3 copies of the final site plan,a water data sheet and a sewer data sheet to the ACSA. Attn: Michael Vieira,PE,when available. Response: Sewer and Water data sheets are provided with this submittal. 2. Show the existing private sanitary sewer pump station serving 3350 Berkmar Drive. Response: The existing private sanitary sewer pump station serving 3350 Berkmar Drive has been shown on the Final Site Plan. 3. Re-label the proposed private 8"sanitary sewer as proposed ACSA sanitary sewer. Response: The proposed private 8"sanitary sewer line has been relabeled as an ACSA sanitary sewer. 4. Show easements on the 8"sanitary sewer. Response: Easements are shown on the 8"sanitary sewer line. 5. Show easement for future public sewer extension to Berkmar Drive and TMP#45-112. Response: The easement for the future public sewer extension to Berkmar Drive and TMP#45-112 are shown on this submittal. 6. RWSA approval of the water main tap is required.Relocate the proposed tap to the 8" ACSA water main along the frontage of 3350 Berkmar Drive. Response: The RWSA will not allow us to tap their 24"waterline. The proposed tap has been moved to the 8"ACSA water main along the frontage of 3350 Berkmar Drive. 7. Re-align the proposed water main through the drive isles in the parking lots,tapping the meters at the appropriate locations. Response: The proposed water main has been re-aligned along Berkmar Dr, through the existing parking lots and tapping meters are shown in the appropriate locations. 8. Advise if there will be any sprinkler systems within the buildings. Response: Building 1 will not have a sprinkler system. 9. Advise if there will be irrigation service for this development. Response: There is no anticipated irrigation service at this time. 6 of 8 ets e;%:ce oits ear Dominion an `i L Engineering 172 South Pantops Drive Charlottesville, VA 22911 Vs.‘Ie 434.979.8121 (p) 4't ee 434.97 r �s9.1681 (f) cts DominionEng.com Ms. Megan Yaniglos, Principal Planner 1. [Comment] It is difficult to distinguish between the existing conditions and the proposed improvements on sheet S4.Recommend that the existing conditions be grayed back for clarity. Response: The existing conditions have been removed from the site plan sheets. 2. [32.5.2(a)] On sheet SP4 reference the approval of the buffer disturbance that was approved with SDP1996-012. There are currently two notes that reference the exception that need to be updated. Response: The notes have been updated with this submittal. 3. [32.5.2(c)]Provide the approximate timing for Phase 2. Response: The anticipated timing for Phase II has been added to sheet SP2. 4. [32.5.2(1)] Will the proposed utilities have easements?If so, show the easements on the plan. Response: Easements for the sanitary sewer, and waterline and public storm sewer have been provided. 5. [32.5.2(m)] Show the distance to the centerline of Berkmar from the proposed ingress and egress. Response: The distance to the centerline of Berkmar Drive from the proposed ingress and egress has been shown on sheet SP4. 6. [32.5.2(n)] Show the dimensions of the walkways/sidewalks and screening fence.Also, indicate the proposed paving materials for all walks,parking lots and driveways. Response: The dimensions and paving materials for walkways/sidewalks, parking lots and driveways are shown on sheet SP4. Screening Fence details are on Sheet SP10. 7. [32.5.2(1)] A plat and associated deeds will be required for all easements prior to final site plan approval. Response: A plat and deed will be provided under separate cover. 8. [Recommendation] If possible,provide a reservation for dedication upon demand of the County for the future widening of Berkmar. This reservation should be a total of 44 feet from the centerline of Berkmar. Adjustment will need to be made to Building 4 for this reservation so that the turn lane can be accommodated,however it appears there is room to make this adjustment and meet the required setback. 7 of 8 4, c ce ors 0,,J0��s Dominion a y ,I ki Engineering 172 South Pantops Drive' Charlottesville, VA 22911 �n`o,% 1wjr 434.979.8121 (p) 4' 4er 434.979.1681 eels (f) DominionEng.com Response: The developer has opted to not provide the reservation for future dedication at this time. Mr. Robbie Gilmer, Fire Rescue 1. Fire flow test required before final approval. Response: The fire flow test results are shown on SP1. 2. Building 3 needs to have a sprinkler system or an approved fire access turn around behind the building. A sprinkler system or an approved travel distance from 150'to 200'and eliminate the required turn around behind the building. Response: Comment noted. Building 3 comment will be addressed with the Phase 2 Site Plan. Phase 1 Final Site Plan only involves Building 1 and hardscapes. VDOT 1. Sight/lines/distances need to be added to the site plan for proposed entrance from Berkmar Drive to help determine whether the proposed entrance will have sight distance issues or not. Response: Sight lines and distances and profiles are shown on sheet SP10. We trust the above adequately addresses your comments. Please let me know if you have any questions or require additional information. Best Regards, '---2,,,i,,t„..., Dustin Greene. EIT 8 of 8