Loading...
HomeMy WebLinkAboutSDP201600073 Review Comments Initial Site Plan 2017-02-03Short Review Comments Report for: SDP201600073 SubApplication Type: Tandem Friends Middle School Expansion Initial Site Plan Date Completed:01/18/2017 Reviewer:Christopher Perez CDD Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/13/2016 Reviewer:Jay Schlothauer CDD Inspections Review Status:No Objection Reviews Comments:Based on plans dated December 5, 2016. No comments or conditions. Division: Date Completed:12/13/2016 Reviewer:Margaret Maliszewski CDD ARB Review Status:No Objection Reviews Comments:This development is not expected to be visible from the Entrance Corridor. Consequently, ARB review/approval is not required. Division: Date Completed:01/11/2017 Reviewer:Derek Bedarf CDD E911 Review Status:No Objection Reviews Comments:Based on plans dated December 5, 2016. No comments or conditions. Division: Date Completed:01/10/2017 Reviewer:Adam Moore VDOT Review Status:Requested Changes Reviews Comments: Division: Date Completed:12/30/2016 Reviewer:Josh Kirtley Thomas Jefferson Health District Review Status:No Objection Reviews Comments: Division: Date Completed:01/22/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:Requested Changes Reviews Comments:Based on plans dated 12/5/16. 1. Radii entering the parking lot shall be a minimum of 25' to allow for fire apparatus access. 2. Access shall be provided to with in 150' of all the first floor for the new building. 3. Access shall be provided to existing buildings on site. 4. Fire flow test attached to final set of plans. 5. FDC location shall be on the address side of the structure and with in 100' of a fire hydrant. 6. Fire hydrant spacing shall be 400' per travel way. 7. Any access roads greater than 150' in length shall have an approved turn around. Division: Page:1 of 3 County of Albemarle Printed On:February 09, 2017 5. FDC location shall be on the address side of the structure and with in 100' of a fire hydrant. 6. Fire hydrant spacing shall be 400' per travel way. 7. Any access roads greater than 150' in length shall have an approved turn around. Date Completed:01/18/2017 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments: Division: Date Completed:01/17/2017 Reviewer:Bobby Jocz CDD Engineering Review Status:Pending Reviews Comments:Comments on Plans Dated 12/5/2016 1. [General Note] WPO VSMP permit application submittal will be needed before final site plan approval [17-401]. Note: The SWM Plan and E&S plan should be submitted together as part of the VSMP submittal. These documents should be submitted separately from the Final Site Plan and should be titled appropriately, including VSMP submittal number. 2. [General Note] Stormwater management easement must be established for proposed facility. This should encompass all facility elements and access. 3. [All] Professional Engineer seal with original signature and date will need to be included on final submittal. 4. [Sheet SP3] Provide contour elevations. 5. [Sheet SP3] Recommend using shading or hatching to better indicate where pavement and other items are being removed in Demo Plan. 6. [Sheet SP4] Some elements appear to be on plan out of context; for instance, the two spot shots for HDPE pipe on the west side of the site near the exit to mill road have no pipe diagram associated with them. In addition, there is a note stating “stone wall” on the southwest corner of the property that has no diagram associated with it and there is a symbol typically reserved for silt fencing displayed on the west and eastern side of the property with no label identifying what the structure represents. Please clarify or remove. 7. [Sheet SP4 and SP2] Some abbreviations appear without definition. The abbreviations “WW”, “BW”, and “WV” appear on sheet SP4 and there is no context for what they refer to as they are not defined on sheet SP2. Please correct and ensure all symbols/abbreviations are represented in the key. 8. [Sheet SP4] Provide dimensions and material used for the exit to Mill Creek Road. 9. [Sheet SP4] Reconfigure handicap access to parking lot. It appears that there is no way for people needing handicap access to exit the parking lot. Ensure persons using the handicap parking spaces do not have to cross behind parking spaces to exit parking lot. Parking lot access for the 6’ concrete sidewalk from the southeast (stairways) and northwest (shown as curb) do not provide handicap accessible ramps, and no curb ramp is provided as shown on the sidewalk to the north of the parking lot near the entrance to the parking lot from the roadway to either the northwest (towards the gyms) or southeast (towards the main campus). 10. [Sheet SP4] Curb/curb and gutter should be provided around parking lot islands and along the northwestern side of the entrance road. 11. [Sheet SP5] Contours appear to switch between 2’ and 1’ contours within bioretention facility detail. This makes evaluation of the design difficult. Please correct. 12. [Sheet SP5] Evaluating proposed contours, a drainage ditch/channel appears to be designed to the north side of the proposed “Middle School” building. Please ensure this drainage channel is adequately designed to prevent erosive flows. 13. [Sheet SP6] Drainage areas for proposed bioretention facility are incorrect. The drainage area shown does not incorporate areas captured by proposed stormsewer system, and therefore do not encompass all areas drainage to facility. Please revise. 14. [Sheet SP6] Notes located near bioretention facility #1 detail reference a facility BF-2. This facility does not exist as presented in plans. Please clarify. 15. [Sheet SP6] For final site plan submittal, please provide information outlined in the following checklist: [http://www.albemarle. org/upload/images/forms_center/departments/Community_Development/forms/Engineering_and_WP O_Forms/Engineering_Review_Drainage_Plans_Checklist_1Dec2014.pdf]. 16. [Sheet SP8] Provide details for drop inlets used in proposed stormsewer system. Provide detail for proposed trash rack on the overflow of the bioretention facility. Division: Page:2 of 3 County of Albemarle Printed On:February 09, 2017 16. [Sheet SP8] Provide details for drop inlets used in proposed stormsewer system. Provide detail for proposed trash rack on the overflow of the bioretention facility. Date Completed:02/03/2017 Reviewer:Ron Higgins CDD Admin Zoning Review Review Status:Requested Changes Reviews Comments:[32.5.2(b), 4.12] Parking. Prior to final site plan approval, the Zoning Administrator shall approve a parking study for the site. The study provided on sheet 2 is not adequate for Zoning to make a parking determination. Additional information on the parking needs of the site are required prior to final site plan approval. Please provide a true parking assessment of various uses and needs. If you have additional questions pertaining to this requirement please contact Ron Higgins of Zoning. Division: Date Completed:02/03/2017 Reviewer:Christopher Perez CDD Planning Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:February 09, 2017 Christopher Perez From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Wednesday,January 18, 2017 3:37 PM To: Christopher Perez /LCS4 Subject: SDP201600073:Tandem Friends Middle School Expansion Chris, „l--1-o I have reviewed the above referenced plan and have the following comments: I'14-11 7 :HO4— • Show a water meter vault and call-out the meter to be sized by the ACSA. • Fixture counts will be required to size the water meter. • The applicant is proposing a domestic service extension to the school.A public water main extension may be required to provide fire hydrant coverage for the new building. • If a water main extension is required then a Construction Plan Review submittal for water will be required during the final site plan stage. • Advise if the new building will have a sprinkler system. • Advise if there will be any cafeteria or food preparation within the new building (to determine if a grease interceptor is required). Let me know if you have any questions. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville,Virginia 22911 (0)434-977-4511 Ext. 116 (C)434-981-5577 (F)434-979-0698 1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 January 18, 2017 Mike Myers 172 South Pantops Dr. Charlottesville VA 22911 SDP201600073 Tandem Friends Middle School Expansion - Initial Site Plan Mr. Myers: The Site Review Committee has reviewed the development proposal referenced above. Initial comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services Albemarle County Engineering Services Albemarle County Information Services (E911) Albemarle County Building Inspections Architectural Review Board (ARB) Virginia Department of Transportation Albemarle County Zoning Services [Comments pending to be forwarded once received] Albemarle County Department of Fire Rescue [Comments pending to be forwarded once received] Albemarle County Service Authority [Comments pending to be forwarded once received] Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval. The lead reviewer will either approve with conditions or deny the initial site plan within 15 days of the site review meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Senior Planner County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Phone 434-296-5832 Memorandum To: Mike Myers From: Christopher P. Perez, Senior Planner Division: Planning Date: January 18, 2017 Subject: SDP201600073 Tandem Friends Middle School Expansion - Initial Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] Pay the public notification fee of $215 prior to any further review/action of the plan. 2. [32.5.2(n)] Proposed Improvements. Does the school intend to construct the gym expansion as approved on SP2013- 19? Currently the subject improvement is not part of this site plan. If it is intended to be included on these plans then a revised initial site plan shall be provided and the plan shall be redistributed for SRC review prior to initial site plan approval. 3. [32.5.2(b), 4.121 Parking. Prior to final site plan approval, the Zoning Administrator shall approve a parking study for the site. The study provided on sheet 2 is not adequate for Zoning to make a parking determination. Additional information on the parking needs of the site are required. Revise. 4. [32.5.2(n), 4.12.15(8)] Curb and Gutter. Provide curb and gutter throughout the parking area and along the proposed travelways. 5. [32.5.2(n)] Existing and Proposed Improvements. Clearly depict and label limits of disturbance, and show areas where existing vegetation will be removed. 6. [32.2.1(c)] Special Use Permit Conditions. On sheet 2, under the zoning of the property please list all Special Use Permits (SPs) associated with the site and a general note that conditions apply to these SPs. 7. [32.5.2(n), 4.12.171 Existing and Proposed Improvements. Label and dimension the proposed drop off arca. 8. [32.5.2(n), 4.12.16(c)(5)1 Provide ADA accessible curb cuts for the handicapped parking spaces. 9. [32.5.1(c)] Dimensions. Provide dimensions on the travelway aisles into and out of the parking area. 10. [32.5.2(n), 4.12.171 Existing and proposed improvements. Provide directional arrows throughout the parking area and travelways. 11. [32.5.1(c)] Dimensions. Throughout the plan dimension all proposed improvements. 12. [32.5.2(n)] Existing and Proposed Improvements. Dimension the full width and height of the retaining walls required for construction. Also, list the type of retaining wall used in the development (i.e., Geogrid, block/redi-rock walls). 13. [32.5.2(n)] Existing and Proposed Improvements. Provide the width of the access road to Mill Creek Road and the width of the turnaround for the Fire Department. 14. [32.5.2(n)] Proposed Improvements. Depict, label, and dimension the trash receptacles. 15. [32.5.2(n), 4.171 Outdoor Lighting. If any new outdoor lighting is proposed (including wall packs) or the relocation of existing lighting is proposed, then a lighting plan meeting the requirements of section 4.17 shall be required prior to final site plan approval. 16. [Comment] Throughout the plan there is a light pole in the travelway of the bus loop. Omit this light pole as it is an impediment to vehicles traveling within the travelway. 17. [32.7.9.4] Contents of Landscape Plan. The landscape plan shall show the size and type of all proposed plant materials. Provide plant types and sizes (caliper and/or height depending on ordinance requirements for each planting type) and plant amounts in a planting list. 18. [32.7.9.6] Interior Landscaping. Provide interior landscape calculations on the plan. 19. [32.6.2(h)] Signature Panel. Provide the required signature panel. Assure that each member of the site review committee is provided a signature line. Please contact Christopher P. Perez in the Planning Division by using cperezkalbemarle.org or 434-296-5832 ext. 3443 for further information. Tandem Friends Middle School — SDP201600073 Engineering Comments on Plans Dated 12/5/2016 By Bobby Jocz 1. [General Note] WPO VSMP permit application submittal will be needed before final site plan approval [17-401]. Note: The SWM Plan and E&S plan should be submitted together as part of the VSMP submittal. These documents should be submitted separately from the Final Site Plan and should be titled appropriately, including VSMP submittal number. 2. [General Note] Stormwater management easement must be established for proposed facility. This should encompass all facility elements and access. 3. [All] Professional Engineer seal with original signature and date will need to be included on final submittal. 4. [Sheet SP3] Provide contour elevations. 5. [Sheet SP3] Recommend using shading or hatching to better indicate where pavement and other items are being removed in Demo Plan. 6. [Sheet SP4] Some elements appear to be on plan out of context; for instance, the two spot shots for HDPE pipe on the west side of the site near the exit to mill road have no pipe diagram associated with them. In addition, there is a note stating "stone wall" on the southwest corner of the property that has no diagram associated with it and there is a symbol typically reserved for silt fencing displayed on the west and eastern side of the property with no label identifying what the structure represents. Please clarify or remove. 7. [Sheet SP4 and SP2] Some abbreviations appear without definition. The abbreviations "WW", "BW", and "WV" appear on sheet SP4 and there is no context for what they refer to as they are not defined on sheet SP2. Please correct and ensure all symbols/abbreviations are represented in the key. 8. [Sheet SP4] Provide dimensions and material used for the exit to Mill Creek Road. 9. [Sheet SP4] Reconfigure handicap access to parking lot. It appears that there is no way for people needing handicap access to exit the parking lot. Ensure persons using the handicap parking spaces do not have to cross behind parking spaces to exit parking lot. Parking lot access for the 6' concrete sidewalk from the southeast (stairways) and northwest (shown as curb) do not provide handicap accessible ramps, and no curb ramp is provided as shown on the sidewalk to the north of the parking lot near the entrance to the parking lot from the roadway to either the northwest (towards the gyms) or southeast (towards the main campus). 10. [Sheet SP4] Curb/curb and gutter should be provided around parking lot islands and along the northwestern side of the entrance road. 11. [Sheet SP5] Contours appear to switch between 2' and 1' contours within bioretention facility detail. This makes evaluation of the design difficult. Please correct. 12. [Sheet SP5] Evaluating proposed contours, a drainage ditch/channel appears to be designed to the north side of the proposed "Middle School" building. Please ensure this drainage channel is adequately designed to prevent erosive flows. 13. [Sheet SP6] Drainage areas for proposed bioretention facility are incorrect. The drainage area shown does not incorporate areas captured by proposed stormsewer system, and therefore do not encompass all areas drainage to facility. Please revise. 14. [Sheet SP6] Notes located near bioretention facility #1 detail reference a facility BF -2. This facility does not exist as presented in plans. Please clarify. 15. [Sheet SP6] For final site plan submittal, please provide information outlined in the following checklist: [http://www.aIbemarle.org/upload/images/forms_center/departments/Community_Developm ent/forms/Engi nee ring_and_WPO_Forms/Engineering_Review_Drainage_Pl ans_Checklist_1Dec 2014.pdf]. 16. [Sheet SP8] Provide details for drop inlets used in proposed stormsewer system. Provide detail for proposed trash rack on the overflow of the bioretention facility. Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, >rrginia 22701 January 10, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: Tandem Friends Middle School- Initial site plan SDP -2016-00073 Review #I Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Dominion Engineering, dated December 5, 2016, and offers the following comments: Land Use 1. Tandem lane currently loops around the school complex with an ingress/egress entrance onto Mill Creek Drive to the north and a egress only entrance to the south. The proposed building is shown to break this loop, resulting in all traffic being forced to use the northern entrance. Is that entrance adequate to accommodate all generated trips of the school? 2. Will School Buses be accommodated for adequate queuing space on Tandem lane? Please note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or other requirements. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis C. Bedsaul at 434422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process Sincerely �t1�J Adam J. oore, P.E. Area Land Use Engineer Charlottesville Residency