Loading...
HomeMy WebLinkAboutWPO201500055 Review Comments 2016-05-19Short Review Comments Report for: WPO201500055 SubApplication Type: Branchlands Whistler House - VSMP Stormwater Management/BMP Plan Erosion and Sediment Control Plan Stream Buffer Development Request Date Completed:10/08/2015 Reviewer:John Anderson CDD Engineering Review Status:Denied Reviews Comments: Division: Date Completed: Reviewer:Troy Austin VDOT Review Status:Pending Reviews Comments: Division: Date Completed:12/15/2015 Reviewer:John Anderson CDD Engineering Review Status:Denied Reviews Comments: Division: Date Completed:02/21/2016 Reviewer:John Anderson CDD Engineering Review Status:Denied Reviews Comments: Division: Date Completed:03/18/2016 Reviewer:John Anderson CDD Engineering Review Status:See Recommendations Reviews Comments:Please revise SWPPP (exhibit; ref. two new comments), and then submit plan/SWPPP (signed/dated), and documentation of payment of nutrient credits for VSMP Plan Approval. .PDF preview welcome. janderson2 3/18/2016 6:13 AM _________________________ following update: janderson2 5/25/2016 3:02 PM Nutrient credits: Finalized. Ref. email, LJ Lopez (psprouse@rebkee.com); Tue 5/24/2016 10:20 AM “Ana: Attached is the Affidavit for Nutrient Credit Purchase of Branchlands. Another item checked off the list." Division: Date Completed:05/25/2016 Reviewer:John Anderson CDD Engineering Review Status:See Recommendations Reviews Comments:VSMP bond estimate amounts sent to A. Kilmer, Wed 5/25/2016 6:23 PM (email). Division: Date Completed:05/19/2016 Ana Kilmer Page:1 of 2 County of Albemarle Printed On:February 13, 2017 Reviewer:Ana Kilmer Review Status:Approved Reviews Comments:5/10/2016 - swa was submitted 5/11/2016 - swa approved by CAO 5/11/2016 - swa in CE office 5/16/2016 - swa approved by the county 5/19/2016 - swa recorded at clerks office, deed book 4758, page 733. Division: Page:2 of 2 County of Albemarle Printed On:February 13, 2017 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project: Branchland Whistler House —VSMP Plat/Plan preparer: Craig Kotarski, Timmons Group 919 2' St. SE, Charlottesville, VA 22902 craig.kotarskiAtimmons.com Owner: Wial LLC, 12095 Gayton Rd, Richmond, VA 23238 [Graham Aldelman] Owner Rep: L. J. Lopez, Milestone Partners, 300 2"d St. NE, Charlottesville, VA 22920 llopezkniilestonepartners.co Plan received date: 24 Aug 2015 / e -plans (Rev. 1): 18 Nov 2015 / e -plans (Rev. 2): 19 Jan 2016 / e -plans Date of comments: 8 Oct 2015 / e -review (Rev. 1): 15 Dec 2015 / e -review (Rev. 2): 21 Feb 2016 / e -review Reviewer: John Anderson A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Comments reference binder dated 22 -Jun 2015 —Recommend do not re -submit SWPPP until ESC/SWM plan comments addressed. SWPPP contains reduced -size ESC and SWM plans.(Bev. 2 Please submit SWPPP. 1. Sec. 1, Registration Statement —please sign/date. 2. Sec. 4,5 —Revise per comments. Recommend wait until ESCP/SWMP comments addressed. 3. Sec. 6 —Revise 11" x 17" PPP Exhibit: Relocate mortar mix/concrete washout so distant from future bioretention. Describe berm containment: impermeable heavy -mil linerNolume sufficient to contain stored fuel volume +10%. Show solvent/paint/chemical storage. Add SF or similar downslope of temporary toilets. Show non -hazardous solid waste collection (dumpster) draining to ST, or equivalent. Show sediment basin or equivalent to capture wash waters. 4. Sec. 6.c. —Delete `No concrete washout shall occur on site.' 5. Sec. 6.c. —Delete `Existing basketball court to the north.' 6. Sec. 9 —Certification Statement: sign/date. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500055) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for minor reason in comment #33, below. 1. C0.0 —Revise Title: Branchlands Memory Care and Assisted Living, VSMP WPO201500055. (Rev. 1) Addressed. Remove sheets C1.0, C1.1, L-001. Please mark through sheet numbers in index. (Rev. 1) Addressed. C3.1 —Revise IP @ Nyoplast overflow structure. Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. (Rev. 1) Addressed. Engineering Review Comments Page 2 of 4 4. C4.0/4.1 -Revise sheet titles to `Site Layout' or similar. A VSMP may not approve a site plan. (Rev. 1) Addressed. 5. C0.0 -Edit index. Ref. item #4. (Rev. 1) Addressed. 6. C4.1 -Label pipe structure #105. (Rev. 1) Addressed. 7. C4.1 -Label DI structure #108. (Rev. 1) Addressed. 8. C4.1 -Revise bottom of bioretention label to read floor elevation (or grade elevation) of bioretention. (Rev. 1) Addressed. 9. C4.1 -Label bioretention clean-out. Label bioretention overflow structure. (Rev. 1) Addressed. 10. LD -229: Storm Sewer Design Computations -in this (or separate table) list pipe structures # 109, 107. (Rev. 1) Addressed. 11. C6.0 -Pipe Str. # 109 (6.83' of 15" HDPE), 107 (22.74' of 15" HDPE) @ 0.00% slope is problematic. Revise to provide positive slope at least 0.5%. (Rev. 1) Addressed. 12. C4.1 -There appears to be no MH access to either ADS "Stormtech" System (Area to W), or 3 -line, 125' L 60" DIA storage system (Area to S). Provide manway access to each system. (Rev. 1) Addressed. 13. C4.1 -Provide notes, labels, or detail that shows how the two 50' lines of ADS system make connection, with particular emphasis on Access for maintenance. Ensure that each line is accessible. Provide same for 60" DIA, 125' L detention system (Area to S). All detention system lines must be accessible. Design should ensure debris accumulation will not block, back-up, or short-circuit either system. (Rev. 1) Addressed. 14. C4.1 -Provide new Str. #104 away from biofilter; use Std. MH. The biofilter 24" Nyoplast overflow structure (dome drain) will be upstream of this MH. The Nyoplast structure is ineligible as an inline storm system element. Organic debris is likely to collect at the base of the overflow structure. Any obstruction of the 24" (dome drain) overflow structure will compromise the entire Area to W storm runoff system. (Rev. 1) Addressed. 15. C5.1 -Recommend revise elevation of 4" perforated underdrain to 424.33' (biofilter). (Rev. 1) Addressed. 16. C5.0 or C5.1 -Add Note: Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. (Rev. 1) Addressed. 17. C5.0 or C5.1 -Provide bioretention planting schedule. (Rev. 1) Addressed. 18. C5.1 -Revise `bottom of biofilter 427.50' to read top of biofllter Mix. (Rev. 1) Addressed. 19. C5.1 -Label elevation/top of biofilter cleanout: set Elev. at least 4-6" above 3" hardwood bark mulch. (Rev. 1) Addressed. 20. C5.1 -Label %slope of line between biofilter overflow structure and new MH (2% Min). Also, items #14, 29. (Rev. 1) Addressed. 21. C5.1 -Provide plan view, Str. #106. Plan view/design must provide means of clearing pipe #107 of debris. (Rev. 1) Addressed. 22. C5.1 -WEIR Plate in Str. 106 Detail -Show top of structure (top of weir/top of storage are shown). C6.0 shows Str. 106: MH -1 W/ WEIR PLATE, TOP =430.04'. (Rev. 1) Partially addressed. Str. 106 Detail. Please review 10 yr-WSE which appears to be high/in wrong location. (Rev. 2) Addressed. 23. C6.0 -Pipe #207, 205: Increase DIA to 15" Min. (Yard inlet system 12" DIA, is the exception). (Rev. 1) Addressed. 24. Revise LD -229 to reflect pipe DIA increase, item #23. (Rev. 1) Addressed. 25. C4. VC6.0 -It is unclear how Str. 112, listed as MH -1, functions. Str. is located in parking area that routes to UG Detention, but is not identified as a grate or DI. Confirm design; revise profile label as necessary. (Rev. 1) Addressed. 26. C6.0 -Str 204-218 profile: Revise label to read INV IN 435.00 (213) (Rev. 1) Addressed. 27. Revise Str. 213 DIA to 15" Min; this leads from a standard VDOT DI to the 3 -line 60" DIA UG Detention system. (Rev. 1) Addressed. 28. C6.0 -Profile, Str. 200-204: Label horizontal separation between steel plate weir wall and end wall of 60" CMP storage pipe. Consider maintenance, and design reasonable access to this space. With 1.0' Max clearance above the weir plate (rapidly diminishes since circular), it is likely not possible to access the Engineering Review Comments Page 3 of 4 downstream side of the weir plate in the 60" system, should need arise. (Rev. 1) Partially addressed. As follow-up: 60" system 6" orifice detail elevation inconsistent with profile elevation. Please revise. Image [Rev. 2 —image deleted] (Rev.2.) Addressed. 29. C6.0 —Revise profile, Str. 100-110. Provide Std. MH. Ref. item #14, above. (Rev. 1) Addressed. 30. C6.0 —Provide profile for line from biofilter overflow structure to New MH. —Also, item #29 (Rev. 1) Addressed. 31. C5.1 —Revise WEIR Plate in 60" System Detail. Show as circular (plate is circular). (Rev. 1) Addressed. 32. Provide documentation of purchase of nutrient credits: (Rev. 1) Acknowledged. E. Documentation of the applicant's acquisition of nutrient credits shall be provided to the VSMP authority and the Department in a certification from the credit provider documenting the number of phosphorus nutrient credits acquired and the associated ratio of nitrogen nutrient credits at the credit -generating entity. Until the effective date of regulations establishing application fees in accordance with § 62.1-44.19:20, the credit provider shall pay the Department a water quality enhancement fee equal to six percent of the amount paid by the applicant for the credits. Such fee shall be deposited into the Virginia Stormwater Management Fund established by § 62.1-44.15:29. 17 Nov 2015 Applicant comment response letter: "Nutrient credit pruchase documentationw will be provided closer to final approval." New 33. C6.0 —Provide/show Manway structures for StormTech and 60" CMP storage pipe systems in profile views. (Rev. 2) Partially Addressed. Provide section view of arched chamber system; show arch. Restore view included with last submission, deleted with this plan submission; sheet C5.1. plans, belo'�: CONVEYANCEPIPE _ MATVARY (PVC,C,HHOPEOPE, ETC.) INSERTA TEE CONNECTION INSERTA TEE DETAIL NTS (X) DO NOT INSTALL INSERTA-TEEAT CHAMBER JOINTS A A INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION PLACE ADS GEOSYNTHETICS 315 WOVEN CEOTEXTILE(CENTERED ON INSERTATEESECTION A -A SIDE VIEW INLET)OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTE%TLE MUST EXTEND 8' (150 mm) MAX DIAMETER OF HEIGHT FROM BASE OF PAST CHAMBER FOOT CHAMBER INSERTATEE CHAMBER (X) SC -310 6'(150 mm) V (100 mm) SC -740 10' (250 mm) 4'(100-) DC 780 10' (250 mm} 4'(100-) MC -35W 12' (300 mm) 6'(150-) NOTE: MC -450D 12' (300 mm) B' (200 mm) PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS CONTACT STORMTECH FOR MORE INFORMATION. GASXETED 8 SOLVENT WELD, N-12, HP STORM, 0900 OR DUCTILE IRON 34. C6.0 —Specify gauge (steel thickness) of 60" CMP storage pipe system and both weir plates, if not shown. (Rev. 2) Addressed. C. VSMP: SWPPP: Erosion Control Plan (WP0201500055) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved. C3.0 —Sediment trap design Elev. vs wet/dry storage —If table presents Vol. per 1' vertical interval, please clarify. It appears, for example, that Elev. 423.7' provides <43.4 cy storage, when it may provide < 80.4 cy. Please Add note or revise volume(cy) heading to indicate incremental storage (/1' interval). Revise values as necessary. (Rev. 1) Addressed. C3.1 —Revise ESC Legend, soil stabilization blanket =BM. (Rev. 1) Addressed. Engineering Review Comments Page 4 of 4 3. C3.1 —Label floor of sediment trap, plan view (16' X 52'). (Rev. 1) Partially addressed/misunderstanding. As follow-up: please add sediment trap floor dimensions to plan view: (16' X 52). (Rev. 2) Addressed. 4. C3.1 —Provide vegetative cover hardier than grass for proposed 2:1 slopes along SW edge of building. (ACDSM 8.A.2.); Ref Phase II. (Rev. 1) Addressed. 5. C3.1/C5.1 —Specify material (Eley. 42P to 424') to replace excavated material beneath bioretention since C3.1 stipulates removal to Elev. 421.00'. (Rev. 1) Addressed. 6. Show soil stockpile location, if any. (Rev. 1) Addressed. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Plan review staff are also available at 434-296-5832 (-x3069) should you have questions. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to request a pre -construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htt2://www.albemarle.ora/deptforms.asp?dgpartment=cdengmMo Thank you /434.296-5832 —x3069 WP0201500055_Branchlands MemCare_VSMP_022116rev2 pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review Project: Branchland Whistler House —VSMP Plat /Plan preparer: Craig Kotarski, Timmons Group 919 2' St. SE, Charlottesville, VA 22902 craig.kotarskiAtimmons.com Owner: Wial LLC, 12095 Gayton Rd, Richmond, VA 23238 [Graham Aldelman] Owner Rep: L. J. Lopez, Milestone Partners, 300 2nd St. NE, Charlottesville, VA 22920 llopezkmilestonepartners.co Plan received date: 24 Aug 2015 / e -plans (Rev. 1): 18 Nov 2015 / e -plans Date of comments: 8 Oct 2015 / e- review (Rev. 1): 15 Dec 2015 / e- review Reviewer: John Anderson A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Comments reference binder dated 22 -Jun 2015 — Recommend do not re- submit SWPPP until ESC /SWM plan comments addressed. SWPPP contains reduced -size ESC and SWM plans. 1. Sec. 1, Registration Statement — please sign/date. 2. Sec. 4,5 — Revise per comments. Recommend wait until ESCP /SWMP comments addressed. 3. Sec. 6 — Revise 11" x 17" PPP Exhibit: Relocate mortar mix/concrete washout so distant from future bioretention. Describe berm containment: impermeable heavy -mil linerNolume sufficient to contain stored fuel volume +10 %. Show solvent /paint /chemical storage. Add SF or similar downslope of temporary toilets. Show non - hazardous solid waste collection (dumpster) draining to ST, or equivalent. Show sediment basin or equivalent to capture wash waters. 4. Sec. 6.c. — Delete `No concrete washout shall occur on site.' 5. Sec. 6.c. — Delete `Existing basketball court to the north.' 6. Sec. 9 — Certification Statement: sign/date. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500055) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons provided in comments below. The stormwater management plan content requirements can be found in County Code section 17 -403 1. C0.0 — Revise Title: Branchlands Memory Care and Assisted Living, VSMP WPO201500055. (Rev. 1) Addressed. 2. Remove sheets C 1.0, C 1. 1, L -001. Please mark through sheet numbers in index. (Rev. 1) Addressed. 3. C3.1 — Revise IP @ Nyoplast overflow structure. Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. (Rev. 1) Addressed. Engineering Review Comments Page 2 of 5 4. C4.0/4.1 - Revise sheet titles to `Site Layout' or similar. A VSMP may not approve a site plan. (Rev. 1) Addressed. 5. C0.0 -Edit index. Ref. item #4. (Rev. 1) Addressed. 6. C4.1 -Label pipe structure #105. (Rev. 1) Addressed. 7. C4.1 -Label DI structure #108. (Rev. 1) Addressed. 8. C4.1 - Revise bottom of bioretention label to read floor elevation (or grade elevation) of bioretention. (Rev. 1) Addressed. 9. C4.1 -Label bioretention clean -out. Label bioretention overflow structure. (Rev. 1) Addressed. 10. LD -229: Storm Sewer Design Computations -in this (or separate table) list pipe structures # 109, 107. (Rev. 1) Addressed. It. C6.0 -Pipe Str. # 109 (6.83' of 15" HDPE), 107 (22.74' of 15" HDPE) @ 0.00% slope is problematic. Revise to provide positive slope at least 0.5 %. (Rev. 1) Addressed. 12. C4.1 -There appears to be no MH access to either ADS "Stormtech" System (Area to W), or 3 -line, 125' L 60" DIA storage system (Area to S). Provide manway access to each system. (Rev. 1) Addressed. 13. C4.1 - Provide notes, labels, or detail that shows how the two 50' lines of ADS system make connection, with particular emphasis on Access for maintenance. Ensure that each line is accessible. Provide same for 60" DIA, 125' L detention system (Area to S). All detention system lines must be accessible. Design should ensure debris accumulation will not block, back -up, or short- circuit either system. (Rev. 1) Addressed. 14. C4.1 - Provide new Str. #104 away from biofilter; use Std. MH. The biofilter 24" Nyoplast overflow structure (dome drain) will be upstream of this MH. The Nyoplast structure is ineligible as an inline storm system element. Organic debris is likely to collect at the base of the overflow structure. Any obstruction of the 24" (dome drain) overflow structure will compromise the entire Area to W storm runoff system. (Rev. 1) Addressed. 15. C5.1 - Recommend revise elevation of 4" perforated underdrain to 424.33' (biofilter). (Rev. 1) Addressed. 16. C5.0 or C5.1 -Add Note: Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. (Rev. 1) Addressed. 17. C5.0 or C5.1 - Provide bioretention planting schedule. (Rev. 1) Addressed. 18. C5.1 - Revise `bottom of biofilter 427.50' to read top of biofilter Mix. (Rev. 1) Addressed. 19. C5.1 -Label elevation/top of biofilter cleanout: set Elev. at least 4 -6" above 3" hardwood bark mulch. (Rev. 1) Addressed. 20. C5.1 -Label %slope of line between biofilter overflow structure and new MH (2% Min). Also, items #14, 29. (Rev. 1) Addressed. 21. C5.1 - Provide plan view, Str. #106. Plan view /design must provide means of clearing pipe #107 of debris. (Rev. 1) Addressed. 22. C5.1 -WEIR Plate in Str. 106 Detail -Show top of structure (top of weir /top of storage are shown). C6.0 shows Str. 106: MH -1 W/ WEIR PLATE, TOP = 430.04'. (Rev. 1) Partially addressed. Str. 106 Detail. Please review 10 yr -WSE which appears to be high/in wrong location. TOP OF STIR 106 TOP OF 4' WEIR 430.04 PLATE 426.70 TOP OF STORAGE 427.20 4.0' - - - - -Q 100YEARWSE 426.90 - - - - -- 1.01 --- - - - - -� 10 YEAR WSE 425.19 STEEL PLATE 2 YEAR WSE 5j5' 50, - - - -- - - - - - -- - Q- 423.38 I INV 423.ORIFICE 80 ELEV. 421.20 `3.0" ORIFICE INV 421.20 WEIR PLATE SECTION WEIR PLATE IN STIR 106 DETAIL Engineering Review Comments Page 3 of 5 23. C6.0 -Pipe #207, 205: Increase DIA to 15" Min. (Yard inlet system 12" DIA, is the exception). (Rev. 1) Addressed. 24. Revise LD -229 to reflect pipe DIA increase, item #23. (Rev. 1) Addressed. 25. C4.1 /C6.0 -It is unclear how Str. 112, listed as MH -1, functions. Str. is located in parking area that routes to UG Detention, but is not identified as a grate or DI. Confirm design; revise profile label as necessary. (Rev. 1) Addressed. 26. C6.0 -Str 204 -218 profile: Revise label to read INV IN 435.00 (213) (Rev. 1) Addressed. 27. Revise Str. 213 DIA to 15" Min; this leads from a standard VDOT DI to the 3 -line 60" DIA UG Detention system. (Rev. 1) Addressed. 28. C6.0 - Profile, Str. 200 -204: Label horizontal separation between steel plate weir wall and end wall of 60" CMP storage pipe. Consider maintenance, and design reasonable access to this space. With 1.0' Max clearance above the weir plate (rapidly diminishes since circular), it is likely not possible to access the downstream side of the weir plate in the 60" system, should need arise. (Rev. 1) Partially addressed. As follow-up: 60" system 6" orifice detail elevation inconsistent with profile elevation. Please revise. Image: STEELPLATEWEIR WALL 6.5 "ORIFICE 431.50 �' t1 6"ORIFICE BIOMI' 432.50 425 TOPWEIR 435.50 THEO 204; 60'CMP - , 29. ,O.0 - Revise prof le, qtr. I uu -< <u. erovioe Std. MH. Ret. Item #14, above. (Rev. 1) Addressed. TOP OF WEIR F STORAGE PLATE 435.50 TOP 43650 OF STORAGE [ "on N4p - - -- -- 100 YEAR W SE - -436.8 k4ff _______ _ g UM-WSE 435.06 �R 2 YEAR W n 43x.00 440 Ne20 8.0' ORROUND INV 433 ,6. E 44>>> R'rOzZ 2.6'Min CAVM = 4.0' 204: 60'CMP ELEV. 431.50 435 STORAGE PIPE TO ELEV. 436.50 6.5"ORIFICE BOTTOM ELEV. 431.50 INV 431.50 INV OUT 431.50 (203) WEIR PLATE SECTION 430 IN 60" SYSTEM STEELPLATEWEIR WALL 6.5 "ORIFICE 431.50 �' t1 6"ORIFICE BIOMI' 432.50 425 TOPWEIR 435.50 THEO 204; 60'CMP - , 29. ,O.0 - Revise prof le, qtr. I uu -< <u. erovioe Std. MH. Ret. Item #14, above. (Rev. 1) Addressed. Engineering Review Comments Page 4of5 30. C6.0 - Provide profile for line from biofilter overflow structure to New MH. -Also, item #29 (Rev. 1) Addressed. 31. C5.1 - Revise WEIR Plate in 60" System Detail. Show as circular (plate is circular). (Rev. 1) Addressed. 32. Provide documentation of purchase of nutrient credits: (Rev. 1) Acknowledged. E. Documentation of the applicant's acquisition of nutrient credits shall be provided to the VSMP authority and the Department in a certification from the credit provider documenting the number of phosphorus nutrient credits acquired and the associated ratio of nitrogen nutrient credits at the credit - generating entity. Until the effective date of regulations establishing application fees in accordance with § 62.1 - 44.19:20, the credit provider shall pay the Department a water quality enhancement fee equal to six percent of the amount paid by the applicant for the credits. Such fee shall be deposited into the Virginia Stormwater Management Fund established by § 62.1 - 44.15:29. 17 Nov 2015 Applicant comment response letter: "Nutrient credit pruchase documentationw will be provided closer to final approval." New 33. C6.0 - Provide /show Manway structures for StormTech and 60" CMP storage pipe systems in profile views. 34. C6.0 - Specify gauge (steel thickness) of 60" CMP storage pipe system and both weir plates, if not shown. C. VSMP: SWPPP: Erosion Control Plan (WPO201500055) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons provided in comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. C3.0 - Sediment trap design Elev. vs wet /dry storage -If table presents Vol. per V vertical interval, please clarify. It appears, for example, that Elev. 423.7' provides <43.4 cy storage, when it may provide < 80.4 cy. Please Add note or revise volume(cy) heading to indicate incremental storage (/1' interval). Revise values as necessary. (Rev. 1) Addressed. 2. C3.1 - Revise ESC Legend, soil stabilization blanket =13M. (Rev. 1) Addressed. 3. C3.1 -Label floor of sediment trap, plan view (16' x 52'). (Rev. 1) Partially addressed /misunderstanding. As follow -up: please add sediment trap floor dimensions to plan view: (16' x 52). 4. C3.1 - Provide vegetative cover hardier than grass for proposed 2:1 slopes along SW edge of building. (ACDSM 8.A.2.); Ref, Phase II. (Rev. 1) Addressed. 5. C3.IIC5.1 - Specify material (Elev. 42 P to 424') to replace excavated material beneath biorctention since C3.1 stipulates removal to Elev. 421.00'. (Rev. 1) Addressed. 6. Show soil stockpile location, if any. (Rev. 1) Addressed. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Plan review staff are also available at 434 - 296 -5832 (- x3069) should you have questions. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. Engineering Review Comments Page 5 of 5 After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htt2://www.albemarle.oriz/deptforms.asp?departrnent--cdengMTo Thank you /434.296 -5832 —0069 WPO201500055_Branchlands MemCare_VSMP_121515revl pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit plan review Project: Branchland Whistler House —VSMP Plat /Plan preparer: Craig Kotarski, Timmons Group 919 2' St. SE, Charlottesville, VA 22902 craig.kotarski(ctimmons.com Owner: Wial LLC, 12095 Gayton Rd, Richmond, VA 23238 [Graham Aldelman] Owner Rep: L. J. Lopez, Milestone Partners, 300 2nd St. NE, Charlottesville, VA 22920 llopezkmilestonepartners.com Plan received date: 24 Aug 2015 / e -plans Date of comments: 8 Oct 2015 / e- review Reviewer: John Anderson A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Comments reference binder dated 22 -Jun 2015 — Recommend do not re- submit SWPPP until ESC /SWM plan comments addressed. SWPPP contains reduced -size ESC and SWM plans. 1. Sec. 1, Registration Statement — please sign/date. 2. Sec. 4,5 — Revise per comments. Recommend wait until ESCP /SWMP comments addressed. 3. Sec. 6 — Revise 11" x 17" PPP Exhibit: Relocate mortar mix/concrete washout so distant from future bioretention. Describe berm containment: impermeable heavy -mil linerNolume sufficient to contain stored fuel volume +10 %. Show solvent /paint/chemical storage. Add SF or similar downslope of temporary toilets. Show non - hazardous solid waste collection (dumpster) draining to ST, or equivalent. Show sediment basin or equivalent to capture wash waters. 4. Sec. 6.c. — Delete `No concrete washout shall occur on site.' 5. Sec. 6.c. — Delete `Existing basketball court to the north.' 6. Sec. 9 — Certification Statement: sign/date. B. VSMP: SWPPP: Stormwater Management Plan (WP0201500055) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons provided in comments below. The stormwater management plan content requirements can be found in County Code section 17 -403 1. C0.0 — Revise Title: Branchlands Memory Care and Assisted Living, VSMP WPO201500055 2. Remove sheets C1.0, C1.1, L -001. Please mark through sheet numbers in index. 3. C3.1 — Revise IP @ Nyoplast overflow structure. Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. 4. C4.0/4.1 — Revise sheet titles to `Site Layout' or similar. A VSMP may not approve a site plan. 5. C0.0 —Edit index. Ref. item #4. 6. C4.1 —Label pipe structure #105. 7. C4.1 —Label DI structure #108. Engineering Review Comments Page 2 of 5 8. C4.1 - Revise bottom of bioretention label to read floor elevation (or grade elevation) of bioretention. 9. C4.1 -Label bioretention clean -out. Label bioretention overflow structure. 10. LD -229: Storm Sewer Design Computations -in this (or separate table) list pipe structures # 109, 107. 11. C6.0 -Pipe Str. # 109 (6.83' of 15" HDPE), 107 (22.74' of 15" HDPE) @ 0.00% slope is problematic. Revise to provide positive slope at least 0.5 %. 12. C4.1 -There appears to be no MH access to either ADS "Stormtech" System (Area to W), or 3 -line, 125' L 60" DIA storage system (Area to S). Provide manway access to each system. 13. C4.1 - Provide notes, labels, or detail that shows how the two 50' lines of ADS system make connection, with particular emphasis on Access for maintenance. Ensure that each line is accessible. Provide same for 60" DIA, 125' L detention system (Area to S). All detention system lines must be accessible. Design should ensure debris accumulation will not block, back -up, or short- circuit either system. 14. C4.1 - Provide new Str. #104 away from biofilter; use Std. MH. The biofilter 24" Nyoplast overflow structure (dome drain) will be upstream of this MH. The Nyoplast structure is ineligible as an inline storm system element. Organic debris is likely to collect at the base of the overflow structure. Any obstruction of the 24" (dome drain) overflow structure will compromise the entire Area to W storm runoff system. 15. C5.1 - Recommend revise elevation of 4" perforated underdrain to 424.33' (biofilter). 16. C5.0 or C5.1 -Add Note: Bioretention may not be installed until all upslope areas are stabilized. IP will not be required for bioretention overflow structure. 17. C5.0 or C5.1 - Provide bioretention planting schedule. 18. C5.1 - Revise `bottom of biofilter 427.50' to read top of biofilter Mix. 19. C5.1 -Label elevation/top of biofilter cleanout: set Elev. at least 4 -6" above 3" hardwood bark mulch. 20. C5.1 -Label %slope of line between biofilter overflow structure and new MH (2% Min). Also, items #14, 29. 21. C5.1 - Provide plan view, Str. #106. Plan view /design must provide means of clearing pipe #107 of debris. 22. C5.1 -WEIR Plate in Str. 106 Detail -Show top of structure (top of weir /top of storage are shown). C6.0 shows Str. 106: MH -1 W/ WEIR PLATE, TOP = 430.04'. 23. C6.0 -Pipe #207, 205: Increase DIA to 15" Min. (Yard inlet system 12" DIA, is the exception). 24. Revise LD -229 to reflect pipe DIA increase, item #23. 25. C4.IIC6.0 -It is unclear how Str. 112, listed as MH -1, functions. Str. is located in parking area that routes to UG Detention, but is not identified as a grate or DI. Confirm design; revise profile label as necessary. 26. C6.0 -Str 204 -218 profile: Revise label to read INV IN 435.00 (213) PROP. GRADE 204: 60" CMP STORAGE PIPE TOP ELEV. 436.50 BOTTOM ELEV. 431.50 INV IN 435.00 (215) 2w1 OF ?1� �6 COQ 4� 57 6HA- Cpl, ° GROUND -213 8.63' OF ti 4: 12" HDPE \ @ 2.32% 27. Revise Str. 213 DIA to 15" Min; this leads from a standard VDOT DI to the 3 -line 60" DIA UG Detention system. 28. C6.0 - Profile, Str. 200 -204: Label horizontal separation between steel plate weir wall and end wall of 60" CMP storage pipe. Consider maintenance, and design reasonable access to this space. With 1.0' Max Engineering Review Comments Page 3 of 5 clearance above the weir plate (rapidly diminishes since circular), it is likely not possiblc to access the downstream side of the weir plate in the 60" system, should need arise. 29. C6.0 - Revise profile, Str. 100 -110. Provide Std. MH. Ref. item #14, above. 30. C6.0 - Provide profile for line from biofilter overflow structure to New MH. -Also, item #29 31. C5.1 - Revise WEIR Plate in 60" System Detail. Show as circular (plate is circular). 32. Provide documentation of purchase of nutrient credits: E. Documentation of the applicant's acquisition of nutrient credits shall be provided to the VSMP authority and the Department in a certification from the credit provider documenting the number of phosphorus nutrient credits acquired and the associated ratio of nitrogen nutrient credits at the credit - generating entity. Until the effective date of regulations establishing application fees in accordance with § 62.1- 44.19:20, the credit provider shall pay the Department a water quality enhancement fee equal to six percent of the amount paid by the applicant for the credits. Such fee shall be deposited into the Virginia Stormwater Management Fund established by § 62.1 - 44.15:29. C. VSMP: SWPPP: Erosion Control Plan (WP0201500055) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons provided in comments below. The erosion control plan content requirements can be found in County Code section 17 -402. 1. C3.0 - Sediment trap design Elev. vs wet/dry storage -If table presents Vol. per P vertical interval, please clarify. It appears, for example, that Elev. 423.7' provides <43.4 cy storage, when it may provide < 80.4 cy. Please Add note or revise volume(cy) heading to indicate incremental storage ( /1' interval). Revise values as necessary. 2. C3.1 - Revise ESC Legend, soil stabilization blanket =BM. 3. C3.1 -Label floor of sediment trap, plan view (16' x 52') 4. C3.1 - Provide vegetative cover hardier than grass for proposed 2:1 slopes along SW edge of building. (ACDSM 8.A.2.); Ref. Phase II. 5. C3.1 /C5.1 - Specify material (Elev. 421' to 424') to replace excavated material beneath bioretention since C3.1 stipulates removal to Elev. 421.00'. Sediment Trap design drainage area (acres) ( <3) 0.91 trap volumes: CREST OF STONE WEIR p"'BLE" elevation (ft) area (sf) .ulume(cy) N0 ILI 422 859 423 1139 370 ORYSTORAGE t Yv vnF 424 1203 43.4 425 1385 47 9 426 1573 wEr STORAGE (F%GV FID) nhR aorN cRaiao wet storage: ILI 1 cmRSC wwccn*s� clus c Rrwa wet storage required (cy) (67TDA) 61 0 bottom of stone weir (ft) 4237 wet storage provided at this elevation (cy) 63.0 . "coarse aggregate shall be VDOT #3, #357 of #5 slope of wet storage sides 1:1 weir length (ft) (6x DA) 15.0 dry storage: bottom of trap elevation (ft) 422 dry storage required (cy) (67'DA) 61.0 bottom trap dimensions: 1052' crest of stone weir 425.0 top of dam elevation (ft) 426 dry storage provided at this elevation (cy) 61.0 top width of dam (ft) 2 slope of dry storage sides 1:1 top trap dimensions 185176' 2. C3.1 - Revise ESC Legend, soil stabilization blanket =BM. 3. C3.1 -Label floor of sediment trap, plan view (16' x 52') 4. C3.1 - Provide vegetative cover hardier than grass for proposed 2:1 slopes along SW edge of building. (ACDSM 8.A.2.); Ref. Phase II. 5. C3.1 /C5.1 - Specify material (Elev. 421' to 424') to replace excavated material beneath bioretention since C3.1 stipulates removal to Elev. 421.00'. Engineering Review Comments Page 4of5 EXCAVATE AND REMOVE SOIL TQ AN, ELEVATION OF 421.00 IN ALL AREAS WHERE SEDIMENT TRAP FOOTPRINT OVERLAPS BIORET ENTION FOOTPRINT BEFORE..INSTALLING BI ORETE�ITJQN , � MU , ITS aF ' A f , CLEAPM,G cj PS Al D G AIDING /03 � , 6. Show soil stockpile location, if any. Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to discuss this review. Plan review staff are also available at 434 - 296 -5832 (- x3069) should you have questions. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforins.asp?department=cdengmTo Thank you /434.296 -5832 —x3069 Engineering Review Comments Page 5 of 5 WPO201500055_Branchlands MemCare_VSMP_100815