HomeMy WebLinkAboutWPO201400008 Correspondence 2014-07-07 July 7, 2014
Mr. Glenn Brooks
County of Albemarle
Department of Planning and
Community Development
401 McIntire Road
Charlottesville, VA 22902-4596
Re: E&S and Stormwater
Management Plan Resubmittal
WPO# 2014-00008
Crozet WTP
Dear Mr. Brooks:
The Rivanna Water and Sewer Authority (RWSA) is proposing an addition to their
previously approved site plan, SDP 1999-00043 for the Crozet Water Treatment Plant
(WTP). As such, we have resubmitted WPO Plan #2014-0004 for review on May 14,
2014, and received approval back from the county on June 13, 2014.
Please find attached two (2) copies of the approved WPO plan for your use. Please do
not hesitate to contact me should you require any additional information or have any
questions.
Sincerely,
HAZEN AND SAWYER, P.C.
Bret T. Edwards, PE
Principal Engineer
Attachments 64j
Michelle Roberge
To: Edwards, Bret
Subject: FW: E2_wpo_CrozetGAC
Hi Bret,
I also need two more signed copies of plan prior to the pre-con so that I can stamp as approved.
-Michelle Roberge
From: Michelle Roberge
Sent: Wednesday, June 18, 2014 2:07 PM
To: 'Edwards, Bret'
Subject: E2_wpo_CrozetGAC
Hello Bret,
Please see my letter below.
E2_wpo_CrozetGA
C.pdf
-Michelle Roberge
Michelle Roberge
Department of Community Development
County of Albemarle,Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3458
1
HAZEN AND SAWYER Hazen and Sawyer,P.C.
4011 WestChase Blvd.
Environmental Engineers & Scientists Suite Soo
Raleigh,NC 27607
(919)833-7152
(919)833-1828(Fax)
May 14, 2014
Mr. Glenn Brooks
County of Albemarle
Department of Planning and
Community Development
401 McIntire Road
Charlottesville, VA 22902-4596
Re: E&S and Stormwater
Management Plan Resubmittal
WPO # 2014-00009
Crozet WTP
Dear Mr. Brooks:
The Rivanna Water and Sewer Authority (RWSA) is proposing an addition to their
previously approved site plan, SDP 1999-00043 for the Crozet Water Treatment Plant
(WTP). As such, we have submitted WPO Plan #2014-00009 for review on February 12,
2014, and received comments back from the county on March 24, 2014. We hereby
offer resubmittal of the WPO plan for the Crozet WTP additions for your review.
The improvements included in this amendment consist of the construction of a new
granular activated carbon (GAC) facility and improvements to existing roadway and
sidewalk. Minor grading will also take place, but for the most part the new GAC facility
and associated roadway will be constructed closely to existing grade.
Please find attached two (2) copies of modified drawings illustrating the additional work
to the Crozet WTP, a revised narrative with supporting documents and calculations, a
WPO application, the response to comments, and the associated $600 review fee
check. Please do not hesitate to contact me should you require any additional
information or have any questions.
Sincerely,
HAZEN AND SAWYER, P.C.
Bret T. Edwards, PE
Principal Engineer
Attachments
www.hazenandsawyer.com
Michelle Roberge
From: Michelle Roberge
Sent: Wednesday, April 16, 2014 5:03 PM
To: 'Edwards, Bret'
Cc: Ellie Ray
Subject: RE: SDP201400014 Crozet Water Treatment Plant- Major
Hello Bret,
I hope this answers all your questions from the meeting.
1) Gravel pavement—This will be ok, but you need to submit a justification letter to the County Engineer, Glenn
Brooks,to waive Section 14.12.15 (a)and (g).
2) WPO buffer-The buffer is incorrect and a mitigation plan will not be required.
3) Travel aisle—The 12'wide travelway will need to be increased to 20' per 4.12.17 (c).
4) As part of MS-19,adequate channels should be shown with easements through neighboring properties.
5) If a letter granting authority to develop the parcel is submitted,Glenn Brooks will send to the County Attorney
for review.The County Attorney will let us know if the letter will suffice for the SWM agreements and bonds.
Also, I recommend submitting a circulation path for the entire site.
-Michelle Roberge
From: Ellie Ray
Sent: Friday, April 11, 2014 1:39 PM
To: Edwards, Bret
Cc: Michelle Roberge
Subject: SDP201400014 Crozet Water Treatment Plant- Major
Bret,
I wanted to follow up on some of the outstanding issues discussed in yesterday's SRC meeting,so here's is what I've
found so far:
1. I just sent Fire Rescue comments; I believe that should be the last of all potential reviewers.
2. The underground water meter vault is not subject to building setbacks, but will need to be outside of the
undisturbed buffer area.
3. Michelle will send information about, 1)WPO buffer(whether it's shown correctly in GIS),2)Whether waivers
will be needed for gravel versus asphalt and no curbing,and 3) If the letter granting authority to develop the
parcel gives signatory authority for WPO related documents.
I think this covers the remaining questions, please let me know if I've neglected anything.
Thanks,
Ellie Carter Ray, PLA
Senior Planner
Albemarle County Community Development
Planning Division
401 McIntire Road, North Wing
Charlottesville,Virginia 22902
ph: 434.296.5832 x. 3432
fax: 434.972.4126
1
February 7, 2014
Mr. Glenn Brooks
County of Albemarle
Department of Planning and
Community Development
401 McIntire Road
Charlottesville, VA 22902-4596
Re: E&S Plan
Stormwater Management Plan
Crozet WTP
Dear Mr. Brooks:
The Rivanna Water and Sewer Authority is proposing an addition to their previously
approved site plan, SDP 1999-00043. As such, we offer for review an erosion and
sediment control plan and a stormwater management plan for the Crozet Water
Treatment Plant (WTP) additions.
The improvements of this amendment include the construction of a new granular
activated carbon (GAC) facility. In addition to the proposed facility, improvements to
existing roadway and sidewalk will be included in this amendment. Minor grading will
also take place, but for the most part the new GAC facility and associated roadway will
be constructed closely to existing grade.
Please find attached two (2) copies of drawings illustrating the additional work to the
Crozet WTP, a descriptive narrative with supporting documents and calculations, an
erosion and sediment control application, and a stormwater management plan
application, and the associated $450 review fee check. Please do not hesitate to
contact me should you require any additional information or have any questions.
Sincerely,
HAZEN AND SAWYER, P.C.
Bret T. Edwards, PE
Pr cipal Engineer
Attachments