HomeMy WebLinkAboutWPO201700005 Review Comments WPO VSMP 2017-02-17�RCl,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Timberland Park Apartments
Project file number: WP0201700005
Plan preparer: Balzer & Associates [dodonohue@balzer.cc]
Owner or rep.: Timberland Park VA LLC Densurber@surberdev.com]
Plan received date: 20 Jan 2017
Date of comments: 17 Feb 2017
Reviewers: Emily Cox
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please update any E&S or SWM sheets if changes are made with the next submission.
2. Ensure that the offsite disposal area is added to the SWPPP.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. PPP appears satisfactory at this time.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Detention pipe is located offsite. Please show the agreement that allows this or move the pipe on
the property. Also, if these pipes convey offsite water, they will need to be in an easement.
2. Grading occurs offsite in the NE corner. Please show the agreement or temporary easement that
allows this proposed grading.
3. Level 2 bioretention requires 2 forms of pre-treatment. Please illustrate the 2 forms being used.
4. Provide infiltration test results or underdrain in BMP #2.
5. Please provide maintenance requirements for detention pipe on the plan to include annual
inspections, cleanings and necessary repairs.
6. The actual Q Dev on PDF page 51 was whited out. Please correct so the number is shown.
Engineering Review Comments
Page 2 of 3
7. Provide summary/narrative on plan sheet that describes compliance with water quality and
quantity requirement (show pre vs post quantity and phosphorus removal required vs achieved
quality). Supporting calculations can remain in the provided SWM report.
8. Provide an easement around the BMP facilities that includes access for maintenance.
9. Please ensure that water drains away from the buildings. Provide spot elevations in the graded
ditches. Show that these graded ditches will not erode over time.
10. Provide detail for PG-4 flume and show the proposed flow/velocity vs. its capacity.
11. Show equations used for inlet calculations or use standard VDOT Appendix 9B-1 LD-204
Stormwater Inlet Computations.
12. Ensure that drainage in the southern corner of the site does not runoff into neighboring properties.
It should be directed to the point of analysis 2 on site.
13. A Stormwater Management (SWM) Maintenance Agreement and a SWM Easement Plat with a
SWM Deed of Dedication will be needed before the VSMP plan can be approved. Please contact
Ana Kilmer to begin the process of completing the Maintenance Agreement. The application for
an easement plat can be found here:
http://www.albemarle.org/upload/images/fonns_center/departments/Community Development/for
ms/applications/Easement_ Plat _&_Checklist.pdf. The fee for the easement plat will be the one
shown for the easement plat required with a site plan. We recommend you begin this process as
soon as possible.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Please provide a separate existing conditions sheet and ESC Phase 1 sheet. Insert the ESC Phase I
sheet with the other ESC sheets of the plan set.
2. Please remove all "field observed steep slopes". Only the steep slopes from the County GIS
should be shown.
3. Show a wash rack on plans with the construction entrance. Ensure that water from wash rack is
directed to the sediment trap.
4. A paved construction entrance is required for this site. Gravel will not be allowed. Please note
this on the plans.
5. Show dust control and temporary seeding on ESC Phase 1. It is currently only shown on Phase 2.
6. Show the stockpile, concrete washout, staging area, etc. on Phase 1 as well as Phase 2.
7. Please explain why RWD diversion was used in the NW corner of the site. There does not appear
to be a road or travel way.
8. It appears the required outlet protection on structure 13 will be offsite. Please obtain/provide a
temporary access easement/agreement.
9. Ensure that grading/construction of retaining wall in the NW corner of the site does not encroach
on the steep slopes.
10. Please label and darken the contours for the proposed sediment traps.
11. Show OP symbol at structure 13 Out.
12. The landscape plan shows proposed trees outside of the limits of disturbance and in the steep
slopes in the NW corner. Please remove.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
Engineering Review Comments
Page 3 of 3
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hLtp://www.albemarle.org/deptfonns.asp?department=cdengMTo
File: E1_vsmp_review projectname.doc