RE: WPO201700011 Meade Builders Office Building - VSMP Permit Plan
Dear Mr. Jocz,
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
Please find attached two (2) copies of the revised Plans. The plans have been revised to
address your comments received on 10/12/2017 in accordance with the following:
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
Width of SWM easement inadequate. Easement must beat least 30' in width *15' wide
structure @ 9' depth max + 1' access on each side of the outer pipes, with 1:1 slopes
from top pipe to final grade level (6')).
Response: We have moved the pipe that is closest to the retainin all to the other side
of the storm structure to provide a 30' easement exclusiveof tIt
etaining wall. Across
section of the storm sewer system has been added to SW10. 7101lu
2. Plase amend the label for the stormwater facility easement to sttate"New variable width
SWM Facility Easment".
Response: The label for the stormwater facility
easement has been amended as
requested. 01,6,1 lw5 40 6 &*Jtey l-/ pled R 12A'--
3. 0.55 lbs of Offsite Phosphorous Credit will need to be purchased prior to final VSMP
approval.
Response: 0.55 lbs of Offsite Phosphorous Credit will be purchased once all technical
comments have been addressed and prior to final VSMP approval from a Nutrient Credit
Bank in or adjacent to the Hydrologic Unit Code as the development in the same
watershed.
1 of 2
�s
,e%
e %S
c ° Dominion
Engineering
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
5. VSMP approval must occur prior to major site plan amendment approval -
Acknowledged. n�
Response: Comment Noted. of
We thank you for taking the time to review these plans and trust the above adequately
addresses your comments. However, please let me know if you have any questions or require
additional information.
Very truly
Michel Myers, PE, CFM
Cc: Charlie Armstrong
6 of 6
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Meade Builders Office Building
Project file number: WP0201700011
Plan preparer: Dustin Greene, Dominion Engineering
[dgreene@dominionemg. com]
Owner or rep.: Charlie Armstrong, Ballif Investments, LLC
[CharlesA@southern-development. com]
Plan received date: Rev 1 — 6 Feb. 2017
Rev 2
— 20 August 2017
Rev 3 — 8 September 2017
Date of comments: Rev 1 —
21 Feb. 2017
Rev 2 —12
September 2017
Rev 3 —
28 September 2017
Reviewers: Rev 1 —
Bobby Jocz
Rev 2 —
Bobby Jocz
Rev 3 —
Bobby Jocz
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is Approved
contingent on purchase of 0.55 lbs of Nutrient Credits and recordation of deed of
dedication/easement. The rationale is given in the comments below. The application may be
resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP
application content requirements can be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. [General] Confirm accurate existing topography is provided. All topography should be at least
visually field verified by the designer within the last year.
Rev 2 — Addressed.
2. [General] Display extent of 100yr floodplain and WPO buffer {County Code 17-403(8)1.
Rev 2 — Addressed.
3. [General] Plans show construction/grading occurring on the adjacent parcel. Please include these
parcels and owner's signature on future submittals, or obtain temporary construction easement.
Rev 2 — Addressed.
4. [SWPPP] Provide copy of DEQ coverage letter when obtained {County Code 17-405}.
Rev 2 — Acknowledged.
5. [SWPPP] Correct Table of Contents to reflect section headings in document. The SWPPP seems
to be missing section 5 "Stormwater Management Plan", replacing it as the "Pollution Prevention
Plan".
Rev 2 — Addressed.
6. [SWPPP]The approved SWM plan will need to be included within the SWPPP when plans are
Engineering Review Comments
Page 2 of 4
ready to be approved {County Code 17-4051.
Rev 2 — Acknowledged.
7. [SWPPP]The approved Erosion and Sediment Control Plan will need to be included within the
SWPPP when plans are ready to be approved {County Code 17-405}.
Rev 2 - Acknowledged.
8. [SWI ] Update plan sheets and SWPPP with current WPO submittal number [WP0201700011 ]
Rev 2 — Addressed.
9. [SW5] Separate the SWM plan and E&S Phase II details on sheet SW5. The SWM plan should
have its own sheet.
Rev 2 — Addressed.
10. [SW6] Remove the "Frame Shed" diagram located over the parking lot on the southeastern portion
of the site. According to plans this will already be demolished.
Rev 2 — Addressed.
11. [SW8] Level spreader detail should be included as SWM detail, not on E&S detail sheet.
Rev 2 — Addressed.
12. [All] Please more clearly label proposed and existing contour elevations.
Rev 2 — addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. [SWPPP] Provide a Pollution Prevention Plan exhibit outlining expected locations of construction
staging, parking areas, expected pollutant sources and pollution prevention practices.
Rev 2 — Addressed on plan sheet SW3 which is included in SWPPP.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is Approved contingent on purchase of 0.55 lbs of Nutrient Credits and
recordation of deed of dedication/easement, and the reasons are provided in the comments
below. The stormwater management plan content requirements can be found in County Code
section 17-403.
1. [General] A stormwater management maintenance agreement, along with deed and plat for
stormwater management easements encompassing both the proposed conserved forest and open
space and the underground stormwater management facility, must be recorded prior to final VSMP
approval. Contact Ana Kilmer, Management Analyst II, at (434) 296-5832 ex. 3246 for more
information regarding the Stormwater Management Agreement.
Rev 2 — Acknowledged. Easements/agreement under review.
Rev 3 — SWM agreement recorded, Deed and PLAT under review
2. [General] Provide Pre -development dra...-, , _as.
Rev 2 — Addressed.
3. [SW7] Please verify the correct drainage areas are represented in the VRRM spreadsheet.
According to E&S narrative and presented drainage areas only 0.29 Ac will be protected as
conserved forest and open space; however, this area is indicated as being 0.32 acres on the VRRM
spreadsheet.
Rev 2 — Addressed.
4. [SW7] Junction box and outlet structure details (diagrams 1&2) do not match what is presented on
the structure profile and subsequent calculations. Please correct.
Rev 2 — Addressed.
5. [SW7] Include long term maintenance notes for conserved forest and open space, level spreader,
and underground stormwater management facility on plan sheet.
Rev 2 — Addressed.
Engineering Review Comments
Page 3 of 4
6. [All] The SWPPP and plan sheets indicate that water quality requirements will be met through
conservation of conserved open space; however, the E&S narrative and hydrologic/hydraulic
calculation packet state that water quality requirements will be met through the purchase of offsite
nutrient management credits. Please clarify how 0.471b/yr of phosphorous removal will be
accounted for on site.
Rev 2 — Clarified. Water quality with be addressed through the purchase of offsite water
quality credits.
7. [Level Spreader] The level spreader appears to discharge water outside the parcel into areas not
able to be included as conserved open space due to the lands not being owned by the parcel holder.
The level spreader must discharge into areas that can be conserved as open space. Please correct or
provide justification.
Rev 2 — Withdrawn, forest and open space no longer used to meet water quality
requirements.
8. [Level Spreader] The water authority must approve construction of stormwater features over water
and sanitary sewer easements.
Rev 2 — VSMP approval occurs prior to site plan approval. Please provide documentation of
correspondence so that VSMP plan can be approved.
Rev 3 - Acknowledged
Additional Rev 2 Comments:
With of SWM easement inadequate. Easement must be at least 30' in width (15' wide
structure @ 9' depth max + V access on each side of the outer pipes, with 1:1 slopes from
top of pipe to final grade level (6')).
Rev 3 — Addressed.
2. Please amend the label for the stormwater facility easement to state "New variable width
SWM Facility Easement"
Rev 3 - Addressed
3. 0.55 lbs of Offsite Phosphorous Credit will need to be purchased prior to final VSMP
approval.
Rev 3 — Acknowledged. Water quality credits to be purchased once all technical comments
are addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. [Sequence of constructioiij indicate when demolition and initial grading activities will be
occurring.
Rev 2 — Addressed
2. [Section B 11 of E&S narrative] Maintenance schedule task #7 states removal of controls is
contingent on approval of "city" E&S inspector. Please change this to "County E&S Inspector".
Rev 2 — Addressed
3. [SW4 & SW5] Silt fence should be added along the southeast edge of the site.
Rev 2 — Addressed
4. [SW8] Provide tree protection detail as specified in E&S plan.
Rev 2 — Addressed
Engineering Review Comments
Page 4 of 4
Additional Rev 2 Comments:
1. Include all curbing/parking lot areas to be demolished for connection to adjacent parcel in
demo plan.
Rev 3 — Addressed.
2. Provide drop inlet protection detail such as Block and gravel Sediment Filter or other
method. Currently curb inlet protection detail is included, when no curb inlets are to exist
on site.
Rev 3 - Addressed.
3. Ensure Phase II perimeter controls do not conflict installation of SWM facility.
Rev 3 — Addressed.
For final submittal please provide 4 copies of the plans with 2 copies of the SWPPP and 1 copy of
the final calculations booklet with a completed application form. Ensure calculations booklet and
SWPPP are signed and sealed by P.E.
Process;
After approval, plans will need to be bonded. The County's Management Analyst will prepare bond
agreement forms, which will need to be completed by the owner and submitted along with cash,
certificates or sureties for the amounts specified. The agreements will need to be approved and signed by
the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures
and forms.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
Bobby Jocz, EIT
Civil Engineer I
County of Albemarle
Department of Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext: 3283
www.Albemarle.org
�5
Dominion
Engineering
September 18, 2017
Mr. Bobby Jocz
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
172 South Pantops Drive
Charlottesville, VA 22911
RE: WPO201700011 Meade Builders Office Building — VSMP Permit Plan
Dear Mr. Jocz,
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
Please find attached two (2) copies of the revised Plans. The plans have been revised to
address your comments received on 02/21/2017 in accordance with the following:
A. Stormwater Pollution Prevention Plan (SWPPP)
[General] Confirm accurate existing topography is provided. All topography
should be at least visually field verified by the designer within the last year.
Response: The topography was field verified by Dominion Engineering and Design, LLC
on March 9th, 2017. The note on Sheet SW2 has been updated accordingly.
2. [General] Display extent of 1 00yr floodplain and WPO buffer (County Code 17-403(8)).
Response: The 100yr floodplain and the WPO buffer lines have been added to the plan
sheets
3. [General] Plans show construction/grading occurring on the adjacent parcel. Please
include these parcels and owner's signature on future submittals, or obtain temporary
construction easement.
Response: As noted on the plan, TMP 78-15C2 and TMP 78-15C3 are both owned by Ballif
Investments, LLC. We have added a temporary construction easement to be executed by
the owners.
4. [SWPPP] Provide copy of DEQ coverage letter when obtained (County Code 17-4051.
Response: Acknowledged
5. [SWPPP] Correct Table of Contents to reflect section headings in document. The
SWPPP seems to be missing section 5 "Stormwater Management Plan", replacing it as
the "Pollution Prevention Plan".
Response: The section headings have been corrected.
I of 5
�s
ce o
��..,rs Dominion
�? Engineering
0
s
s
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
6. [SWPPP] The approved SWM plan will need to be included within the SWPPP when
plans are ready to be approved (County Code 17-405).
Response: Acknowledged.
7. [SWPPP] The approved Erosion and Sediment Control Plan will need to be included
within the SWPPP when plans are ready to be approved (County Code 17-405}.
Response: Acknowledged.
8. [SW1] Update plan sheets and SWPPP with current WPO submittal number
[WP0201700011 ].
Response: The VSMP cover sheet and the SWPPP have been updated.
9. [SW5] Separate the SWM plan and E&S Phase II details on sheet SW5. The SWM plan
should have its own sheet.
Response: A detailed SWM detail showing grading and spot elevations have been added
to sheet SW5. We have created separate sheets for the SWM details and E&S details.
10. [SW6] Remove the "Frame Shed" diagram located over the parking lot on the
southeastern portion of the site. According to plans this will already be
demolished.
Response: The frame shed diagram has been removed from sheet SW6.
11. [SW8] Level spreader detail should be included as SWM detail, not on E&S
detail sheet.
Response: The level spreader detail has been moved to Sheet SW9.
12. [All] Please more clearly label proposed and existing contour elevations.
Response: Existing and proposed contour elevations have been labeled more clearly.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
[SWPPP] Provide a Pollution Prevention Plan exhibit outlining expected locations of
construction staging, parking areas, expected pollutant sources and pollution prevention
practices.
2 of 5
�5
CMZ ���5
Dominion
Engineering
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
Response: The Pollution Prevention Plan has been updated to include the PPP exhibit
showing the required elements.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
[General] A stormwater management maintenance agreement, along with deed and plat
for stormwater management easements encompassing both the proposed conserved
forest and open space and the underground stormwater management facility, must be
recorded prior to final VSMP approval. Contact Ana Kilmer, Management Analyst II, at
(434) 296-5832 ex. 3246 for more information regarding the Stormwater Management
Agreement.
Response: A stormwater management maintenance agreement will be provided under
separate cover. Easements will be recorded prior to VSMP approval.
[General] Provide Pre -development drainage areas.
Response: Pre -Development areas have been added to sheet SW6 and SW7.
[SW7] Please verify the correct drainage areas are represented in the VRRM
spreadsheet. According to E&S narrative and presented drainage areas only 0.29 Ac will
be protected as conserved forest and open space; however, this area is indicated as
being 0.32 acres on the VRRM spreadsheet.
Response: The areas have been updated to show 0.29 Acres.
4. [SW7] Junction box and outlet structure details (diagrams 1 &2) do not match what is
presented on the structure profile and subsequent calculations. Please correct.
Response: The outlet structure details have been updated and matched on all pertinent
sheets.
[SW7] Include long term maintenance notes for conserved forest and open space, level
spreader, and underground stormwater management facility on plan sheet.
Response: The maintenance notes have been added to cover sheet SWI. Please note
that the applicant is not using conserved open space to meet water quality because the
slope in this area is above the maximum allowable in the DEQ specifications.
3 of 5
�s
ce ops
Dominion
Engineering
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
[All] The SWPPP and plan sheets indicate that water quality requirements will be met
through conservation of conserved open space; however, the E&S narrative and
hydrologic/hydraulic calculation packet state that water quality requirements will be met
through the purchase of offsite nutrient management credits. Please clarify how 0.47
Ib/yr of phosphorous removal will be accounted for on site.
Response: The applicant has chosen to purchase offsite credits to satisfy the water
quality portion of the VRRM. The SWPPP plan sheets have been updated to
reflect this. Please also refer to response to comment #5.
7. [Level Spreader] The level spreader appears to discharge water outside the parcel into
areas not able to be included as conserved open space due to the lands not being owned
by the parcel holder. The level spreader must discharge into areas that can be conserved
as open space. Please correct or provide justification.
Response: We are not claiming any Water Quality credits for outflow the level spreader.
The level spreader does not have to discharge on to conserved open space, as it is being
used to mimic pre -development conditions at the current site outfall.
8. [Level Spreader] The water authority must approve construction of stormwater features
over water and sanitary sewer easements.
Response: The ACSA has approved the level spreader in discussions. ACSA approval
will be provided prior to Site Plan approval.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 require the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. [Sequence of construction] Indicate when demolition and initial grading activities will be
occurring. *
Response: The sequence has been updated. Demolition activities are expected
to begin 10/1/17.
2. [Section 1311 of E&S narrative] Maintenance schedule task #7 states removal of
controls is contingent on approval of "city" E&S inspector. Please change this to
"County E&S Inspector". t /
Ott"/
�
Response: The sequence has been updated.
[SW4 & SW51 Silt fence should be added along the southeast edge of the site
4 of 5 A PJ
cs
e ois
Dominion
Engineering
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
Response: A silt fence has been added to the Southeast edge of the property. ► I
4. [SW8] Provide tree protection detail as specified in E&S plan.
Response: A tree protection detail has been added to sheet SW8. oYv
We thank you for taking the time to review these plans and trust the above adequately
addresses your comments. However, please let me know if you have any questions or require
additional information.
Very
Michllyers, PE, CFM
Charlie Armstrong
5 of 5
�5
Oz's
Dominion
y Engineering
172 South Pantops Drive
Charlottesville, VA 22911
434.979.8121 (p)
434.979.1681 (f)
DominionEng.com
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 require the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
Include all curbing/parking lot areas to be demolished for connection to adjacent parcel in
demo plan.
Response: All curbing/parking lot areas to be demolished have been added to
the demo plan.
2. Provide drop inlet protection detail such as Block and gravel Sediment Filter or other
method. Currently curb inlet protection detail is included, when no curb inlets are to
exist on site.
Response: Drop inlet protection detail has been added to sheet SW8.
3. Ensure Phase II perimeter controls do not conflict installation of SWM facility.
Response: Phase II perimeter controls have been adjusted to not conflict with the
installation of SWM Facility.
We thank you for taking the time to review these plans and trust the above adequately
addresses your comments. However, please let me know if you have any questions or require
additional information.
Cc' Charlie Armstrong
2 of 2
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Meade Builders Office Building
Project file number: WP0201700011
Plan preparer:
Dustin Greene, Dominion Engineering
[dgreene@dominionemg.com]
Owner or rep.:
Charlie Armstrong, Ballif Investments, LLC
[CharlesA@southern-development.com]
Plan received date:
Rev 1 — 6 Feb. 2017
Rev 2 — 20 August 2017
Date of comments:
Rev 1 — 21 Feb. 201
Rev 2 —12 September 2017
Reviewers:
Rev 1 — Bobby Jocz
Rev 2 — Bobby Jocz
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
[General] Confirm accurate existing topography is provided. All topography should be at least
visually field verified by the designer within the last year.
Rev 2 — Addressed.
2. [General] Display extent of 100yr floodplain and WPO buffer {County Code 17-403(8)1.
Rev 2 — Addressed.
3. [General] Plans show construction/grading occurring on the adjacent parcel. Please include these
parcels and owner's signature on future submittals, or obtain temporary construction easement.
Rev 2 — Addressed.
4. [SWPPP] Provide copy of DEQ coverage letter when obtained {County Code 17-405}.
Rev 2 — Acknowledged.
5. [SWPPP] Correct Table of Contents to reflect section headings in document. The SWPPP seems
to be missing section 5 "Stormwater Management Plan", replacing it as the "Pollution Prevention
PI"',
Rev 2 — Addressed.
6. [5 wrrrl i ne approved SWM plan will need to be included within the SWPPP when plans are
ready to be approved {County Code 17-405}.
Rev 2 — Acknowledged.
Engineering Review Comments
Page 2 of 4
7. [SWPPP]The approved Erosion and Sediment Control Plan will need to be included within the
SWPPP when plans are ready to be approved {County Code 17-4051.
Rev 2 - Acknowledged.
8. [SW 1] Update plan sheets and SWPPP with current WPO submittal number [WPO20170001 I]
Rev 2 — Addressed.
9. [SW5] Separate the SWM plan and E&S Phase II details on sheet SW5. The SWM plan should
have its own sheet.
Rev 2 — Addressed.
10. [SW6] Remove the "Frame Shed" diagram located over the parking lot on the southeastern portion
of the site. According to plans this will already be demolished.
Rev 2 — Addressed.
It. [SW8] Level spreader detail should be included as SWM detail, not on E&S detail sheet.
Rev 2 — Addressed.
12. [All] Please more clearly label proposed and existing contour elevations.
Rev 2 — addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. [SWPPP] Provide a Pollution Prevention Plan exhibit outlining expected locations of construction
staging, parking areas, expected pollutant sources and pollution prevention practices.
Rev 2 — Addressed on plan sheet SW3 which is included in SWPPP.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. [General] A stormwater management maintenance agreement, along with deed and plat for
stormwater management easements encompassing both the proposed conserved forest and open
space and the underground stormwater management facility, must be recorded prior to final VSMP
approval. Contact Ana Kilmer, Management Analyst II, at (434) 296-5832 ex. 3246 for more
information regarding the Stormwater Management Agreement.
Rev 2 — Acknowledged. Easements/agreement under review.
2. [General] Provide Pre -development drainage areas.
Rev 2 — Addressed.
3. [SW7] Please verify the correct drainage areas are represented in the VRRM spreadsheet.
According to E&S narrative and presented drainage areas only 0.29 Ac will be protected as
conserved forest and open space; however, this area is indicated as being 0.32 acres on the VRRM
spreadsheet.
Rev 2 — Addressed.
4. [SW7] Junction box and outlet structure details (diagrams 1&2) do not match what is presented on
the structure profile and subsequent calculations. Please correct.
Rev 2 — Addressed.
5. [SW7] Include long term maintenance notes for conserved forest and open space, level spreader,
and underground stormwater management facility on plan sheet.
Rev 2 — Addressed.
6. [All] The SWPPP and plan sheets indicate that water quality requirements will be met through
conservation of conserved open space; however, the E&S narrative and hydrologic/hydraulic
calculation packet state that water quality requirements will be met through the purchase of offsite
Engineering Review Comments
Page 3 of 4
nutrient management credits. Please clarify how 0.47lb/yr of phosphorous removal will be
accounted for on site.
Rev 2 — Clarified. Water quality with be addressed through the purchase of offsite water
quality credits.
[Level Spreader] The level spreader appears to discharge water outside the parcel into areas not
able to be included as conserved open space due to the lands not being owned by the parcel holder.
The level spreader must discharge into areas that can be conserved as open space. Please correct or
provide justification.
Rev 2 — Withdrawn, forest and open space no longer used to meet water quality
requirements.
[Level Spreader] The water authority must approve construction of stormwater features over water
and sanitary sewer easements.
Rev 2 — VSMP approval occurs prior to site plan approval. Please provide documentation of
correspondence so that VSMP plan can be approved.
Additional Rev 2 Comments:
1. With of SWM easement inadequate. Easement must be at least 30' in width (15' wide
structure @ 9' depth max + V access on each side of the outer pipes, with 1:1 slopes from
top of pipe to final grade level (6')).
2. Please amend the label for the stormwater facility easement to state "New variable width
SWM Facility Easement"
3. 0.55 lbs of Offsite Phosphorous Credit will need to be purchased prior to final VSMP
approval.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. [Sequence of construction] Indicate when demolition and initial grading activities will be
occurring.
Rev 2 — Addressed
2. [Section B 11 of E&S narrative] Maintenance schedule task #7 states removal of controls is
contingent on approval of "city" E&S inspector. Please change this to "County E&S Inspector".
Rev 2 — Addressed
3. [SW4 & SW5] Silt fence should be added along the southeast edge of the site.
Rev 2 — Addressed
4. [SW8] Provide tree protection detail as specified in E&S plan.
Rev 2 — Addressed
Additional Rev 2 Comments:
1. Include all curbing/parking lot areas to be demolished for connection to adjacent parcel in
demo plan.
2. Provide drop inlet protection detail such as Block and gravel Sediment Filter or other
method. Currently curb inlet protection detail is included, when no curb inlets are to exist
on site.
3. Ensure Phase II perimeter controls do not conflict installation of SWM facility.
Engineering Review Comments
Page 4 of 4
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
httD://www.albemarle.oriz/deDtforms.asD?deDartment--cdenizwDo
Bobby Jocz, EIT
Civil Engineer I
County of Albemarle
Department of Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext: 3283
www.Albemarle.org
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title:
Dominion Office Park
Project file number:
WP0201700011
Plan preparer:
Dustin Greene [dgreene@dominionemg.com]
Owner or rep.:
Ballif Investments, LLC.
Plan received date:
6 Feb. 2017
Date of comments:
21 Feb. 2017
Reviewers:
Bobby Jocz [Rev -1]
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. [General] Confirm accurate existing topography is provided. All topography should be at least
visually field verified by the designer within the last year.
2. [General] Display extent of 100yr floodplain and WPO buffer {County Code 17-403(8)1.
3. [General] Plans show construction/grading occurring on the adjacent parcel. Please include these
parcels and owner's signature on future submittals, or obtain temporary construction easement.
4. [SWPPP] Provide copy of DEQ coverage letter when obtained {County Code 17-405 1.
5. [SWPPP] Correct Table of Contents to reflect section headings in document. The SWPPP seems
to be missing section 5 "Stormwater Management Plan", replacing it as the "Pollution Prevention
Plan".
6. [SWPPP]The approved SWM plan will need to be included within the SWPPP when plans are
ready to be approved {County Code 17-405}.
7. [SWPPP]The approved Erosion and Sediment Control Plan will need to be included within the
SWPPP when plans are ready to be approved {County Code 17-405}.
8. [SWI] Update plan sheets and SWPPP with current WPO submittal number [WP020170001I
9. [SW5] Separate the SWM plan and E&S Phase II details on sheet SW5. The SWM plan should
have its own sheet.
10. [SW6] Remove the "Frame Shed" diagram located over the parking lot on the southeastern portion
of the site. According to plans this will already be demolished.
11. [SW8] Level spreader detail should be included as SWM detail, not on E&S detail sheet.
12. [All] Please more clearly label proposed and existing contour elevations.
Engineering Review Comments
Page 2 of 3
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. [SWPPP] Provide a Pollution Prevention Plan exhibit outlining expected locations of construction
staging, parking areas, expected pollutant sources and pollution prevention practices.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. [General] A stormwater management maintenance agreement, along with deed and plat for
stormwater management easements encompassing both the proposed conserved forest and open
space and the underground stormwater management facility, must be recorded prior to final VSMP
approval. Contact Ana Kilmer, Management Analyst II, at (434) 296-5832 ex. 3246 for more
information regarding the Stormwater Management Agreement.
2. [General] Provide Pre -development drainage areas.
3. [SW7] Please verify the correct drainage areas are represented in the VRRM spreadsheet.
According to E&S narrative and presented drainage areas only 0.29 Ac will be protected as
conserved forest and open space; however, this area is indicated as being 0.32 acres on the VRRM
spreadsheet.
4. [SW7] Junction box and outlet structure details (diagrams 1&2) do not match what is presented on
the structure profile and subsequent calculations. Please correct.
5. [SW7] Include long term maintenance notes for conserved forest and open space, level spreader,
and underground stormwater management facility on plan sheet.
6. [All] The SWPPP and plan sheets indicate that water quality requirements will be met through
conservation of conserved open space; however, the E&S narrative and hydrologic/hydraulic
calculation packet state that water quality requirements will be met through the purchase of offsite
nutrient management credits. Please clarify how 0.47lb/yr of phosphorous removal will be
accounted for on site.
7. [Level Spreader] The level spreader appears to discharge water outside the parcel into areas not
able to be included as conserved open space due to the lands not being owned by the parcel holder.
The level spreader must discharge into areas that can be conserved as open space. Please correct or
provide justification.
8. [Level Spreader] The water authority must approve construction of stormwater features over water
and sanitary sewer easements.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. [Sequence of construction] Indicate when demolition and initial grading activities will be
occurring.
2. [Section B 11 of E&S narrative] Maintenance schedule task #7 states removal of controls is
contingent on approval of "city" E&S inspector. Please change this to "County E&S Inspector".
3. [SW4 & SW5] Silt fence should be added along the southeast edge of the site.
4. [SW8] Provide tree protection detail as specified in E&S plan.
Engineering Review Comments
Page 3 of 3
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
httD://www.albemarle.oriz/deDtforms.asD?deDartment--cdenizwDo
Bobby Jocz, EIT
Civil Engineer I
County of Albemarle
Department of Community Development
401 McIntire Rd.
Charlottesville, VA 22902
(434) 296-5832 ext: 3283
www.Albemarle.org
feiP,7*
Ircrett
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
VSMP Permit plan review
Project title: Dominion Office Park
Project file number: WP0201700011
Plan preparer: Dustin Greene [dgreene@dominionemg.com]
Owner or rep.: Ballif Investments,LLC.
Plan received date: 6 Feb 2017
Date of comments: 17 Feb 2017
Reviewers: Bobby Jocz [Rev-1]
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP,authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan(SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain(1)a PPP,(2)an ESCP, (3)a SWMP, and(4)any TMDL measures necessary.
1. [General] Confirm accurate existing topography is provided. All topography should be at least
visually field verified by the designer within the last year. /
2. [General] Display extent of 100yr floodplain and WPO buffer {County Code 17-403(8)}. ,/
3. [General] Plans show construction/grading occurring on the adjacent parcel. Please include these
parcels and owner's signature on future submittals,or obtain temporary construction easement.
4. [SWPPP] Provide copy of DEQ coverage letter when obtained {County Code 17-405}. ✓
5. [SWPPP] Correct Table of Contents to reflect section headings in document. The SWPPP seems
to be missin section 5 "Stormwater Management Plan",replacing it as the"Pollution Prevention
Plan".
6. [SWPPP]The approved SWM plan will need to b -included within the SWPPP when plans are
ready to be approved {County Code 17-405}.�/
7. [SWPPP]The approved Erosion and Sediment Control Plan will need tol‘yitiuded within the
SWPPP when plans are ready to be approved {County Code 17-405}.
8. [SW1] Update plan sheets and SWPPP with current WPO submittal number[WPO201700011]
9. [SW5] Separate the SW)I plan and E&S Phase II details on sheet SW5. The SWM plan should
have its own sheet.
10. [SW6]Remove the"Frame Shed"diagram located over the parking lot on the southeastern portion
of the site. According to plans this will already be demolished.
11. [SW8] Level spreader detail should be included as SWM detail,not on E&S detail sheet.
12. [All] Please more clearly label proposed and existing contour elevations.
.- Lew) 61404v dors Moi- cAti 'io op"
refffid 41,04""--
oyer/ .5,r't7/ '
1.4440-440- 014110(1.1) 11a 411,444- +O <o� /
Engineering Review Comments
Page 2 of 3
B. Pollution Prevention Plan(PPP)
The PPP content requirements can be found in County Code section 17-404.
1. [SWPPP] Provide a Pollution Prevention Plan exhibit outlining expected locations of construction
staging,parking areas,expected pollutant sources and pollution prevention practices.
C. Stormwater Management Plan(SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved,and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. [General] A stormwater management maintenance agreement, along with deed and plat for
stormwater management easements encompassing both the proposed conserved forest and open
space and the underground stormwater management facility,must be recorded prior to final VSMP
approval. Contact Ana Kilmer,Management Analyst II,at(434)296-5832 ex. 3246 for more
informationl. ?ADN' Aebmtm',
2. [General] Provale Pre-development drainage areas.
3. [SW7] Please verify the correct drainage areas are represented in the VRRM spreadsheet.
According to E&S narrative and presented drainage areas only 0.29 Ac will be protected as
conserved forest and open space;however,this area is indicated as being 0.32 acres on the VRRM
spreadsheet.✓
4. [SW7] Junction box and outlet structure details(diagrams 1&2)do not match what is presented on
the structure profile and subsequent calculations. Please correct.
5. [SW7] Include long term maintenance notes for conserved forest and open space, level spreader,
and underground stormwater management facility on plan sheet.
6. [All] The SWPPP and plan sheets indicate that water quality requirements will be met through
conservation of conserved open space;however,the E&S narrative and hydrologic/hydraulic
calculation packet state that water quality requirements will be met through the purchase of offsite
nutrient management credits. Please clarify how 0.471b/yr of phosphorous removal will be
accounted for on site.
D. Erosion and Sediment Control Plan(ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved,and the reasons are provided in the comments below. The erosion
control plan content requirements can be found in County Code section 17-402.
1. [Sequence of construction] Indicate when demolition and initial grading activities will be
occurring. Overall,would like to see a little more detail.
2. [Section B11 of E&S narrative]Maintenance schedule task#7 states removal of controls is
contingent on approval of"city"E&S inspector. Please change this to"County E&S Inspector".
3. [SW4& SW5] Silt fence should be added along the southeast edge of the site.
4. [SW8]Provide tree protection detail as specified in E&S plan.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re-submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
.c sA- 7c
'Z ‘`I <-.7- SI, t 1 1 %C:1
41\ 1 ki--- A f t t
1 z- _ .
k,,, ,- ,
_ - U.► N
-"Z H
O C) O s
_...1 .-ett, 1 t
:
• w
tJ ) d
Cil -4--;\ 'A tat
N zs
N ti I
' 1 ti\ X ),(e ,...,vo 5} .34.
iS Si t tl" ," 1
oo
4 0
c►t • I
-I- NI-i)
Q
_ -.
°`
a
i 1 -Ni 1 ..... i t*) \ trt
ci4 N-
0.'
‘ .J n ciN be.,
U
1 c
:'0l3