Loading...
HomeMy WebLinkAboutSUB201600250 Checklist - Project Closeout (Administrative) 2017-02-23 G. SUBDIVISION/SITE PLAN " FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please com to this form within 30 days of final action,place in folder and forward to CDA FOR QC and stat ab I. CDA will forward to the Imaging Center for digital closeout. / SDP/ UB# •O/6'-(9'S O PROJECT TITLE / CI/ y, Ht !! `� e4t ``��f 41- y FULL AME OF LEAD REVIEWER vk (Is-e_z__ FINAL ACTION DATE: 2 -�}3_)7 Co View — Nal Application,Page 2 Data Entered _ . . . - , - , ; f.-e . c -tis ." .ceo'n-C a.*n,.,,. , ., Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. i Engineerin Folder Information/documentation Scan ❑ Saved location Applicatio (signature copy) Scan 0 Saved location • • , '. ., i •" ..I. -nee 1,,13 Applicant Correspondence(to/from, memos/emails) I Scan 0 Saved location tETComplete,set of printed Review Comments Scan 0 Saved location `JApprove lan/plat(signed,or stamped"Approved"with Planner/Engineer name) ,? Scan 0 Saved location MI ,1 ` A... ._ '. : .``ion rr '.,., ,,,, " �_.. ' , .P; ,�,„, ,.. .„ a,<. .lat presented,PC/BOS Action Letter) :7' _ t • ave. cc. ..0 .:� '---:---------*0 Saved location ❑ r-- = ° . furt -. •„.,. .,. :: .-. .;, location mi " . r ., a p. 0 ,a , . ,� s.�._ ®..Save' °ocation ; .."`-s of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location i 1 Additional Information on this Droiect: i