VSMP Permit plan review
Project title: Old Trail Village (Amendment to WP0201300052)
Project file number: WP0201700008
Plan preparer: Roudabush, Gale & Associates [bill@roudabush.com]
Owner or rep.: County of Albemarle [email]
Plan received date: 31 Jan 2017
Date of comments: 02 Mar 2017
Reviewers: Emily Cox
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Old Trail SWPPP must be updated to contain information for this site.
2. Please provide proof that this site plan falls under the current general permit for Old Trail.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. Please show a staging/laydown area.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-403.
1. Since this is an Albemarle County property, this plan will need to go before the Board of
Supervisors for review and approval.
2. Please show all existing storm pipes in the area and update the drainage divides if necessary.
3. Please clarify the total disturbed area. The cover sheet says 3.24 AC, Sheet 4 says 3.45 AC and
the narrative on sheet 5 says 4.58 AC.
4. Add the maintenance requirements for all BMP/SWM facilities. These requirements can be found
in section 9 of the respective DEQ Stormwater design specifications.
5. Show SWM facility easements around each BMP/SWM facility.
6. Show CN breakdown & Tc paths/calculations on the drainage divides sheet. Both were provided
Engineering Review Comments
Page 2 of 3
in the calculations packet, but you need to show how they were derived (impervious area per
drainage divide, etc).
7. DEQ stormwater specification for grass channels requires a bottom width between 4-8 ft wide.
The proposed channels on this plan have a bottom width of 3 ft. Please revise to meet the
specification. (Table 3.2 in this document):
http://www.vwrrc.vt.edu/swc/documents/2013/DEQ%20BMP%20Spec%20No%203_GRAS S%2
OCHANNELS_Final%20Draft_vl-9_03012011.pdf
8. The water quality compliance tracking ledger from WPO201600009, the stormwater master plan
for Old Trail, must be revised/updated to show the change in drainage to the proposed facilities.
Also, the SWM checklist must be completed.
9. Old Trail is grandfathered for IIC regulations. Using IIB is ok, however not necessary and may be
difficult to relate to the approved master plan.
10. A Stormwater Management Maintenance Agreement and an Easement Plat with a Deed of
Dedication will be needed before the VSMP plan can be approved. The application for an
easement plat can be found in the Community Development Documents section of the County's
website under Subdivisions. The fee for the easement plat will be the one shown for the easement
plat required with a site plan. We recommend you begin this process as soon as possible.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is disapproved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Show the total area to the silt fence and verify that it complies with the VESCH requirement of
0.25 AC of drainage per 100 LF of silt fence.
2. Provide a paved construction entrance with a wash rack per the Albemarle County Design
Standards Manual, Section 3 F.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
Engineering Review Comments
Page 3 of 3
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hlt2://www.albemarle.org/deptforins.asp?department--cdengMo
File: E1_vsmp_review projectname.doc