HomeMy WebLinkAboutWPO201600014 Bond Estimates 2017-03-06Charlottesville -Albemarle Airport Runway 3-21 Rehabilitation WPO file number: WP020201600014 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 15.5 acres $5,000.00 $77,600.00 silt fence (SF) 3700.0 ft $5.00 $18,500.00 safety fence (SAF) 0.0 ft 00 $0.00 diversion (DID, FD, RWD) 3500 ft $13.00 $45,500.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 earthwork for trap/basin height of dam at toe ft cut at high side 0 ft height of fill at faceoft ft cut at face 0 ft length of damft length of cut ft top width width of cut ft (area above transition) 0 sf (area below transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway ft (TOAL CY estimate) 3279 cy $13.00 $42,627.00 _ width of spillway ft (spillway stone tons) 1208.7 tons $50.00 $60,435.00 structures for basin riser height PPr ft riser diameter in (riser unit price) $0.00 $0.00 barrel length ft base plate or fdn $200.00 $0 barrel diameter lin (barrel unit price) $0.00 $0.00 barrel collars $200.00 $0 baffle length Mft $50.00 $0 silt fence inlet protection (IP) $0.00 stone inlet protection (IP) $200.00 $3,200.00 outlet protection (OP) length 0 ft N $0.00 channel (SCC, matted) length 0 ft width ft $0.00 check dam depth in channel 3 ft channel width ft $405.00 $2,835.00 construction entrance (CE) 0 $2,500.00 $0.00 wash rack $2,000.00 $4,000.00 paved construction entrance $3,500.00 $7,000.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 0 traps and basins 0 $0.00 mobilization $2,500.00 stream crossing (computed independently) $0.00 cost sum $264,197.00 contingency $26,419.70 Total $290,620 3/6/2017