HomeMy WebLinkAboutSDP201600049 Review Comments Final Site Plan and Comps. 2017-03-07County of Albemarle Department of Community Development Memorandum To: Will Cockrell From: Matt Wentland Date: 7 March 2017 Subject: The Vue - FSP (SDP201600049) The final site plan for The Vue has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. An approved WPO submittal will be required containing ESC and SWM plans and a SWPPP before site plan approval [17-300, 17-301]. Water quantity and water quality will need to be addressed under the UB criteria. (Rev. 1) The WPO plan will need to be approved before FSP approval. (Rev. 2) The WPO plan is currently under review. 2. This site is subject to the Lickinghole Basin Fee. This will be provided with the WPO bond estimates. 3. The stream buffer should extend 100' on each side of the stream or to the limits of the flood plain, whichever is wider (17-600(B)). Any disturbance in a stream buffer will require a mitigation plan (17-406). (Rev. 1) The mitigation plan will need to be approved before FSP approval. (Rev. 2) The mitigation plan is currently under review. 4. Grading is being shown right to the property line in several areas. Engineering recommends that temporary grading easements are acquired from the neighboring properties or that the grading is shown at least 5' from the property line. (Rev. 1) The grading has been pulled back in some places, however Engineering wants to make clear that no construction activities should disturb the neighboring properties without an easement. 5. Boilerplate wall details will not be acceptable and engineered retaining wall plans will be required. A guardrail/barrier will be required at the ends of travelways/parking adjacent to retaining walls and safety railing is required for retaining walls over 4' high. (Rev. 1) Between the camber of the wall and the length of the geogrid, it appears that wall construction will take place right to the property line. Please detail how the wall will be built within the space shown, including how the over 15' cuts on the property line will be performed without affecting the neighboring property. Any railings and guard rail should also be shown on the plans. The guard post detail in the wall plans does not appear adequate for vehicles or equivalent to guardrail. Please provide guardrail or an engineer's certification that the guard posts shown are equivalent. (Rev. 2) Comment Addressed. Engineering Review Comments Page 2 of 2 6. An approved Road Plan submittal for the improvements to Blue Ridge Avenue will be required before site plan approval [14-311]. Please contact VDOT for any additional requirements. (Rev. 1) Comment withdrawn. Since no road plans will be submitted, drainage calculations should be included with the site plan. 7. The utilities will need to be labelled on the plan sheets and shown and labelled on the profiles. (Rev. 1) Comment addressed. 8. A Floodplain Development Permit application containing a floodplain impact plan will be required for grading activities in the floodplain [18.30.3.11]. (Rev. 1) The FDP will need to be approved before FSP approval. (Rev. 2) It does not appear that a FDP has been submitted at this time. New Comments (317117) 9. The plan will need to be updated to show the revised level spreaders, including easements. File: SDP201600049 The Vue FSP Engineering Comments 03-07-17.doc