Loading...
HomeMy WebLinkAboutWPO201600064 Bond Estimates 2017-03-07Canaan Christian Church WPO file number: WP0201600064 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance pipe length -ft height of dam at toeft ft height of fill at faceoft ft length of damft top width (area above transition) 0 sf (total width of dam) 0 ft (height below transition) 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length spillway _ft width off spillway ft riser height Wft riser diameter 0 in barrel length ft barrel diameter in length 8 ft length 6 ft length 0 ft depth in channel 0 ft rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) Mft pipe diameter - 15 in cut at high sidehift ft cut at face ft length of cut ft width of cut (area below transition; 0 sf (total width of cut) 0 ft (depth below transition 0 ft (area above transition 0 sf (total fill volume) 0.0 cy (TOAL CY estimate) 0 cy (spillway stone tons) 0 tons (riser unit price) $0.00 base plate or fdn - (barrel unit price) $0.00 barrel collars baffle length Mft width 9.25 ft width 6.67 ft width 0 ft channel width 0 ft length kMMWft (tons) 0 tons traps and basins - No. Unit Unit Cost Cost installed 'R acres $5,000.00 $10,000.00 ft $5.00 $7,000.00 ft $5.00 $4,000.00 ft $13.00 $0.00 $35.00 $2,110.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $100.00 $200.00 $0.00 $333.00 $333.00 di $180.09 $180.09 $0.00 $0.00 $0.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $0.00 $2,500.00 $0.00 cost sum $30,723.09 contingency $3,072.31 Total $33,800 2/24/2017 Canaan Christian Chruch WPO file number: WP0201600064 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch (includes length of the two level spreaders)ft $13.00 $7,280.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rep, cmp (15 to 48") n d ES -1,2 'EC -1 ft $0.00 $0.00 aggregate base or drainage stone in d ft L 0.0 ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin 9 height of dam at toeoft ft cut al high sideOftft 9height of fill at faceftcut at facelength of damft length of cutft top width width of cut ft (area above transition) 0 at (area below transition) 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition 0 ft (depth below tmnsitior 0 ft (area below transition) 0 at (area above transition; 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser heightMin ft riser diameterin (riser unit price) $0,00 $0.00 barrel lengthft base plate or fen $200.00 $0 barrel diameter (barrel unit price) $0,00 $0.00 barrel collars MIt $200.00 $0 baffle length $50.00 $0 trees 0 as $275.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 0 as $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 bioflter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth length -ft width Wft (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres basins $0.00 mobilaafion $2,500.00 as -built drawings (per facility)�ea $2.000.00 $4.000.00 materials testing (per facility) ea $2,000.00 $0.00 compaction testing (per dam) ea $3,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $13,780.00 contingency $1,378.00 Total $15,160 2/24/2017