Loading...
HomeMy WebLinkAboutSDP201700008 Review Comments Final Site Plan and Comps. 2017-03-08Phone 434-296-5832 D�N�P County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Scott Collins From: Sarah Baldwin Division: Planning Date: March 8, 2017 Subject: SDP 201700008 Northtown Block IIB -Final Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [Comment] This site plan cannot be approved until the following attached comments are addressed. Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The Code is kept up to date by the County Attorney's office. The Code may be found on the County Attorney's website which may be found under "Departments and Services" at Albemarle.org. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six (6) months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. Please contact Sarah Baldwin in the Planning Division by using sbaldwin(@albemarle.org or 434-296- 5832 ext. 3313 for further information. Sarah Baldwin From: Alexander Morrison <amorrison@serviceauthority.org> Sent: Thursday, March 02, 2017 2:38 PM To: Christopher Perez Cc: Sarah Baldwin Subject: RE: SDP201700008 - Northtown Block IIB — Final site plan That comment will suffice. I will recommend final approval once I give utility approval through the water construction plan review process that they started yesterday. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Thursday, March 02, 2017 2:36 PM To: Alexander Morrison Cc: Sarah Baldwin Subject: RE: SDP201700008 - Northtown Block IIB — Final site plan Alex, Will you be providing Sarah comments on the final site plan? Or will your comments on the final site plan merely be "prior to final site plan approval construction plans shall be reviewed and approved by ACSA." Or something to that affect? From: Alexander Morrison [mailto:amorrison@serviceauthority.org] Sent: Thursday, March 02, 2017 2:34 PM To: Christopher Perez <cperez@albemarle.org> Cc: Sarah Baldwin <sbaldwin@albemarle.org> Subject: RE: SDP201700008 - Northtown Block IIB — Final site plan Chris, I was going to request water construction plan review but they submitted a review package yesterday. I have been assigned the plans and they are currently under construction plan review by the ACSA. Alexander J. Morrison, P.E. Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 Review Comments for SDP201700008 Final Plat Project Name: Northtown Block IIB - Final Date Completed: Thursday, March 02, 2017 Department/Division.+Agency: Review Status: Reviewer: CDD q Change Mar are# Maliszewski ARB '� Re nested Chan es .�. This application is scheduled for ARB reveiw on April 3, 2017_ Comments will be provided after that meeting_ Review Comments for SDP201700008 Final Plat L] Project Name: Northtown Block IIB - Final Date Completed: Saturday, February 25, 201777 Department/Division?Agency: Review Status: Reviewer:Robbie Gilmer Fire Rescue lRequested Changes Based on plans dated 216117. 1. Fire flow test required before final approval_ Please attach to the final set of plans_ 2. FDC locations shall be located on the address side of the structure and with in 100' of a fire hydrant_ County of Albemarle Department of Community Development Memorandum To: Sarah Baldwin From: Matt Wentland Date: 1 March 2017 Subject: Northtown Block IIB - FSP (SDP201700008) The final site plan for Northtown Block IIB has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. The WPO submittal will need to be approved (it is very near approval) and the SWM Forest & Open Space Easement Plat, including a Deed of Dedication, will need to be approved and recorded. 2. If two-way travel is proposed, the 20' aisle south of the buildings will need to be 24' or the parking spaces increased to 10' x 18'. If the aisle is one-way, please provide pavement markings and signage. [I 8.4. l 2.16(c) I] 3. The retaining wall height label next to the loading area appears to be incorrect. 4. Label the type and size of the easements. The Forest & Open Space used in the VRRM worksheet should be labelled as `SWM Forest & Open Space Easement'. Also include the following note on the plan: "The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative community (but no more than four times a 91 yea.) 5. Provide guardrail along the parking and drive aisle that are adjacent to the retaining wall. Review Comments for SDP201700008 !Final Plat n Project Name: Northtown Block IIB -Final Date Completed: Wednesday, March 01, 2017 --] Department/Division?Aency:gReview Status: _. ❑Reviewer: Matthew Wentland F-11 CDD Engineering Requested Changes In addition to the comments in laserfiche: `An amendment to the VSMP plan (WPO201600063) will also be required and will need to show erosion and sediment control measures for the proposed site and verify that the proposed development will be covered by the stormwater measures shown in the previous plan.' COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Charles A. Kilpatrick, P.E. Culpeper, Vninia 22701 ComrrJsslonar February 21, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: Northtown Block IIB — Final Site Plan SDP -2017-00008 Review #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 6 February 2017, and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired please contact Justin Deel at (434) 422-9894. Sincerely, ��OVL' +LL/ Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.arg WE KEEP VIRGINIA MOVING