HomeMy WebLinkAboutSUB201000060 Review Comments Bond Inspection 2017-03-14COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Bond Reduction Request
14`h March, 2017
Charles William Hurt
Pantops-Lakeridge, LLC
195 Riverbend Drive
Charlottesville, VA 22911
CAHBuildkntelos.net
Re: Bond reduction request for Pavilions at Pantops Phase III — SUB2010-000060
Thank you for the documentation regarding bond inspection of Pavilions at Pantops Phase III.
Unfortunately, a reduction of the recalculated bond amount of $870,350 could not be completed
at this time due to some missing documentation described below.
For bond reduction the following must be provided:
a. Stone depth and material/core test reports as well as base and surface pavement
inspections. Without this it is not possible to reduce bullet items related to the completion
of the road surface.
b. Concrete test reports. Without these it is not possible to reduce bullet items related to
Curb/gutter/sidewalk/CG-12 structures.
Ensure the appropriate amount of CBR tests are provided for each road section. Kempton
place and Whittington Drive should have additional CBRs taken. Soil Sample Frequency
and CBR Tests for Design of New Subdivision Streets are as follows:
1. For streets less than 200 feet in length, one soil sample for conducting AASHTO
soil classification and CBR test is required.
2. For streets 200 to 500 feet in length, at least two soil samples for conducting
AASHTO soil classification and CBR tests is required, which includes one at each
intersection of an existing state road.
3. For longer streets, one soil sample shall be taken at each intersection with an
existing state road plus one test sample every 500 feet in length, or portion
thereof, is required for conducting AASHTO soil classification and CBR tests.
For final bond release all the items above, as well as following will be required:
a. Copies of recorded plats for ROW, and other easements. Copies of all recorded drainage
easements, sight easements, and right of way PLATS should be provided. These should be
copies of actual recorded PLAT documents from the Clerk's office.
b. Signed and sealed letter from P.E certifying that completed improvements are built to
Engineering Review Comments
Page 2 of 2
plan.
c. Completed Certificate of Completion signed by the owner.
d. Repair sections of pipe/pipe issues noted in the attached punchlist or provide Professional
Engineer certifications
e. Address remaining missing items in the attached punchlist.
Ensure final As-builts are submitted according to Albemarle County's as -built road plan policy.
See attached punchlist for more information.
Please contact me if you have any further questions.
Sincerely,
114e
Bobby Jocz, EIT
Civil Engineer 1
(434) 296-5832 ext: 3283
County of Albemarle
Department of Community Development
401 McIntire Rd.
Charlottesville, VA 22902
Copy: Ana Kilmer, File
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Subdivision Bond Inspection
Bond Title: Pavilions at Pantops Phase III
File Number: SUB2010-000060
Date of inspection: N/A
Reviewer: Bobby Jocz Original Bond Amount: $399,299 recalculated to $870,350
[20%=$174,070]
Phone: (434) 296-5832 Current Bond Amount: $870,350
Your bond inspection request has been processed. This list contains an update on the items
received and approved.
Received
Approved
Y
N
Y
N
N/A
VDOT
■
❑
Completed inspection request and fee
■
❑
❑
❑
■
❑
As -built plan, updated, sealed to current date, per As -built policy
❑
■
❑
❑
❑
■
Copies of recorded plats for right-of-way, easements
❑
■
❑
❑
❑
■
VDOT approval AM-4.3, or partial completion via punchlist
❑
❑
■
❑
❑
■
Letter from P.E. certifying improvements are built to plan
❑
■
❑
❑
❑
■
Current certification form completed by owner/developer
❑
■
❑
❑
■
❑
CBR test reports for each road
❑
■
❑
❑
❑
■
Stone depth and material inspection reports (or core tests)
❑
■
❑
❑
❑
■
Pavement depth and material inspection reports (or core tests)
❑
■
❑
❑
❑
■
Compaction test reports for fill areas under road
■
❑
❑
❑
❑
■
Pipe trench inspection reports
❑
❑
■
❑
■
❑
Pipe interior inspections reports and video
■
❑
❑
❑
❑
■
Concrete test reports for structural concrete, curbing, aprons, etc.
❑
■
❑
❑
❑
■
Structural inspection reports for any bridges or box culverts
❑
❑
■
❑
❑
■
county road name signs and posts, or a sign agreement for alt. posts ❑
❑
■
Updated bond amount based on completed work: $870,350
Checklist Items
- Winthrop
Drive 10+00 to 17+64
o
Aggregate Base
o
Asphalt Base
o
Asphalt Surface
o
Curb CG-6
o
Sidewalk, Concrete 4'
o
Ramp CG-12
o
Street Name Sign
o
Traffic Control Sign
o
Clear and Grub
Unit
Notes Completed
Repair/partial Not Built
367.9cy
Field Check (FC)
■
❑
❑
278.1 tons
FC, complete on asbuilt
■
❑
❑
185.4 tons
FC, complete on asbuilt
■
❑
❑
1528.Oft
FC, complete on asbuilt
■
❑
❑
1568.0ft
FC, partially comp. asbuilt
❑
■
❑
2
Not complete per asbuilt
❑
❑
■
1
Not complete per asbuilt
❑
❑
■
2
Not complete per asbuilt
❑
❑
■
0.5 Acre
■
❑
❑
o
Grading
■
❑
❑
o
CBR tests
3
Only 2 completed
❑
■
❑
o
As -built drawings
2
■
❑
❑
o
Survey and layout
2
■
❑
❑
o
Mobilization
1
■
❑
❑
- Kempton Place 10+00 to 12+30
o
Aggregate Base
110.Ocy
FC, complete on asbuilt
■
❑
❑
o
Asphalt Base
83.7 tons
FC, complete on asbuilt
■
❑
❑
o
Asphalt Surface
55.8 tons
FC, complete on asbuilt
■
❑
❑
o
Curb CG-6
460ft
FC, complete on asbuilt
■
❑
❑
o
Sidewalk, Concrete 4'
460ft
FC, partially comp. asbuilt
❑
■
❑
o
Street Name Sign
1
FC needed
❑
❑
■
o
Traffic Control Sign
2
FC, only 1 shown on asbuilt ❑
■
❑
o
Clear and Grub
0.2 Acre
■
❑
❑
o
Grading
■
❑
❑
o
CBR tests
1
■
❑
❑
o
As -built drawings
1
■
❑
❑
o
Survey and layout
1
■
❑
❑
o
Mobilization
1
■
❑
❑
- Newcastle
Court 10+00 to 11+96
o
Aggregate Base
94.4cy
FC, complete on asbuilt
■
❑
❑
o
Asphalt Base
71.3 tons
FC, complete on asbuilt
■
❑
❑
o
Asphalt Surface
47.6 tons
FC, complete on asbuilt
■
❑
❑
o
Curb CG-6
392ft
FC, complete on asbuilt
■
❑
❑
o
Sidewalk, Concrete 4'
196ft
FC, complete on asbuilt
■
❑
❑
o
Street Name Sign
1
Not complete per asbuilt
❑
❑
■
o
Traffic Control Sign
2
FC, complete on asbuilt
■
❑
❑
o
Clear and Grub
0.1 Acre
■
❑
❑
o
Grading
■
❑
❑
o
CBR tests
I
■
❑
❑
o
As -built drawings
1
■
❑
❑
o
Survey and layout
1
■
❑
❑
o
Mobilization
1
■
❑
❑
- Whittington Place 10+00 to 17+84
o
Aggregate Base
377.5cy
FC, complete on asbuilt
■
❑
❑
o
Asphalt Base
285.4 tons
FC, complete on asbuilt
■
❑
❑
o
Asphalt Surface
190.3 tons
FC, complete on asbuilt
■
❑
❑
o
Curb CG-6
1568.Oft
FC, complete on asbuilt
■
❑
❑
o
Sidewalk, Concrete 4'
1568.Oft
FC, partially comp. asbuilt
❑
■
❑
o
Ramp CG-12
6
Not complete per asbuilt
❑
❑
■
o
Street Name Sign
1
Not complete per asbuilt
❑
❑
■
o
Traffic Control Sign
2
FC needed, only one shown
❑
■
❑
o
Clear and Grub
0.5 Acre
0
❑
0
o Grading
■
❑ ❑
o CBR tests 3
Only 2 completed ❑
■ ❑
o As -built drawings 2
■
❑ ❑
o Survey and layout 2
■
❑ ❑
o Mobilization 1
■
❑ ❑
Notes:
- Punchlist items shown above are from items provided on asbuilts dated 10/31/2016. Field verification
of punchlist items will
occur once all required documents
are provided (see attached letter).
- Pipe Inspection video
notes
o D5-D6
Deformed Vertical 15%
93.75ft
[Severe] -> Ok, low priority
Fracture
97.00ft
[Good] -> Ok, low priority
o D6-D6A
Hole/Void
3.00ft
[severe] -> Priority issue, Repair
Hole/soil
13.00ft
[severe] -> Medium priority
o 137-136
Hole
35.90ft
[severe] -> Priority issue, Repair
o D8-D9
Deformed Horizontal 15%
115.65
[severe] -> Ok, low priority
o D14-Dl l
Deformed 15%
20.30ft
[severe] -> Ok, low priority
o 1314-1315
Deformed 35%
47.00ft
[severe] -> Ok, low priority
Deformed Vertical 60%
49.65ft to
Deformed Vertical 60%
56.70ft
[severe] -> Priority issue, Repair
Deformed 30%
52.00ft to
Deformed 30%
70.15ft
[severe] -> Ok, low priority
o D21-D20
hole
35.90ft
[poor] -> Medium priority
o D21-1322
Hole
9.89ft
[severe] -> Priority issue, Repair
Deformed Vertical 20%
90.85ft to
Deformed Vertical 20%
100.90ft
[severe] -> Ok, low priority
Deformed Vertical 20%
116.70 to
Deformed Vertical 20%
119.83ft
[severe] -> Ok, low priority
Deformed Vertical25%
133.6ft
[severe] -> Ok, low priority
o D30-D29
Deformed Vertical 15%
6.67ft to
Deformed Vertical 15%
23.42ft
[severe] -> Ok, low priority
o D36A-D36
Deformed Vertical 20%
2.00ft
[severe] -> Ok, low priority
Deformed Vertical 35%
9.0011
Deformed Vertical 35%
24.05ft
[severe] -> Medium priority
o D37-D36A
Deformed Vertical 15%
9.45ft to
Pipe Needs
Deformed Vertical 15%
56.22ft
[severe] -> Ok, low priority
Replacement
Deformed Vertical 20%
56.13ft to
Deformed Vertical 20%
69.51ft
[severe] -> Ok, low priority
Deformed Vertical 35%
69.51 ft to
Deformed Vertical 35%
88.34ft
[severe] -> Medium priority
Hole/soil
85.96ft
[severe] -> Priority issue, Repair
Hole/soil
85.96ft
[severe] -> Priority issue, Repair
o D37-3 8
Deformed Horizontal 10%
4.01 ft
[severe] -> Low/Medium priority
Deformed Horizontal 15%
15.48ft
Deformed Horizontal 15%
34.50ft
[severe] -> Ok, low priority
- As -Built Notes:
o Show and label constructed edge of pavement radii for all intersections.
o Provide pavement designs. Label the as -built pavement and base layers. Provide the measured
pavement thickness based on inspections.
o Label deed book and page numbers for all dedicated ROW easements. Provide copies of
recorded documents.
o Show all installed signs and pavement markings.