Loading...
HomeMy WebLinkAboutWPO201600060 Bond Estimates 2017-03-16 (2)Region 10 Women's Shelter WPO file number: WP0201600060 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed No. Unit Unit Cost Cost installed 1.1acres $5,000.00 $5,500.00 850. ft $5.00 $4,250.00 0.0 ft $5.00 $0.00 13gft $13.00 $1,690.00 pipe length 0 ft pipe diameter Min $0.00 $0.00 height of dam at toe 16ft ft cut at high side ft height of fill at faceft cut at face ftlength of dam ft length of cut ft top width width of cut ft kaiaa above transition) 0 sf (a,ua uciuvv transition 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway =ft (spillway stone tons) 0 tons $50.00 $0.00 riser height ft riser diameter win (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn �' $200.00 $0 barrel diameter Min (barrel unit price) $0.00 $0.00 barrel collars ft � $200.00 $0 baffle length $50.00 $0 $100.00 $0.00 $200.00 $1,200.00 length 0 ft width ft $0.00 $0.00 length 0 ft width ft $0.00 depth in channel 0 ft channel width ft $0.00 $0.00 $2,000.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 depth 0 ft length -ft width 0.0 0 tons $60.00 $0.00 [ti`CDIke]IN Region 10 Women's Shelter WPO file number: WPO201600060 Erosion and Sediment Control Bond Estimate Item Item Number survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 1.1 traps and basins No. Unit cost sum contingency Total Unit Cost Cost $550.00 $1, 500.00 $0.00 $20,190.00 $2,019.00 $22,210 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2.1 for simplicty Cut at High Side h2 Height of Fill at Face h1 %, w Width of Cut Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut Top I-w transitic h1 Cut at Fa liment traps and basins Width ►n point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)