Loading...
HomeMy WebLinkAboutWPO201600060 Bond Estimates 2017-03-16Region 10 Women's Shelter WPO file number: WP0201600060 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 4 ea $500.00 $2,000.00 drop inlet or grate 1 ea $3,500.00 $3,500.00 manhole structure (per ft. rise) 40 ft $450.00 $18,000.00 pipe, rcp, cmp (15 to 56") 56.0 in d 0 ES-1,2 0 EC-1 140.0 ft $150.00 $21,000.00 pipe, rcp, cmp (12 to 48") 12.0 in d 0 ES-1,2 0 EC-1 180.0 ft $35.00 $6,300.00 aggregate base or drainage stone 12.0 in d 320.0 ft L 1.0 ft W 22.4 ton $35.00 $784.00 earthwork for trap/basin biofiler #1 height of dam at toe 2 ft cut at high side 2 ft height of fill at face 2 ft cut at face 2 ft length of dam ft 1"ft length of cut 180 ft L top width width of cut 20 ft (aiud duove transition) 18 sf (area below transition; -- - (total width of dam) 4 ft (total width of cut) 28 ft (height below transition 0 ft (depth below transition 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 13.3 cy (total fill volume) 320.0 cy length of spillway ft JOAL CY estimate) 324 cy $13.00 $4,212.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin biofilter #1 riser height 10 ft riser diameter 56 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn $200.00 $0 barrel diameter 0 in $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 earthwork for trap/basin biofiler #2 height of dam at toe 2 ft cut at high side ft height of fill at face 2 ft cut at face ft length of dam ft length of cut ft top width ft width of cut LAft (area above transition) 18 sf (area below transition; 108 sf (total width of dam) 4 ft (total width of cut) 58 ft (height below transitior 0 ft (depth below transitioi 0 ft (area below transition) 0 sf (area above transition 0 sf (total fill volume) 33.3 cy (total fill volume) 100.0 cy 3/16/2017 Region 10 Women's Shelter WPO file number: WP0201600060 Stormwater Management Plan Bond Estimate Item Item Number length of spillway ft 9ft width of spillway structures for basin biofiler #2 riser height 10 ft riser diameter 56� in barrel length 0 ft barrel diameter 0 in trees shrubs seedlings underdrain (LF) biofilter soil mix (CY) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft width 0.0 survey and layout (price per 0.1 mi.) acres 1.1 mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) No. Unit Unit Cost Cost installed (TOAL CY estimate) 111 cy $13.00 $1,443.00 (spillway stone tons) 0 tons $50.00 $0.00 (riser unit price) $0.00 $0.00 base plate or fdn $200.00 $0 (barrel unit price) $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 0 ea $275.00 $0.00 0 ea $50.00 $0.00 ea $5.00 $0.00 ft $5.00 $1,175.00 180 cy $38.00 $6,840.00 2 ea $1,500.00 $3,000.00 0 ft $50.00 $0.00 length 0.0 ft (tons) 0 $60.00 $0.00 basins 3 $2,050.00 $1, 500.00 3 ea $2,000.00 $6,000.00 3 ea $2,000.00 $6,000.00 0 ea $5,000.00 $0.00 $0.00 cost sum $83,804.00 contingency $8,380.40 Total $92J 90 3/16/2017