Loading...
HomeMy WebLinkAboutWPO201600068 Bond Estimates 2017-03-16Rivanna Water & Sewer Authority Crozet Water Treatment Plant Finished Water Pump Station WPO file number: WP0201600068 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) earthwork for trap/basin structures for basin silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed pipe length height of dam at toe height of fill at face length of dam top width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter -ft 0 sf Oft Oft 0 sf 0.0 cy _ft ft ft in ft in pipe diameter -in cut at high sideft cut at face ft length of cutoft ft width of cut (area below transition) 0 sf (total width of cut) 0 ft (depth below transitior 0 ft (area above transition, 0 sf (total fill volume) 0.0 cy (TOAL CY estimate) 0 cy (spillway stone tons) 0 tons (riser unit price) $0.00 base plate orfdn - (barrel unit price) $0.00 barrel collars baffle length Mft length ft width Eft ft length ft width ft -depth in channel ft channel width depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) �ft length 0 tft (tons) 0 tons traps and basins - No. Unit Unit Cost Cost (installed) acres $5,000.00 $4,700.00 ft $5.00 $2,850.00 ft $5.00 $1,850.00 ft $13.00 $2,730.00 $35.00 $1,900.00 $13.00 $0.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 ■ $100.00 $0.00 $200.00 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $0.00 $2,500.00 $0.00 cost sum $25,330.00 contingency $2,533.00 Total $27,870 3/16/2017 Rivanna Water & Sewer Authority Crozet Water Treatment Plant Finished Water Pump Station WPO file number: WP0201600068 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") -in d ■ ES -1,2 0 EC -1 0 ft $0.00 $0.00 aggregate base or drainage stone in d ft L I 0.0, ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam a[ toeOft it cu[ a[ high sideRO9 9height of fillatfacecut at facelength of damft length of cut ft top width width of cut ft (area above transition; 0 sf (area below transition 168 sf (total width of dam) 0 ft (total width of cut) 44 ft (height below transitio 0 ft (depth below transitio 3 ft (area below transition) 0 sf (area above transitior 57 sf (total fill volume) 0.0 cy (total fill volume) 541.7 cy length of spillway _it (TOAL CY estimate) 542 cy $13.00 $7046.00 width of spillway it (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height it riser diameter in (riser unit price) $0.00 $0.00 barrel length ft base plate or ton $200.00 $0 barrel diameter in (barrel unit price) $0.00 $0.00 barrel collars Mft $200.00 $0 baffle length $50.00 $0 trees ea $275.00 $1,375.00 shrubs ea $50.00 $250.00 seedlings ea $5.00 $0.00 underdrain (LF) 5ft $5.00 $250.00 biofilter soil mix (CY) 30 cy $45.00 $1,350.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth length IMFO ft width Wlt (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres basins $950.00 mobilization $2,500.00 as -built drawings (per facility) ea $2,000.00 $2,000.00 materials testing (per facility) ea Mae $2,000.00 $2,000.00 compaction testing (per dam) $3,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cast sum $17,721.00 contingency $1,772.10 Total $19,500 3/16/2017