Loading...
HomeMy WebLinkAboutWPO201600069 Bond Estimates 2017-03-17The Vue WPO file number: WP0201600069 TMP 56-115, 56-6A Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number(installed) TS) siftfence( acres $5.0$5.00 $35,0 silt fence (SF) F) ft oft $5.00 $6,750.00 $6,750.00 safety fence (SAF) ft $5.00 $0.00 diversion (DD, FD, RIND) $13.00 $16,900.00 temporary slope drain (TSD) pipe length Oft pipe diameter WO in $0.00 $0.00 earthwork for trap/basin he! M of dam at toe 9 16 ft cut at hi h side re 8 ft heightof fill at face 13 ft cu[ at face 3 ft length of dam 320 ft length of out ft top width 10 ft width of cul ft SB (area above transition) 468 sI (area below transition) 228 sf (total width of dam) 32 ft (total width of cut) 92 ft (height below transition) 3 k (depth below transitior 5 ft (area below transition) 39 sf (area above transition, 205 at (total fill volume) 6008.9 cy (total fill volume) 962.2 cy length of spillway ft (TOAL CV estimate) 6330 cy $13.00 $82,290.00 width of spillway 0 ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin "*ser height 16 ft hiser diameter 48 in (riser unit price) $150.00 $2,400.00 barrel length 57 ft base plate or fdn $200.00 $200 barrel diameter 18 in (barrel unit price) $40.00 $2,280.00 barrel collars Mh $200.00 $0 baffle length $50.00 $0 earthwork for trap/basin bei M of dam at toe 9 k cut at high sideoft reheight of fill at face ft cul at face ft length of dam k length of cutft top width tt width Of cul ft ST 1 (area above transition) 14 sf (area below transition) 52 at (total width of dam) 4 ft (total width of cut) 21 ft (height below transition) 0 k (depth below transitior 0 ft (area below transition) 0 sf (area above transition, 0 at (total fill volume) 51.9 cy (total fill volume) 154.1 cy length of spillway X (TOAL CV estimate) 171 cy $13.00 $2,223.00 width of spillway k (spillway stone tons) 1.4 tons $50.00 $70.00 earthwork for trap/basin height of dam at toe 9 k cut at high sideMftft reheight Of fill at face ft cul at face ft length of dam k length of cutfttop width ft width of cut ST 2 (area above transition) 14 sf (area below transition) 48 at (total width of dam) 4 ft (total width of cut) 22 ft (height below transition) 0 k (depth below transitior 0 ft (area below transition) 0 sf (area above transition, 0 at (total fill volume) 36.3 cy (total fill volume) 195.6 cy length of spillway X (TOAL CV estimate) 208 cy $13.00 $2,704.00 width of spillway X (spillway stone tons) 1 tons $50.00 $50.00 earthwork for trap/basin height of dam at toe 9 X cut at high sideMftft reheight of fill at face it cul at face ft length of dam X length of cutfttop width X width of cut ST 3 (area above transition) 6 sf (area below transition) 80 at (total width of dam) 3 ft (total width of cul) 30 ft (height below transition) 0.5 k (depth below transitior 1 ft (area below transition) 0.5 sf (area above transition; 14 at (total fill volume) 12.0 cy (total fill volume) 278.5 cy length of spillway X (TOAL CV estimate) 283 cy $13.00 $3,679.00 Width of spillway X (spillway stone tons) 2.3 tons $50.00 $115.00 silt fence inlet protection (IP) $100.00 $0.00 stone inlet protection (IP) $200.00 $7,000.00 outlet protection (OP) lengthft In width ft $0.00 $0.00 channel (SCC, matted) length k width k $0.00 check dam depth in channel ft width ft $0.00 construction entrance (CE) .$0.00 $2,500.00 $2,500.00 wash rack $2,000.00 $2,000.00 paved construction entrance $3,500.00 $3,500.00 rip -rap, placed depth tt length -ft (level spreader) width (tons) 151.8 tons $60.00 $9,108.00 survey and layout (price per 0.1 mi.) acres traps and basins $5,500.00 mobilization $2,500.00 stream crossing (computed independently) $0.00 cost sum $186,769.00 contingency $18,676.90 Total $205,450 3/17/2017 The Vue WPO file number: WP0201600069 TMP 56-115, 56-6A Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") d ES -1.2 EC -1 0.0 ft $0.00 $0.00 aggregate base or drainage stone -n in d . ft L Jim" ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin 9 height of dam at toeOft it cut at high side 9 ft height of fill at faceit cut at face ft length of damft length of cut ft top width width of cut ft (area above transition; 0 sf (area below transitior 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transitio 0 ft (area below transition) 0 sf (area above transitior 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway _it (TOAL CV estimate) 0 cy $13.00 $0.00 width of spillway ft (spillway stone tons) 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars Mff $200.00 $0 baffle length $50.00 $0 trees 108 ea $275.00 $29,700.00 shrubs 108 ea $50.00 $5,400.00 seedlings 0 ea $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth length 75.0ft width 0 1&2ft (tons) 168.75 $60.00 $10,125.00 survey and layout (price per 0.1 mi.) acres 0 basins 0 $0.00 mobilization $2,500.00 as -built drawings (per facility) (level spreaders) $2,000.00 $4,000.00 materials testing (per facility) Mae as $2,000.00 $0.00 compaction testing (per dam) as $3,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $51,725.00 contingency $5,172.50 Total $56,900 3/17/2017