HomeMy WebLinkAboutSDP201700016 Application Final Site Plan and Comps. 2017-03-14 Community Development Department
Albemarle I i I 401' tire Road Charlottesville,VA 229324 e:(434)296-5832 Fax:(434)972-4126
- - Planning Application
PARCEL I OWNER INFORMATION
TMP 07600-00-00-04680 Owner(s): TIMBERLAND PARK VA LLC
Application# SDP201
PROPERTY INFORMATION
Legal Description I AMACE
Magisterial Dist.jScottsviile T Land Use Primary Forest
Current AFD Not in A/F District El Current Zoning Primary R15 Residential
APPLICATION INFORMATION
Street Address Entered By
Application Jennifer Smith
PP ype Site Development Pians 20 2017
Project TIMBERLAND PARK APARTMENTS FINAL DIGITAL
Received Date 03/16/17 Received Date Final Submittal Date 03/10/17 Total Fees 1613
Closing File Date Submittal Date Final Total Paid 1613
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type dub�Appltcabo Conned
Fsite :
opm lir .{
........ u..w. +rr...+.::.u.+.1' . .1aaa. rsuw.. w.....r.t..G� ws.axs.J.a.Jw.au v..u........ h.....ara..a.. .w.wvc. .. .. .Lul........ •...r .aw.........s..s......
APPLICANT /CONTACT INFORMATION
ContactTYpe Name I Adtkess Citye Zip .Phone IFixweceii
n„1T114BERLAND PARKVA LLCr2t # BEAM D E CHARL�E?NC..._ `2821 _ C N,
Pr�meryCcntect KENT O'DONOHUE-BALZER& 1561 COMMERCE ROAD.SUITE VERONA,VA 24482 5402483220
Signature of Contractor or Authorized Agent Date
Application for
Initial Site Flan or Final Site Plan or Site Plan Exception ? tl
Project Name: Timberland Park Apartments
Tax map and parcel(s): 07600-00-00-046BO Zoning: R15'& ECO
Contact (who should we contact about this project) Kent O'Donohue (Balzer & Associates)
Street Address 1561 Commerce Road, Suite 401
City Verona State VA Zip Code 24482
Phone Number 540-248-3220 Email dodanohue@balzer.cc
Owner of Record M b l Qa << VA , LL G
Street Address 2021 Cross Beam Drive
City Charlotte State NC Zip Code 28217
Phone Number 704-357-6000 Email jensurber@sut'berdey.com
Applicant (same as owner)
Street Address
City State Zip Code
Phone Number Email
of
is Residential
Type of unit(s): 2 -bedroom & 3 -bedroom Apts
# of building(s): 4 Apts + 1 Community Center
Sq. ft. of building(s): +/ 88,000Total
# of units per building: Between 8 80 .24
Total # of units. $0
Resulting density:
Acreage of site -
10.31 units / acre
7:757
Acreage in open space: 112.76
Acreage in roads: n/a
Average gallons of water used per day: 32,400 GPD
Non-residential
❑ Commercial
❑ ,Industrial
❑ Quasi -Public
Sq. ft. of building(s):
Acreage of site:
Acreagein open space:
Acreage in roads:
Average gallons of water used per day:
FOR OFFICE USE ONLY SUP #.
Fee Amount S DatePaidBy lvho? Receiptft Ck# By:
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
REVISED 11/02/2015 Page 1 of 2
Intended use or iustitication for request:
Comments/Attachments:
FEES
SITE DEVELOPMENT
-PLAN
SITE PLAN EXCEPTION
Initial Site Plan
Final site Plan
Exception to drawing of site
plait under section 32.15(a)
Approved
No
preapplication plan
Proapplication plan
m $1>693
$1,613
❑ $752 plus $16/dwelling
❑ s1,290 plus sib/dweliingCl
unit And/or $0.016 per
unit and/or $0.016 per
square foot of
square foot of
nonresidential structure
nonresidential structure
$
$
1 d folded copies of the pion
d of coples required for submiltal ivill be noted with
8 folded copies of theplah
pills all addit/mial 6 copies Jivlthiu an Entrance Corrldor
your initial approval letter. Copies of the plan should
be folded mrd in blue or black ink. Also provide 1
reduced'eo of the lnnnolarger than 11 by] 7 in.
❑ The initial site pian has a parking structure,
l7 The final site plait has a parking
❑ Included are architectural elevations, drawings,
structure.
photographs or other visual materials showing any
❑ Included are revised architectural elevations,
parking structure proposed on the site and surrounding
drawings, photographs or other visual
structures and land uses.
materials submitted with the initial site plan.
The elevations shall be part of the approved
ring site plan.
GROUNDWATER. ASSESSMENT
(Required far all non-residential site plans not serviced by public water)
❑ If the plans show a use using less than 2,000 gallons/day (average) Tier 3 Groundwater Review = $548
❑ If the pians show a use using greater than 2,000 gallons/day (average) Tier d Groundwater Review = $1,183
❑ Special Exception =$457
Notices required by Section 32.4.2.1(f)
Preparing and mailing or delivering up to fifty (50) notices = $215.00 plus the actual cost of first class postage.
Preparing and mailing or delivering, per notice more than fifty 50 =$1.08 plus the actual cost of first class postage4
Owner/Applicant Must Read and Sign
This site plan as submitted contains all of the information required by Section 32.5 (Initial Site Plan) or Section 32.6 (Final Site Plan) of
Chapter 18 of the Code of the County of Albemarle, 1 understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1
of Chapter 18 of the Cade_ as the case may be, By signing this application 1 am consenting to written comments, letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email. This consent.does not. preclude such
written caintr nication from _also being sent via first class mail.
Signature of OwnContract Pukiaser, Agent"
C-1 (�
Print Name
3 - /z -1t
Date
357- opo
Daytime pho eml.M r-pfSignatory;
REVISED 11/02/2015 Page 2 of
Final Site Development Flan
Checklist
Project Name: Timberland Park Apartments
Firm: ga 1 uv *
This checklist must be completed, signed and submitted with the application. The information contained in this
checklist reflects the contents of the Section 32 of Chapter 18 of the Code of the County of Albemarle also known as
the Site Plan Ordinance as of January 1, 2013. The applicant is responsible for insuring that no revisions to the
Ordinance have occurred since preparation of this document.
This final site plan has:
U' -an initial site plan that was approved for the development and it remains valid; SDP - 20-1�
Z --satisfied all of the requirements of section 32.6 below; and
satisfied all of the conditions delineated in the letter provided under section 32.4.2.5(c) required to be satisfied prior to
submitting the final site plan.
.O�-Authorized preparer,
The plan, and any amendments to a plan, is prepared and sealed, signed and dated by one of the following
❑ An architect licensed to practice in the Commonwealth of Virginia.
❑ A professional engineer licensed to practice in the Commonwealth of Virginia.
❑ A land surveyor licensed to practice in the Commonwealth of Virginia.
- -� A certified landscape architect licensed to practice in the Commonwealth of Virginia.
-a—Number of copies when first submitted.
Provide the number of copies as directed in the Initial Site Plan approval letter
NW One (1) reduced copy of the plan no larger than eleven (11) by seventeen (17) inches in size.
,13 ---Scale and size.
ATThe plan is prepared to the scale of one (1) inch equals twenty (20) feet or larger, or to another scale approved by
the agent in a particular case,
❑ Other scale approved - one (1) inch equals (_) feet, by
AEr'-No sheet exceeds forty-two (42) inches by thirty-six (36) inches in size.
❑ The plan IS prepared on one (1) sheet. OR
-Z'The plan IS prepared on more than one (1) sheet and match lines clearly indicate where the several sheets join.
-0--The top of ach sheet is approximately
North or
❑ East
.EY -Dimensions.
The plan is dimensioned to at least the following standards for accuracy:
--U/Boundary, setback and zoning lines: Within one one-hundredth (0.01) of a foot,.
� Existing contours: Within one-half (1/2) of the contour interval required in section 32.6.2(c).
Proposed contours: Within one (1) foot horizontally and vertically.
-ESpot elevations: Within one-tenth (0.10) of a foot.
,-U Existing critical structures including utilities and other topographic features: Within two (2) feet,
provided that for critical structures, which include, but are not limited to, gas lines, other utilities, pipes,
conduits, walls and buildings to be preserved, within one-tenth (0.10) of a foot.
-Zr'--Proposed structures, roads, parking lots and other improvements: Within one one-hundredth (0.01) of a
foot.
REVISED 06/10/2015 Page 1 of 4
Albemarle County - Final Site Plan Checklist
Site Plan Ordinance Section 32.6 - Contents of final site plan
In addition to containing all of the information required to be on an initial site plan, as provided in section 32.5, a final
site plan shall contain the following:
-Lr--b emonstrate compliance with chapter. Specific written schedules or notes as necessary to demonstrate that the
requirements of this chapter are satisfied.
.Proposed grading.
A3 Proposed grading (up to twenty [20] percent slope, maximum two [2] foot contours; over twenty [20]
percent slope, maximum five [5] foot contours).
,a' Water and sewer facilities.
'Detailed plans for proposed water and sewer facilities, including all pipe sizes, types and grades;
'proposed connections to existing or proposed central water supplies and central sewage systems;
.0'location and dimensions of proposed easements and whether they are to be publicly or privately
maintained;
Z' rofiles and cross sections of all water and sewer lines including clearance where lines cross;
all water main locations and sizes; valves and fire hydrant locations;
-LY—all sewer appurtenances by type and number;
,El ---the station on the plan to conform to the station shown on the profile and indicate the top and invert
elevation of each structure.
-O---Drainage and grading plans.
-O�Detailed construction drainage and grading plans:
rofiles of all ditches and channels whether proposed or existing, showing existing and
proposed grades, and invert of ditches, cross pipes or utilities; typical channel cross
sections for new construction; and actual cross sections for existing channels intended
to remain;
10- Profiles of all storm sewer systems showing existing and proposed grades;
,Lr --Plan view of all drainage systems with all structures, pipes and channels numbered or
lettered on the plan and profile views. Show sufficient dimensions and bench marks to
allow field stake out of all proposed work from the boundary lines;
,JJ'A drainage summary table for culverts, storm sewer and channels as described in the
following example:
Structure
Description
Length
Invert
Invert
Slope
Remarks
Number
In
Out
1
42" RCP
50'
24.50
424.00
100.00%
Provide
Class III
2, EW
2
DI- 3B
L=8
26.00
432.00
-
IS -1
To
3
PG -2A
400'
420.00
400.00
5.00%
D=12"
4
Grade
200'
420.00
415.00
2.50%
D=18"
Swale
VV legend showing all symbols and abbreviations used on the plan;
General notes, typical sections, and details of all items not covered by Virginia
_P
epartment of Transportation standard drawings; and
Flood plain limits for the one hundred (100) year storm for all watercourses with an
upstream drainage area of fifty (50) acres or more provided that the county engineer
may waive this requirement for drainage areas of less than one hundred (10 0) acres
upon determining that the information is unnecessary for review of the proposed
development.
REVISED 06/10/2015 Page 2 of 4
Albemarle County - Final Site Plan Checklist
,0'Street sections.
X Typical street sections together with specific street sections where street cut or fill is five (5) feet or
greater;
centerline curve data;
radius of curb returns or edge of pavement;
�ocation, type and size of proposed ingress to and egress from the site together with culvert size;
ms's mmetrical transition of pavement at intersection with existing street;
the edge of street surface or face of curb for full length of proposed street;
,a --when proposed streets intersect with or adjoin existing streets or travelways, both edges of existing
pavement or travelway together with curb and gutter indicated for a minimum of one hundred (100)
feet or the length of connection, whichever is the greater distance.
ublic facilities and utilities.
' ,All public facilities, utility and drainage easements outside the right-of-way of public streets, provided
that new easements may be generally shown and accurately dedicated by separate plat.
All water and sewer facilities to be dedicated to public use and the easements for those facilities and
shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service
Authority.
-0--Signature panel.
.-0'Signature panel for signature by each member of the site review committee.
-0-- Parking and loading areas.
.0'For all parking and loading areas, indicate the
-El� size,
a— angle of stalls,
,Q- width of aisles and specific number of spaces required and provided, and
.a' method of computation. Indicate type of surfacing for all paved or gravel areas.
2r -landscape plan.
J2r-Alandscape plan that complies with section 32.7.9
,U'Outdoor lighting.
Outdoor lighting information including
-L' a photometric plan with
J2' location, description, and photograph or diagram of each type of outdoor luminaire.
.a --Recreational facilities.
Ja'Specifications for recreational facilities.
In addition to the items required by the ordinance, Albemarle County Engineer, the Virginia
Department of Transportation, the Albemarle County Service Authority, and the Thomas Jefferson
Health District require these items on plans submitted for final site plan approval. Plans will not be
rejected if these items are not present, but they are required for approval. These items are provided in
an effort to communicate all final site plan comments.
Reference the benchmarks used for surveys. (Albemarle County Engineering Policy)
-Aa-2. Indicate the available sight distance for entrances and left turn lanes. (Albemarle County Engineering Policy)
,a---3. Label the maximum height of all retaining walls. (Albemarle County Engineering Policy)
Provide copies of off-site easements, or letters of intent to grant them from off-site property owners.
(Albemarle County Engineering Policy)
REVISED 06/10/2015 Page 3 of 4
Albemarle County - Final Site Plan Checklist
,#�-5. Show and label stream buffer limits. (Water Protection Ordinance, WPO)
.U--6. Indicate the deed book and page reference for all existing utility easements located on the property.
(Albemarle County Service Authority)
*7. Tier 3 - Draft or Final Groundwater Management Plan (WPO Section 17-403)
*-8- Tier 4 —Aquifer testing work plan (WPO Section 17-403)
Read and Sign
In representing the above referenced firm submitting this plan for final approval, I hereby sate that, to the best of my knowledge, the attached plan
contains a 'nformation requir d by this checklist.
. 1—d 7 /Y-.16/ 7
Signattlure of Owner, Contract Purchaser, Agent Date
Print Name Daytime phone number of Signatory
REVISED 06/10/2015 Page 4 of 4