Loading...
HomeMy WebLinkAboutSDP201700009 Review Comments Initial Site Plan 2017-03-20j� pE AIL y% County of Albemarle Department of Community Development Memorandum To: Patty Saternye, Senior Planner From: Francis MacCall, Principal Planner Division: Zoning Date: March 20, 2017 Subject: SDP2017-00009 Boyd Tavern Market Initial — zoning comments Please omit any comment that you have believe has already been made with your comments. PAGE 1 - Remove reference to incorrect sign regulations and correct with statement that "All signs will comply with Section 4.15 as applicable" 2. PAGE 1 - Under the "WATER & SANITARY SERVICES provide the following calculation. Water use permitted without Special Use Permit 1218 gallons per day is permitted for the 3.046ac zoned C-1 This acreage is calculated per the old rezoning applications. 3. Data on proposed water usage must be provided as a condition for the final site plan. The limit for the amount permitted to be used for this site is 1218 gallons per day. This data must be evaluated by the Zoning Administrator and the County Engineer to determine the need for a special use permit. The plan appears to show a different number for the total area on C-1 zoning. If there is confusion/disagreement of total acres of C-1 to be used for this use for this calculation then a new survey of the parcel can be done to identify the area per the previous rezoning applications. This should be resolved before the final site plan is submitted. 4. Section 5.1.20 should be noted on the first page under the zoning designation on the final plan. Both the underground gasoline storage tanks and the loading facility for those tanks will need to be shown complying with the setback in Section 5.1.20. Phone 434-296-5832 AL IRGINZ�' County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Justin Shimp (justin0shimp-engineering.com) From: Paty Saternye, Senior Planner Division: Planning Date: March 20, 2017 Subiect: SDP 201700009 Bovd Tavern Market — Initial Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [17-403, 16-100, 32.5.2(k)] As specified in the engineering comments that have been attached, either a Tier 3 or Tier 4 groundwater assessment, and the associated fee, is required prior to approval of the Initial Site Plan. The type of assessment required is determined by water use and the potential of a central water supply. Once it is determined whether a Tier 3 or Tier 4 groundwater assessment is required submit a draft Tier 3 or Tier 4 groundwater assessment for evaluation by engineering. The Initial Site Plan cannot be approved until this has been submitted. 2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. 3. [32.7.2.1] Each entrance onto any public street shall be designed and constructed as required by the standards of the Virginia Department of Transportation (VDOT). VDOT approval of the entrance to the site shall be required prior to final site plan approval. See the attached VDOT comments. 4. [22.2.2.11] Provide data that shows the expected water consumption in "gallons per site acre per day". This must be based only on the acreage of the C-1 zoned portion of the parcel. A special use permit is required for uses permitted by right, not served by public water, and that involve water consumption exceeding four hundred (400) gallons per site acre per day. If water usage is above that level a special use permit will be required prior to final site plan approval. 5. [32.5.2(k) & 16-100] Provide information on the proposed water and septic systems, including the proposed number of connections to each. Each physical connection to a system (water or septic) is counted, including multiple connections serving one structure; any more than two connections requires approval by the Board of Supervisors of a central water supply and/or central sewerage system. A Compliance with the Comprehensive Plan review may also be required if central system(s) are necessary. 6. [21.7(c)] No construction activity including grading or clearing of vegetation shall occur closer than 20 feet to any residential or rural areas district unless waived by special exception by the Board of Supervisors. This applies not only to the adjoining parcels but also to the RA zoned area of the subject parcel. The proposed stormwater pond location is shown within the buffer zone. Relocate the proposed stormwater pond location such that the pond, and any grading or disturbance caused by its creation, do not impact the buffer zone. Page 1 of 3 7. [32.5.2(p), 32.7.9.7(a)(1)&(2) & 32.7.9.7(d)] Provide a complete landscape plan that meets all requirements of section 32.7.9 with the Final Site Plan. This includes, but is not limited to, screening requirements to all adjacent Rural Area Districts as well as Residential uses. It is important to note that disturbance of the buffer zone (21.7(c)) is not allowed even for the purpose of screening. Therefore, required screening will need to be located elsewhere. If the screening is accomplished by landscaping the layout does not appear to include sufficient space for a 20' screening planting strip on the southwest side of the property. 8. [5.1.20] In reference to petroleum products provide the: • Location of the storage tanks and loading facilities on the site plan. No storage tanks or loading facilities shall be located closer than 100' from any lot line. • Labels for the setback for the petroleum products storage tanks and loading facilities on the existing conditions and site overview sheets • Setback for the petroleum products storage tanks and loading facilities on the site overview sheet. 9. [32.5.2(n) & 4.12.13(c)] Provide the location and dimensions of the required loading space within the site plan. 10. [4.12.15(g)] Provide curb and gutter in the parking area and along the travelways. 11. [32.5.1(c) & 32.5.2(a)] Revise the: • Dimensions for the boundary (bearing and distances) of the parcel so that they are darker and more visible. They need to be dark enough to be visible when scanned and copied. • 6.60' boundary line bearing and distance near the south corner of the lot along Black Cat Road to include the bearing. • Setbacks on the coversheet to include the Front -Minimum setback, specify all districts that the side and rear setback applies to, include information on the side and rear setbacks abutting lots zoned commercial or industrial, and expand the 10' Parking setback note to specify when it applies. 12. [32.5.1(c)] On the: • Site plan and grading & utility plan sheets revise the label for the "20' Parking Setback and Buffer" to more clearly specify what the "buffer" is for. As 21.7(c) specifies the buffer is for any construction activity including grading or clearing of vegetation. • Existing conditions and site overview sheets label the setback and buffer lines to differentiate them. 13. [32.5.2(a)] Revise the: • "Abutting Parcel Information" so that TMP 94-40 shows the correct owner and most recent Deed Book and page numbers. The parcel appears to have changed hands in 2015. • "Abutting Parcel Information" of TMP 94-38 to include its zoning district. • Departing lot lines so that they are dark enough to be visible when scanned and copied. 14. [32.5.2(b)] Revise the Land Use Schedule to include the overall size of the parcel, how much is zoned RA and how much is zoned C-1. 15. [32.5.2(e)] Provide labels, on all plan view sheets, identifying whether the existing wooded areas are composed of evergreen, deciduous or a mix of types of trees. 16. [32.5.2(1)] Provide the centerline of Black Cat Road. 17. [32.5.1(a)] Revise the vicinity map to be black and white and not color. Site plans are to be only black and white. 18. [32.5.2(j)] If there are any existing water, wastewater or storm drainage systems on the property show the location and size of each. Also provide the deed book and page references for any and all existing water, wastewater or storm drainage systems easements that are located on the property. 19. [32.5.2(k)] Provide the proposed location of the waterlines leading from the well to the proposed structures and facilities. Page 2 of 3 20. [32.5.2(1)] Provide the location of any existing or proposed utilities and utility easements including telephone, cable, electric and gas. Indicate the deed book and page reference for all exiting utility easements located on the property. 21. [32.5.2(n)] Provide: • Outdoor lighting information including a photometric plan and location, description, and photograph or diagram of each type of outdoor luminaire [Sec. 32.7.8 & Sec. 4.17]. If there will be any external lighting fixtures a photometric plan will be required for Final Site Plan approval. In addition to meeting all lighting requirements a standard lighting note will be required. • If there is to be a sign for the proposed use, on the final site plan depict and label the sign location. (Depicting the sign on the final site plan is not approval of the sign location or type). • Information on the proposed paving material types for all walkways, access ways and parking lots. 22. [Comment] Recommendations in reference to the cemetery: • No fence exists around the perimeter of the existing cemetery. It appeared during the site visit that the graveyard may extend further to the north and south then shown on the site plan. It is recommended that more information on the extents of the cemetery are acquired and a more accurate location of the cemetery be provided on the site plan so that it will not be disturbed by any of the proposed improvements to the site. • Because of the State requirement of access to graveyards, it is recommended that a path is provided as part of the site plan for access to the cemetery and that the path be located in an area that is not steep and hard for some people to utilize. • Provide a note on the site plan that specifies the state requirement of right to access of the cemetery. 23. [Comment] This property is within the Monticello Viewshed. It is strongly encourage that you consult with the Thomas Jefferson Foundation early in the site plan process about any potential visual impact of the project. 24. [Comment] See the attached comments from the other SRC reviewers. Please contact Paty Saternye in the Planning Division by using psaternye@albemarle.ora or 434-296-5832 ext. 3250 for further information. Page 3 of 3 A', COMMONWEALTH of VIRUINIA In Cooperation with the Thomas Jefferson Health District State Department of Health 1138 Rose Hill Drive Phone (434) 972-6219 P. O. Box 7546 Fax (434)972-4310 Charlottesville, Virginia 22906 March 20, 2017 Paty Satemye, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Boyd Tavern Market Initial Site Development Plan SDP2017-9 Ms. Satemye: ALSEMARLE CHARLOTTESVILLE F1UVANNA COUNTY (SALMYRA) GREENE COUNTY ISTANAROSVILLEI LOUISA COUNTY ILOUISA) NELSON COUNTY (LOVINGTGN) As requested, I've reviewed the Initial Site Development Plan (2/6/17) for the Boyd Tavern Market, referenced above. The plan indicates that the proposed convenience store will be served by a private onsite septic system and well. In order to permit the construction of the septic system and well, the developer must submit an application and 3 sets of designs prepared by a professional engineer to the Charlottesville/Albemarle County Health Department. Be advised that approval of the site plan by this office will be contingent upon review and approval of the septic system and well designs. If there are any questions or concerns, please do not hesitate to contact me. Sincerely, Alan Mazarowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowski!d vdh. v i re i n ia.1'ov Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 February 14, 2017 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Paty Saternye Re: Boyd Tavern Market — Initial Site Plan SDP -2017-00009 Review #1 Dear Ms. Saternye: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Shimp Engineering, dated 6 February 2017, and offers the following comments: 1. Show ADT and design/posted speed for Route 616 on plans. 2. The minimum required spacing for full access entrances on Route 616 (Collector, 45 mph design speed) is 335 feet. The proposed spacing of 205 feet between the two entrances will not be permitted. Additionally, it does not appear to be feasible to have 2 entrances that are 335 feet apart while maintaining the required distance (750') from the I-64 interchange ramp. 3. Include a trip generation report and provide left and right turn lane warrant analyses on the plans. Based on the plans it is not clear where the proposed entrance(s) are in relation to the existing right turn Iane; please provide more detail. 4. Provide entrance profiles, as well as sight distance profiles. 5. Please note that trees within the sight distance easements or right-of-way may have to be removed if not pruned in such a way as to avoid becoming sight Iine obstructions. 6. Provide the VDOT WP -2 detail and note on plans the required area of mill and overlay in accordance with the WP -2 standard. 7. The entrance curbing should be offset 12 feet from the edge of pavement, and extended the required length of storage and taper if a right turn lane is warranted. See Figure 4-9, Appendix F. 8. Please label all entrance radii; 45' minimum. 9. Provide a Traffic Maintenance Plan in accordance with the April 1, 2015 revision of the Virginia Work Area Protection Manual. 10. Note that the final site plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. VirginlaDOT.org WE KEEP VIRGINIA MOVING February 14, 2017 Paty Saternye Page 2 Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin DeeI at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, NOIL, - W4V6UV Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING