HomeMy WebLinkAboutFDP201700003 Plan - VSMP 2017-03-16M M
ENGINEERING, P.C.
L' ng i u e e r•s • S ri r r y o r•s • Lark! Planners
March 16, 2017
Mr. Frank V. Pohl, PE, CFM
County Engineer
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: WP0201600069, The Vue
Dear Mr. Pohl:
In regards to the above referenced project, the purpose of this letter is to provide
written documentation that no above grade structures will be constructed within the 100-
year base floodplain limits. This is also documented on the WPO plan dated November
20, 2015 with a noted plot date of March 9, 2017. Since structures will not be
constructed above the existing grade, I can certify there will be no -rise or increase in the
base flood elevation. If you should have any questions, or need additional information,
please contact me at your earliest convenience.
Sin
� r
UO� 5I16I11 c
BRASIL W. HAMRICK, jR.
Uc. No.1OI&-\
Brasil W. Hamrick, Jr., P.E.
156 Laurel Hill Road (Rt. 612 E.), Verona, VA 24482 • (540) 248-7407 • Fax (540) 248-7408