Loading...
HomeMy WebLinkAboutSDP201700003 Checklist - Project Closeout (Administrative) 2017-03-20 SUBDIVISION/SITE PLAN , FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and status label. CDA will forward to the Imaging Center for digital ��ppcloseout. SDP SUB# l 7 - 3 PROJEC TITLE �okie/e _"' r 'l, t,a ( -S r` ek FULL NAME OF LEAD REVIEWER Spe.,.,-z._ FINAL ACTION DATE: 3 - /7 CoptyView— :.❑Application,Page 2 Data Entered ❑ ' 1 1 • ' -- D Tl:..' Ian l���J J11, a..'.mU V. .... /.,—.......1, . _A__ a 4 Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse 1 chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. Engineer' Folder Information/documentation Scan ❑ Saved location Applica ' n(signature copy) Scan ❑ Saved location Public tification records/Abutting Owner correspondence Scan ❑ Saved location I.FrApplica t Correspondence(to/from, memos/emails) Scan ❑ Saved location fzi Complet set of printed Review Comments All Scan ❑ Saved location Approved plan/plat(signed, or stamped"Approved"with Planner/Engineer name) ..Fi Scan ❑ Saved location Action Lett (Administrative Approval) Scan ❑ Saved location ❑ Other(Please explain-i.e. Studies) ❑ Scan ❑ Saved location 11` ❑ Other(Please explain-i.e. Studies) ❑ Scan ❑ Saved location ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location Additional Information on this project: i