Loading...
HomeMy WebLinkAboutSDP201600067 Review Comments Initial Site Plan 2017-03-24Christopher Perez From: Christopher Perez Sent: Friday, March 24, 2017 2:54 PM To: 'dhines@bohlerEng.com' Cc: 'wec8y@virginia.edu' Subject: RE: SDP201600067 Shops at Westfield Road - Initial Site Plan (resubmittal) Mr. Hines, SDP201600067 Shops at Westfield Road - Initial Site Plan (resubmittal) Prior to initial site plan approval, at a minimum, comments 1— 2 shall be addressed in a resubmittal. 1. <<,omment] The pumic nouncaiion iee of ,�LlD was not paid prior to the SRC meeting. Please pay the fee prior to any further review/action of the plan. Rev 1. Comment addressed. 2. [32.5.2(p), 32.7.9.5(d)] Landscape Plan. There are numerous conflicts with the required/proposed landscaping and the 40-foot utility easement along the lot's frontage (Rte. 29 and a portion of Westfield Road). Prior to the initial site plan receiving conditional approval provide written authorization from the easement holder that the proposed plantings are permitted within the easement. If authorization is not received, then the planting strip shall be enlarged to accommodate the required plantings. Prior to the initial site plan receiving conditional approval the plan shall be revised to address the above requirements. Rev 1. Comment not adequately addressed. While you have provided documentation that a specific type of planting is permitted in the easement. These specific plantings provided in this easement, as depicted on the revised landscape sheet, are not acceptable to ARB. See ARB review comments below*. Prior to initial site plan approval the plantings in this easement shall be acceptable to ARB and the easement holder. *ARB Review Comments: "At the March 20, 2017 ARB meeting, staff summarized the proposed landscape change involving frontage tree sizes smaller than required for the Shops at Westfield. It was the consensus of the ARB that the frontage planting requirements should be met, but a combination of streetfront and additional planting in other available areas could be considered. The ARB encouraged the applicant to pursue measures to reduce required parking. " How do you wish to proceed? Request deferral with a resubmittal date (within 6 months) specified, or request withdrawal? Christopher P. Perez I Senior Planner Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3443