Loading...
HomeMy WebLinkAboutSUB199000040 Plan - Approved Stormwater Management Plan 1988-01-28EXISTING POND TO REMAIN MEADOWFIELD SUBDIVISION ROBERT B. MCKEE & ASSOCIATES t i r lC i o' JANUARY 22, 1988 SCALE: 1" = 50' �� 1. The pond is located within lots 20, 21 and 22. 2. An access driveway to Lot 20 will be constructed across the dam. The minimum width of the surface shall be 10' at a 2% cross- It5ea-- i ' slope to the downstream side of the dam. The minimum elevation on the driveway shall be 509.5. iX / % 1 / r \�\\\ �� // 3. The existing 4" diameter riser pipe shall be fitted with a cap constructed of 1/2" x 1/2" welded wire mesh to protect the riser from __ \ �� clogging. Connect cap to pipe with a T ri /— -- — _— _ i minimum of two 1/2" wide hose % clamps spaced as follows: top clamp shall be located f 1" from the top of the pipe, bottom clamp shall be located 6" from the top of the pipe. ��--- / 4. The existing 4" diameter outflow pipe is deteriorated at its downstream end. The pipe i shall be cut upstream at a location where the j pipe is not corroding. Place rip rap from the pipe to the existing channel. Ir; r I I 'r I I I I o s ! !, � r 5. A 12" C.M. pipe shall be installed under the 11 In I I10 driveway to provide an emergency spillway. '9"RISER r i[CI C L.F. 12" C.M.P. @ 2.0 1r f 'I r Cr Invert in = 508.0 �FWe ��•�. filI LI 11 ! ` � - t — Invert /out=507.4 ge I I -♦ I. \ \\ \ r I I i I r — — � I _ � \ \ � , .3� � r I I l i � \ � > 4. Z I6!{ ✓�egwt �i'e (i l� . C`,, _ o�- `ll� ♦ '..;rte _ By ti 5 ye,,)