Loading...
HomeMy WebLinkAboutWPO201600051 Bond Estimates 2017-03-31Project Name: Albemarle County Service Authority Crozet Phase 3 Water Main Replacement Project WPO file number: WP0201600051 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stabl tion (PS, TS)cr- $5,000.00 $1,250.00 silt fence (SF) fi $5.00 $5,250.00 safety fence (SAF) ft $5.00 $0.00 diversion (DD, FD, RWD) ft $13.00 $0.00 temporary slope dem(TSD) pipe length 0 f pipe diameter -in $0.00 $0.00 eanhwatr for trap/basin het ht of dam at Ice 9 0 ft out al high side 9 fl height of fill at face 0 ft out at face fl length of dam 0 ft length of cut fl top width 0 ft width of out fl (area above transition) (area below transition) 0 sf (total width of dam) 0 k (total width of cut) 0 ft (height below transition) 0 ft (depth below transitior 0 ft (area below transition) 0 sf (area above transition) 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway R (TOAL CV estimate) 0 cy $13.00 $0.00 width of spillway R (spillway stone tons) 0tons $50.00 $0.00 structures for basin riser height R rise r diameter in (riser unit price) $0.00 $0.00 barrel length R base plate or fdn $200.00 $0 barrel diameter (barrel unit price) $000 $0.00 barrel collars $200.00 $0 baffle length h $50.00 $0 sill fence inlet protection (11P) $100.00 $2,100.00 stone inlet protection (IP) $200.00 $0.00 cutlet protection (OP) length ft width 8 fi $540.00 $540.00 channel (SCC, matted) length fl width 0 fi $0.00 check dam depth in channel fi channel width 0 ft $0.00 $0.00 construction entrance (CE) $2.50000$5,00000 wash rack $2,000.00 $0.00 paved construction entrance $3,500.00 $0.00 rip -rap, placed depthfi length r width 0.0 0 tons $60.00 $0.00 survey and layout (price per 0.1 mi.) acres r 0.5 traps and basins ' $250.00 mobilization $2,500.00 stream crossing (computed independently) $0.00 cost sum $16,890.00 contingency $1,689.00 Total $18,580 3/31/2017 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2:1 for simplicty Cut at High Side h2 Height of Fill at Face h1 %, w Width of Cut Fill area above transition = h1(2h1) + hl (w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2 -h1, area = (width*height)/2 - height x height Length of Cut Top I—w transitic h1 Cut at Fa liment traps and basins Width ►n point \ Height of Dam at Toe h2 ice Volume= Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)