HomeMy WebLinkAboutARB201600125 Application 2016-09-27 Community Development Departi7
Albemarle C Nunty 401 McIntire Road CharliJttesville,VA 22902-4!
`,,41,1110,
Voice:(434)296-5832 Fax:(434)972-4'
,4 Planning Application
PARCEL OWNER INFORMATION
TMP 07600-00-00-046BQ Owner(s): WOODLANDS PROPERTIES III LLC
Application # ARB201600125
PROPERTY INFORMATION
Legal Description[ACREAGE
Magisterial Dist. Scottsville Land Use Pi-imari Forest
Current AFD Not iii A/F District
Current Zoning Primary R15 Residential
APPLICATION INFORMATION
Entered
Street Address
Judy Main
Application Type Architectural Review Roam 9127/2016
Project Timberland Park Apartments- Preliminary
Received Date 09/26/16 Received Date Final Submittal Date 09/26/16 Total Fees
Closing File Date Submittal Date Final Total Paid
Revision Number
Cornments
Legal Ad
SUB APPLICATION(s)
TA, Sth ication omnlent
PriniySfte - rtentPlan 09/26/16
APPLICANT CONTACT INFORMATION
ColtactT Name . a ess Ci tState Zi Phone PistoneC,f
cE14,,11,9-riAlvtitalit :' ImootAspa,PROPERTIES.HI LLC 4I EAST MAIN STREET STE 3 ',...c.HARLoTTESVILL 22902
Primary Contact VA. 24452 5402483220
,.„..
Signature of Contractor or Authorized Agent Date
N111110, NINO°
Architectural Review Board Application `vg
looft
�;lt�
Part A: Applicant, Contact and Parcel Information
Project Name: TIMBERLAND PARK APARTMENTS
Tax map and parcel(s): 07600-00-00-046B Physical Street Address: OLD LYNCHBURG ROAD
Contact Person: KENT O'DONOHUE
Business Name: BALZER &ASSOCIATES, INC.
Address 1561 COMMERCE ROAD, SUITE 401 City VERONA State VA Zip 24482
Daytime Phone( ) 540-248-3220 Fax#( ) 540-248-3221 E-mail DODONOHUE@BALZER.CC
Owner of Record: WOODLANDS PROPERTIES III LLC
Address 416 EAST MAIN STREET, SUITE 301B City CHARLOTTESVILLE State VA Zip 22902
Daytime Phone( ) Fax#( j E-mail
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special.Use Permit or a No Fee
Rezoning)
X Preliminary/Initial Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750' or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building penults where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# ARB#
Fee Amount$ Date Paid By who? Receipt# Check# By
County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126
10/2015 Page 1 of 2
OVER—a
Part C: Description of Proposal
Describe your proposal.Attach a separate sheet if necessary.
THE CONSTRUCTION OF FOUR RESIDENTIAL BUILDINGS &A COMMUNITY CENTER WITH PUBLIC
UTILITIES AND ASSOCIATED PARKING. NECESSARY GRADING, EROSION CONTROL, AND
STORMWATER MANAGEMENT WILL BE PERFORMED.
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain(8)folded copies of all plans and documents being submitted.
Only(1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
/(f1--- 09/26/2016
Signature of owner, owner's representative Date
or contract purchaser
D. KENT O'DONOHUE JR, PROJECT MANAGER 540-248-3220
Printed name, Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER—>
o
Architectural Review Board
ikTrtiEr
Preliminary Review of a Site Development Plan
Submittal Requirements Checklist
~ Part, A , eant Cenat aria Farce[1nformatlW ,
Project name: TIMBERLAND PARK APARTMENTS
Tax map and parcel#: 07600-00-00-046B0
Physical street address (if assigned):
Location of property (landmarks, intersections, or other): RTE 780 B/W SHERWOOD MANOR& 1-64
Contact person: KENT O'DONOHUE
Business name: BALZER&ASSOCIATES, INC.
Address: 1561 COMMERCE ROAD, SUITE 401 City: VERONA State: VA Zip: 24482
Daytime phone: 540-248-3220 Fax: 540-248-3221 Email: DODONOHUE@BALZER.CC
Pre1ti rr a r tt rrela e t�'a �e €trerr epkIis
Important Note: Submittal packages must contain (8)collated copies of all information unless otherwise
indicated.
A. Written description of the proposal
• Provide a general description of all proposed work.
64 Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of"1"=20', clearly legible and folded):
▪ Location(s) of proposed building(s) on the site.
E1 Schematic layout of parking, travelways, and other improvements.
671 Location of existing and proposed tree lines. Individually identify trees of a 6-inch caliper or greater.
Existing and proposed topography drawn with contour intervals of 2-feet, and with sufficient off-site
topography to describe prominent and pertinent off-site features and physical characteristics, but in
no case less than 50-feet outside of the site.
121 Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
• Conceptual stormwater management plan.
▪ Conceptual landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings.
1
Revised 7/28/10
C. Appearance of the proposed building(s)
▪ Show a representation of the appearance of the proposed building(s). This must include architectural
elevations drawn to the scale of at least 1/16"=1'-0". This may also include perspective sketches, or
photos of the proposed building(s). These documents should provide a basic understanding of:
I2:1 The size, form, and scale of the building.
WI The architectural style of the building.
The proposed building materials and color(s).
D. Additional material
64 Provide labeled, color, 8-Y" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
▪ The applicant is welcome to submit any additional material that will make the preliminary review more
productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping,
or other unique or unusual conditions are welcome.
[21 Site sections may be useful.
Padc . v
807hil "rpt A re��erit
`'".,_Mti. ..,a.=
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a preliminary site development plan review by the ARB. Additional submittal materials may be
required, depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided on this application, and all accompanying information, is accurate, true and correct
to the best of my knowledge, and that the attached plans contain all information required by this checklist.
/6f. • 09/26/2016
Signature of person completing checklist Date
D. KENT O'DONOHUE JR. 540-248-3220
Printed Name/Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434) 296-5832 Tel, (434) 972-4126 Fax
www.albemarle.orq
2
Revised 7/28/10