Loading...
HomeMy WebLinkAboutSDP201500004 Plan - Approved Initial Site Plan 2015-03-12VILLAS AT FOOTHILL CROSSING PRESERVED SLOPES NO PRESERVED SLOPES ARE LOCATED AT THE PROPERTY. MANAGED SLOPES: SLOPES ARE LABELED ON THE S70RMWA7ER MANAGEMENT PRELIM INAR GENERAL NOTES OWNER. ROUTE 240 HOLDINGS LLC P.O. BOX 1467 CHARLOTTESVILLE, VA 22902 DEVELOPER: RIVERBEND DEVELOPMENT, INC. 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE, VA 22902 ATTN: ALAN TAYLOR ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUI7E K CHARLOTTESVILLE, VA 22902 (434)293-3719 PRE -APPLICATION CONFERENCE: SEPTEMBER 23, 2013 SHEETS. SITE PLAN WHITEHALL DISTRICT OFFSITE DISTURBANCE OFFSITE DISTURBANCE TO PARCEL 05600-0RED FOR 5700 (R-1 AND 056KO-0-00-000AI ALBEMARLE COUNTY, VIRGINIA ROADWAY CONNECPO ONT PARK RIDGE DDRIIVE.FOR INE BUILDING HEIGHTS: MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 35 FEET PROPOSED DENSITY • R-6 SINGLE FAM/LY DETACHED: 1 (p SETBACKS FRONT.- 25' TAX MAP NO.: 05600-00-00-05700 (D.B. 2478, PG. 251) SINGLEFAMII 1)- / SIDE., f0'- 056A2 -O7-00-06200 (D.B. 2525, PG. 75) TOTAL PROPOSED LOTS: 0 '� �'t' REAR: 20' R-6 DENSITY D. U./14.67 AC =4.79 D.U./AC. A REDUCTION IN THE SIDE SETBACK FROM 15' TO 10' IS E PROJECT AREA: 74.61 AC (05600-00-00-05700 R-6 PORTION) IN ACCORDANCE WITH ALBEMARLE COUNTY COD ON) R-2 SEC77ON 4.11.3, PROVIDED ADEOUA TE FIRE FLOW AND 2.13 AC (056A2-01-00-06200) SINGLE FAMILY ATTACHED: 2 STRUCTURES CONSTRUCTED IN ACCORDANCE WITH THE BUILOIN 0.67 AC (05600-00-00-05700 R-1 PORTION) R-2 DENSITY 2 D.U.12.13 AC. = 0.94 O.U./AC, ODE 17.41 AC. d /) NIN R-6 RES/DEN7IAL (05600 -00 -00 -05700) -CG OPEN SPACE: SUBDIVISION STREETS* CURB & GUTTER OPEN SPACE A=1.87 ac. OPEN SPACE K=0.11 ac. a OPEN SPACE B=0.04 oc. OPEN SPACE L=0.08 ac. R-2 RESIDENTIAL (056A2-07-00-06200) �•� WATERSHED: LICKINGHOLE CREEK WATER SUPPLY WATERSHED R-1 RESIDENTIAL (05600-00-00-05700) OPEN SPACE C=0.13 ac. OPEN SPACE M=0.04 cc, OPEN SPACE D=0.05 cc. P = AGRICULTURAL/ FORESTAL DISTRICT' NONE DENSITY- R-6 ALLOWABLE DENSITY FOR STANDARD LEVEL OPEN SPACE E=0.03 OC. .4.88 AC. / 7 4T A - 28.0% ` (,Ys• OPEN SPACE F=1.14 cc. ----7 - CLUSTER DEVELOPME T. 6 D.U./AC. TOPO &SURVEY.' TOPOGRAPHY PROVIDED N A COMB/NARIA OF ROUDAINC., OPEN SPACE G=0.14 ac. OPEN SPACE TO BE OWNED AND MAINTAINED BY R-2 ALLOWABLE DEN ITY FOR BONUS LEVEL GALE AND ASSOCIATES AND LOU/SA AERIAL SURVEYS INC, CLUSTER DEVELOPMENT.' 3 D.U./AC. OPEN SPACE =0.04 ac. THE HOMEOWNERS ASSOCIATION. ALL OPEN SPACE JANUARY BUS THE BOUNDARY LINE INFORMATION IS PROVIDED OPEN SPACE 1 1=0.06 ac. SHALL BE RESERVEDD IN IN AA DEED FOR THE COMMON BY ROUDABUSH, GALE, AND ASSOCIATES INFORMA770N FIELD OPEN SPACE J=0.20 ac. USE OF LOT OWNERS /N THE SUBDIVISION VERIFIED BY COLLINS ENGINEERING MAY 2014. DATUM' NAD 83 S89° 49' 05.99"W 4823.78' - S89° 48' 11.42"W 4823.78' Sheet Title 1 ^,c _...,,-...,..,, . _..........», �.�,. ^= r:,unnnimnrr n �z.�np..�,.:. rcr ....• ..x .�. .», .. 2 EXISTING CONDITIONS EXIS77NG VEGETAPON: PAR77ALLY WOODED _ ___ __ ___ --- SIGHT DISTANCE -- DRIVEWAY (TYP) -I --- NOTES & DETAILS LIGHTING: NO LIGH77NG IS PROPOSED _ EASEMENT (TYP) 7 POST -DEVELOPMENT SWM PLAN 8 SWM PLAN DETAILS 225 l -- --_ 20 SETBACK -- �� �- ' l7 (• v at / ' °' - PARK/NG: A MINIMUM OF 2 OFF-STREET PARKING SPACES SHALL BE 1i a S.D - (TYP) 7g F�C,p ,, -- PHASE I t L1 PROVIDED ON EACH LOT. n C �� I - � -�' .-.::._ .'� �� PARKING WILL BE PROVIDED ON ONE -SIDE OF THE STREET ON BINION DRIVE o. I FREMONT ST, NEWPORT ST & ' nl Y I y TOTIOT Umi PHASING: TOTAL OF (3) PHASES PROPOSED W77H THIS PLAN. W rm V m o - LOT 38 LOT 39 mll I�-M< IIw I �/ C .. r I � .LOT 40 LOT 41 LOT 42 �. LOT 43 q ; y PROFERS. NONE. WIC LOT44 , W7� I -. - - -._ _ / /. - �y EACH PARCEL CONTAINS A BUILDING S17F 77 -IAT COMPLIES I I / _ � \ BUILDING SITES RE REQUIREMENTS OF THE ALBEMARLE COUNTY ZONING S ZI 'li 25'SE78ACK.) LOT 45N s k BURIAL SITES NO CEMETERIES WERE FOUND DURING FIELD INVESTIGA PON OF LOT 46 \ OPEN SPACE A: i THE SITE VICINITY MAP SCALE: I" = 2000' TH OFD t� 01 SCOTT R. COLLINS-- U Lic. No. 035791 w� �SIONAL Y' S O -33 OPOSED _ SARK -Dut DRIVE ' LOT 47 I `> \ \ \ �� 1,$7 AC .$7REAM BUFFERS THE STREAM BUFFERS SHOWT4 HEREON SHALL BE MANAGED IN I I KESS/EGRESS 61' UBLIC ` � -�;A,o ' \ \ j. ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PR07EC710N N01E5: ----Y'" o - ,33's'-`- \ \ .� _. - ORDINANCE S.D. 1) THIS PROPERTY DOES NOT LIE WITH/N AN AGR/CULTURAL ✓RECREA7INAL AREAS PROPOSED T LOT MHN AREA IS 1OPEN SF. RECREATIONAL AND/OR FORESTAL DISTRICT i AREA IS PART F THE PROPOSED OPEN SPACE. I , " TREET TREE (TYP.) ' O\' 04 AC. B - - .'...;, \�' \ + - \ \`�S N.. 2) THIS PRO.ECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, O Q � L w �.... \ ' \ v, _ -RETAINING WALLS: (1) 4' WALL LOCATED IN THE NORTHWEST CORNER OF THE S17E. BASED ON FEMA MAP NUMBER 51003CO229D ADOPTED J I SIGHT DISTANCE \ - .y"� - \ =f - FEBRUARY 4, 2005. IH I EASEMENT (TYP.) . `a. ?S'S �\ �' LOT 69 \ \ �/ F_ JIM AREAS ROADS d 17 AC M �rB .. \ 3 EACH LOT AS SHOWN HEREON CONTAINS A BUILDING S17E - �_ +.. LOT 37 O /� I / C/r�r� ° \ SIDEWALKS: 0.81 AC ) • _ -� \\ + \ Z( ----- HOMES 4.13 AC WHICH MEETS THE REQUIREMENTS OF SECTION 4.22(6)1 L LU 1 11LOT 36 / \ \ TOTAL: 8.11 AC (18-520) N LOT 1 + LOT 35 �y I CIDP/ I m/ ti335, \ / 4) ALL PROPOSED EASEMENTS SHALL BE DEDICATED i0 PUBLIC \ \ § LANDSCAPING. SIRE T TREES ARf PROPOSED ALONG THE NEIGHBORHOOD USE. /� o ` a STREETS IN ACCORDANCE K17H ALBEMARLE COUNTY H V i LOT 2 y m : LOT 33 \` . * / y CL,a 6 . m LANDSCAPING REQUIREMENTS. 5) STREET TREES SHALL BE PROVIDED ALONG ALL THE PUBLIC N STREETS 40' O.C. IN ACCORDANCE WITH VDOT AND ALBEMARLE LL �- ' ( TRASH: EACH LOT SHALL HAVE ITS OWN INDIVIDUAL TRASH RECEPTACLE. I �. COUNTY STANDARDS. C14 PROPOSED USE., SINGLE FAMILY ATTACHED & SINGLE FAMILY DETACHED HOUSING INTERSECTION S17E DISTANCE IS 335' ALONG PARK RIDGE O q rW i I LOT 3 < ' + I._ - -- - 36 AOk(h, �- \ \ '1S GG r l \ ��, I DRIVE AND 280' ALONG ALL OTHER PROPOSED ROADS W N \ s �� .., Lor 31 O E SP ` ,� P A v �i \ %� Z 1\ ( LOT 15 0.05 (LOT 70 - 7) THE DESIGN SPEED FOR THE PROPOSED COLLECTOR ROAD IS 094 \ \ \ \ NOTE: A SEPARATE ROAD PLAN 30 MPH. THE INTERSECTION SPACING /S A MINIMUM OF 225' Q C 0 z',\ OPEN SPACE C. cFo / \ \ \ - (SUB2o2400287) AND E&S/ SWM PLAN ALONG THE COLLECTOR ROAD. G Lora r 0.13A,C. R ` : \ \ (WPO2oiy0oo92)ARE UNDER REVIEW PROJECT IS NOT LOCATED WITH/N A DAM /NUNDAION LLf ~ J I , \ \ FOR ROADS AND UTILITIES FOR THE o EIS J J \\s LOT 14 I I- sQ FOOTHILL CROSSING II DEVELOPMENT. Z J �„ j 10' TB�K (P.) --- I j T" \'";,�� PROPOSED i PHASE LINE (TYP.) PROPOSED VAR WIDTH LIMITS OF 46 & W .� y, - `^3- ' \ ; SHARED DRIVEWAY EASEMENT RI ZONE LINE Z h -T-1 6 / _ \ • %. / ,� 1.. \ N89 53'43.22"W 4823.78' -. N89" 48'46 22 W 4823.78' N89° 58'09.04'W 4823.78' - � a LOT5 LIL LOT 30 - .kgs_ j - _ 310 R .\18' F C F/C ..: ALLEY F 44 13.67'E 4823.78' O z o I -- -- 15'4 h�-------- -- - - - - CCESS EASEMENT N89 i 21'PRIVATEA 1--I h �� OPEN SPACE J: 20'! - --- -- -- -� ,,i Lor s Lar ' 0.20 AC. ���i OPEN SPACE N: Z - U C. V - R.. 0.95 A I I PEN S AE H \ \ LOT a8 b 3---I V _ Lor 18 O 04 AC Lor i6 \ m dim --s--` - Ss L0T7 , I A . ` LOT 49 D.{I Iw I• 2° Y + \ LOT 50 LOT 51 I O) q. LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 n s2• J . , m � I I LOT 57 LOT 58 � "4jBp, w V - -- - PROPOSED PHASE LINE QYP^ I 4 a _ 9 * o 335,... ``.. �ml,-.i - �� F ♦- r n VAR. WIDTH TEMPORARY B a : Q' :). *;*...... TREET TREE (TYP.) -4 I.. _-- _._. _ - _. _._ v I 3>& J E / - I -- -. I= I ACCESS EASEMENT I y 9 d dI 18 - (A J m - \ "_, SIGHT DISTANCE '� \ ~I DRIVEWAY (TYP) \ ` LOT 26 \ •' .• \ � _ \ \ EASEMENT (TYP )- ' �� I.rs,, -� j NOTE: THIS PORTION OF THE ROAD LL LOT 11 �, - \-`' 1 LOT 19 _ � �' _ __ ;. + I SHALL SERVE AS PROPOSED INGRESS/ LL - s Mi 231. D.=335 PARK i�fbGE V� X35 ~ z GRESS INTO THE SITE. THIS PORTION � bF THE ROAD IS PROPOSED UNDER O a O z ( LOT 10 PEiV Spm LOTIO � . •' LOT 24 r O.Ds AAAAA y�.v - i � ��• 1- � o 0.04A A.J II OP N.SP 3 o I R OPEN SPACE: Lor 2z / OT s1 I p ` I V / a - or ss Lor s7 „ EXISTING 00 STREAM BUFFER \ .LOT 21 - / 19 - LOT 62 LOT 63 LOT fi4 N27° 23' 26.43"E 4823.78 O O LOT s5 OT s6 114.'RC. � � / .LOT 25 i .r � I I ROJECT BOUNDARY 7 (1I \ I OPEN SPACE G: ky J �� /� k°;::,.. PE L; IC. L DRIVEWAY ::I R1 ZONE R6& : d DRIVE (TYP)--L �.,h\ LIMITSONE LINE S89° 56' 51.48"E 4823.78' _ Y• - _•0,9�'>. y w w E \ a2rR -- ,e F/c F1c 21' PRIVATE ACCESS EASE NT r p- o PROJECT BOUNDARY TREET TREE ( I v P.) _ ____________ _____ ____ _ _- 0_08 AC. 1A 4��p623 __ _;I F � �' VAR. WIDTH TEMPORARY1. Ric � - a m - - Submittal Type\_` \ \ \ ResNwed and Approved by the"\ \'' ACCESS EASEMENT Fp Sp ]OB NO Community Development d-attment \ -�9. p0 r`'1`r��P�`i'ZQ ' NOTE: ANY SIGHT DISTANCE LINE THAT VAR. WIDTH N I -__________.`I _I� I °FBF •. 122066 0 y \ ACCESS EASEMENT S46° 20' 40.80"E 4823.78'_ �" I 2,/12/2015 " 4�Fv0` / CROSSESALOT OUTSIDE OF THE ROAD \ Glyn SCALE Fp FC>. j\/ PHIC S. L Date XISTING STREAM n 4_ , ti 7 SCALE RIGHT-OF-WAY SHALL REQUIRE ASIGHT � o a zt Iw loo CgtiQy File# _vV D \ 'esr DISTANCE EASEMENT. \ goo ` ' V -" F 1" 50' I \ / I � ) "nature (1N �Er) sBEEr No. o inch = 50 Sheet List Table Sheet Number Sheet Title 1 OVERALL PLAN 2 EXISTING CONDITIONS 3 GRADING & UTILITIES 4 GRADING & UTILITIES 5 NOTES & DETAILS 6 PRE -DEVELOPMENT SWM PLAN 7 POST -DEVELOPMENT SWM PLAN 8 SWM PLAN DETAILS TH OFD t� 01 SCOTT R. COLLINS-- U Lic. No. 035791 w� �SIONAL Y' S O -33 OPOSED _ SARK -Dut DRIVE ' LOT 47 I `> \ \ \ �� 1,$7 AC .$7REAM BUFFERS THE STREAM BUFFERS SHOWT4 HEREON SHALL BE MANAGED IN I I KESS/EGRESS 61' UBLIC ` � -�;A,o ' \ \ j. ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PR07EC710N N01E5: ----Y'" o - ,33's'-`- \ \ .� _. - ORDINANCE S.D. 1) THIS PROPERTY DOES NOT LIE WITH/N AN AGR/CULTURAL ✓RECREA7INAL AREAS PROPOSED T LOT MHN AREA IS 1OPEN SF. RECREATIONAL AND/OR FORESTAL DISTRICT i AREA IS PART F THE PROPOSED OPEN SPACE. I , " TREET TREE (TYP.) ' O\' 04 AC. B - - .'...;, \�' \ + - \ \`�S N.. 2) THIS PRO.ECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, O Q � L w �.... \ ' \ v, _ -RETAINING WALLS: (1) 4' WALL LOCATED IN THE NORTHWEST CORNER OF THE S17E. BASED ON FEMA MAP NUMBER 51003CO229D ADOPTED J I SIGHT DISTANCE \ - .y"� - \ =f - FEBRUARY 4, 2005. IH I EASEMENT (TYP.) . `a. ?S'S �\ �' LOT 69 \ \ �/ F_ JIM AREAS ROADS d 17 AC M �rB .. \ 3 EACH LOT AS SHOWN HEREON CONTAINS A BUILDING S17E - �_ +.. LOT 37 O /� I / C/r�r� ° \ SIDEWALKS: 0.81 AC ) • _ -� \\ + \ Z( ----- HOMES 4.13 AC WHICH MEETS THE REQUIREMENTS OF SECTION 4.22(6)1 L LU 1 11LOT 36 / \ \ TOTAL: 8.11 AC (18-520) N LOT 1 + LOT 35 �y I CIDP/ I m/ ti335, \ / 4) ALL PROPOSED EASEMENTS SHALL BE DEDICATED i0 PUBLIC \ \ § LANDSCAPING. SIRE T TREES ARf PROPOSED ALONG THE NEIGHBORHOOD USE. /� o ` a STREETS IN ACCORDANCE K17H ALBEMARLE COUNTY H V i LOT 2 y m : LOT 33 \` . * / y CL,a 6 . m LANDSCAPING REQUIREMENTS. 5) STREET TREES SHALL BE PROVIDED ALONG ALL THE PUBLIC N STREETS 40' O.C. IN ACCORDANCE WITH VDOT AND ALBEMARLE LL �- ' ( TRASH: EACH LOT SHALL HAVE ITS OWN INDIVIDUAL TRASH RECEPTACLE. I �. COUNTY STANDARDS. C14 PROPOSED USE., SINGLE FAMILY ATTACHED & SINGLE FAMILY DETACHED HOUSING INTERSECTION S17E DISTANCE IS 335' ALONG PARK RIDGE O q rW i I LOT 3 < ' + I._ - -- - 36 AOk(h, �- \ \ '1S GG r l \ ��, I DRIVE AND 280' ALONG ALL OTHER PROPOSED ROADS W N \ s �� .., Lor 31 O E SP ` ,� P A v �i \ %� Z 1\ ( LOT 15 0.05 (LOT 70 - 7) THE DESIGN SPEED FOR THE PROPOSED COLLECTOR ROAD IS 094 \ \ \ \ NOTE: A SEPARATE ROAD PLAN 30 MPH. THE INTERSECTION SPACING /S A MINIMUM OF 225' Q C 0 z',\ OPEN SPACE C. cFo / \ \ \ - (SUB2o2400287) AND E&S/ SWM PLAN ALONG THE COLLECTOR ROAD. G Lora r 0.13A,C. R ` : \ \ (WPO2oiy0oo92)ARE UNDER REVIEW PROJECT IS NOT LOCATED WITH/N A DAM /NUNDAION LLf ~ J I , \ \ FOR ROADS AND UTILITIES FOR THE o EIS J J \\s LOT 14 I I- sQ FOOTHILL CROSSING II DEVELOPMENT. Z J �„ j 10' TB�K (P.) --- I j T" \'";,�� PROPOSED i PHASE LINE (TYP.) PROPOSED VAR WIDTH LIMITS OF 46 & W .� y, - `^3- ' \ ; SHARED DRIVEWAY EASEMENT RI ZONE LINE Z h -T-1 6 / _ \ • %. / ,� 1.. \ N89 53'43.22"W 4823.78' -. N89" 48'46 22 W 4823.78' N89° 58'09.04'W 4823.78' - � a LOT5 LIL LOT 30 - .kgs_ j - _ 310 R .\18' F C F/C ..: ALLEY F 44 13.67'E 4823.78' O z o I -- -- 15'4 h�-------- -- - - - - CCESS EASEMENT N89 i 21'PRIVATEA 1--I h �� OPEN SPACE J: 20'! - --- -- -- -� ,,i Lor s Lar ' 0.20 AC. ���i OPEN SPACE N: Z - U C. V - R.. 0.95 A I I PEN S AE H \ \ LOT a8 b 3---I V _ Lor 18 O 04 AC Lor i6 \ m dim --s--` - Ss L0T7 , I A . ` LOT 49 D.{I Iw I• 2° Y + \ LOT 50 LOT 51 I O) q. LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 n s2• J . , m � I I LOT 57 LOT 58 � "4jBp, w V - -- - PROPOSED PHASE LINE QYP^ I 4 a _ 9 * o 335,... ``.. �ml,-.i - �� F ♦- r n VAR. WIDTH TEMPORARY B a : Q' :). *;*...... TREET TREE (TYP.) -4 I.. _-- _._. _ - _. _._ v I 3>& J E / - I -- -. I= I ACCESS EASEMENT I y 9 d dI 18 - (A J m - \ "_, SIGHT DISTANCE '� \ ~I DRIVEWAY (TYP) \ ` LOT 26 \ •' .• \ � _ \ \ EASEMENT (TYP )- ' �� I.rs,, -� j NOTE: THIS PORTION OF THE ROAD LL LOT 11 �, - \-`' 1 LOT 19 _ � �' _ __ ;. + I SHALL SERVE AS PROPOSED INGRESS/ LL - s Mi 231. D.=335 PARK i�fbGE V� X35 ~ z GRESS INTO THE SITE. THIS PORTION � bF THE ROAD IS PROPOSED UNDER O a O z ( LOT 10 PEiV Spm LOTIO � . •' LOT 24 r O.Ds AAAAA y�.v - i � ��• 1- � o 0.04A A.J II OP N.SP 3 o I R OPEN SPACE: Lor 2z / OT s1 I p ` I V / a - or ss Lor s7 „ EXISTING 00 STREAM BUFFER \ .LOT 21 - / 19 - LOT 62 LOT 63 LOT fi4 N27° 23' 26.43"E 4823.78 O O LOT s5 OT s6 114.'RC. � � / .LOT 25 i .r � I I ROJECT BOUNDARY 7 (1I \ I OPEN SPACE G: ky J �� /� k°;::,.. PE L; IC. L DRIVEWAY ::I R1 ZONE R6& : d DRIVE (TYP)--L �.,h\ LIMITSONE LINE S89° 56' 51.48"E 4823.78' _ Y• - _•0,9�'>. y w w E \ a2rR -- ,e F/c F1c 21' PRIVATE ACCESS EASE NT r p- o PROJECT BOUNDARY TREET TREE ( I v P.) _ ____________ _____ ____ _ _- 0_08 AC. 1A 4��p623 __ _;I F � �' VAR. WIDTH TEMPORARY1. Ric � - a m - - Submittal Type\_` \ \ \ ResNwed and Approved by the"\ \'' ACCESS EASEMENT Fp Sp ]OB NO Community Development d-attment \ -�9. p0 r`'1`r��P�`i'ZQ ' NOTE: ANY SIGHT DISTANCE LINE THAT VAR. WIDTH N I -__________.`I _I� I °FBF •. 122066 0 y \ ACCESS EASEMENT S46° 20' 40.80"E 4823.78'_ �" I 2,/12/2015 " 4�Fv0` / CROSSESALOT OUTSIDE OF THE ROAD \ Glyn SCALE Fp FC>. j\/ PHIC S. L Date XISTING STREAM n 4_ , ti 7 SCALE RIGHT-OF-WAY SHALL REQUIRE ASIGHT � o a zt Iw loo CgtiQy File# _vV D \ 'esr DISTANCE EASEMENT. \ goo ` ' V -" F 1" 50' I \ / I � ) "nature (1N �Er) sBEEr No. o inch = 50 ----I _fDEAN, Total Acres D.B. P •HVILLAGE HOMEOWNERS ASSOCIATION INC 5.694 3205/626 GRAPHIC SCULL''�HOMAS C OR HEATHER J 0.218 2848/441 VILLAGE HOMEOWNERS ASSOCIATION INC 0.014 32051626 �za z+)NEYEJR TRUSTEE; RODNEY E DEANE JRTRUSTUA DTD 0.108 4122/202 SCOTT R. COLLINS'ZARAH 8 0.040 3007/304'--' l ---- --� NICHOLA PROPERTIES LLC 0.040 3072/720 ( IN FEET) U Lie. Na 035791 ,a 1 inch = 60 ft. A 4 - - _- - DILLARD WILLIAMH 0.114 3020/075 Poco THREE NOTCH'D ROAD -ROUTE 240 UNION MISSION RAPT ST CHURCH 1.000 371/553 ---------- --- - --- _--- UNION MISSION CHURCH C/O ELIZABETH BROWN 1.000 159/294 TONAL E - - - - COLLINS MARIAN 1.050 970/668 - - _ - — FLANAGAN, ROBERT MICHAEL 0.504 3678/232 FLANAGAN, ROBERT 0.640 2106/416 - --_- ---- -- -- - FLANAGAN, ROBERT M 0.450 2091/472 CSX RAILROAD FLANAGAN, ROBERT M 0.450 2388/360 -.. j ROUTE 240 HOLDINGS LLC -- - -. - -- 3.070 2675/384 S89" 49'05.99"W 4823.78' S89° 48'1 1.42"W 4823.78' - - -_- - -. ----- ------------------- --------- _------------------------------ 20' WATERLINE EASEMENT D.B. 611, PG. 440 ® D.B. 692, PG. 148 I BENCHMARK - TOP OF MANHOLE u m _ o � ELEVATION = 671.09 - C Z J � s .. EXISTING 40' STRIP RESERVED FOR FUTURE EXTENSION OF HILL _ - TOP STREET. TO BE I ,; W I " 4THE C0'PRIVATE ROAD EASEMEGNT2D FOR PUBILC USE UPON DEMAND BY li v 100' STREAM BUFFER `. D.B. 2478, PG. 251 056A2-01-00-06200 ROUTE 240 HOLDINGS LLC 2.13 AC z j ZONING: R-2 RESIDENTIAL ADJUSTED 100'STREAM BUFFER " PER APPROVED PARKSIDEVILLAGE - AS -BUILT PLANS DATED JAN 2, 2002 1 I s/ 0 0 05600-00-00-05700 ® �--:: 6 2-01-00-06100 \ \ ROUTE 240 601 AC PORTIO ; ROUTE CR LL\ V� �, 20,00 C ( N) EXISTING STREAM 13.052 ACRES z ZONING: R-6 RESIDENTIAL ZONING: PUD L9 rn m D.B. 2012 PG. 352 N89' 53' 43.22"W 4823.78' N89° 48!,46.22-W 4823.78' N89° 58'09.04"W 4823.78' Cl? g 89'44'13.67"E 4823.78' �S2° - Z N ui I M ZONING LINE �� R1 PORTION OF THE PROPERTY C'7 I (? n 0.64 ACRES FROM 5.39 ACRES ��Y C ~� M m I I I w I 11 Ss?es ry��• � ��/ Lo CF) w 04 EX. ACSA SANITARY SEWER z I �� " I IN 20' ACSA SANITARY ESMT EXISTING TREELINE \ Q H I D.B. 1997, PG. 2356 - ZONING LINE ti .. _ F—t O J - - - - - - - - - - - 05600-00-00-05700 i Z 100' STREAM BUFFER b ti ROUTE 240 HOLDINGS LLC Lu \ \ \ — „ /a 20.00 AC (5.39 AC PORTION) H s Fi v♦ s,� ZONING: R-1 RESIDENTIAL 0 v �\ _J Z Z ol v�y� Q H 27° 23'26.43"E 4823.78' i S89' 56' 51.48"E 4823.78' NOTE THIS PORTION OF THE ROAD PRO \ \ gg POSED UNDER SUB -2014-00187 ,, \ Y a I I EXISTING STREAM \ \ p1T2 \\ w I \ N \ 146° 20'40.80"E 4823.78' I I 056KO-00-00-000AIX E FOOTHILLS CROSSING INC U W 20' ROW TO BE VACATED 48.825 ACRES = s \ ul 05600-00-00-057BO D B. 227, PG. 380 DAILY, EDMUND J I --I (PLAT) i �� ZONING: R -I RESIDENTIAL Lu \ / \ D.B. 3122, PG. 544 (LLJ �J v & CHRISTOPHER DAILY ! w \ & CYNTHIA DAILY DICANIO / z 11 \ w ��� \ 26.875 ACRES ZONING: R-I/R-6 RESIDENTIAL LL_ o I JLu I \\Of Q 0 05600-00-00-057B0 o / DAILY, EDMUND J 0 O \ \ & CHRISTOPHER DAILY04 RWSA NOTES: \ \ \ & CYNTHIA DAILY DICANIO �` 056K0-00-00-000AI \ `� J 1. CONTRACTOR SHALL COORDINATE WITH RWSA AND ACSA DURING CONSTRUCTION OF \ NOTES: 26.875 ACRESFOOTHILLS CROSSING INC THE CONNECTION TO THE EXISTING RWSA 20" WATERLINE. CONTRACTOR SHALL USE 1,\ \ 1. THIS PROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS, BASED \ ZONING: R-I/R-6 RESIDENTIAL 48.825 ACRES DUE DILIGENCE TO PROTECT THE RWSA 20" WATERLINE DURING CONSTRUCTION AND \ \ ON FEMA MAP NUMBER 51003CO229D ADOPTED FEBRUARY 4, 2005. / G TAPPING. \\ \ 2. TOPOG VIDED BYA COMBINATION OF ROUDABUSH & / ZONING: R-1 RESIDENTIAL Li 2. CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION, THE OUTSIDE \, s GALE AN LOUISA' RIAL SURVEYS. THE BOUNDARY LINE a DIAMETER AND THE PIPE MATERIAL OF THE 20" WATERLINE PRIOR TO ORDERING THE \ \ \ INFORMATI OVIDED BY ROUDABUSH, GALE &ASSOCIATES. Jos NO. TAPPING SLEEVE. RWSA SHALL BE CONTACTED 3 BUSINESS DAYS IN ADVANCE OF THE \ \\ TOPOGRAPHY HAS BEEN FIELD VERIFIED IN MAY 2014. / .. 122066 TEST PIT AND SHALL BE PRESENT DURING THE TEST PIT. THE TAPPING SLEEVE SHALL \ 3. NO PRESERVED STEEP SLOPES ARE LOCATED ON THE PROPERTY. BE APPROVED BY RWSA PRIOR TO BEING ORDERED. THE TAPPING CONTRACTOR SHALL �. s \ THE MANAGED STEEP SLOPE IS LABELED. SCALE BE APPROVED BY RWSA PRIOR TO THE TAP. \ \ 4. 100' WPO STREAM BUFFER IS SHOWN. 3. A MINIMUM OF 3 BUSINESS DAYS' NOTICE SHALL BE GIVEN PRIOR TO INSTALLATION OF \\ \ 1"=60' „osO, THE TAPPING SLEEVE. THE 20"X8" TAPPING SLEEVE AND VALVE SHALL BE INSTALLED PLUMB. FOLLOWING THE PLACEMENT OF THE 20"X8" TAPPING SLEEVE, A CONCRETE PAD \ \\ / SHEET NO, - AND THRUST BLOCK SHALL BE PLACED UNDER AND BEHIND THE TAPPING SLEEVE. \\ \\ 2 -- — e PROPOSED WALL - -4'MAX. HEIGHT SCOTT R. S89'49 05 99' W 4823 78 20 DRAINAGE EASEMENT -7 -411 . .. ... ..... TOTLOT>' LOT 40 LOT 41 LOT 42 R/ -�- / - LOT 38 LOT 39 I i i I--, 10" PRIVATE r� � LOT 43 � �C \iC 71 1-14 FJ- �� 3 I UTILITY EASEMENT I I,. -. ' LOT 44 20' DRAINAGE EASEMENT-- - / F,gsF _." , b- r a -I- 1 \\ — --- z - e. IRE HIYDRANT (TYP 674= LOT 46 \fig 692 Z N w 8'x6' TEE 61' PUB IC ` -�_` 666 20' UTILITY'/ EASEMENT \`�\ \ 8 7 0 ,. • ICON CTI N TO EXISTING I I WATERLINE - Lu w 8" SDR 35 PVC SANITARY SEWER ' r A� - - LOT 69 1 I I LOT 37 LOT 36 A LOT 1 z � r o LOT ' LOT 2. I SANITARY LATERAL (TYP.) LOT 33 \ \ l y a -_) 10' PRIVATE `I - - E : UTILITY EA EMENT LOT 32 0' UTILITYEASEMENT T ��'aRIV Y�� AT . LOTS I r _ _ -_-_-----;.-" \ LOT 31 /\\ O, I LOT 15 I .\ l / \ LOT 70 � CL. 52 DI WATERLINE s N LOT4 I — _ A \\ m f� \ \\s\\I L I LOT 14 LLJ I— _ \ k 6j6 \ ✓ _ N I I H HYDRANT (TYP.) i I WATER SERV TY I � �LGTS' LOT 16 66 -LOT 13 D h I = LOT 30 N z I rn -rZ �\\20' DRAINAGE EASEMENT: - �- _ _---_\ Q ri 52 DI WATERLINE_- LOT 17 E�'I \ A �> I r I kqT I \. z 4' I 6.45° BEND � GOT12 - -ffI ■ `. ! \ " -LOT 48 (n % J -J U) L1 J g� - -- I - LOT 18 I LOT 28 \ 1o"x10"TEE m c w \ I I LOT 7 m \ 3)- 10" G.V. LOT 49 co az _� rtl \ to"xa" REDUCER LOT 50 LOT 51 y W -- � IRE HYDRANT TYP. - � SANITARY LATERAL (TYP. \ T A I _ s WATER SERVICE = U) s" as BEN \ \ LOT 26 U (n x 1 \/I LOT 19 /� \ e'3 �o LOT 8 LOT 11 \ 6� \ W Z o 8" SDR 35 PVC / v x Y LOT 9 6" CL 52 DI WATERLINE . \ VA SANITARY SEWER, �(/� _ ui LOT 10 660 LOT 2 IRE HYDRANT U E 6 / / / LOT 24 \\ \ \ Cq I� U) J a / ,�I WATER . r� / �_ W i ��Y z V w g54 < / Y / Z LOT 23 � i w�. LOT 60 O �' / I LOT 21 \ / / 10" CL. 52 DI WATERLINE, J LOT 61 LOT 62 LOT 8 - �- 20' UTILITY EASEMENT` I LOT 22 \ w \ ` LOT 25 Ic I / i \ rn o Q I J 656 t "t / >r S89" 56 51.48"E 4823.78' 66Q -�� ''PRI N J l _—spa —'------ CONNECTION TO EXISTING SANITARY SEWER U ° 10" WATERLINE PILL - - - - - - - - - - - - - 7 66 20' DRAINAGE EASEMENT - -WIDTH/ - - - - - o E 12 066 JOB No. GRAPHIC SCALE PROPOSED� GRADNGVEAS EASEMENT \ = n SCALE as o ao eo J \1 \ ( IN FEET ( SHEET NO. inch = 40 ft. ( } 3 s - GENERAL CONSTRUCTION NOTES FOR STREETS 1. CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTIFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296-5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY. IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS FOR APPROVAL. J. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NA TURAL WA TERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUAIRDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRI VEWA Y ENTRANCES SHALL CONFORM TO VDOT CG -9(A, B OR C. 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE -1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND V00. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD -1 OR CD -2 CROSS -DRAINS UNDER TO BE INSTALLED BINDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT A L..B'EMA RLE COUNTY GENERAL CONSTRUCTION NOTES 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENTS OF THE PERMIT SHALL GOVERN. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICA TIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. J. EROSION AND SIL TA TION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED, AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL). WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3: 1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VIRGINIA MANUAL FOR' UNIFORM TRAFFIC CONTROL DEVICES. 8. UNLESS OTHERWISE NOTED, ALL CONCRETE PIPE SHALL BE REINFORCED CONCRETE PIPE -CLASS Ill. 9. ALL EXCA VA TION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). R W CONCRETE SIDEWALK CONCRETE R . SIDEWALK 1'• 1' PLAN77NG STRIP -1". 1' PLAN77NG S7RIP 6 - CG -6 CURB & GUTTER 1/4". 1' L POINT OF FINISHED GRADE 1/4"• 1' ROAD NOTES GRADING 1. THE LATEST EDITION OF THE ROAD & BRIDGE SPECIFICATIONS, THE ROAD & BRIDGE STANDARDS OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS SHALL GOVERN THE MATERIAL AND CONSTRUCTION METHODS OF THIS PROJECT. 2. WHERE UNSUITABLE MATERIAL IS ENCOUNTERED IN THE ROADWAY, IT SHALL BE REMOVED FROM THE ENTIRE ROAD RIGHT OF WAY WIDTH AND REPLACED WHERE NECESSARY WITH SUITABLE MATERIAL TO THE SATISFACTION OF THE ENGINEER. J. ALL GROWTH OF TREES AND VEGETATION SHALL BE CLEARED AND GRUBBED FOR THE ENTIRE EASEMENT. OTHER TREES AND VEGETATION WHICH OBSTRUCT SIGHT DISTANCES AT ROAD INTERSECTIONS SHALL BE REMOVED. 4. ALL VEGETATION AND OVERBURDEN TO BE REMOVED FROM SHOULDER TO SHOULDER PRIOR TO THE CONSTRUCTION OF THE SUBGRADEE, DRAINAGE 1. ALL PIPE CULVERTS, EXCEPT PRIVATE ENTRANCES, SHOWN HEREON ARE TO BE ROP WITH A MINIMUM COVER OF ONE (1) FOOT. 2. STANDARD UNDERDRAINS (CD -1 OR CD -2 OR UD -4'S) TO BE PROVIDED AS INDICATED ON THE PLANS, OR WHERE FIELD CONDITIONS INDICATE. J. ALL DRIVEWAY ENTRANCE PIPES SHALL BE A MINIMUM OF TWENTY (20) FEET IN LENGTH AND HAVE A MINIMUM DIAMETER OF FIFTEEN (15) INCHES AND SHALL BE PLACED IIN ACCORDANCE WITH THE VIRGINIA DEPARTMENT OF TRANSPORTAION SPECIFICATIONS UNLESS OTHERWISE NOTED ON PLANS. 4. ALL DRAINAGE EASEMENT SHALL BE CLEARED AND GRADED TO THE SATISFACTION OF THE ENGINEER. DRAINAGE EASEMENTS SHALL EXTEND TO A POINT DEEMED AS NATURAL WATER COURSE. PA VVEMEN T 1. AN ACTUAL COPY OF THE CBR REPORT IS TO BE SUBMITTED PRIOR TO THE PLACEMENT OF THE AGGREGATE BASE MATERIAL. IF THE SSV VALUES ARE LESS THAN 10, THE DEVELOPER WILL BE REQUIRED TO SUBMIT FOR ENGINEERS APPROVAL THE PROPOSED METHOD OF CORRECTION. 2. SUBGRADE MUST BE APPROVED BY THE ENGINEER FOR GRADE, TEMPLATE AND COMPACTION BEFORE BASE IS PLACED. 3. TEST REPORTS ON SELECT MATERIALS MUST BE SUBMITTED SHOWING THE MATERIAL MEETS REQUIRED GRADATION FOR TYPE I, li, OR Ill PRIOR TO PLACING AGGREGATE BASE. 4. THE REQUIREMENTS TO PUGMILL AGGREGATE BASE WILL BE WAIVED IN THE EVENT THAT THE SURFACE COURSE IS BEGINNING AT THE COMPLETION OF THE INSTALLATION OIF THE AGGREGATE BASE. IN THE EVENT THAT THE SURFACE COURSE IS APPLIED PRIOR TO 60 DAYS, THE PUGMILL REQUIREMENT WILL APPLY. 5. THE USE OF AN AGGREGATE SPREADER IS REQUIRED WHEN PLACING AGGREGATE BASE. 6. BASE MUST BE APPROVED BY ENGINEER FOR DEPTH, TEMPLATE, AND COMPACTION BEFORE SURFACE TREATMENT IS APPLIED. 7. PRIME COAT MUST BE APPLIED TO BASE MATERIAL PRIOR TO PLACEMENT OF ASPHALT (PRIME COAT RC -250 @ 0.3 GAL./SQ. YD.). 8. BITUMINOUS SURFACE TO BE APPLIED IN ACCORDANCE WITH CURRENT VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS. 9. ENCROACHMENT- POSTS, WALLS, SIGNS, OR SIMILAR ORNAMENTAL STRUCTURES THAT DO NOT ENHANCE A ROADWAY'S CAPACITY OR TRAFFIC SAFETY, SHALL NOT BE PERMI'TTED WITHIN THE RIGHT OF WAY ONLY THOSE STRUCTURES SPECIFICALLY AUTHORIZED BY PERMIT ISSUED BY VIRGINIA DEPARTMENT OF TRANSPORTATION MAY BE LOCATED WITHIN THE STREETS RIGHT OF WA Y. NOTE: MANDATORY INSPECTIONS AT THE FOLLOWING PHASES ARE REQUIRED FOR ROADS THAT ARE PROPOSED TO BE STATE MAINTAINED: CG -6 CURB & CUTTER 13' 1 13' (TRAVEL LANE) (TR;A 1/EL LANE) 30' FIC -FIC [--2.5' 55' PUBLIC ROAD R/W TYPICI4L STRE'E'T S.E'CTION - 55' PUBLIC ROAD (FR&E&fONT STREET, NL'IYA'ORT STREET, & BINION STRENT) 25 JfPH DESIGN SPEED' NOT TO SCALE' CG -6 CURB & GUTTER 5-1 i/4"' 1' POINT OF FINISHED GRADE L 1.14". 1' CG -6 CURB & GUTTER 16' 16' (TRAVEL LANE) TRA VEL LANE) 36' FIC -FIC 61' PUBLIC ROAD R/W S.7RE'E'T S`E'CTION 61 PUBLIC ROAD (PARA- RIDGE' DRIV F) 30 dfPH DESIGN SPE'E'D' NOT TO SCALL' i. INSTALLATION OF ANY ENCLOSED DRAINAGE SYSTEM BEFORE IT IS COVERED. ii. INSTALLATION OF ANY ENCLOSED UTILITY PLACEMENTS WITHIN THE RIGHT-OF-WAY BEFORE BEING COVERED. iii. CONSTRUCTION OF THE CUTS AND FILLS, INCLUDING FIELD DENSITY TESTS, BEFORE PLACEMENT OF ROADBED BASE MATERIALS. iv. A FINAL PAVEMENT DESIGN, BASED ON ACTUAL SOIL CHARACTERISTICS AND CERTIFIED TESTS, SHALL BE COMPLETED AND APPROVED BEFORE THE PAVEMENT STRUCTURE IS PLACED. v. PLACEMENT OF BASE MATERIALS, INCLUDING STONE DEPTHS, CONSISTENT WITH THE APPROVED PAVEMENT DESIGN, PRIOR TO PLACEMENT OF THE PAVING COURSE OR COURSES, FOLLOWED BY FIELD DENSITY AND MOISTURE TESTS AND THE PLACEMENT OF A PAVING COURSE AS SOON AS POSSIBLE. vi. CONSTRUCTION OF PAVEMENT, INCLUDING DEPTH AND DENSITY, UPON COMPLETION AS PART OF THE FINAL INSPECTION. vii. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING VDOTA MINIMUM OF ONE WEEK PRIOR TO EACH OF THE ABOVE PHASES OF CONSTRUCTION TO SCHEDULE AN INSPECTION. viii. FAILURE OF THE CONTRACTOR TO SCHEDULE THESE INSPECTIONS WILL REQUIRE ADDITIONAL TESTING OF THE ROADS AT THE DISCRETION OF VDOT OR MAY LEAD TO THE ROADS NOT BEING ELIGIBLE FOR STATE MAINTENANCE. 1,,1• PLAN77NG STRIP 6= CONCRETE SIDEWALK 5' CONCRETE SIDEWALK PLAN77NG STRIP - 6' 5 CSL POIINT OF FINIISHED GRADE RA RAW CG -2 CURB CG -2 1/4": 1 1/4"• 1' o�oo opo Po 000 CSCOTT R. COLLINS� U Lic. No. 035791,E ��SSjONAL E�01 R� 1 (TRAVEL LANE (71RAVEL LANE) 1 18' FIC-FIC- 21' /C-F/C21' PRIVATE ROAD R/W - TYPICI4L 14LLFr S'E'CTION - 21' PRIY_4TE ROAD (ALL.EY A ate' ALLEN' F) 20 JfPH DL'SIGN SYNEO NOT TO SCALLr,' POIINT OF I CG -2 CURB R/W R W CI;//CG-2 FINIISHED GRADE RIW CURB iz�L 8Ra)0000 00 1 (TRAVEL LANE) (7TRAVEL LANE) 1 18' FIC-FIC- 21' /C-F/C21' PRIVATE ROAD R/W .7 MM<IL ALLEY SUCTION ,2> PRIVATE' 80141 (ALLEY B, ALLEY C, ALLEY D) 20fPII DESIGN SPE'E'D NOT TO SCARF TRIP GENERATION 1"=100' TRIP GENERATION CALCULATIONS TRIP GENERATION BASED ON ITE TRIP GENERATION MANUAL (8TH EDITION) 1 SINGLE FAMILY DETACHED UNIT (CODE 210) & 72 SINGLE FAMILY ATTACHED UNITS (CODE 230) ADT: 428 VPD (214 ENTER/ 214 EXIT) AM PEAK: 32 VPH (5 ENTER/ 27 EXIT) PM PEAK: 38 VPH (26 ENTER/ 12 EXIT) (5' MIN.) 4" CONC. max 4" 21-A STONE BASE CONCRETE SIDEWALK NO SCALE 4" MIN STANDARD CG -6 CURB & GU T TER NO SCALE 7„ VDOT #57,#68, OR #78 STONE BASE UNDER CURB & CHECKED BY VDOT PRIOR TO PAVING AND/OR BACKFILLING. SURFACE COURSE INTERMEDIATE COURSE 6"-8 COMPACTED AGGREGATE - BASE COURSE, VDOT #21A OR #2113 DEPENDING ON ULTIMATE TRAFFIC LIMITS • UNDERDRAINS COMPACTED SUBGRADE ASPHALT PAVING ROADS NO SCALE w C) ® (N Lu uj s t fi- i i u `f$ 01, Lu • ce I!i> • : NO. „. 122066 SCALEA SHOWN Summary of Watersheds 2 -Year 10 -Year Predevelopment (cfs) Post -Development (cfs) Predevelopment (cfs) Post -Development (cfs) D.A. #1 4.91 D.A. #1 4.54 D.A. #1 20.89 D.A. #1 19.30 D.A. #2 8.88 D.A. #2 2.62 D.A. #2 29.96 D.A. #2 6.53 Tot-". 13.79 1 7.16 1 50.84 25.83 Summary of Drainage Areas Predevelopment Post -Development D.A. #1 17.52 D.A. #1 33.64 D.A. #2 18.50 D.A. #2 2.38 Tota Is: 36.02 36.02 STORMWATER NARRATIVE THE STORMWATER RUNOFF VOLUMES, VELOCITIES, AND PHOSPHORUS CONCENTRATION RESULTING FROM �K ��� THE PROPOSED DEVELOPMENT SHALL BE IMPROVED PRIOR TO ENTERING THE EXISTING WATERSHED. STORMWATER QUALITY AND QUANTITY REQUIREMENTS WILL BE MET THROUGH USE OF A LEVEL 11 WET O POND. 0 SCOTT R. COLLINSZ� VVPk I t QUALITY: U Lic. No. 035791 THE STORMWATER QUALITY REQUIREMENTS FOR THIS DEVELOPMENT WERE CALCULATED WITH THE VRRM ET, RESULTING IN A TOTAL LOAD REDUCTION (TP) REQUIRED OF 29.11 LB/YR, AFNT I InAF C1F nRAI NEVN DEVELOPMENT WORKSHEET, Anrn A hncT_nFVFI nPnnFNT TRFATn vnl NArF ARFA W OF 67.220 CF- A WFT POND LEVEL II I�NAL _ J r LU F— z << 0 a <_ CL a 0 z �� w W (D LL' �w LU z �� z � �z �w Q O Z d J _ J _0 r16 O O O O L 3 N U O ry 70 U a U N L.� N N N Q Q X � N O N O J C O . 3 F—i z 0 cp wz c � F w C w 0 F= o (J�\� w V U i 0 J � L w O O O F— W T C i O r N Q � O � II Q._0 WLr) ry N� xc U O X J O U N � C O O I� W p U O O U 0LU� N LU E n W U E Ci = Q (/i -0- 0 JOB IVO. ( c 122066 0 G) aj rn > SCALE ° C U U c � O SHEET NO. fl 0 0 ul m� 0 0 Summary of Drainage Areas Summary of Watersheds Post -Development 2 -Year 10 -Year Predevelopment (cfs) Post -Development (cfs) Predevelopment (cfs) Post -Development (cfs) D.A. #1 4.91 D.A. #1 4.54 D.A. #1 20.89 D.R. #1 19.30 D.A. #2 8.88 D.A. #2 2.62 D.A. #2 29.96 D.A. #2 6.53 Tota Is: 13.79 7.16 50.84 25.83 Summary of Drainage Areas Predevelopment Post -Development D.A. #1 17.52 D.A. #1 33.64 D.A. #2 18.50 D.A. #2 2.38 Totals: 36.02 36.02 r R. COLLINS No. 035791 2� NAL `technical Bulletin 7 klinimurn Standard 3,02 f M ,, !14' mpg plate _ i= aqA to :-M-1 ` HS3P£ e+r stur 7vfth 11!s, }+iepWtn#A ,e s �saaxvX.`�ekvrad zxp 70x1.:;: i r✓ wl Sc�a ¢, ar Wall tvrnrp;ii0100*... t`aaan with cpiycnal a�A Y YnOT sia..,r'''` F -k (d- 4.trki 1Zp& fit.-trctacatl p:nxkla :2oH11 `-t Je hoLax ar3 i�'4" pta.ta ,`a�3Ct,1Csri �',`xxeo.�„t>zce.,,s.� 6u A�Unatitc 'a'aiudivta i>rc. sr epvit erg' a,a. lwltl ! ("e A. j4 i _r , Ce%-,-Itiar_ a.re X �� ��Li.�1'l�la'�;u wa aa� BMP DEBRIS CAC tit lt�eat<; 7A MFA 1f(URE3.01 I £Iurtrogeireorrs .lwatr7+rtraV«ments 0inlro1v ucragene s fill I ?s rC'n ^Cui off trench -F' ae9ax sitifab[e i g m7�te<ici TYPICAL HOMOGENEOUS EMBANKMENT 1, i i irerts;t;o Ii;i ., Rork or grave`: i Al Pe a `If l L.. Caur"e s r atanri slrrfs 1 e r aratetl .oile ?e, Faun 3€ tiaa drttFn Btanket drain FOUNDATION DRAIN BLANKET DRAIN I txira,n a.�t�ct f fie l ar grovel pw� trP iron '`-�_.Trnns,ftn fitter TcnuaPi r: flt�r CHIMNEY DRAIN TOE DRAIN 1r.. tG r.;: 5'd �; f:rrrVlrart ere; I�t�r}<i �l1�rt,rr«t 3.071 - 3 RE WET POND LEVEL 11 (1.5TV) Basin Input Data Summary of Watersheds 12 Conitour Areas 0 626 �. 2 -Year Hydrograph o 10 -Year 0.0 Predevelopment (cfs) Post -Development (cfs) Predevelopment (cfs) Post -Development (cfs) D.A. #1 4.91 D.A. #1 4.54 D.A. #1 20.89 D.A. #1 19.30 D.A. #2 8.88 D.A. #2 2.62 D.A. #2 29.96 D.A. #2 6.53 ,Totals: 13.79 Pr Ast Anti -Vast Oeyke (Cap rand Riser? 7.16 50.84 632.00 26791.00 25.83 `technical Bulletin 7 klinimurn Standard 3,02 f M ,, !14' mpg plate _ i= aqA to :-M-1 ` HS3P£ e+r stur 7vfth 11!s, }+iepWtn#A ,e s �saaxvX.`�ekvrad zxp 70x1.:;: i r✓ wl Sc�a ¢, ar Wall tvrnrp;ii0100*... t`aaan with cpiycnal a�A Y YnOT sia..,r'''` F -k (d- 4.trki 1Zp& fit.-trctacatl p:nxkla :2oH11 `-t Je hoLax ar3 i�'4" pta.ta ,`a�3Ct,1Csri �',`xxeo.�„t>zce.,,s.� 6u A�Unatitc 'a'aiudivta i>rc. sr epvit erg' a,a. lwltl ! ("e A. j4 i _r , Ce%-,-Itiar_ a.re X �� ��Li.�1'l�la'�;u wa aa� BMP DEBRIS CAC tit lt�eat<; 7A MFA 1f(URE3.01 I £Iurtrogeireorrs .lwatr7+rtraV«ments 0inlro1v ucragene s fill I ?s rC'n ^Cui off trench -F' ae9ax sitifab[e i g m7�te<ici TYPICAL HOMOGENEOUS EMBANKMENT 1, i i irerts;t;o Ii;i ., Rork or grave`: i Al Pe a `If l L.. Caur"e s r atanri slrrfs 1 e r aratetl .oile ?e, Faun 3€ tiaa drttFn Btanket drain FOUNDATION DRAIN BLANKET DRAIN I txira,n a.�t�ct f fie l ar grovel pw� trP iron '`-�_.Trnns,ftn fitter TcnuaPi r: flt�r CHIMNEY DRAIN TOE DRAIN 1r.. tG r.;: 5'd �; f:rrrVlrart ere; I�t�r}<i �l1�rt,rr«t 3.071 - 3 RE 10+00 10+50 SCALE: V:1 "=5' H:1 "=50' SWM FACILITY #s WET POND LEVEL 11 (1.5TV) Basin Input Data Inflow Hydrographs Routing Method: storage -indication 12 Conitour Areas 0 626 �. q,',j r�ati9t »� 4�n � ,w �f 4tls i6's} c i>G"$b �l"w z o-,�"N. A,--74.r'„i Hydrograph o 111 VN2121vu (Ar as tr^vt Pn 0.0 Ira,, L.a tr' av:4z .ra 4 2 -Year 24 -Hour SCS Method Storm f4.) {- t. 749 ARIFi 14 4 yx EAP. 647.6 ppnt-�s„.@,y �51) inflow (cfs) 57.7oo at 11.98 (hrs) fi"er25.x ''"is'2.5`s'MFirm m... 1520.6 C{tf.dcln discharge (cfs) 4.537 at 12.78 (hrs) 629.00 16863.00 2079.3 Area (acres) 33.640 AAa:.r r.,. x.1.,ui� iN, IF qr; ..e:aFe� xv *3' LD, fii.Pa WJ 2785.6 CN 78.000 storage (cy) 6750.493 630.40 214415.00 Pr Ast Anti -Vast Oeyke (Cap rand Riser? Type z Harm 10+00 10+50 SCALE: V:1 "=5' H:1 "=50' SWM FACILITY #s 11+00 11+50 12+00 12+50 13+00 WET POND LEVEL 11 WET POND LEVEL II DESIGN & REQUIREMENTS Treatment Volume, Tv (VRRM) Minimum Treatment Volume Regtluired 1.5Tv (VRRM) Treatment Volume Provided at MiWSE Treatment Volume Provided abovre MWSE Minimum Percentage of Tv Providled at MWSE Percentage of Tv Provided at MW'SE Ponding Depth Corresponding to Minimum Tv Required Maximum Ponding Depth allowed) for Minimum Tv Maximum Percentage of Tv Provided above MWSE Percentage of Tv Provided above MWSE Minimum Forebay Volume Requirted (15% of Tv) Forebay Volume Provided Minimum Upper Wetland Shelf Area (10% of Pond Area) Upper Wetland Shelf Provided STORMWATER MANAGEMENT FACILITY GRADING (AS SHOWN) Elevation (ft) WET POND LEVEL 11 (1.5TV) Basin Input Data Inflow Hydrographs Routing Method: storage -indication 12 Conitour Areas 0 626 Elevation(ft) Areia(sf) Computed Vol.(cy) 3 Inflow Hydrographs Hydrograph o 624.00 '73o6.00 0.0 Hydrograph o 2 -Year 24 -Hour SCS Method Storm 626.00 10264.00 647.6 SCS inflow (cfs) 57.7oo at 11.98 (hrs) 628.o0 133375.00 1520.6 name: 2 -Year 24 -Hour SCS Method Storm discharge (cfs) 4.537 at 12.78 (hrs) 629.00 16863.00 2079.3 Area (acres) 33.640 water level (ft) 634.o11 at 12.8o (hrs) 630.00 21L366.00 2785.6 CN 78.000 storage (cy) 6750.493 630.40 214415.00 3124.5 Type z 639.5 632.00 26791.00 4641.2 rainfall, P (in) 3.700 Hydrograph 1 634.00 29)851.00 6738.0 time of conc. (hrs) 0.2300 10 -Year 24 -Hour SCS Method Storm 636.00 31012.00 9065.3 time increment (hrs) 0.0200 inflow (cfs) 112.814 at 11.98 (hrs) 638.00 361272.00 1163o.4 time limit (hrs) 30.000 discharge (cfs) 19.298 at 12.34 (hrs) 639.00 37940.00 13004.6 fudge factor 1.00 water level (ft) 637.046 at 12.34 (hrs) 639.50 383784.00 13715.0 routed true storage (cy) 10377.174 peak flow (cfs) 57.988 Start _Elevation(ft) 1630.00 Vol.(cy) 2785,64 peak time (hrs) 11.991 Hydrograph 2 6 Outlet Structures Outlet structure --I volume (cy) 7458.887 loo -Year 24 -Hour SCS Method Storm Outlet structure o Curve inflow (cfs) 224.229 at 11.98 (hrs) Orifice name: Anti -Vortex Device Hydrograph 1 discharge (cfs) 209.771 at 12.04 (hrs) name: Low -Flow Orifices, multiple 1 SCS .1 O at 12.0 f water level (ft) 638 9 4 (firs) area (sf) 0.087 Invert (ft) 636.5oo name: 10 -Year 24 -Hour SCS Method Storm storage (cy) 11886.685 diameter or depth (in) 4.000 discharge into riser Area (acres) 3 3.640 CN 78.000000 width for rect. (in) 0.000 file: fortyeight.txt Type z coefficient o.600 rainfall, P 5 0 invert (ft) 630.000 Outlet structure 4 . 2 time of conc. (hiss) 0.2300 hr multiple 4 Culvert name: Barrel time increment (hrs) 0.0200 discharge into riser multiple 1 time limit (tits) 30.000 Outlet structure 1 discharge out of riser fudge factor 1.00 routed true Orifice D (in) 30.000 h (in) 0.000 peak flow (cfs) 113.377 name: Mid -Flow Orifices Length (ft) 15o.000 peaktime ime (hrs) 1.991 area (sf) 0.087 Slope 0.007 volume (cy) 145883.613.61 7 diameter or depth (in) 4.000 width for rect. (in) 0.000 Manning's n 0.013 Hydrograph z coefficient o.600 Inlet coeff. Ke 0.500 SCS invert (ft) 633.000 Equation constant set 3 name: loo -Year 24 -Hour SCS Method Storm multiple P 4 Invert (ft) 624.000 Area (acres) 33.640 discharge into riser Outlet structure 5 CN 78.000 Outlet structure 2 Orifice Type z rainfall, P (in) 9.100 Weir name: Inverted Pipe time of conc. (hrs) 0.2300 name: Emergency Spillway area (sf) 0.049 time increment (hrs) 0.0200 length (ft) 30.000 diameter or depth (in) 3.000 time limit (hrs) 30.000 side angle 78.46o width for rect. (in) 0.000 fudge factor 1.00 coefficient 3.300 coefficient o.600 routed true invert (ft) 637.000 invert (ft) 629.000 peak flow (r-fs) 225.348 multiple 1 multiple 1 peak time (hrs) 11.991 discharge through dam discharge into riser volume (cy) 28986.296 11+00 11+50 12+00 12+50 13+00 WET POND LEVEL 11 WET POND LEVEL II DESIGN & REQUIREMENTS Treatment Volume, Tv (VRRM) Minimum Treatment Volume Regtluired 1.5Tv (VRRM) Treatment Volume Provided at MiWSE Treatment Volume Provided abovre MWSE Minimum Percentage of Tv Providled at MWSE Percentage of Tv Provided at MW'SE Ponding Depth Corresponding to Minimum Tv Required Maximum Ponding Depth allowed) for Minimum Tv Maximum Percentage of Tv Provided above MWSE Percentage of Tv Provided above MWSE Minimum Forebay Volume Requirted (15% of Tv) Forebay Volume Provided Minimum Upper Wetland Shelf Area (10% of Pond Area) Upper Wetland Shelf Provided STORMWATER MANAGEMENT FACILITY GRADING (AS SHOWN) Elevation (ft) Area of Forebay Cell Contours (sf) Volume (cf) 624 749 0 626 1,586 2,283 628 2,710 6,529 629 3,362 9,560 630 4,074 13,272 630.4 - - 632 26,791 125,312 634 - 181,926 636 - 244,763 638 - 314,021 639.5 - 369,676 Elevation (ft) Total Facility Area Contours (sf) Volume (cf) 624 7,306 0 626 10,264 17,486 628 13,375 41,057 629 16,863 56,142 630 21,366 75,212 630.4 24,415 84,362 632 26,791 125,312 634 29,851 181,926 636 33,012 244,763 638 36,272 314,021 639.5 37,940 369,676 SUMMARY OF DESIGN IMPERVIOUS AREAS 67,220 cf 100,830 cf 75,212 cf 25,618 cf 50 % 75 % 1.1 ft 4 ft 50 % 25 % 10,083 cf 13,272 cf 2,137 sf 2,671 sf 13+50 14+00 Elevation (ft) Area of Wetland Cell Contours (sf) Volume (cf) 624 - - 626 8,678 - 628 - - 629 1892 0 630 2,671 2,270 630.4 - - 632 - - 634 - - 636 - - 638 - - 639.5 - - 14+50 15+00 15+25 Elevation (ft) Area of Main Cell Contours (sf) Volume (cf) 624 6,557 0 626 8,678 15,186 628 10,665 34,494 629 11,609 45,628 630 14,621 58,714 630.4 - 632 - - 634 - - 636 - - 638 - - 639.5 - - Notes: 1 A minimum forebay volume depth of 4' with an aquatic bench 4' wide, 2' deep has been provided. 2 A minimum forebay volume of 15% of the total Tv has been provided. 3 A wetland maximum treatment volume depth of 12" has been provided. 4 A 10' wide aquatic bench ranging from 12"-18" in depth has been provided. 5 An 8'-15' wide safety bench with a maximum 5% slope has been provided. 5 The minimum treatment volume required has been provided. Foothill Crossing II Impervious Areas Draining to Wet Pond Only Roads, Sidewalks & Parking 173,470 sf Detached Homes (21 units) 22,000 sf Attached Homes (53 units) 106,000 sf Existing Impervious (Offsite) 7,460 sf Subtotal 308,930 sf Foothill Crossing I & II Future Development Area (65% Impervious) 375,720 sf Subtotal 375,720 sf Total = 684,650 st [Foothill Crossing it Impervious Areas Untreated 20,000 sf Tota I = 20,000 sf V SCOTT R. COLLINSzZ Lie. No. 035791,'b ��S'sIONAL ���1 z O U Z w m o V) 0 z < H UJI H LU Ine in w xi < _4