Loading...
HomeMy WebLinkAboutARB201700029 Review Comments Architectural Review Board Approval 2017-04-06COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 229024596 Phone 434 296-5832 Fax 434 972-4126 April 6, 2017 Callie Robertson Anchor Sign 2200 Dicher Avenue Charleston, SC 29405 RE: ARB-2017-24 and ARB-2017-29: City Electric Supply Signs Dear Callie, I have reviewed the above -noted sign applications. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. For the freestanding _signn: 1. The approved shade of red for tenant panels in the freestanding sign is Pantone 186C. The approved blue colors are Pantone 301C and Pantone 280c. Please revise the drawing to show color identifications that are consistent with these approved colors. For the wall sign; 2. Indicate on the drawing a Pantone number for the blue color. 3. Although the sign is centered over an entrance, it appears unbalanced because the C-E-S letters and flagscape are much heavier in appearance than the tagline. An alternate arrangement is required. 4. The top of the C letter appears too close to the "cornice" of the building. Additional clear space is needed to avoid an over -crowded appearance. 5. This proposal is the second wall sign for this building. As a multi -tenant building, a comprehensive sign plan is required and should be submitted at this time for review. Note that Comprehensive Sign Plans require coordination in sign type, size, placement, illumination, and color across the building, and only the color and illumination of the proposed sign are consistent with the existing ABC sign. Comprehensive Sign Plans require action by the Architectural Review Board. A sample Comprehensive Sign Plan is attached. 6. The $129 Entrance Corridor sign fee was not paid. Please submit payment so that review of your application may continue. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60-day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. Sincerely, ttf44�� Chief of Planning/Resource Management cc: ARB-2017-24 and ARB-2017-29 Seminole North LLC, 1180 Seminole Trail; Suite 105, Charlottesville VA 22901 ARB COMPREHENSIVE SIGN REVIEW APPROVED CONDITIONS PROJECT #/NAME: ARB-2016-144: Luxor Building 3 TAX MAP/PARCEL#: Tax Map 78, Parcel 55AD SIGN FEATURE PROPOSED CRITERIA SIGN TYPE Reverse channel letter MATERIALS Aluminum, paint SIZE Channel letter height: 18" max. LIMITATIONS Channel letter returns: exactly 4" Logo: max. height not to exceed the tallest letter in the sign LOCATION(S) Building 3: Southeast elevation: centered horizontally and vertically with a pair of first and second story windows and between the two gutter downspouts in the approved sign bands. Note: • See accompanying building photograph for the location of approved sign bands. • Sign bands designed to fit between existing downspouts on either side of the front entrance. LETTER FACE/ Ivory 116 RETURN COLOR LETTER FONT Times New Roman or similar LOGO/GRAPHIC Face & return: Ivory 116 COLOR TEXT/LOGO Internal halo -lit, JS warm white LED ILLUMINATION Lighting intensity to be verified with the note: DETAILS The level of illumination provided will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. This form outlines the specific design criteria established for signs at this location. All standard ARB Sign Guidelines also apply. _� ++■■■■I`I 'fir - � F r - �•I ' +ira�;R� � ■ J Y Y 6 'I .� I Y1 !: # -F J 1 1 - 40 .! 00 k Ask 71 1415 ROLKIN COURT Luxor Building 3 Tax Map 78, Parcel 55 AD ARB — 2006 - 136 rIS�Ignore x P r� L?Meeting Mare ta? ITo Manager y ,O Rules- L y �� I► dig AFind E 4 0 Team Email ✓ Done .P DneNate II O Related - �, I1unk- Delete Reply Reply Forward W4J' Mare- Reply&Delete f Create Nev Mark Categorize Fallow Translate Zoom 4select All - O�Aaions- Unread - lJp- Delete Respond Quick Steps Move Tags r„ Editing Zoom Wad 201710:43 AM Margaret Maliszewski City Electric Supply Signs To 'Collie Robertson' Callie, We have found that there are three wall signs insta lied at this site {photos belci Possibly only one has an approved permit. Our Code Compliance staff is looking into the situation, and will likely be contacting the property owner to facilitate resolution of the problem. As we've discussed previously, there are some outstanding items that need to he addressed for the City Electric Supply signs. 1. An olte-nate lora:ieni argemert is -egLTed for the t+tall all due :o'h inbalanced snpeara ice and becocse it is too close tothe -utter at the top of the wall, 2. The;c-tprehE �sivE SigL Plat tta:."as su:rtit.ed isitcensistert rd Th tPe City E Ect':Si_pp-y-1-ardtheother Sig—1 TPear.ildng-,1-CC rtpr E iELsiveS gn Plan is mesetto outline the various design elements of signs to be installed on the building in order to establish a level of coordination .1-1-g lout tPe bt. ilding. You may find the Entrance Corndor� 2ii Es a he pf_I rE-erence in comparing sou Comprehensive Sigr Plan, 3. Yoc F:-;- pi ov :1=:1 the Pantone color number for the blue used in the City Electric St. I:,l _ gins. It differs from :he approved blues, so tni_ aill need to be considered by the ARB with the rest of the proposal. To move fc"I, rr tI, the ARE reeie- of :he •Cty El ecti is SdppIy sors. 'r;e iAi I need: 1. A C it are e_r siae 5 gn P ar that-.ir11,=_s-h=_ dEYg i =_lerrerts of sigre to he installed on the building, establishing a level of coordination throughout the building. 2. Revised d'a':•A n,, shc•.�;irg a'E: se:: Iccatc1 o ld desigi fPor :he City Electric Supplywall sign that is balanced and uncluttered, and that is consistent with the approved Camp Sign Plan. 3. PdntCne wr-leers =cc all zolors Ide is fied on the cra•, rgs, Thanks. Margaret _711I LBuilders i FirstSource Margaret Malisxewski, Chief of Planning/Rescurce Management L lberr arle Co.n!y Department of Community Development Cf=rlatt2,v l 2. %A 229D2 -s3s� r. _. nrralisz evsKi 211ema-1—ir�rle.org r'L=JCaTY ELECTRIC 5uPPLy IJ