Loading...
HomeMy WebLinkAboutWPO201600066 Bond Estimates 2017-04-07 (2)West Leigh Stream Crossing WPO file number: wpo201600066 Stormwater Management Plan Bond Estimate Item Item Number n No. Unit Unit Cost Cost (Installed) 78 ea $2]5.00 $20,900.00 38 ea $50.00 $1,900.00 0 ea $5.00 $o.00 $2,500.00 cosi spm $25,300.00 commgency $2,530.00 Total $27,830 4/3/2017 West Leigh Stream Crossing WPO file number: WP0201600066 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stabf tan (PS, TS)$5,000.00 $3,800.00 silt fonce(SF) $5.00 $1,725.00 diversion (DD, FD, RWD) fl $13.00 $3,380.00 outlet protection (OP) length ft width fl J..or. $486.00 $486.00 check dam depth in channel ft channel width It $337.50 $1,687.50 paved construction entrance $3,500.00 $3,500.00 mobilization $2,500.00 cost sum $17,078.50 contingency $1,707.85 Total $18,790 4/3/2017