HomeMy WebLinkAboutARB201700026 Application Review History 2017-04-07APPLICATION REVIEW HISTORY
ARB #/Name ARB201700026 Albemarle High School
ACTION
DATE
NOTES
County received application
3/28/17
Corresponding submittal
deadline/ARB meeting date
4/3/17 filing
deadline; 5/15/17
ARB meeting
Transfer from intake to ARB Staff
_
First ARB staff review
4/7/17
Application complete; proposed scope of
work = repairs
Comments to applicant
Resubmittal received by staff
Resubmittal reviewed by staff
Were all comments addressed?
Comments to applicant
Resubmittal received by staff
Resubmittal reviewed by staff
Were all comments addressed?
Comments to applicant
Resubmittal received
Resubmittal reviewed
Approval letter sent
4/7/17
CoA letter and email sent
ARB meeting date
ARB action
COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS
Building ernits in which the proposed change occupies 50% or less of the altered elevation
DESIGN CRITERIA
Proportion
AIteration must be in proportion with the existing elevation.
Roof form
Roof form must be consistent with the existing patterns of scale and proportion
of the roof form of the existing building.
Materials
Materials must be consistent with the existing patterns of scale and proportion
of the existing materials. No new vinyl.
Colors
Colors must be coordinated with existing colors.
Planting
Trees and shrubs may be required to integrate the alteration into the building
and site.
. 4
rk 'rrCL,h` t
a.
4 _
R-14 Am
# A
♦
4proovet-,�0
+uK ylrcl-1l-4
OVERALL VIEW
ALBEMARLE HIGH SCHOOL- EXTERIOR WALL PANEL REPLACEMENT PROJECT MAY 12, 2016
c 1-7 2 �'P 1, r (Z- IG- I r— I I P
t
P -
fF i
J
IL
cw
jaw
RL 19'
i eTi xis' , • U '
`iAkio
N6&jb 41w w
4r 2.+ IS --;,
pp
.7#;ails
LOCATION OF EXTERIOR PANEL REPLACEMENT
ALBEMARLE HIGH SCHOOL - EXTERIOR WALL PANEL REPLACEMENT PROJECT
LOCATION OF PARAPET WALL
EXTERIOR METAL PANEL REPLACEMENT
IWORK COMPLETED LAST SUMMER- NEW METAL
PANELS MATCH THOSE OF 2088 MESA ADDITION
MAY 12, 2016
LOCATION OF PARAPET WALL PANEL
REPLACEMENT VMKCOMPLETED LaSTSUM1ulER
ALBEMARLE HIGH SCHOOL - EXTERIOR WALL PANEL REPLACEMENT PROJECT MAY 12, 2016
WINDOW INFILL
PARAPET AIL
EXISTING CONDITION DETAIL PHOTOGRAPHS
ALBEMARLE HIGH SCHOOL - EXTERIOR WALL PANEL REPLACEMENT PROJECT
ELEVATION WITH PARAPET AND WINDOW INFILL
PARAPET DETAIL
MAY 12, 201 B
- mm.vw,-
WINDOW INFILL
v
PARAPET DETAIL
THE NEW PANEL AND WINDOW WORN WILL
MATOH THAT OF TFIE 2808 f&8A ADDITION
EXISTING CONDITIONS - METAL WALL PANELS AT THE 2009 ADDITION
ALBEMARLE HIGH SCHOOL - EXTERIOR WALL PANEL REPLACEMENT PROJECT
ELEVATION WITH PARAPET AND WINDOW INFILL
PARAPET DETAIL
MAY 12, 2016
Ike
-
.
-
\
P7 , -
ERR.
9--1
Imam
I Min
bw m S. ftM a I SW wm oil
s6q�z MI
i L ON mli�Lzlol
son
-MRANSIR
im I
' mm `
ISR"m @7%m% L"
-%
--�
m "S
gtgk 11r. _f,
IRVsaki
T w vyr F
•ate.. s � l __ - y+r. -_rt. - - — -� —
EL
IL
f �
■ —�- —
�'
W i0
�—��—
MEN
lMERNME i
MMMT
NEW
1 a
���—
Imams
■ �■■ maws
gpM� �M ==I
MMMMMI
M1 oun
��
I� MWS.
MIN
i
man��� om-mama nownwoompopa -now-
-MR
+JjJ
9
F
�Mlll
IMIM
WN
low
no
7q"
5 '
a ir' A •f -
00o
7.
1. Ir
ip
�w'• t. yI� f r y
' AV' .F ,
*fes, +.I.• r •y * r.
r
lop pp�
7A.
ddp 11 PP
OP
do 7
OP
+ 1 .rte #rte �2 ,� wr+ -'. r+r:r .+w•"� / ZZE NO 0 ®r
�� t.�^It +��*��� �� ,�� ,�; ��� wry ��+• *���" j
Ire'Moir
.+*��
y ; j
PC
11 owl
000 'Mmsd
.W�00 n r AW :towage dE� +.
SfFrs4�- ,. memo
.Mrs
swim
Ed
p loam Min
r - ;ice � �' f r+�..�+�.. rF �� �i►�++r+'•'
AWS WOMB
VIE
sup
KN
'1111111 INS
�rt!!l�t���� � tii•sr i� ��.
r rltirr= � •ice+-
--
■4A#t w'7ill���� �t
_ f alarm an mom=