Loading...
HomeMy WebLinkAboutSP201700002 Review Comments Special Use Permit 2017-04-07p� .4L �37 �IRGi;31� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 April 7, 2017 Pastor Peter Chege 13378 Cox Mill Road Gordonsville, VA 22942 pastorlbtc@gmail.com RE: SP 201700002 Africa Lighthouse Baptist Temple of Charlottesville Dear Mr. Chege: Staff has reviewed your initial submittal for the request for a special use permit amendment (SP) for the addition of a modular classroom structure to an existing church in the Rural Areas zoning district. We have a few questions and comments which we believe should be resolved before your proposal goes to public hearing. We would be glad to meet with you to discuss these issues. Planning Comments (Rachel Falkenstein) • Provide the size of the existing sanctuary (number of seats) and list the number of parking spaces provided in the existing parking area to confirm there is ample parking on site. • Identify the septic field location on the concept plan to demonstrate compliance with Health Department comments (see below). • A building permit and certificate of occupancy will be required for the mobile unit. Staff recommends you work with the building department to determine the building code requirements for the structure at this time. For building permit information please contact: Michael Dellinger, 434-296-5832 x3228 mdellinger@albemarle.org • Though not required by the building code for a non-residential mobile unit, staff strongly recommends skirting or safety fencing be installed around the base of the unit. Site Plan reauirement • A site plan is required for this use; however, you have the option to submit a site plan exception. If you plan to submit a site plan exception, provide a written request to address why a full site plan would result in "substantial injustice or hardship" (see Section 32.3.5). This can be submitted while your SP is under review or you have the option to waiting to see if the SP is approved. Approval of a site plan or site plan exception is required prior to the issuance of a certificate of occupancy. Communitv Meetin • The applicant is required by ordinance to undertake a community meeting process as part of the review of the SP amendment. Staff has not been notified that the community meeting has been scheduled (see attached Community Meeting Guidelines). • You will be required to notify neighboring properties (staff can work with you to provide a list of property owners) as well as the Board Member and Planning Commissioner for your district. • Please work on scheduling this meeting ASAP and keep staff informed of the community meeting location and time. Staff will attend the meeting to answer questions, but the applicant is responsible for facilitating the discussion. Zoning Comments (Ron Higgins) Comments attached. Engineering Comments (Frank Pohl) • We recommend the applicant provide needed maintenance to the site entrance by installing additional gravel to provide a level transition from Gilbert Station Road, provide a stable entrance (non -erosive), and to provide positive drainage away from the entrance and road. The entrance shall be at least 12-ft wide and tie smoothly into the roadway surface. Entrance radius should be 20-ft minimum. Additional gravel should extend at least 20-ft into the site. Refer to VDOT Figure 4-1 for details (attached). Virginia Department of Transportation Comments Comments attached. Virginia Department of Health Comments (Josh Kirtley) The existing Sewage Disposal Construction Permit does not specify the number of church attendees and the modular classroom does not include plumbing. We have no issues with the proposal provided: 1. The modular building should retain at least a 10' setback to any septic component (septic tank, sewer line, drainfield, etc). 2. The Church must use no more than 100 gallons per day in order to stay within the permitted limits of the septic system. 3. Parking must not occur over the septic system. 4. Daycare is not permitted under this approval. 5. A kitchen should not be placed in the modular unit. 6. 1 recommend that the Church use be limited to basic worship services given the very small size of the septic field. 7. The applicant should adhere to the Office of Drinking Water guidelines to determine the need for a public water well on site. 2 Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action after Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is a $1,075.00 fee for each additional resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $276.00 Cost for newspaper advertisement $215.00 Cost for notification of adjoining owners (minimum $215 + actual postage/$1 per owner after 50 adjoining owners) $491.00 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing is needed: $276 Additional amount due prior to Board of Supervisors public hearing $767.00 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information. I can be reached at rfalkenstein@albemarle.org or 434-296-5832, ext. 3272. Sincerely, W Rachel Falkenstein Senior Planner Planning Division CC — Faith Painter Thomas Blalock G. Raye Jones Enc — Zoning Comments VDOT comments Action after receipt of comments 3 County of Albemarle Department of Community Development Memorandum To: Rachel Falkenstein, Senior Planner From: Ron Higgins, Chief of Zoning Division: Zoning Date: April 6, 2017 Subject: SP201700002 — African Lighthouse Baptist Temple - Amendment This special permit is being proposed to begin to address various violations of the codes, including: Building without permits (the modular addition to the rear); expansion without a special permit amendment (the same modular addition), and; other structures on the site (a large mobile home structure and another small structure). The mobile home structure has been removed. This can be recommended for approval with the following conditions: 1. The proposed improvements shall be in general accord with a sketch plan to be provided by the applicants. Major items shall include: building location; parking area, lighting and access. 2. The area of assembly shall not be increased with this special use permit. 3. Setbacks shall be: front-75 feet; sides-25 feet, and; rear-35 feet 4. There shall be no day care center or private school on site without approval of a separate special use permit; 5. VDOT review and approval of access. 6. Compliance with the Virginia State Department of Health. 7. The construction shall commence within one year of approval of the special permit, after obtaining required building permits and any other approvals needed. Occupancy of the additions shall not take place until all permits are obtained and construction is completed in compliance with building codes. 8. All outdoor lighting shall be full cutoff and directed away from adjacent properties and roads. Charles A. Kilpatrick, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 March 30, 2017 County of AIbemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Rachel Falkenstein Re: Africa Lighthouse Baptist Temple- Amendment S P-2017-00002 Review #1 Dear M31. Falkenstein: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the Special Use Permit request dated February 21, 2017 and offer the following comment. Land use Please see VDOT Road Design Manual appendix F, Access Management Design Standards for Entrances. Please see page F105, Figure 4-1, private entrance and low volume commercial entrance detail. If further information is desired, please contact Willis C. BedsauI at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the VDOT Charlottesville Residency Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency WE KEEP VIRGINIA MOVING F-1 fly Moderate Volume Commercial Entrance: A commercial entrance along highways with shoulders with certain site and design criteria reduced. Site requirements are: Maximum highway vehicles per day: 5,000 Maximum entrance vehicles per day: 200 Maximum entrance percent truck trips of vehicles per day: 10% PrivateEntrpnce: An entrance that serves up to two private residences and is used for the exclusive benefit of the occupants or an entrance that allows agricultural operations to obtain access to fields or an entrance to civil and communication infrastructure facilities that generate 10 or fewer trips per day such as cell towers, pump stations, and stormwater management basins. Private and Low Volume Commercial Entrances All private and low volume commercial entrances shall be designed in accordance with the entrance design criteria below and Figure 4-1 to promote safe and efficient movement of vehicles in the entrance and on state highways. Low Volume Commercial Entrance Stopping Sight Distance Adequate stopping sight distance is required for low volume commercial entrances, as specified in the Stopping Sight Distance Tables 2D-1 and 2D-2. Private Entrance Sight Distance The installation of a private entrance cannot be denied on the basis of sight distance. VDOT will review the property owner's highway frontage and determine a useable location for the private entrance with the best possible sight distance. The property owner's preferred location can be denied by the Department if the location does not have the best possible sight distance and therefore is less safe for users of the entrance as well as for motorists on the intersecting highway. The Department may require the property owner to grade slopes, clear brush, remove trees, and conduct other similar efforts necessary to provide the safest possible means of ingress and egress that can be reasonably achieved. Private and Low Volume-CQmmercial Entrance Curb and Gutter Standard entrance gutter (Std. CG-9D; other options are CG-9A or CG-9B) shall be used with Std. CG-6 or CG-7 curb and gutter. A special design entrance gutter shall be submitted for approval when roll top curb is used. Private and Lpw Volume Commercial Entrance Design ri ria All private and low volume commercial entrances shall be designed and constructed as noted below and shown in Figure 4-1. Entrance radius shall be 20' minimum. Rev. 7/14 F-106 Entrance pipe culverts shall be sized to accommodate the run-off expected from a 10- year frequency storm. Altemate methods for placing pipe culverts under the entrance (cut/fill details) are presented in the PEA design standard illustration in the VDOT Road and Bridge Standards, Section 600, available on the VDOT web.* All private and low volume commercial entrance grades shall start back of the shoulder line. If drainage is necessary, the ditch line may be moved back to provide 9 inches minimum cover over pipe. Entrances shall be at least 12' wide and tied smoothly into the roadway surface. The entrance surface can be crusher run aggregate (gravel), asphalt, concrete, etc. and shall extend from the edge of the roadway to the right-of-way line. Private and Low Volume Commercial Entrance Grades In the interest of assuring an adequate, convenient, and safe access to public roads, VDOT recommends the grades along such entrances not exceed 10%. Modification of an Existing _Private _or Low Volume Commercial Entrance When an existing street is re -developed and modification of an existing entrance is required, the entrance surface shall be extended to the right-of-way line or the extent of disturbance to the existing entrance. Pipe culvert if necessary Ditch flow line -- \, Shoulder Entrance details, including widths shown on this sheet, may be modified to meet specific site requirements as directed or approved by the Engineer when based on sound engineering principles 12 FT. Minimum; 24 Ft Maximum Width Surfaced t? s o 16 Ft Minimum Width m; Graded ; '• R=20' Minimum �mmm = t. m w y X N H [ °J¢ ov Edge of Roadway Pavement Roadway Pavement FIGURE 4-1 PRIVATE ENTRANCE AND LOW VOLUME COMMERCIAL ENTRANCE DETAIL Rev. 7/14 DEPARTMENT OF COMMUNITY DEVELOPMENT ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit/request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been resolved and/or when you are ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. 4 By no later than twenty-one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty-two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. 5 FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: 1. Additional lots under section 10.5.2.1; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 2. Public utilities; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 3. Day care center; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 4. Home occupation Class B; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 5. Amend existing special use permit; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 6. Extend existing special use permit; application and first resubmission Fee..................................................................................................................................... $1,075.00 Each additional resubmittal..................................................................................................$538.00 7. All other special use permits; application and first resubmission Fee..................................................................................................................................... $2,150.00 Each additional resubmittal...............................................................................................$1,075.00 8. Deferral of scheduled public hearing at applicant's request Fee........................................................................................................................................ $194.00 B. For amendment to text of zoning ordinance: Fee....................................................................................................................................$1,075.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee..................................................................................................................................... $2,688.00 2. Less than 50 acres; each additional resubmission Fee..................................................................................................................................... $1,344.00 3. 50 acres or greater; application and first resubmission Fee..................................................................................................................................... $3,763.00 4. 50 acres or greater; each additional resubmission Fee..................................................................................................................................... $1,881.00 5. Deferral of scheduled public hearing at applicant's request Fee........................................................................................................................................ $194.00 11 FOR OFFICE USE ONLY SP # Fee Amount $ Date Paid By who? Receipt # Ck±k By: pF' Rl. Resubmittal of information for Special use PermitN� PROJECT NUMBER THAT HAS BEEN ASSIGNED: SP201700002 Africa Lighthouse Baptist Temple of C-ville Owner/Applicant Must Read and Sign I hereby certify that the information provided with this resubmittal is what has been requested from staff Signature of Owner, Contract Purchaser Date Print Name Daytime phone number of Signatory FEES to be paid after application For original Special Use Permit fee of $1,075 di First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free 1 ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) $538 For original Special Use Permit fee of $2,000 ❑ First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) Free ❑ Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF) 1 $1,075 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 Revised 11/2/2015 Page 1 of 1