HomeMy WebLinkAboutSUB201700012 Review Comments 2017-04-11Short Review Comments Report for:
SUB201700012
SubApplication Type:
Region Ten Women's Shelter - WPO16-60 VSMP
Easement Plat
Date Completed:04/11/2017
Reviewer:Emily Cox CDD Engineering
Review Status:Approved
Reviews Comments:
Division:
Date Completed:02/10/2017
Reviewer:Will Cockrell CDD Planning
Review Status:Requested Changes
Reviews Comments:- Confirm ownership of easement through WPO/Deed or some other instrument.
- Under zoning classification, include: Airport Impact Area, Entrance Corridor Overlay, Steep Slopes
Overlay, and Damn Inundation Zone
- Indicate boundaries of the Damn Inundation Zone.
Division:
Page:1 of 1 County of Albemarle Printed On:April 14, 2017
Plat Changes:
1. Add a SWM definition: SWM = Stormwater Management
2. Add the following note: "The SWM Forest and Open Space Easement is subject to the guidance
set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain
undisturbed in a natural, vegetated state, except for activities as approved by the local program
authority, such as forest management, control of invasive species, replanting and revegetating,
passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative
community (but no more than four times a year)."
3. The title of the plat should be "Plat showing a new SWM facility easement and a new SWM
forest and open space easement."
4. Show SWM forest & open space easement.
5. Show a SWM facility easement around the drainage pipe that conveys offsite water and for your
actual BMP facility areas. This will overlap your forest & open space easement, so just use a
different hatch or designation.
Plan Changes:
1. Add the following note: "The SWM Forest and Open Space Easement is subject to the guidance
set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain
undisturbed in a natural, vegetated state, except for activities as approved by the local program
authority, such as forest management, control of invasive species, replanting and revegetating,
passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative
community (but no more than four times a year)."
2. Add the maintenance requirements for the BMP facilities.
3. Show the SWM forest & open space easement.
4. Show a SWM facility easement around all of the BMPs and the drainage pipe that conveys
offsite water.
5. Provide 4 copies of the plan.