HomeMy WebLinkAboutARB201700015 Review Comments Architectural Review Board Approval 2017-04-21COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832
April 21, 2017
Scott Collins
Collins Engineering
200 Garrett Street
Charlottesville VA 22902
RE: ARB-2017-15: Northtown Phase 2B
Dear Scott,
Fax (434) 972-4126
I have reviewed the recently submitted revised drawings for the above -referenced project (including site and architectural plans
dated 416117). I have the following comments.
1. The photometric plan shows spillover in excess of .5 fc on the eastern property Iine. This appears to be an error in the
calculations because no light pole is nearby. Please correct the plan.
2. Because the linear fluourescent fixture is not a full cutoff fixture, it must emit less than 3000 lumens. Please clearly
note on the lighting plan the number of lumens emitted by this fixture.
3. Sheet A301 shows uplights and LED fixtures that are not shown on the other lighting plans. Provide for review
complete information on these fixtures on sheets 7-9 of the site plan. However, note that the uplights may not be
approvable.
4. Most of the light symbols shown at the buildings on sheet A7 are not legible. Indicate what the six groups of four
fixtures are at the retail building and the two AM fixtures at the entrance to the BWW building.
Please provide:
1. One set of revised drawings addressing each of these conditions. Include updated revision dates on each drawing.
2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those
requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with
"clouding" or by other means will facilitate review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper
tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness
may be issued. If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
Chief of Planning/Resource Management
cc: First Gold Leaf Land Trust Wendell W Wood, Trustee, PO Box 5548, Charlottesville VA 22905
File
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated
below what they think will be required as a resubmission of revisions. If you need to submit additional information please
explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in
order to be accepted for submittal.
TO: DATE:
PROJECT NAME; Northtown Center 213
Submittal Type Requiring Revisions () indicates submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan E&S)
Mitigation Plan P)
Waiver Request (WR)
Stormwater Management Plan SWMP
Road Plan (RP)
_
Private Road Request, with private/public comparison PRR
Private Road Request — Development Area PRR-DA
y Site Plan PSP
Preliminar
Final Site Plan or amendment) (FSP)
Final Plat FP
I Preliminary Plat P
Easement Plat (EP)
Boundary A9justment Plat AP
Rezoning Plan REZ
Special Use Permit Concept Plan (SP-CP)
Reduced Concept Plan R-CP
Proffers (P
Bond Estimate Request (BER
Draft Groundwater Management Plan (D-GWMP
Final Groundwater Management Plan (F-GWMP)
Aquifer Testing Work Plan (ATWP)_
Groundwater Assessment Report GWAR
Architectural Review Board (ARB)
ARB-2017-15
1
Other: Please explain
(Fnr ctaffncP nniv)
Submittal Code
# Copies
Distribute To:
Submittal Code
it Copies
Distribute To:
ARB
1
Margaret
Maliszewski