HomeMy WebLinkAboutSUB201600008 Bond Estimates 2017-04-24Briarwood Phase 4 and portion of Phase 6 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201600008 Item Sunset Drive Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6) ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections No. Unit Unit Cost Cost installed % compete cost remaining 10+20.00 25+00.00 road length 1480.0 ft 4.0 in d 1480.0 ft L 24.0 ft W 828.8 ton $35.00 $29,008.00 0% $29,008.00 1480.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 1480.0 ft L 24.0 ft W 652.7 tons $100.00 $65,268.00 0% $65,268.00 2.5 in d 1480.0 ft L 24.0 ft W 543.9 tons $120.00 $65,268.00 0% $65,268.00 0.0 ft $13.00 $0.00 0% $0.00 2960.0 ft $15.00 $44,400.00 0% $44,400.00 2920.0 ft $17.00 $49,640.00 0% $49,640.00 2 each $350.00 $700.00 0% $700.00 1 each $200.00 $200.00 0% $200.00 4 each $200.00 $800.00 0% $800.00 27 Each 27 each $275.00 $7,425.00 0% $7,425.00 1 ES @ 3000 140.0 ft $17.00 $5,380.00 0% $5,380.00 18 each $3,500.00 $63,000.00 0% $63,000.00 0 each $500.00 $0.00 0% $0.00 162 ft $450.00 $72,900.00 0% $72,900.00 15.0 in d 0 ES -1,2 0 EC -1 618.0 ft $35.00 $21,630.00 0% $21,630.00 24.0 in d 0 ES -1,2 0 EC -1 1067.0 ft $50.00 $53,350.00 0% $53,350.00 30.0 in d 1 ES -1,2 0 EC -1 40.0 ft $65.00 $3,100.00 0% $3,100.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES -1,2 0 EC -1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 4500.0 cy $4.00 $18,000.00 0% $18,000.00 470.0 cy $9.00 $4,230.00 0% $4,230.00 1480.0 ft L 0.2803 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 1480.0 ft L 0.2803 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 1 Isum $5,000.00 $5,000.00 0% $5,000.00 1480.0 ft L 2.96 inc of 500' 4 each $200.00 $800.00 0% $800.00 1480.0 ft L 2.96 inc of 500' 4 each $200.00 $800.00 0% $800.00 1480.0 ft L 2.96 inc of 500' 4 each $200.00 $800.00 0% $800.00 1480.0 ft L 2.96 inc of 500' 4 each $200.00 $800.00 0% $800.00 C:\Users\mwentland\Documents\SUB201600008 Briarwood Ph4 RP bond est 04-24-17.xls 4/24/2017 Briarwood Phase 4 and portion of Phase 6 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201600008 Item No. Unit Sunset Drive pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) Unit Cost Cost installed % compete cost remaining 1480.0 ft L 2.96 inc of 500' 4 each $200.00 $800.00 0% $800.00 1725 ft $1.00 $1,725.00 0% $1,725.00 1480.0 ft L 0.2803 mi. 2 Lanes $2,000.00 $11,212.12 0% $11,212.12 1480.0 ft L 0.2803 mi. 2 Lanes $150.00 $840.91 0% $840.91 1480.0 ft L 0.2803 mi. 2 Lanes $100.00 $810.61 0% $810.61 cost sum $541,887.64 $541,887.64 contingency $54,188.76 $54,188.76 Total $596,080 $596,080 C:\Users\mwentland\Documents\SUB201600008 Briarwood Ph4 RP bond est 04-24-17.xls 4/24/2017 Briarwood Phase 4 and portion of Phase 6 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201600008 St. Ives Item Begin station End station aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections No. Unit Unit Cost Cost installed % compete cost remaining ileIIeIeIiIll, 12+65.00 road length 265.0 ft 4.0 in d 265.0 ft L 32.0 ft W 197.9 ton $35.00 $6,925.33 0% $6,925.33 265.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3.0 in d 265.0 ft L 32.0 ft W 155.8 tons $100.00 $15,582.00 0% $15,582.00 2.5 in d 265.0 ft L 32.0 ft W 129.9 tons $120.00 $15,582.00 0% $15,582.00 0.0 ft $13.00 $0.00 0% $0.00 450.0 ft $15.00 $6,750.00 0% $6,750.00 0.0 ft $17.00 $0.00 0% $0.00 0 ft $350.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 6 Each 6 each $275.00 $1,650.00 0% $1,650.00 1 ES @ 3000 120.0 ft $17.00 $5,040.00 0% $5,040.00 1 each $3,500.00 $3,500.00 0% $3,500.00 0 each $500.00 $0.00 0% $0.00 6 ft $450.00 $2,700.00 0% $2,700.00 15.0 in d 1 ES -1,2 0 EC -1 102.0 ft $35.00 $4,070.00 0% $4,070.00 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 96.0 in d 0 ES -1,2 0 EC -1 0.0 ft $320.00 $0.00 0% $0.00 2.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 0.0 cy $4.00 $0.00 0% $0.00 0.0 cy $9.00 $0.00 0% $0.00 265.0 ft L 0.05019 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 265.0 ft L 0.05019 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 1 Isum $5,000.00 $5,000.00 0% $5,000.00 265.0 ft L 0.53 inc of 500' 2 each $200.00 $320.00 0% $320.00 265.0 ft L 0.53 inc of 500' 2 each $200.00 $320.00 0% $320.00 265.0 ft L 0.53 inc of 500' 2 each $200.00 $320.00 0% $320.00 265.0 ft L 0.53 inc of 500' 2 each $200.00 $320.00 0% $320.00 265.0 ft L 0.53 inc of 500' 2 each $200.00 $320.00 0% $320.00 102 ft $1.00 $102.00 0% $102.00 C:\Users\mwentland\Documents\SUB201600008 Briarwood Ph4 RP bond est 04-24-17.xls 4/24/2017 Briarwood Phase 4 and portion of Phase 6 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201600008 Item No. Unit Unit Cost St. Ives VDOT surety (1 lane) 265.0 ft L 0.05019 mi. VDOT maintenance fee (1 In rd, 1 yr) 265.0 ft L 0.05019 mi. VDOT admin. Cost recovery fee(1 lane) 265.0 ft L 0.05019 mi. Cost % compete cost remaining 2 Lanes $2,000.00 $2,007.58 0% $2,007.58 2 Lanes $150.00 $150.57 0% $150.57 2 Lanes $100.00 $350.38 0% $350.38 cost sum $77,009.86 $77,009.86 contingency $7,700.99 $7,700.99 Total $84,720 $849720 C:\Users\mwentland\Documents\SUB201600008 Briarwood Ph4 RP bond est 04-24-17.xls 4/24/2017