Loading...
HomeMy WebLinkAboutWPO201700005 Bond Estimates 2017-04-26Timberland Park Apartments WPO file number: WP0201700005 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed slablization (PS, TS) $5,000.00 $27,500.00 silt fance(SF) ftr� $5.00 $3,]50.00 safely fence(SAF)/ Tree pmlection(TP) it $5.00 $2,400.00 diversion (DD, FD, RWD) It $13,00 $20,475.00 temporary slope drain(TSD) pipe length -ft pipe diameter in $0.00 S0.00 aadhxark for trap/basin ST1 height of dam at tee 9 R cut al high side 9 ft height dfill d face ft out at face It length of dam R length of cut ft tap width It width of cut It (area above transition) 6 sf (area below transition) 68 sf (ldal width of dam) 4 ft (total width ofcut) 56 it (height below transition) 1 ft (depth below transition 9 it (area below transition) 1 sf (area above transitlon) 171 sf (total fill volume) 28.5 cy (total fill volume) 9737 cy length dspillway ft (TOAL CV estimate) 983 cy $1300 $12,P9.00 width d spillway R (spillwaystonetons) 0 tons $50.00 S0.00 earth-kfartrap/basin ST2 height d dam et tee 9 R cut a[ high side 9 R height d fill d face ft cut at face ft length of dam R length of cut ft tap width It width of out R (area above transition) 30 of (area below transitlon) 132 sf (total width of dam) 10ft (total width d cut) fit It (height below transition) 2 ft (depth below transition 10 ft (area below transition) 6 at (area above transition) 205 sf (total fill volume) 867 cy (total fill wlume) ti"3 cy length dspilhvay ft (TOAL CV estimate) 840 cy $13.00 $10,920.00 width d spillway 20 ft spillwaystonetons) 17.3 tons $50.00 5865.00 structures for basin riser height 0 ft 'se, diameter 0 in (hserunit price) $0.00 $0.00 barrel length 0 ft base plateorfdn $200.00 $0 bartel diameter ' 0,in $0.00 $0.00 barrel collars $200.00 $0 beRle IMP 0 It $11 00 $0 sill fence inlet protection(IP) $100.'0 $0.00 stone Inlet protection(IP) $20000 $5,400.00 outlet protection (OP)(atr#1) length R width 14.5 It $652.W $652.50 In,in(OP)(str#13) length ft width 7.7R $27720 $277.20 outlet Protection (OP) hAnK1)) length ft width 9ft $243.00 $243.00 outlet protection (OP)(str#39)) length ft width 6.15 f1 $16605 $166.05 channel (SCC, matted) length ft width It $0.00 check dam depth in channel ft channel width ft $000 $0.00 construction entramm(CE) $2,500.00 $0.00 wash rack $2,00000500.00 $2,000.00.00 paved canstrudicn entrance $3, $3,500 rip-rap, placed depth _tt length ` 0.0 It width (tons) ns $60.00 $0.00 surveyandlayout (pdcepar 0.1mi.) acres traps and basins ■ 2 $3,]50.00 mobllt, tlon $2,500.00 stream crossing (computed] independently) $0.00 coat sum $97,M.75 contingency $9,717.78 Total $106,900 4/25/2017