Erosion and Sediment Control Bond Estimate
Item Item
No. Unit
Unit Cost
Cost
Number
installed
slablization (PS, TS)
$5,000.00
$27,500.00
silt fance(SF)
ftr�
$5.00
$3,]50.00
safely fence(SAF)/ Tree pmlection(TP)
it
$5.00
$2,400.00
diversion (DD, FD, RWD)
It
$13,00
$20,475.00
temporary slope drain(TSD)
pipe length
-ft
pipe diameter
in
$0.00
S0.00
aadhxark for trap/basin
ST1
height of dam at tee
9
R
cut al high side
9
ft
height dfill d face
ft
out at face
It
length of dam
R
length of cut
ft
tap width
It
width of cut
It
(area above transition)
6 sf
(area below transition)
68 sf
(ldal width of dam)
4 ft
(total width ofcut)
56 it
(height below transition)
1 ft
(depth below transition
9 it
(area below transition)
1 sf
(area above transitlon)
171 sf
(total fill volume)
28.5 cy
(total fill volume)
9737 cy
length dspillway
ft
(TOAL CV estimate)
983 cy
$1300
$12,P9.00
width d spillway
R
(spillwaystonetons)
0 tons
$50.00
S0.00
earth-kfartrap/basin
ST2
height d dam et tee
9
R
cut a[ high side
9
R
height d fill d face
ft
cut at face
ft
length of dam
R
length of cut
ft
tap width
It
width of out
R
(area above transition)
30 of
(area below transitlon)
132 sf
(total width of dam)
10ft
(total width d cut)
fit It
(height below transition)
2 ft
(depth below transition
10 ft
(area below transition)
6 at
(area above transition)
205 sf
(total fill volume)
867 cy
(total fill wlume)
ti"3 cy
length dspilhvay
ft
(TOAL CV estimate)
840 cy
$13.00
$10,920.00
width d spillway
20 ft
spillwaystonetons)
17.3 tons
$50.00
5865.00
structures for basin
riser height
0 ft
'se, diameter
0 in
(hserunit price)
$0.00
$0.00
barrel length
0 ft
base plateorfdn
$200.00
$0
bartel diameter
' 0,in
$0.00
$0.00
barrel collars
$200.00
$0
beRle IMP
0 It
$11 00
$0
sill fence inlet protection(IP)
$100.'0
$0.00
stone Inlet protection(IP)
$20000
$5,400.00
outlet protection (OP)(atr#1)
length
R
width
14.5 It
$652.W
$652.50
In,in(OP)(str#13)
length
ft
width
7.7R
$27720
$277.20
outlet Protection (OP) hAnK1))
length
ft
width
9ft
$243.00
$243.00
outlet protection (OP)(str#39))
length
ft
width
6.15 f1
$16605
$166.05
channel (SCC, matted)
length
ft
width
It
$0.00
check dam
depth in channel
ft
channel width
ft
$000
$0.00
construction entramm(CE)
$2,500.00
$0.00
wash rack
$2,00000500.00
$2,000.00.00
paved canstrudicn entrance
$3,
$3,500
rip-rap, placed
depth
_tt
length
` 0.0 It
width
(tons)
ns
$60.00
$0.00
surveyandlayout (pdcepar 0.1mi.)
acres
traps and basins
■ 2
$3,]50.00
mobllt, tlon
$2,500.00
stream crossing (computed] independently)
$0.00
coat sum
$97,M.75
contingency
$9,717.78
Total
$106,900
4/25/2017