HomeMy WebLinkAboutARB201600114 Checklist - Project Closeout (Administrative) 2016-11-07 ARCHITECTURAL REVIEW BOARD
FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please complete this form within 30 days of final action,place in folder and forward to CDA for QC and
status label. CDA will forward to the Imaging Center for digital closeout. Imaging Center will return the
file to the Planning Division once documents are in the Laserfiche Repository.
ARB#Name: 2 O t) o ° 1 I til
LEAD REVIEWER FULL NAME: F&I.-vi S at':PI✓HA-- FINAL ACTION DATE: >> 111 11v1 b
CounVieW: the following items must be available in CountyView
53pL
Staff report, actions, final approval letter,updated status on Application 1 page
Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file.Please indicate those items on the"Other" lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or, if the document is already in digital format,note that it can be saved to LaserFiche. Please provide
the digtal location(path/name)of the document in the space provided.
y
[ pplicati
ri Scan ❑ Saved location
--allo ification letter
❑ ,.Scan ❑ Saved location
Edd' Applica Correspondence'(to/from-including emails; do not include duplicate emails)
Scan L av d location
[Review comments
❑ San Saved location 1£_S.0& kSC -
[Approve. lan(site, architectural and/or sign plan that is marked"Approved")
Scan ❑ Saved,location
[Action Letter(s), including final proval letter(Certificate of ppropriateness letter) 94-
0 Scan Saved location `Itf,,t.A.._ SCio•t
4.3...ARB presentation display documents(in separate, labeled envelope)
❑ an ❑ Saved location
Review •4 story form
San ❑ Saved location i
Other Ite s Please explain) tide- SI ✓� l - Gti.t -
❑ Saved location
VOther
/an
ease explain) 444 aj c CLIC-tal—
an ❑ Saved 1 cation
Other Ite s(Please explain) 0-11„t0t_ 415v......_ CIA.t.44 t i sh
Scan ❑ Saved location
❑ At the planner's discretion, copies of unapproved plans may be placed in the file if they lend clarity to the
review/file. If such plans are included, they should be clearly marked as unapproved and contain a
note clarifying why they were included.
❑ Scan ❑ Saved location
NOTES: ARB project folders will be accepted by the Imaging Center when the following items are complete:
1) Checklist is completed and included in folder;
2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top);
with Review History Form on top;
3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche.
If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the
appropriate Division Head.
5/29/2012—Revised 11/19/2012